LBD12554-05-3
2 12554-05-3
CCP), purposes, and projects, being the undisbursed and/or unexpended
balances of the prior year's appropriations, are reappropriated and
unless otherwise amended or repealed in part or total in this chapter
shall continue to be available for the same purposes as the prior appro-
priations or as otherwise amended for the fiscal year beginning April 1,
2023.
The capital projects reappropriations contained in this chapter may be
amended by repealing the items set forth in brackets and by adding ther-
eto the underscored material. Certain reappropriations in this chapter
are shown using abbreviated text, with three leader dots (an ellipsis)
followed by three spaces (... ) used to indicate where existing law
that is being continued is not shown. However, unless a change is clear-
ly indicated by the use of brackets [ ] for deletions and underscores
for additions, the purpose, amounts, funding source and all other
aspects pertinent to each item of appropriation shall be as last appro-
priated.
For the purpose of complying with section 25 of the state finance law,
the year, chapter and section of the last act reappropriating a former
original appropriation or any part thereof is, unless otherwise indi-
cated, chapter 54, section 1, of the laws of 2022.
d) No moneys appropriated by this chapter shall be available for
payment until a certificate of approval has been issued by the director
of the budget, who shall file such certificate with the department of
audit and control, the chairperson of the senate finance committee and
the chairperson of the assembly ways and means committee.
e) The appropriations contained in this chapter shall be available for
the fiscal year beginning on April 1, 2023 except as otherwise noted.
3 12554-05-3
ADIRONDACK PARK AGENCY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 30,000,000
Special Revenue Funds - Other ...... 0 1,500,000
---------------- ----------------
All Funds ........................ 0 31,500,000
================ ================
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to the rehabilitation and
construction of facilities, including but not limited to design and
construction, consultation, inspection and engineering, and personal
service, fringe and indirect costs (13AB2203) (81010) ..............
29,000,000 ....................................... (re. $29,000,000)
By chapter 54, section 1, of the laws of 2020:
For alterations, rehabilitations and other improvements to facilities,
including but not limited to design and construction, consultation,
inspection and engineering costs (13AB2003) (81010) ................
1,000,000 ......................................... (re. $1,000,000)
Special Revenue Funds - Other
Combined Expendable Trust Fund
Miscellaneous Gifts Account - 20100
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2012:
For alterations, rehabilitations and improvements of various facili-
ties, including personal service and payment of liabilities incurred
prior to April 1, 2012 (13GI1203) (81010) ..........................
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2011:
For alterations, rehabilitations and improvements of various facili-
ties, including personal service and payment of liabilities incurred
prior to April 1, 2011 (13GI1103) (81010) ..........................
500,000 ............................................. (re. $500,000)
By chapter 55, section 1, of the laws of 2010:
For alterations, rehabilitations and improvements of various facili-
ties, including personal service and payment of liabilities incurred
prior to April 1, 2010 (13GI1003) (81010) ..........................
500,000 ............................................. (re. $500,000)
4 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs,
purposes and projects as herein specified
in accordance with the following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 61,080,000 113,151,000
---------------- ----------------
All Funds ........................ 61,080,000 113,151,000
================ ================
NEW FACILITIES PURPOSE (CCP) ................................ 36,200,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
For grants to municipal shelters established
pursuant to section 114 of the agriculture
and markets law and any entity registered
by the department of agriculture and
markets pursuant to the provisions of
section 408 of the agriculture and markets
law. Use of the grant funds is restricted
to the costs of capital projects includ-
ing, but not limited to, construction,
renovation, rehabilitation, installation,
acquisition, or expansion of buildings,
equipment, or facilities necessary for the
secure containment, health, and adequate
care of sheltered dogs and cats. These
grants shall be allocated by the commis-
sioner on a competitive basis until such
funds are extinguished as follows: (a) In
municipalities with a population of less
than two million, for such municipal shel-
ters established pursuant to section 114
of the agriculture and markets law and any
entity registered by the department of
agriculture and markets pursuant to the
provisions of section 408 of the agricul-
ture and markets law that are operated by
or under contract for the provision of
pound or shelter services with one or more
municipalities: projects serving an indi-
vidual municipality, grants in amounts not
less than $50,000 and not more than
$200,000, not to exceed ninety percent of
the total project cost; and for projects
serving two or more municipalities, grants
in amounts not less than $100,000 and not
5 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2023-24
more than $500,000, not to exceed ninety
percent of the total project cost; (b) In
municipalities with a population of more
than two million, for such municipal shel-
ters established pursuant to section 114
of the agriculture and markets law and any
entity registered by the department of
agriculture and markets pursuant to the
provisions of section 408 of the agricul-
ture and markets law that are operated by
or under contract for the provision of
pound or shelter services with one or more
municipalities, grants in amounts not less
than $100,000 and not more than $500,000,
not to exceed seventy-five percent of the
total project cost; and (c) not less than
$500,000 for projects in underserved muni-
cipalities or regions, for such municipal
shelters established pursuant to section
114 of the agriculture and markets law and
any entity registered by the department of
agriculture and markets pursuant to the
provisions of section 408 of the agricul-
ture and markets law that are not under
contract with one or more municipalities
for the provision of pound or shelter
services, grants in amounts not less than
$50,000, and not more than $200,000, not
to exceed ninety percent of the total
project cost. Up to five percent of the
total appropriation amount may be made
available for the services and expenses of
the department in relation to these
grants, including personal service,
nonpersonal service, fringe benefits, and
indirect costs (60AS2303) (11433) ............ 5,000,000
For additional grants to municipal shelters
established pursuant to section 114 of the
agriculture and markets law and any entity
registered by the department of agricul-
ture and markets pursuant to the
provisions of section 408 of the agricul-
ture and markets law ......................... 3,000,000
For the food access expansion grant program,
to provide grants to support and establish
food access infrastructure in underserved
communities. All or a portion of the funds
appropriated hereby may be suballocated or
transferred to any department, agency or
public authority (60CO2307) ................. 10,000,000
For services, expenses, and grants for the
cost of construction, renovation, alter-
6 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2023-24
ation, rehabilitation, improvements,
installation, acquisition, repair or
replacement of buildings, equipment, or
permanent or temporary facilities for the
development of facilities to support the
preparation and distribution of New York
focused meals for regional school infras-
tructure, such as aggregation, storage
hubs and/or commissary-type kitchens
(60SK2307) .................................. 10,000,000
For services and expenses related to
projects for alterations, rehabilitation,
and improvements at the New York feder-
ation of growers and processors agribusi-
ness child development centers (60AB2307)
(11326) ...................................... 3,200,000
For payment to agricultural or horticultural
corporations and county extension service
associations that are eligible to receive
premium reimbursement pursuant to section
286 of the agriculture and markets law
for: the costs of construction, reno-
vation, alteration, rehabilitation,
improvements, installation, acquisition,
repair or replacement of fairground build-
ings, equipment or permanent or temporary
facilities used to house or promote agri-
culture, excluding parking facilities and
signage; or for the costs of construction,
renovation, alteration, rehabilitation,
improvements, installation, acquisition,
repair, or replacement of water systems,
restrooms, septic systems, and/or storm
water management systems on fairgrounds or
in fairground buildings to be allocated by
the commissioner in amounts not to exceed
$200,000 to such eligible agricultural and
horticultural corporations or county
extension services on a non-competitive
basis until such funds are exhausted. Up
to five percent of the total appropriation
amount may be made available for the
services and expenses of the department in
relation to these grants, including
personal service, nonpersonal service,
fringe benefits, and indirect costs .......... 5,000,000
NEW YORK WORKS (CCP) ........................................ 21,180,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
7 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2023-24
Administrative Services Purpose
For the purchase and replacement of vehicles
and equipment (60VS23AS) (11420) ............... 600,000
For services and expenses related to the
purchase or replacement of laboratory
equipment (60ES23AS) (11421) ................... 115,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For services and expenses related to New
York Works Infrastructure projects for
alterations, rehabilitation, improvements,
and land acquisition at the state fair,
including personal service and the payment
of liabilities incurred prior to April 1,
2023. All or a portion of the funds appro-
priated hereby may be suballocated or
transferred to any department, agency or
public authority (60NY2303) (10300) .......... 5,000,000
For services and expenses of state fair
projects, such costs may include but shall
not be limited to personal services,
nonpersonal services, fringe benefits and
indirect costs, such projects may include
but shall not be limited to alterations,
rehabilitation, improvements, preventive
maintenance, replacement, refurbishment,
and construction including the payment of
liabilities incurred prior to April 1,
2023 (60SF2303) (11422) ...................... 9,000,000
For services and expenses of Cornell Univer-
sity College of Agriculture and Life
Sciences research facilities for infras-
tructure and improvement projects, includ-
ing developing innovative practices to
manage climate adaptation and resiliency ..... 5,000,000
For the Hudson Valley Research Lab, operated
by Cornell University's College of Agri-
culture and Life Sciences and the Hudson
Valley Research Lab Board, for capital
improvement projects, including, but not
limited to, heating and cooling systems,
new lab equipment and insulation projects .... 1,000,000
For services and expenses of GrowNYC related
to the New York State Regional Food Hub in
Hunts Point. All or a portion of the funds
appropriated hereby may be suballocated or
transferred to any department, agency or
public authority ............................... 465,000
8 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2023-24
STATE FAIR (CCP) ............................................. 3,700,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For payment of the costs including personal
services, nonpersonal services, fringe
benefits and indirect costs, of alter-
ations, rehabilitation and improvements
including preventive maintenance, replace-
ment, refurbishment and energy conserva-
tion of various facilities, including the
payment of liabilities incurred prior to
April 1, 2023 (60MN2303) (11493) ............. 1,700,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
State Fair Capital Improvement Account - 32208
Preservation of Facilities Purpose
For payment of the costs including personal
services, nonpersonal services, fringe
benefits and indirect costs, of alter-
ations, rehabilitation and improvements
including preventive maintenance, replace-
ment, refurbishment and energy conserva-
tion of various facilities, including the
payment of liabilities incurred prior to
April 1, 2023 (60RI2303) (11493) ............. 2,000,000
9 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NEW FACILITIES PURPOSE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For grants to municipal and incorporated not-for-profit pounds, shel-
ters and humane societies. Use of the grant funds is restricted to
the costs of capital projects including, but not limited to,
construction, renovation, rehabilitation, installation, acquisition,
or expansion of buildings, equipment, or facilities necessary for
the secure containment, health, and adequate care of sheltered dogs
and cats. These grants shall be allocated by the commissioner on a
competitive basis until such funds are extinguished as follows: (a)
In municipalities with a population of less than two million, for
such pounds, shelters or humane societies that are operated by or
under contract for the provision of pound or shelter services with
one or more municipalities: projects serving an individual munici-
pality, grants in amounts not less than $50,000 and not more than
$200,000, not to exceed fifty percent of the total project cost; and
for projects serving two or more municipalities, grants in amounts
not less than $100,000 and not more than $500,000, not to exceed
seventy-five percent of the total project cost; (b) In munici-
palities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) not less than $500,000 for projects in
underserved municipalities or regions, for such pounds, shelters or
humane societies that are not operated by or under contract with one
or more municipalities for the provision of pound or shelter
services but that are registered with the department and can demon-
strate providing similar pound or shelter services, grants in
amounts not less than $50,000, and not more than $200,000, not to
exceed fifty percent of the total project cost. Up to five percent
of the total appropriation amount may be made available for the
services and expenses of the department in relation to these grants,
including personal service, nonpersonal service, fringe benefits,
and indirect costs (60AS2203) (11433) ..............................
5,000,000 ......................................... (re. $5,000,000)
For additional grants to municipal and incorporated not-for-profit
pounds, shelters and humane societies. Use of the grant funds is
restricted to the costs of capital projects including, but not
limited to, construction, renovation, rehabilitation, installation,
acquisition, or expansion of buildings, equipment, or facilities
necessary for the secure containment, health, and adequate care of
sheltered dogs and cats. These grants shall be allocated by the
commissioner on a competitive basis until such funds are extin-
guished as follows: (a) In municipalities with a population of less
than two million, for such pounds, shelters or humane societies that
10 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
are operated by or under contract for the provision of pound or
shelter services with one or more municipalities: projects serving
an individual municipality, grants in amounts not less than $50,000
and not more than $200,000, not to exceed fifty percent of the total
project cost; and for projects serving two or more municipalities,
grants in amounts not less than $100,000 and not more than $500,000,
not to exceed seventy-five percent of the total project cost; (b) In
municipalities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) not less than $500,000 for projects in
underserved municipalities or regions, for such pounds, shelters or
humane societies that are not operated by or under contract with one
or more municipalities for the provision of pound or shelter
services but that are registered with the department and can demon-
strate providing similar pound or shelter services, grants in
amounts not less than $50,000, and not more than $200,000, not to
exceed fifty percent of the total project cost. Up to five percent
of the total appropriation amount may be made available for the
services and expenses of the department in relation to these grants,
including personal service, nonpersonal service, fringe benefits,
and indirect costs (60CA2203) (11339) ..............................
3,000,000 ......................................... (re. $3,000,000)
For services and expenses related to projects for alterations, reha-
bilitation, and improvements at the New York federation of growers
and processors agribusiness child development centers (60AB2207)
(11326) ... 3,200,000 ............................. (re. $3,200,000)
For payment to agricultural or horticultural corporations and county
extension service associations that are eligible to receive premium
reimbursement pursuant to section 286 of the agriculture and markets
law for: the costs of construction, renovation, alteration, rehabil-
itation, improvements, installation, acquisition, repair or replace-
ment of fairground buildings, equipment or permanent or temporary
facilities used to house or promote agriculture, excluding parking
facilities and signage; or for the costs of construction, reno-
vation, alteration, rehabilitation, improvements, installation,
acquisition, repair, or replacement of water systems, restrooms,
septic systems, and/or storm water management systems on fairgrounds
or in fairground buildings to be allocated by the commissioner in
amounts not to exceed $200,000 to such eligible agricultural and
horticultural corporations or county extension services on a non-
competitive basis until such funds are exhausted. Up to five percent
of the total appropriation amount may be made available for the
services and expenses of the department in relation to these grants,
including personal service, nonpersonal service, fringe benefits,
and indirect costs (60LF2203) (11340) ..............................
5,000,000 ......................................... (re. $5,000,000)
For services and expenses of GrowNYC related to the Bronx Food Hub.
All or a portion of the funds appropriated hereby may be suballo-
11 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cated or transferred to any department, agency or public authority
(60GN2203) (11341) ... 4,000,000 .................. (re. $4,000,000)
By chapter 54, section 1, of the laws of 2021:
For grants to municipal and incorporated not-for-profit pounds, shel-
ters and humane societies. Use of the grant funds is restricted to
the costs of capital projects including, but not limited to,
construction, renovation, rehabilitation, installation, acquisition,
or expansion of buildings, equipment, or facilities necessary for
the secure containment, health, and adequate care of sheltered dogs
and cats. These grants shall be allocated by the commissioner on a
competitive basis until such funds are extinguished as follows: (a)
In municipalities with a population of less than two million, for
such pounds, shelters or humane societies that are operated by or
under contract for the provision of pound or shelter services with
one or more municipalities: projects serving an individual munici-
pality, grants in amounts not less than $50,000 and not more than
$200,000, not to exceed fifty percent of the total project cost; and
for projects serving two or more municipalities, grants in amounts
not less than $100,000 and not more than $500,000, not to exceed
seventy-five percent of the total project cost; (b) In munici-
palities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) not less than $500,000 for projects in
underserved municipalities or regions, for such pounds, shelters or
humane societies that are not operated by or under contract with one
or more municipalities for the provision of pound or shelter
services but that are registered with the department and can demon-
strate providing similar pound or shelter services, grants in
amounts not less than $50,000, and not more than $200,000, not to
exceed fifty percent of the total project cost. Up to five percent
of the total appropriation amount may be made available for the
services and expenses of the department in relation to these grants,
including personal service, nonpersonal service, fringe benefits,
and indirect costs (60AS2103) (11433) ..............................
5,000,000 ......................................... (re. $4,916,000)
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
For payment to agricultural or horticultural corporations and county
extension service associations that are eligible to receive premium
reimbursement pursuant to section 286 of the agriculture and markets
law for: the costs of construction, renovation, alteration, rehabil-
itation, improvements, installation, acquisition, repair or replace-
ment of fairground buildings, equipment or permanent or temporary
facilities used to house or promote agriculture, excluding parking
facilities and signage; or for the costs of construction, reno-
vation, alteration, rehabilitation, improvements, installation,
acquisition, repair or replacement of water systems, restrooms,
12 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
septic systems, and/or storm water management systems on fairgrounds
or in fairground buildings to be allocated by the commissioner in
amounts not to exceed $200,000 to such eligible agricultural and
horticultural corporations or county extension services on a noncom-
petitive basis until such funds are exhausted (60LF1907) (11414) ...
5,000,000 ......................................... (re. $5,000,000)
For grants to municipal and incorporated not-for-profit pounds, shel-
ters and humane societies. Use of the grant funds is restricted to
the costs of capital projects including, but not limited to,
construction, renovation, rehabilitation, installation, acquisition,
or expansion of buildings, equipment, or facilities necessary for
the secure containment, health, and adequate care of sheltered dogs
and cats. These grants shall be allocated by the commissioner on a
competitive basis until such funds are extinguished as follows: (a)
In municipalities with a population of less than two million, for
such pounds, shelters or humane societies that are operated by or
under contract for the provision of pound or shelter services with
one or more municipalities: projects serving an individual munici-
pality, grants in amounts not less than $50,000 and not more than
$200,000, not to exceed fifty percent of the total project cost; and
for projects serving two or more municipalities, grants in amounts
not less than $100,000 and not more than $500,000, not to exceed
seventy-five percent of the total project cost; (b) In munici-
palities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) to the extent such funds have not been
extinguished, for projects in underserved municipalities or regions,
for such pounds, shelters or humane societies that are not operated
by or under contract with one or more municipalities for the
provision of pound or shelter services, grants in amounts not more
than $50,000, not to exceed fifty percent of the total project cost.
Up to five percent of the total appropriation amount may be made
available for the services and expenses of the department in
relation to these grants, including personal service, non-personal
service, fringe benefits, and indirect costs (60AS1907) (11433) ...
5,000,000 ......................................... (re. $4,003,000)
By chapter 54, section 1, of the laws of 2018:
For payment to agricultural or horticultural corporations and county
extension service associations that are eligible to receive premium
reimbursement pursuant to section 286 of the agriculture and markets
law for: the costs of construction, renovation, alteration, rehabil-
itation, improvements, installation, acquisition, repair or replace-
ment of fairground buildings, equipment or permanent or temporary
facilities used to house or promote agriculture, excluding parking
facilities and signage; or for the costs of construction, reno-
vation, alteration, rehabilitation, improvements, installation,
acquisition, repair or replacement of water systems, restrooms,
septic systems, and/or storm water management systems on fairgrounds
13 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or in fairground buildings to be allocated by the commissioner in
amounts not to exceed $200,000 to such eligible agricultural and
horticultural corporations or county extension services on a non-
competitive basis until such funds are exhausted (60LF1807) (11414)
... 5,000,000 ..................................... (re. $3,881,000)
For grants to municipal and incorporated not-for-profit pounds, shel-
ters and humane societies. Use of the grant funds is restricted to
the costs of capital projects including, but not limited to,
construction, renovation, rehabilitation, installation, acquisition,
or expansion of buildings, equipment, or facilities necessary for
the secure containment, health, and adequate care of sheltered dogs
and cats. These grants shall be allocated by the commissioner on a
competitive basis until such funds are extinguished as follows: (a)
In municipalities with a population of less than two million, for
such pounds, shelters or humane societies that are operated by or
under contract for the provision of pound or shelter services with
one or more municipalities: projects serving an individual munici-
pality, grants in amounts not less than $50,000 and not more than
$200,000, not to exceed fifty percent of the total project cost; and
for projects serving two or more municipalities, grants in amounts
not less than $100,000 and not more than $500,000, not to exceed
seventy-five percent of the total project cost; (b) In munici-
palities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) to the extent such funds have not been
extinguished, for projects in underserved municipalities or regions,
for such pounds, shelters or humane societies that are not operated
by or under contract with one or more municipalities for the
provision of pound or shelter services, grants in amounts not more
than $50,000, not to exceed fifty percent of the total project cost.
Up to five percent of the total appropriation amount may be made
available for the services and expenses of the department in
relation to these grants, including personal service, non-personal
service, fringe benefits, and indirect costs (60AS1807) (11433)
5,000,000 ......................................... (re. $3,072,000)
By chapter 54, section 1, of the laws of 2017:
For payment to agricultural or horticultural corporations and county
extension service associations that are eligible to receive premium
reimbursement pursuant to section 286 of the agriculture and markets
law for the costs of construction, renovation, alteration, rehabili-
tation, improvements, installation, acquisition, repair or replace-
ment of fairground buildings, equipment or permanent or temporary
facilities used to house or promote agriculture, excluding parking
facilities and signage, to be allocated by the commissioner in
amounts not to exceed $200,000 to such eligible agricultural and
horticultural corporations or county extension services on a non-
competitive basis until such funds are exhausted (60LF1707) (11414)
... 5,000,000 ..................................... (re. $2,151,000)
14 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For grants to municipal and incorporated not-for-profit pounds, shel-
ters and humane societies. Use of the grant funds is restricted to
the costs of capital projects including, but not limited to,
construction, renovation, rehabilitation, installation, acquisition,
or expansion of buildings, equipment, or facilities necessary for
the secure containment, health, and adequate care of sheltered dogs
and cats. These grants shall be allocated by the commissioner on a
competitive basis until such funds are extinguished as follows: (a)
In municipalities with a population of less than two million, for
such pounds, shelters or humane societies that are operated by or
under contract for the provision of pound or shelter services with
one or more municipalities: projects serving an individual munici-
pality, grants in amounts not less than $50,000 and not more than
$200,000, not to exceed fifty percent of the total project cost; and
for projects serving two or more municipalities, grants in amounts
not less than $100,000 and not more than $500,000, not to exceed
seventy-five percent of the total project cost; (b) In munici-
palities with a population of more than two million, for such
pounds, shelters or humane societies that are operated by or under
contract for the provision of pound or shelter services with one or
more municipalities, grants in amounts not less than $100,000 and
not more than $500,000, not to exceed seventy-five percent of the
total project cost; and (c) to the extent such funds have not been
extinguished, for projects in underserved municipalities or regions,
for such pounds, shelters or humane societies that are not operated
by or under contract with one or more municipalities for the
provision of pound or shelter services, grants in amounts not more
than $50,000, not to exceed fifty percent of the total project cost.
Up to five percent of the total appropriation amount may be made
available for the services and expenses of the Department in
relation to these grants, including personal service, non-personal
service, fringe benefits, and indirect costs (60AS1707) (11433) ....
5,000,000 ........................................... (re. $634,000)
By chapter 55, section 1, of the laws of 2016:
For payment to agricultural or horticultural corporations and county
extension service associations that are eligible to receive premium
reimbursement pursuant to section 286 of the agriculture and markets
law for the costs of construction, renovation, alteration, rehabili-
tation, improvements, installation, acquisition, repair or replace-
ment of fairground buildings, equipment or permanent or temporary
facilities used to house or promote agriculture, excluding parking
facilities and signage, to be allocated by the commissioner in
amounts not to exceed $200,000 to such eligible agricultural and
horticultural corporations or county extension services on a non-
competitive basis until such funds are exhausted (60LF1607) (11414)
... 5,000,000 ....................................... (re. $759,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 53,
section 3, of the laws of 2006:
For services and expenses related to the Fredonia Vineyard Laboratory
(60030607) (11491) ... 2,000,000 ..................... (re. $28,000)
15 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of Cornell University College of Agriculture
and Life Sciences climate adaptive research farms for applied
infrastructure and demonstration projects (60CR2203) (11342) .......
5,000,000 ......................................... (re. $5,000,000)
For the New York State meat processing expansion grant program, to
provide grants of at least $50,000 to be used for the expansion of
existing plants, creation of new plants, job training, safety
upgrades, or other purposes deemed necessary to further opportu-
nities for beef, pork and other meat farmers to process their meat
within the state. Up to five percent of the total appropriation
amount may be made available for the services and expenses of the
department in relation to these grants, including personal service,
nonpersonal service, fringe benefits, and indirect costs (60MP2207)
(11343) ... 5,000,000 ............................. (re. $5,000,000)
NEW YORK WORKS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administrative Services Purpose
By chapter 54, section 1, of the laws of 2022:
For the purchase and replacement of vehicles and equipment (60VS22AS)
(11420) ... 600,000 ................................. (re. $600,000)
For services and expenses related to the purchase or replacement of
laboratory equipment (60ES22AS) (11421) ............................
115,000 ............................................. (re. $115,000)
By chapter 54, section 1, of the laws of 2021:
For the purchase and replacement of vehicles and equipment (60VS21AS)
(11420) ... 600,000 ................................. (re. $600,000)
For services and expenses related to the purchase or replacement of
laboratory equipment (60ES21AS) (11421) ............................
115,000 ............................................. (re. $115,000)
By chapter 54, section 1, of the laws of 2020:
For the purchase and replacement of vehicles and equipment (60VS20AS)
(11420) ... 600,000 ................................. (re. $600,000)
For services and expenses related to the purchase or replacement of
laboratory equipment (60ES20AS) (11421) ............................
115,000 .............................................. (re. $98,000)
By chapter 54, section 1, of the laws of 2019:
For the purchase and replacement of vehicles and equipment (60VS19AS)
(11420) ... 600,000 ................................. (re. $577,000)
For services and expenses related to the purchase or replacement of
laboratory equipment (60ES19AS) (11421) ... 115,000 .. (re. $34,000)
16 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2018:
For the purchase and replacement of vehicles and equipment (60VS18AS)
(11420) ... 600,000 .................................. (re. $23,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation, improvements, and land
acquisition at the state fair, including personal service and the
payment of liabilities incurred prior to April 1, 2022. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency or public authority (60NY2203)
(10300) ... 5,000,000 ............................. (re. $4,688,000)
For services and expenses of state fair projects, such costs may
include but shall not be limited to personal services, nonpersonal
services, fringe benefits and indirect costs, such projects may
include but shall not be limited to alterations, rehabilitation,
improvements, preventive maintenance, replacement, refurbishment,
construction and energy conservation of various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2022
(60SF2203) (11422) ... 28,000,000 ................ (re. $28,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation, improvements, and land
acquisition at the state fair, including personal service and the
payment of liabilities incurred prior to April 1, 2021. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency or public authority (60NY2103)
(10300) ... [5,000,000] 5,007,000 ................. (re. $3,093,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation, improvements, and land
acquisition at the state fair, including personal service and the
payment of liabilities incurred prior to April 1, 2020. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency or public authority (60NY2003)
(10300) ... 15,000,000 ........................... (re. $10,770,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation, improvements, and land
acquisition at the state fair, including personal service and the
payment of liabilities incurred prior to April 1, 2019. All or a
portion of the funds appropriated hereby may be suballocated or
17 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transferred to any department, agency or public authority (60NY1903)
(10300) ... 5,000,000 ............................... (re. $165,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation and improvements at the
state fair, including personal service and the payment of liabil-
ities incurred prior to April 1, 2018. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency or public authority (60NY1803) (10300) ..........
2,500,000 ............................................ (re. $30,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to New York Works Infrastructure
projects for alterations, rehabilitation and improvements to modern-
ize the state fair, including personal service and the payment of
liabilities incurred prior to April 1, 2017. All or a portion of the
funds appropriated hereby may be suballocated or transferred to any
department, agency or public authority (60SF1703) (11422) ..........
50,000,000 .......................................... (re. $212,000)
STATE FAIR (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the costs including personal services, nonpersonal
services, fringe benefits and indirect costs, of alterations, reha-
bilitation and improvements including preventive maintenance,
replacement, refurbishment and energy conservation of various facil-
ities, including the payment of liabilities incurred prior to April
1, 2022 (60MN2203) (11493) ... 1,700,000 ............ (re. $787,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
State Fair Capital Improvement Account - 32208
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the costs including personal services, nonpersonal
services, fringe benefits and indirect costs, of alterations, reha-
bilitation and improvements including preventive maintenance,
replacement, refurbishment and energy conservation of various facil-
ities, including the payment of liabilities incurred prior to April
1, 2022 (60RI2203) (11493) ... 2,000,000 .......... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the costs including personal services, nonpersonal
services, fringe benefits and indirect costs, of alterations, reha-
bilitation and improvements including preventive maintenance,
18 12554-05-3
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
replacement, refurbishment and energy conservation of various facil-
ities, including the payment of liabilities incurred prior to April
1, 2021 (60RI2103) (11493) ... 2,000,000 .......... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the costs including personal services, nonpersonal
services, fringe benefits and indirect costs, of alterations, reha-
bilitation and improvements including preventive maintenance,
replacement, refurbishment and energy conservation of various facil-
ities, including the payment of liabilities incurred prior to April
1, 2020 (60RI2003) (11493) ... 2,000,000 .......... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the costs including personal services, nonpersonal
services, fringe benefits and indirect costs, of alterations, reha-
bilitation and improvements including preventive maintenance,
replacement, refurbishment and energy conservation of various facil-
ities, including the payment of liabilities incurred prior to April
1, 2019 (60RI1903) (11493) ... 2,000,000 .......... (re. $2,000,000)
19 12554-05-3
COUNCIL ON ARTS
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 50,000,000 10,000,000
---------------- ----------------
All Funds ........................ 50,000,000 10,000,000
================ ================
REGIONAL ARTS AND CULTURAL COUNCILS PROGRAM ................. 50,000,000
--------------
Capital Projects Fund - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
The sum of $40,000,000 is hereby appropri-
ated for payments and grants, including
up to $400,000 in costs associated with
program administration to eligible
nonprofit arts and cultural organiza-
tions for the arts and cultural facili-
ties improvement program. Such program
shall provide for targeted investment
for capital projects in such eligible
arts or cultural facilities to improve
the quality, efficiency, and accessibil-
ity of arts and cultural organizations
that benefit New Yorkers. Provided that
such investments may include, but are
not limited to: renovations and retro-
fitting to comply with COVID-19 health
regulations, including outdoor perform-
ance space projects, HVAC upgrades,
renovations or expansions of space that
is open to the public; modifications to
provide for the sustainable, energy
efficient spaces that would result in
overall energy and cost savings; tech-
nology and other equipment that will
benefit the public; and accessibility
renovations. Up to $10,000,000 shall be
made available exclusively for small to
midsize eligible nonprofit arts and
cultural organizations. Funding from
this appropriation shall be made avail-
able through a competitive process to be
determined exclusively by the New York
state council on the arts. The determi-
nation of this competitive process and
20 12554-05-3
COUNCIL ON ARTS
CAPITAL PROJECTS 2023-24
guidelines shall be limited to the New
York state council on the arts in
consultation with the dormitory authori-
ty of the state of New York. The guide-
lines for the program and competitive
process shall ensure that such funding
is made available for uses throughout
the state and takes into account
regional distribution, supports a range
of grant awards including a minimum
grant of $50,000, and no match require-
ments for organizations as deemed appro-
priate by the New York state council on
the arts. Notwithstanding any inconsist-
ent provision of law, the dormitory
authority shall be authorized to admin-
ister this program and designated state
agencies shall provide all necessary
assistance.
Notwithstanding any inconsistent provision
of law, all or a portion of the funds
appropriated herein may be suballocated
or transferred to any department, agen-
cy, or public authority (ACNP2208)
(85021) ................................... 40,000,000
For construction and rehabilitation
projects for Regional Arts and Cultural
Councils outside of New York City ......... 10,000,000
21 12554-05-3
COUNCIL ON ARTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For construction and rehabilitation projects for Regional Arts and
Cultural Councils outside of New York City (61RA2208) (12125) ...
10,000,000 ....................................... (re. $10,000,000)
22 12554-05-3
DEPARTMENT OF AUDIT AND CONTROL
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 2,836,000 35,851,000
---------------- ----------------
All Funds ........................ 2,836,000 35,851,000
================ ================
IT INITIATIVE PROGRAM (CCP) .................................. 2,836,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expenses related to the
acquisition and development of technology,
including but not limited to equipment,
software and services (OS012308) (51919) ..... 2,836,000
23 12554-05-3
DEPARTMENT OF AUDIT AND CONTROL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
IT INITIATIVE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (OS012208) (51919) ... 30,112,000 ....... (re. $26,935,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (OS012008) (51919) ... 10,100,000 ........ (re. $8,916,000)
24 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other...... 1,081,721,000 3,436,964,000
---------------- ----------------
All Funds ........................ 1,081,721,000 3,436,964,000
================ ================
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 384,222,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For services and expenses related to alter-
ations and improvements to existing facil-
ities for capital maintenance, including
but not limited to capital design,
construction, reconstruction, rehabili-
tation, and equipment; for in-kind
replacement of buildings and facilities
upon demonstration, through multi-factor
benefit-cost analysis of capital costs and
life-cycle operating costs comparing
existing facility, renovated facility, and
new construction, that replacement is more
cost-effective and energy-efficient than
full renovation and does not exceed exist-
ing square footage except incidentally
where necessary to provide accessibility,
mechanical efficiency, or required acces-
sory and minor support structures; for
health and safety, preservation of facili-
ties, program improvement or program
change, environmental protection, energy
conservation, accreditation, facilities
for the physically disabled, preventative
maintenance and related projects, includ-
ing costs incurred prior to April 1, 2023
and subject to a plan developed and
submitted annually by the city university
of New York and approved by the director
of the budget, and which may include, but
not be limited to, projects in the follow-
ing schedule. Notwithstanding any other
law to the contrary, all or a portion of
25 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2023-24
the amounts hereby appropriated may be
suballocated or transferred to the dormi-
tory authority of the state of New York
for such purpose (30032303) (15420) ........ 384,222,000
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 4,568
Brooklyn College
Campus-wide maintenance to
various facilities ............................ 10,325
City College
Campus-wide maintenance to
various facilities ............................. 9,078
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................. 1,203
Honors college
Campus-wide maintenance to
various facilities ............................... 120
Hunter College
Campus-wide maintenance to
various facilities ............................. 8,558
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 1,837
Lehman College
Campus-wide maintenance to
various facilities ............................. 5,132
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 1,964
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 2,533
Queens College
Campus-wide maintenance to
various facilities ............................. 8,280
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 6,917
York College
Campus-wide maintenance to
various facilities ............................. 2,838
For university-wide maintenance or
capital improvement costs at senior
26 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2023-24
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 12,464
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 16,757
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 8,310
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 9,694
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 6,786
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,770
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 5,540
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,770
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 9,002
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,387
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 406
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 244,983
--------------
Total ....................................... 384,222
--------------
27 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2023-24
PROGRAM CHANGES - EXPANSION AND IMPROVEMENTS (CCP) ......... 539,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
For services and expenses related to alter-
ations and improvements to various facili-
ties including but not limited to capital
design, construction, reconstruction,
rehabilitation, and equipment; for health
and safety, preservation of facilities,
program improvement or program change,
environmental protection, energy conserva-
tion, accreditation, facilities for the
physically disabled, preventative mainte-
nance and related projects, including
costs incurred prior to April 1, 2023 and
subject to a plan developed and submitted
annually by the city university of New
York and approved by the director of the
budget (30A12308) (40811) .................. 100,000,000
For additional services and expenses related
to alterations and improvements to various
facilities including but not limited to
capital design, construction, recon-
struction, rehabilitation, and equipment;
for health and safety, preservation of
facilities, program improvement or program
change, environmental protection, energy
conservation, accreditation, facilities
for the physically disabled, preventative
maintenance and related projects, includ-
ing costs incurred prior to April 1, 2023
and subject to a plan developed and
submitted annually by the city university
of New York and approved by the director
of the budget .............................. 435,000,000
For services and expenses related to alter-
ations and improvements to facilities and
capital maintenance for the CUNY School of
Labor and Urban Studies (30A32308) ........... 3,000,000
For services and expenses related to alter-
ations and improvements to facilities and
capital maintenance for the Center For
Puerto Rican Studies at Hunter College ....... 1,000,000
PROJECT ADMINISTRATION (CCP) ................................ 38,832,000
--------------
28 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
For payment to the dormitory authority of
the state of New York, for services and
expenses of the authority related to
construction activities administered by
the authority for the state share of capi-
tal projects of the city university of New
York which are appropriated by the state
and otherwise authorized by law (30DA2350)
(15528) ..................................... 22,050,000
For payment to the city university
construction fund, for services and
expenses of the city university
construction fund related to construction
activities administered by the city
university construction fund for the state
share of capital projects of the city
university of New York which are appropri-
ated by the state and otherwise authorized
by law (30CF2350) (40800) ................... 16,782,000
29 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs,
purposes and projects as herein specified
in accordance with the following:
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 119,667,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For services and expenses for the state
share of financial assistance to community
colleges for alterations and improvements
to various facilities, including services
and expenses, capital design,
construction, reconstruction, rehabili-
tation and equipment; for health and safe-
ty, preservation of facilities, new facil-
ities, program improvement or program
change, environmental protection, energy
conservation, accreditation, facilities
for the physically disabled, and related
projects, including costs incurred prior
to April 1, 2023 subject to an annual plan
developed by the city university and
approved by the state director of the
budget. Notwithstanding any other law to
the contrary, all or a portion of the
amounts hereby appropriated may be subal-
located or transferred to the dormitory
authority of the state of New York for
such purpose (30CC2303) (81067) ............ 119,667,000
30 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2017 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30031750) (15420) ... 224,222,000 .............. (re. $102,592,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 2,511
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 5,433
City College
Campus-wide maintenance to
various facilities ............................. 8,136
Graduate School and University Center
Campus-wide maintenance to
various facilities ................................ 25
Honors college
Campus-wide maintenance to
various facilities ................................ 25
Hunter College
Campus-wide maintenance to
various facilities ............................. 5,799
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 3,193
Lehman College
31 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance to
various facilities ............................. 2,438
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 3,096
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 3,485
Queens College
Campus-wide maintenance to
various facilities ............................. 5,433
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 2,877
York College
Campus-wide maintenance to
various facilities ............................. 3,899
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,270
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,463
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,210
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,180
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,120
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
32 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
facilities upgrade needs ......................... 1,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,695
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,047
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 515
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 121,222
--------------
Total ........................................ 224,222
==============
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2017 and subject to a plan developed and submitted annually
by the city university of New York and approved by the director of
the budget, and which may include, but not be limited to, projects
in the following schedule. Notwithstanding any other law to the
contrary, all or a portion of the amounts hereby appropriated may be
suballocated or transferred to the dormitory authority of the state
of New York for such purpose (30051750) (40804) ....................
60,000,000 ....................................... (re. $38,346,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide projects ............................. 1,260
Brooklyn College
Campus-wide projects ............................. 8,460
City College
Campus-wide projects ............................ 15,120
Graduate School and University Center
Campus-wide projects ................................ 60
Honors college
33 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide projects ................................ 60
Hunter College
Campus-wide projects ............................. 9,360
John Jay College of Criminal Justice
Campus-wide projects ............................. 2,940
Lehman College
Campus-wide projects ............................. 1,080
Medgar Evers College
Campus-wide projects ............................. 2,700
New York City College of Technology
Campus-wide projects ............................. 3,660
Queens College
Campus-wide projects ............................. 8,460
College of Staten Island
Campus-wide projects ............................. 2,160
York College
Campus-wide projects ............................. 4,680
--------------
Total ......................................... 60,000
==============
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2016 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30031650) (15420) ... 103,000,000 ................ (re. $6,848,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 2,511
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 5,433
City College
34 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance to
various facilities ............................. 8,136
Graduate School and University Center
Campus-wide maintenance to
various facilities ................................ 25
Honors college
Campus-wide maintenance to
various facilities ................................ 25
Hunter College
Campus-wide maintenance to
various facilities ............................. 5,799
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 3,193
Lehman College
Campus-wide maintenance to
various facilities ............................. 2,438
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 3,096
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 3,485
Queens College
Campus-wide maintenance to
various facilities ............................. 5,433
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 2,877
York College
Campus-wide maintenance to
various facilities ............................. 3,899
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,270
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,463
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,210
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,180
For university-wide maintenance or
35 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,120
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,695
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,047
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 515
--------------
Total ........................................ 103,000
==============
For additional services and expenses related to alterations and
improvements to existing facilities for capital maintenance, includ-
ing but not limited to capital design, construction, reconstruction,
rehabilitation, and equipment; for health and safety, preservation
of facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2016 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30041650) (40802) ... 40,000,000 ................ (re. $40,000,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
36 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................... 378
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 2,538
City College
Campus-wide maintenance to
various facilities ............................. 4,536
Graduate School and University Center
Campus-wide maintenance to
various facilities ................................ 18
Honors college
Campus-wide maintenance to
various facilities ................................ 18
Hunter College
Campus-wide maintenance to
various facilities ............................. 2,808
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................... 882
Lehman College
Campus-wide maintenance to
various facilities ............................... 324
Medgar Evers College
Campus-wide maintenance to
various facilities ............................... 810
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 1,098
Queens College
Campus-wide maintenance to
various facilities ............................. 2,538
College of Staten Island
Campus-wide maintenance to
various facilities ............................... 648
York College
Campus-wide maintenance to
various facilities ............................. 1,404
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 3,600
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
37 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
facilities needs ................................. 4,840
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 2,800
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 2,400
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................... 800
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 1,600
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs ...................................... 800
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ........................... 400
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 2,600
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 1,960
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 200
--------------
Total ......................................... 40,000
==============
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For additional services and expenses related to alterations and
improvements to various facilities for capital projects, including
but not limited to capital design, construction, acquisition, recon-
struction, rehabilitation, and equipment; for health and safety,
preservation of facilities, program improvement or program change,
environmental protection, energy conservation, accreditation, facil-
ities for the physically disabled, preventative maintenance and
related projects, including costs incurred prior to April 1, 2016
38 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and subject to a plan developed and submitted by the city university
of New York board of trustees and approved by the director of the
budget. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the dormitory authority of the state of New York for
such purpose (30051650) (40803) ... 20,000,000 ... (re. $12,300,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2015 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30031550) (15420) ... 103,000,000 ............... (re. $29,649,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 4,635
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 3,811
City College
Campus-wide maintenance to
various facilities ............................. 5,665
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................. 1,030
Honors college
Campus-wide maintenance to
various facilities ............................... 412
Hunter College
Campus-wide maintenance to
various facilities ............................. 3,914
John Jay College of Criminal Justice
Campus-wide maintenance to
39 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
various facilities ............................. 2,163
Lehman College
Campus-wide maintenance to
various facilities ............................. 3,811
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 3,811
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 3,811
Queens College
Campus-wide maintenance to
various facilities ............................. 5,665
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 3,811
York College
Campus-wide maintenance to
various facilities ............................. 3,811
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 8,755
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 10,815
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 6,695
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 5,150
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,120
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,060
For university-wide maintenance or
capital improvement costs at senior
40 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to bathroom
facilities upgrade needs ......................... 1,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,695
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 7,210
For university-wide maintenance or
capital improvement costs at senior
colleges attributable CUNY TV
renovation needs ................................. 1,030
--------------
Total ........................................ 103,000
==============
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to existing facilities for
capital critical maintenance, including but not limited to capital
design, construction, reconstruction, rehabilitation, and equipment;
for health and safety, preservation of facilities, program improve-
ment or program change, environmental protection, energy conserva-
tion, accreditation, facilities for the physically disabled, preven-
tative maintenance and related projects, including costs incurred
prior to April 1, 2014, and subject to a plan developed and submit-
ted annually by the city university of New York and approved by the
director of the budget, and which may include, but not be limited
to, projects in the following schedule. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the dormitory authori-
ty of the state of New York for such purpose (30031450) (15420) ...
206,000,000 ...................................... (re. $90,537,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance to
various facilities .............................. 14,000
Brooklyn College
Campus-wide critical maintenance to
41 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
various facilities .............................. 12,500
City College
Campus-wide critical maintenance to
various facilities .............................. 17,000
Graduate School and University Center
Campus-wide critical maintenance to
various facilities ............................... 2,000
Honors college
Campus-wide critical maintenance to
various facilities................................ 1,000
Hunter College
Campus-wide critical maintenance to
various facilities .............................. 1,000
John Jay College of Criminal Justice
Campus-wide critical maintenance to
various facilities ............................... 5,000
Lehman College
Campus-wide critical maintenance to
various facilities .............................. 10,000
Medgar Evers College
Campus-wide critical maintenance to
various facilities ...............................10,000
New York City College of Technology
Campus-wide critical maintenance to
various facilities .............................. 8,000
Queens College
Campus-wide critical maintenance to
various facilities .............................. 17,000
College of Staten Island
Campus-wide critical maintenance to
various facilities ...............................10,000
York College
Campus-wide critical maintenance to
various facilities .............................. 12,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 27,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 30,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................ 20,500
For university-wide critical maintenance or
capital improvement costs at senior
42 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to ADA needs ...............10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs ................. 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs .............................. 12,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 8,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 3,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,500
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ..................... 15,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable CUNY TV
renovation needs ................................. 1,500
Less an amount to be allocated by the board
of trustees .................................... (52,000)
--------------
Total ........................................ 206,000
==============
Advances for alterations and improvements to various facilities for
capital strategic initiatives, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2014, and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
43 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30041450) (15511) ... 127,000,000 .............. (re. $108,126,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
17 Lex. Ave Building ............................ 30,000
Brooklyn College
Roosevelt Hall .................................. 35,000
College of Staten Island
Interdisciplinary High Performance
Computational Center ............................ 10,000
Lehman College
Nursing Education ............................... 22,000
York College
Academic Village/Conference Center .............. 30,000
--------------
Total ........................................ 127,000
==============
Notwithstanding any provision of law this appropriation shall be allo-
cated only pursuant to a plan setting forth an itemized list of
projects with the amount to be received by each, or the methodology
for allocating such appropriation. Such plan shall be subject to
theapproval of the temporary president of the senate and the direc-
tor of the budget and thereafter shall be included in a resolution
calling for the expenditure of such monies, which resolution must be
approved by a majority vote of all members elected to the senate
upon a roll call vote.
Notwithstanding any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30051450) (15529) ... 67,000,000 ................ (re. $51,174,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2012, and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget, and which may include, but
44 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30031250) (15420) ... 284,222,000 ............... (re. $99,853,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance to
various facilities .............................. 12,000
Brooklyn College
Campus-wide critical maintenance to
various facilities .............................. 15,000
City College
Campus-wide critical maintenance to
various facilities .............................. 12,000
Graduate School and University Center
Campus-wide critical maintenance to
various facilities ............................... 3,000
Hunter College
Campus-wide critical maintenance to
various facilities .............................. 10,000
John Jay College of Criminal Justice
Campus-wide critical maintenance to
various facilities ............................... 9,922
Lehman College
Campus-wide critical maintenance to
various facilities .............................. 10,000
Medgar Evers College
Campus-wide critical maintenance to
various facilities ............................... 6,000
New York City College of Technology
Campus-wide critical maintenance to
various facilities .............................. 15,000
Queens College
Campus-wide critical maintenance to
various facilities .............................. 17,000
College of Staten Island
Campus-wide critical maintenance to
various facilities ............................... 9,000
York College
Campus-wide critical maintenance to
various facilities .............................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
45 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
needs ........................................... 36,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 36,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 3,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs ................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs .............................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ..................... 15,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs ................................... 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 3,300
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,500
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to athletic
facilities upgrade needs ......................... 1,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable CUNY TV
renovation needs ................................. 1,500
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................ 23,000
--------------
46 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Total ........................................ 284,222
==============
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2011, and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30031150) (15420) ... 284,222,000 ............... (re. $24,056,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance to
various facilities ............................... 5,000
Brooklyn College
Campus-wide critical maintenance to
various facilities ............................... 7,500
City College
Campus-wide critical maintenance to
various facilities ............................... 6,000
Hunter College
Campus-wide critical maintenance to
various facilities ............................... 7,000
John Jay College of Criminal Justice
Campus-wide critical maintenance to
various facilities ............................... 3,500
Lehman College
Campus-wide critical maintenance to
various facilities ............................... 3,500
Medgar Evers College
Campus-wide critical maintenance to
various facilities ............................... 8,000
New York City College of Technology
Campus-wide critical maintenance to
various facilities .............................. 10,000
Queens College
47 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide critical maintenance to
various facilities .............................. 12,500
College of Staten Island
Campus-wide critical maintenance to
various facilities ............................... 5,000
York College
Campus-wide critical maintenance to
various facilities ............................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 56,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 60,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 1,800
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs ................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs .............................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ..................... 12,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 8,600
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,700
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,700
For university-wide critical maintenance or
48 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital improvement costs at senior
colleges attributable to athletic
facilities upgrade needs ......................... 2,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable CUNY TV
renovation needs ................................. 2,422
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................ 40,000
--------------
Total ........................................ 284,222
==============
By chapter 53, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2010, and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30031050) (15420) ... 284,222,000 ............... (re. $23,076,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance to
various facilities ............................... 9,400
Brooklyn College
Campus-wide critical maintenance to
various facilities .............................. 14,542
City College
Campus-wide critical maintenance to
various facilities .............................. 22,900
Graduate School and University Center
Campus-wide critical maintenance to
various facilities ............................... 1,500
Hunter College
49 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide critical maintenance to
various facilities .............................. 18,000
John Jay College of Criminal Justice
Campus-wide critical maintenance to
various facilities .............................. 11,000
Lehman College
Campus-wide critical maintenance to
various facilities ............................... 7,000
Medgar Evers College
Campus-wide critical maintenance to
various facilities .............................. 14,630
New York City College of Technology
Campus-wide critical maintenance to
various facilities .............................. 19,800
Queens College
Campus-wide critical maintenance to
various facilities .............................. 11,550
College of Staten Island
Campus-wide critical maintenance to
various facilities ............................... 8,100
York College
Campus-wide critical maintenance to
various facilities ............................... 6,500
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 35,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 30,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 1,800
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs ................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs .............................. 17,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
50 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to educational
technology initiative needs ...................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 8,600
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,700
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,700
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to athletic
facilities upgrade needs ......................... 2,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable CUNY TV
renovation needs ................................. 1,500
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................ 20,000
--------------
Total ........................................ 284,222
==============
By chapter 53, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2009, and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30020950) (15420) ... 284,222,000 ............... (re. $17,375,000)
51 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance to
various facilities ............................. 2,705
Brooklyn College
Campus-wide critical maintenance to
various facilities ............................. 3,661
City College
Campus-wide critical maintenance to
various facilities ............................ 27,407
Hunter College
Campus-wide critical maintenance to
various facilities ............................ 14,482
John Jay College of Criminal Justice
Campus-wide critical maintenance to
various facilities ............................. 5,681
Lehman College
Campus-wide critical maintenance to
various facilities ............................ 30,000
New York City College of Technology
Campus-wide critical maintenance to
various facilities ............................. 9,400
Queens College
Campus-wide critical maintenance to
various facilities ............................ 35,567
College of Staten Island
Campus-wide critical maintenance to
various facilities ............................. 9,565
York College
Campus-wide critical maintenance to
various facilities ............................. 7,954
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 35,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 30,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 1,800
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to certificate of
52 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
occupancy/public assembly needs ................. 10,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs .............................. 17,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 5,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 8,600
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,700
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to asbestos
abatement needs .................................. 1,700
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to athletic
facilities upgrade needs ......................... 2,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................ 20,000
--------------
Total ........................................ 284,222
==============
By chapter 53, section 1, of the laws of 2008:
Alterations and improvements to various facilities for minor rehabili-
tation, including but not limited to capital design, construction,
acquisition, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2008, and subject to a plan submitted annually by the city
university of New York and approved by the director of the budget
(30080850) (15502) ... 23,232,000 ................. (re. $2,732,000)
53 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2008, and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the dormitory authority of the state of New York for such purpose
(30010850) (15420) ... 284,222,000 ............... (re. $16,658,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide critical maintenance
to various facilities ............................ 6,746
Brooklyn College
Campus-wide critical maintenance
to various facilities ........................... 10,811
City College
Campus-wide critical maintenance
to various facilities ........................... 23,466
Graduate School and University Center
Campus-wide critical maintenance
to various facilities .............................. 300
Hunter College
Campus-wide critical maintenance
to various facilities ............................ 3,176
John Jay College of Criminal Justice
Campus-wide critical maintenance
to various facilities ............................ 6,873
Lehman College
Campus-wide critical maintenance
to various facilities ........................... 15,941
New York City College of Technology
Campus-wide critical maintenance
to various facilities ........................... 10,800
Queens College
Campus-wide critical maintenance
to various facilities ........................... 21,117
College of Staten Island
54 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide critical maintenance
to various facilities ........................... 18,125
York College
Campus-wide critical maintenance
to various facilities ........................... 15,223
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to the
findings of condition surveys
for health and safety needs ..................... 33,154
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to the
findings of condition surveys
for preservation of facilities
needs ........................................... 40,001
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to ADA
needs ............................................ 1,989
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to science
and technology equipment needs ................... 5,000
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to
certificate of occupancy/public
assembly needs ................................... 8,000
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to energy
conservation needs .............................. 18,787
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to science
lab upgrade needs ................................ 9,504
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to
educational technology initiative
55 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
needs ........................................... 10,000
For university-wide critical
maintenance or capital
improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,879
For university-wide critical
maintenance or capital improvement
costs at senior colleges
attributable to asbestos
abatement needs .................................. 1,879
For university-wide critical
maintenance or capital improvement
costs at senior colleges
attributable to CUNY TV
renovations needs ................................ 1,450
For university-wide critical
maintenance or capital improvement
costs at senior colleges
attributable to mechanical and
infrastructure needs ............................ 20,000
--------------
Total .......................................... 284,222
==============
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital strategic initiatives, including but not limited to capital
design, construction, acquisition, reconstruction, rehabilitation,
and equipment; for health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2008, and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30060850) (15511) ... 1,311,732,000 ............. (re. $98,778,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Baruch College
17 Lexington Ave. Building
Renovation/Field Building
56 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Renovation ........................ 40,000
Brooklyn College
West Quad Building ................ 22,782
Roosevelt Hall Science
Facility .......................... 52,000
Performing Arts Center ............ 29,000
Fire Alarm and Security
Project ............................ 9,834
City College
New Science Facility .............. 70,334
Marshak Building Interior ......... 10,000
School of Architecture
Renovation ........................ 10,000
Central Plant Expansion and
Distribution ...................... 37,727
Hunter College
School of Social Work ............. 84,318
New Science Lab Building,
Phase I ........................... 74,682
John Jay College of Criminal Justice
John Jay College Building
Expansion ........................ 125,000
CUNY School of Law
New Facility ...................... 50,000
Lehman College
New Science Facility,
Phase II .......................... 20,000
Swing Space for New Science
Facility .......................... 20,000
Media Production Center & Virtual
Small Business Assistance Center ... 2,217
New York City College of Technology
Academic Building I .............. 100,000
Educational Technology Initiative .... 250
Queens College
Louis Armstrong Center ............. 5,000
Tennis Courts ...................... 1,500
College of Staten Island
Center for Computational
Science ............................ 6,500
Sports and Recreation Center
Upgrades ........................... 1,000
Campus-wide Site Security & Lighting,
Phase II .......................... 12,988
York College
Student Services Center/Classroom
Building ........................... 5,000
University-wide
CUNY ERP (CUNY FIRST) ............ 142,000
Advanced Science Research Center,
57 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Phase I, and CCNY New Science
Facility ......................... 207,878
Project Administration ............ 61,722
Operational Changes .............. 110,000
--------------
Total ........................ 1,311,732
==============
By chapter 53, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for alterations and improvements to various facilities
including services and expenses, capital design, construction,
acquisition, reconstruction, rehabilitation and equipment; including
but not limited to health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventive maintenance and related projects,
including costs incurred prior to April 1, 2007, and subject to a
plan to be developed and submitted annually by the city university
of New York and approved by the state director of the budget, and
which may include, but not be limited to, projects in the following
schedule. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the dormitory authority of the state of New York for
such purpose (30670750) (15529) ....................................
225,000,000 ...................................... (re. $53,406,000)
Project Schedule
AMOUNT
----------------------------------------------------------
(thousands of dollars)
For the City College Marshak Building,
provided however that subdivision (b) of
section 6281 of the education law, as
amended by chapter 1081 of the laws of
1969, shall apply to the dormitory author-
ity and/or the city university
construction fund, as the letting agency,
unless, in its discretion, it determines
to utilize a project labor agreement for
all work performed in the renovation of
the Marshak science building, the city
college science facility and the new
science research center at city college,
which means a prehire collective bargain-
ing agreement between the agency and a
labor organization establishing the labor
organization as the collective bargaining
representative for all persons who will
perform work pursuant to all contracts for
58 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the construction, reconstruction, rehabil-
itation or improvement of facilities, and
which provides that only contractors and
subcontractors who sign a prenegotiated
agreement with the labor organization can
perform project work, when the record
supporting the decision to enter into such
an agreement establishes that it is justi-
fied by the interests underlying the
competitive bidding laws ........................ 30,000
For the City College Science Facility,
provided however that subdivision (b) of
section 6281 of the education law, as
amended by chapter 1081 of the laws of
1969, shall apply to the dormitory author-
ity and/or the city university
construction fund, as the letting agency,
unless, in its discretion, it determines
to utilize a project labor agreement for
all work performed in the renovation of
the Marshak science building, the city
college science facility and the new
science research center at city college,
which means a prehire collective bargain-
ing agreement between the agency and a
labor organization establishing the labor
organization as the collective bargaining
representative for all persons who will
perform work pursuant to all contracts for
the construction, reconstruction, rehabil-
itation or improvement of facilities, and
which provides that only contractors and
subcontractors who sign a prenegotiated
agreement with the labor organization can
perform project work, when the record
supporting the decision to enter into such
an agreement establishes that it is justi-
fied by the interests underlying the
competitive bidding laws ........................ 55,300
For the Advanced Science Research Center at
City College .................................... 14,500
For Central Utilities Plan Expansion at
Lehman College .................................. 11,100
For the Voorhees Building facade at New York
City College of Technology ...................... 14,100
For structural repairs at the Pearl Street
Building at New York City College of Tech-
nology ........................................... 5,000
For expansion of the Central Plant at City
59 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
College ......................................... 30,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ........................................... 20,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 30,000
For university-wide critical maintenance or
capital improvement costs at senior
colleges to correct deficiencies in the
mechanical, electrical and plumbing
infrastructure .................................. 15,000
--------------
Total .......................................... 225,000
==============
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
An additional advance for alterations and improvements to various
facilities including services and expenses, service contracts, memo-
randum of understanding, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, technology, environmental protection, energy conser-
vation, accreditation, facilities for the physically disabled and
related projects including costs incurred prior to April 1, 2006
subject to an annual plan developed by the city university of New
York which shall include projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30670650) (15529) ... 235,500,000 ................ (re. $2,601,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Brooklyn College
The West Quad Project ........................... 12,000
Roosevelt Hall .................................. 11,000
The Performing Arts Center ...................... 15,000
City College
School of Architecture (SAUDLA) .................. 8,000
Marshak Building ................................ 13,800
Science Facility ................................ 57,700
College of Staten Island
60 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
2M Building ...................................... 5,000
Upgrades, Renovations, Equipment -
Various .......................................... 4,000
CUNY Law
Law Building Renovation, Phase I ................... 500
Hunter College
Roosevelt House Renovation ....................... 1,000
New Science Lab Building ........................ 10,000
John Jay
Building Expansion .............................. 15,000
Lehman College
Consolidated Computer Center Phase II ............ 1,000
New Science Facility Phase II ................... 10,000
Queens College
Science Upgrades Phase II ........................ 6,000
Louis Armstrong Center ........................... 5,000
School of Journalism
School of Journalism ............................ 10,000
York College
Student Services Center .......................... 6,000
Campus-wide Site Improvements ...................... 7,000
An advance for alterations and improvements
to various facilities including services
and expenses, service contracts, memoran-
dum of understanding, capital design,
construction, acquisition, reconstruction,
rehabilitation and equipment; for health
and safety, preservation of facilities,
new facilities, program improvement or
program change, technology, environmental
protection, energy conservation, accredi-
tation, facilities for the physically
disabled and related projects, to be
developed by the city university of New
York in consultation with the senate
majority leader and approved by the direc-
tor of budget ................................. 28,500
University-wide
For health and safety projects ................... 9,000
--------------
Total ........................................ 235,500
==============
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for alterations and improvements to various facilities
including services and expenses, capital design, construction,
acquisition, reconstruction, rehabilitation and equipment; including
but not limited to health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
61 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
protection, energy conservation, accreditation, facilities for the
physically disabled, preventive maintenance and related projects,
including costs incurred prior to April 1, 2005, and subject to a
plan to be developed and submitted annually by the city university
of New York and approved by the state director of the budget, and
which may include, but not be limited to, projects in the following
schedule. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the dormitory authority of the state of New York for
such purpose (30560550) (15529) ... 69,000,000 ... (re. $21,139,000)
Project Schedule
AMOUNT
--------------------------------------------
(thousands of dollars)
For preliminary planning for
the renovation of Brooklyn
College's Roosevelt Hall ........... 2,500
For the City College Marshak
Building, provided however
that subdivision (b) of
section 6281 of the education
law, as amended by chapter
1081 of the laws of 1969,
shall apply to the dormitory
authority and/or the city
university construction fund,
as the letting agency, unless,
in its discretion, it deter-
mines to utilize a project
labor agreement for all work
performed in the renovation of
the Marshak science building,
the city college science
facility and the new science
research center at City
College, which means a prehire
collective bargaining agree-
ment between the agency and a
labor organization establish-
ing the labor organization as
the collective bargaining
representative for all persons
who will perform work pursuant
to all contracts for the
construction, reconstruction,
rehabilitation or improvement
of facilities, and which
provides that only contractors
and subcontractors who sign a
62 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
prenegotiated agreement with
the labor organization can
perform project work, when the
record supporting the decision
to enter into such an agree-
ment establishes that it is
justified by the interests
underlying the competitive
bidding laws ...................... 10,000
For matching grants for
Governors Island .................. 15,000
For university-wide critical
maintenance or capital
improvement costs at senior
and community colleges includ-
ing but not limited to: costs
attributable to the findings
of condition surveys for
health and safety; preserva-
tion of facilities and access
for the physically disabled;
code compliance; emergencies;
asbestos removal; energy
conservation; fire alarms,
sprinklers, electrical
distribution and heating and
cooling system requirements;
and other similar campus-wide
and systemwide needs, provided
however that subdivision (b)
of section 6281 of the educa-
tion law, as amended by chap-
ter 1081 of the laws of 1969,
shall apply to the dormitory
authority and/or the city
university construction fund,
as the letting agency, unless,
in its discretion, it deter-
mines to utilize a project
labor agreement for all work
performed in the renovation of
the Marshak science building,
the city college science
facility and the new science
research center at City
College, which means a prehire
collective bargaining agree-
ment between the agency and a
labor organization establish-
ing the labor organization as
63 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the collective bargaining
representative for all persons
who will perform work pursuant
to all contracts for the
construction, reconstruction,
rehabilitation or improvement
of facilities, and which
provides that only contractors
and subcontractors who sign a
prenegotiated agreement with
the labor organization can
perform project work, when the
record supporting the decision
to enter into such an agree-
ment establishes that it is
justified by the interests
underlying the competitive
bidding laws ...................... 41,500
--------------
Total ............................. 69,000
==============
By chapter 53, section 1, of the laws of 2004, as added by chapter 55,
section 4, of the laws of 2004:
Alterations and improvements to various facilities including services
and expenses, capital design, construction, acquisition, recon-
struction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventive
maintenance and related projects, including costs incurred prior to
April 1, 2004, and subject to a plan submitted annually by the city
university of New York and approved by the director of the budget
(30060450) (15502) ... 20,000,000 ................. (re. $3,013,000)
By chapter 53, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for alterations and improvements to various facilities
including services and expenses, capital design, construction,
acquisition, reconstruction, rehabilitation and equipment; for
health and safety, preservation of facilities, new facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2004, and which may include, but not be limited to,
projects in the following schedule. Notwithstanding any other law to
the contrary, all or a portion of the amounts hereby appropriated
may be suballocated or transferred to the dormitory authority of the
state of New York for such purpose (30030450) (15529) ..............
1,095,000,000 .................................... (re. $92,069,000)
64 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
AMOUNT
--------------------------------------------
(thousands of dollars)
Brooklyn College .................... 23,600
-West Quad Building
City College ....................... 108,000
-Science Facility, provided
however that subdivision
(b) of section 6281 of the
education law, as amended
by chapter 1081 of the
laws of 1969, shall apply
to the dormitory authority
and/or the city university
construction fund, as the
letting agency, unless, in
its discretion, it deter-
mines to utilize a project
labor agreement for all
work performed in the
renovation of the Marshak
science building, the city
college science facility
and the new science
research center at City
College, which means a
prehire collective
bargaining agreement
between the agency and a
labor organization estab-
lishing the labor organ-
ization as the collective
bargaining representative
for all persons who will
perform work pursuant to
all contracts for the
construction, recon-
struction, rehabilitation
or improvement of facili-
ties, and which provides
that only contractors and
subcontractors who sign a
prenegotiated agreement
with the labor organiza-
tion can perform project
work, when the record
supporting the decision to
enter into such an agree-
ment establishes that it
65 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
is justified by the inter-
ests underlying the
competitive bidding laws
-School of Architecture (Phase I)
Hunter College ...................... 95,000
-Science Lab Building (Phase I)
-Roosevelt House Rehabilitation
-Visual and Performing Arts Complex
John Jay College ................... 130,000
-Academic Facility (Phase II)
Lehman College ...................... 60,000
-Science Facility
New York City College
of Technology ................... 86,000
-Academic Complex I
Queens College ...................... 30,000
-Science Upgrades (Phase I),
including $15 million in
bond proceeds issued
pursuant to a capital
appropriation for Queens
College in chapter 53 of
the laws of 1998
Universitywide
-For a science research
center, excluding furni-
ture and equipment which
shall be secured from
private or other non-
state sources, provided
however that subdivision
(b) of section 6281 of the
education law, as amended
by chapter 1081 of the
laws of 1969, shall apply
to the dormitory authority
and/or the city university
construction fund, as the
letting agency, unless, in
its discretion, it deter-
mines to utilize a project
labor agreement for all
work performed in the
renovation of the Marshak
science building, the city
college science facility
and the new science
research center at City
College, which means a
prehire collective
66 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
bargaining agreement
between the agency and a
labor organization estab-
lishing the labor organ-
ization as the collective
bargaining representative
for all persons who will
perform work pursuant to
all contracts for the
construction, recon-
struction, rehabilitation
or improvement of facili-
ties, and which provides
that only contractors and
subcontractors who sign a
prenegotiated agreement
with the labor organiza-
tion can perform project
work, when the record
supporting the decision to
enter into such an agree-
ment establishes that it
is justified by the inter-
ests underlying the
competitive bidding laws ....... 176,000
-For science laboratory
upgrades ......................... 7,000
-For condition survey-
related health and safety
projects ........................ 75,000
-For condition survey-
related preservation of
facilities projects ............. 60,000
-For condition survey-
related projects related
to the americans with dis-
abilities act ................... 13,000
-For asbestos abatement ............ 7,000
-For capital staff .............. 41,400
-For network infrastructure
and telecommunications .......... 40,000
-For universitywide critical
maintenance or capital im-
provement costs for code
compliance; emergencies;
energy conservation; fire
alarms, sprinklers, elec-
trical distribution and
heating and cooling system
requirements; and other
67 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
similar campuswide and
systemwide needs, includ-
ing Governors Island ........... 143,000
--------------
Total ........................ 1,095,000
==============
By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
section 1, of the laws of 1999, for:
Alterations and improvements to provide a parent resource/day care
facility in the 17 Lexington Avenue Building at Baruch College
(302198C1) (15503) ... 1,000,000 .................... (re. $797,000)
Alterations and improvements to CUNY Libraries (302198C1) (15504) ...
10,800,000 ........................................ (re. $4,190,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Facilities for the Physically Disabled Purpose
By chapter 54, section 1, of the laws of 1995, for:
Alterations and improvements to make facilities accessible to the
physically disabled (30149504) (15507) ... .....................
1,257,000 ........................................... (re. $577,000)
By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
section 3, of the laws of 1992, for:
Alterations and improvements to make facilities accessible to the
physically disabled (30048704) (15507) ... .....................
1,206,000 ............................................. (re. $2,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 1993, for:
Alterations and improvements for health and safety pursuant to a plan,
based on the results of building condition surveys, to be submitted
for approval to the director of the budget on or before July 1,
1993. No funds shall be made available until such plan is approved
by the director of the budget (30029301) (15505) ...................
2,750,000 ........................................... (re. $854,000)
By chapter 54, section 1, of the laws of 1992, for:
Alterations and improvements for facilities for the physically disa-
bled (30A29201) (15523) ... ..... 1,128,000 ........ (re. $44,000)
By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
section 3, of the laws of 1995, for:
Alterations and improvements for health and safety (30018701) (15505)
... ..... 8,507,000 ................................. (re. $2,000)
68 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2022 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30032203) (15420) ... 284,222,000 .............. (re. $284,222,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 3,379
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 7,638
City College
Campus-wide maintenance to
various facilities ............................. 6,715
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................... 890
Honors college
Campus-wide maintenance to
various facilities ................................ 89
Hunter College
Campus-wide maintenance to
various facilities ............................. 6,331
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 1,359
Lehman College
Campus-wide maintenance to
various facilities ............................. 3,796
Medgar Evers College
69 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance to
various facilities ............................. 1,453
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 1,874
Queens College
Campus-wide maintenance to
various facilities ............................. 6,125
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 5,117
York College
Campus-wide maintenance to
various facilities ............................. 2,099
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,220
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,396
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,147
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,171
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,020
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,098
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
70 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
technology initiative needs ...................... 6,659
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,026
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 300
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 181,222
--------------
Total ....................................... 284,222
--------------
For additional services and expenses related to alterations and
improvements to existing facilities for capital maintenance, includ-
ing but not limited to capital design, construction, reconstruction,
rehabilitation, and equipment; for health and safety, preservation
of facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2022 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30A22208)
(40802) ... 60,000,000 ........................... (re. $60,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2021 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30032103) (15420) ... 284,222,000 .............. (re. $262,719,000)
71 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 3,379
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 7,638
City College
Campus-wide maintenance to
various facilities ............................. 6,715
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................... 890
Honors college
Campus-wide maintenance to
various facilities ................................ 89
Hunter College
Campus-wide maintenance to
various facilities ............................. 6,331
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 1,359
Lehman College
Campus-wide maintenance to
various facilities ............................. 3,796
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 1,453
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 1,874
Queens College
Campus-wide maintenance to
various facilities ............................. 6,125
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 5,117
York College
Campus-wide maintenance to
various facilities ............................. 2,099
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,220
For university-wide maintenance or
capital improvement costs at senior
72 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,396
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,147
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,171
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,020
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,098
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,659
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,026
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 300
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 181,222
--------------
Total ....................................... 284,222
--------------
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
73 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2020 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30032003) (15420) ... 284,222,000 .............. (re. $243,260,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 3,370
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 7,640
City College
Campus-wide maintenance to
various facilities ............................. 6,700
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................... 890
Honors college
Campus-wide maintenance to
various facilities ................................ 90
Hunter College
Campus-wide maintenance to
various facilities ............................. 6,330
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 1,360
Lehman College
Campus-wide maintenance to
various facilities ............................. 3,800
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 1,450
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 1,870
Queens College
Campus-wide maintenance to
74 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
various facilities ............................. 6,140
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 5,110
York College
Campus-wide maintenance to
various facilities ............................. 2,110
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,210
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,400
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,140
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,150
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,070
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,080
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,070
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,640
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,050
For university-wide maintenance or
capital improvement costs at senior
75 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to CUNY TV
renovation needs ................................... 300
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 181,222
--------------
Total ........................................ 284,222
--------------
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2019 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30031903) (15420) ... 284,222,000 .............. (re. $221,366,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 3,379
Brooklyn College
Campus-wide maintenance to
various facilities ............................. 8,005
City College
Campus-wide maintenance to
various facilities ............................. 6,716
Graduate School and University Center
Campus-wide maintenance to
various facilities ............................. 1,373
Honors college
Campus-wide maintenance to
various facilities ................................ 98
Hunter College
Campus-wide maintenance to
various facilities ............................. 6,331
John Jay College of Criminal Justice
76 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance to
various facilities ............................... 848
Lehman College
Campus-wide maintenance to
various facilities ............................. 4,166
Medgar Evers College
Campus-wide maintenance to
various facilities ............................... 703
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 1,903
Queens College
Campus-wide maintenance to
various facilities ............................. 6,125
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 5,118
York College
Campus-wide maintenance to
various facilities ............................. 2,100
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,220
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,396
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to ADA needs ............... 6,147
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,171
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,020
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,098
For university-wide maintenance or
77 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,049
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,659
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,024
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 300
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 181,222
--------------
Total ........................................ 284,222
==============
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2018 and subject to a
plan developed and submitted annually by the city university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30031803) (15420) ... 284,222,000 .............. (re. $153,975,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Baruch College
Campus-wide maintenance to
various facilities ............................. 2,511
Brooklyn College
Campus-wide maintenance to
78 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
various facilities ............................. 5,433
City College
Campus-wide maintenance to
various facilities ............................. 8,136
Graduate School and University Center
Campus-wide maintenance to
various facilities ................................ 25
Honors college
Campus-wide maintenance to
various facilities ................................ 25
Hunter College
Campus-wide maintenance to
various facilities ............................. 5,799
John Jay College of Criminal Justice
Campus-wide maintenance to
various facilities ............................. 3,193
Lehman College
Campus-wide maintenance to
various facilities ............................. 2,438
Medgar Evers College
Campus-wide maintenance to
various facilities ............................. 3,096
New York City College of Technology
Campus-wide maintenance to
various facilities ............................. 3,485
Queens College
Campus-wide maintenance to
various facilities ............................. 5,433
College of Staten Island
Campus-wide maintenance to
various facilities ............................. 2,877
York College
Campus-wide maintenance to
various facilities ............................. 3,899
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for health and safety
needs ............................................ 9,270
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to the findings of
condition surveys for preservation of
facilities needs ................................ 12,463
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to mechanical and
infrastructure needs ............................. 7,210
For university-wide maintenance or
capital improvement costs at senior
79 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
colleges attributable to ADA needs ................6,180
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to certificate of
occupancy/public assembly needs .................. 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to energy
conservation needs ............................... 4,120
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science lab
upgrade needs .................................... 2,060
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to bathroom
facilities upgrade needs ......................... 1,030
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to educational
technology initiative needs ...................... 6,695
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to science and
technology equipment needs ....................... 5,047
For university-wide maintenance or
capital improvement costs at senior
colleges attributable to CUNY TV
renovation needs ................................... 515
For university-wide priority capital
maintenance or capital improvement
projects to support the preservation
of facilities .................................. 181,222
--------------
Total ........................................ 284,222
==============
By chapter 53, section 1, of the laws of 1997:
Alterations and improvements for preservation of facilities (30039703)
(15506) ... ..... 3,300,000 ..................... (re. $2,242,000)
By chapter 53, section 1, of the laws of 1996, for:
Alterations and improvements to roofs on various buildings at Brooklyn
College (30299603) (15524) ... 300,000 .............. (re. $300,000)
By chapter 54, section 1, of the laws of 1995, for:
Alterations and improvements to roofs on various buildings (30239503)
(15524) ... ..... 5,933,000 ..................... (re. $2,524,000)
By chapter 54, section 1, of the laws of 1994, for:
80 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Alterations and improvements to roofs (30039403) (15524) .............
5,579,000 ........................................... (re. $236,000)
By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
section 3, of the laws of 1992, for:
Alterations and improvements for preservation of facilities (30A39003)
(15506) ... ..... 9,947,000 ....................... (re. $275,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 1995, for:
Alterations and improvements to child care facilities (30289508)
(15509) ... ..... 1,306,000 ....................... (re. $736,000)
By chapter 54, section 1, of the laws of 1994, for:
Planning for master plans, including telecommunications and predesign
project estimates (30389408) (15525) ... .........................
1,000,000 ........................................... (re. $398,000)
PROGRAM CHANGES - EXPANSION AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2022 and subject to a plan developed and submitted annually
by the city university of New York and approved by the director of
the budget (30A12208) (40811) ... 425,000,000 ... (re. $425,000,000)
For additional services and expenses related to alterations and
improvements to various facilities including but not limited to
capital design, construction, reconstruction, rehabilitation, and
equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2022 and subject to a plan devel-
oped and submitted annually by the city university of New York and
approved by the director of the budget (30A42208) (40812) ...
110,000,000 ..................................... (re. $110,000,000)
81 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses related to alterations and improvements to
facilities and capital maintenance for the CUNY School of Labor and
Urban Studies (30A32208) (40813) ... 3,000,000 .... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2021:
For the capital costs of training and educational programs in offshore
wind power, wind power, and other green energy fields (30GE2108)
(40810) ... 10,000,000 ........................... (re. $10,000,000)
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2021 and subject to a plan developed and submitted annually
by the city university of New York and approved by the director of
the budget (30A12108) (40811) ... 100,000,000 ... (re. $100,000,000)
Capital Projects Funds - Other
City University Capital Projects Fund - 32250
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2022:
For services and expenses of capital improvements, available to city
university of New York senior colleges as defined in section 6203 of
the education law subject to a plan approved by the Director of the
Budget. Funding from this appropriation shall be available for, but
not limited to, service contracts, memoranda of understanding, capi-
tal design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs including costs
incurred prior to April 1, 2020 (30MB2008) (40807) .................
100,000,000 ..................................... (re. $100,000,000)
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
82 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects, including costs incurred prior to April 1, 2017 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1750)
(81067) ... 80,353,000 ........................... (re. $38,614,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Bronx Community College
Critical Maintenance ........... 42,000 21,000
Student Success Center ......... 14,000 7,000
STEM Resource Center ........... 300 150
Borough Manhattan Community College
Cooling Tower Rehab ............ 3,600 1,800
Gymnasium Light Replacement .... 700 350
Hostos Community College
One Stop Student Services Center 7,700 3,850
Kingsborough Community College
Roof Replacements .............. 2,000 1,000
Marina Upgrades ................ 500 250
Science Equipment .............. 454 227
LaGuardia Community College
Center for Career and Employment
Training ....................... 6,774 3,387
Queensborough Community College
Roof Repairs ................... 2,400 1,200
Kitchen and Cafeteria Renovation 5,600 2,800
For university-wide community college
critical maintenance or capital
improvement costs attributable to
preservation of facilities ..... 60,678 30,339
For university-wide community college
critical maintenance or capital
improvement costs attributable to
facilities which support ASAP
programs ....................... 14,000 7,000
------- ------
Total ........................ 160,706 80,353
======= ======
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
83 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2016 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1650)
(81067) ... 61,640,000 ........................... (re. $13,338,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Bronx Community College
Alumni Locker Room Accessibility 500 250
EOC Headquarter Renovation ..... 1,000 500
Campus Utility Upgrade ......... 8,000 4,000
Gould Library Rotunda Staircase 1,330 665
Fire Alarm Upgrades ............ 2,908 1,454
Lowe Hall ADA Improvements ..... 500 250
Borough Manhattan Community College
Lighting Controls and Sensors .. 1,552 776
Variable Frequency Drives ...... 1,934 967
Community Room HVAC ............ 2,700 1,350
Perimeter Security Lighting .... 600 300
199 Chambers Upgrade ........... 4,596 2,298
Hostos Community College
Summer Boiler .................. 206 103
Technology Upgrades ............ 430 215
Kingsborough Community College
Pool Renovations ............... 2,000 1,000
Marina Reconstruction .......... 1,500 750
LaGuardia Community College
Staircase Lighting ............. 160 80
Center 3 Infrastructure Upgrades 20,000 10,000
Business and Entrepreneurial
Training Center .............. 6,800 3,400
M Building Boiler Replacement .. 546 273
E and C Building Cooling Towers 688 344
Chiller Plant .................. 17,964 8,982
Queensborough Community College
84 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Upgrade Research Labs .......... 3,200 1,600
Central Chiller Plant .......... 2,000 1,000
Electrical System Upgrade ...... 7,980 3,990
Kitchen and Cafeteria Renovation 2,000 1,000
For university-wide community college
critical maintenance or capital
improvement costs attributable to
health and safety .............. 14,524 7,262
For university-wide community college
critical maintenance or capital
improvement costs attributable to
preservation of facilities ..... 17,462 8,731
For university-wide community college
critical maintenance or capital
improvement costs attributable to
assistive technology ........... 200 100
------- ------
Total ........................ 123,280 61,640
======= ======
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2015 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30C11550)
(40801) ... 4,503,000 ............................. (re. $4,503,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Hostos Community College
Allied Health and Sciences
Building Complex ............. 9,006 4,503
------- ------
Total ........................ 9,006 4,503
======= ======
85 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
acquisition, reconstruction, rehabilitation and equipment; for
health and safety, preservation of facilities, new facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2015 subject to an annual plan developed by the city
university and approved by the state director of the budget, and
which may include, but not be limited to, projects in the following
schedule. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the dormitory authority of the state of New York for
such purpose (30CC1550) (81067) ... 16,422,000 ... (re. $11,799,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Bronx Community College
Ohio Track and Field Restoration 750 375
Monument Hill Restoration ...... 400 200
Gould Memorial Library Windows . 900 450
Bliss Hall ADA Improvements .... 600 300
Computer and Lab Upgrades ...... 70 35
Hostos Community College
475 Grand Concourse HVAC Upgrades 3,000 1,500
Kingsborough Community College
Pool Upgrades .................. 2,000 1,000
Science and Resiliency Institute 10,000 5,000
LaGuardia Community College
Faculty Offices and Training Center 1,500 750
Tech Center .................... 200 100
Queensborough Community College
Roof Repairs ................... 1,700 850
Central Kitchen and
Cafeteria Renovation ........... 1,100 550
For university-wide community college
critical maintenance or capital
improvement costs attributable to
the preservation of facilities . 4,064 2,032
For university-wide community college
critical maintenance or capital
improvement costs attributable to
accelerated conservation and
efficiency projects ............ 6,560 3,280
------- ------
86 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Total ........................ 32,844 16,422
======= ======
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to existing facilities including
services and expenses, capital design, construction, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, and related projects, including costs incurred
prior to April 1, 2014 subject to an annual plan developed by the
city university and approved by the state director of the budget,
and which may include, but not be limited to, projects in the
following schedule. Notwithstanding any other law to the contrary,
all or a portion of the amounts hereby appropriated may be suballo-
cated or transferred to the dormitory authority of the state of New
York for such purpose (30CC1450) (81067) ...........................
15,628,000 ........................................ (re. $5,265,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Campus-wide critical maintenance
to various facilities .......... 3,500 1,750
Bronx Community College
Campus-wide critical maintenance
to various facilities .......... 2,200 1,100
Kingsborough Community College
Campus-wide critical maintenance
to various facilities .......... 3,000 1,500
LaGuardia Community College
Campus-wide critical maintenance
to various facilities .......... 6,000 3,000
Queensborough Community College
Campus-wide critical maintenance
to various facilities .......... 5,500 2,750
For university-wide community college
critical maintenance or capital
improvement costs attributable to
the preservation of facilities . 5,456 2,728
For university-wide community college
critical maintenance or capital
improvement costs attributable to
87 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
accelerated conservation and
efficiency projects ............ 5,600 2,800
------- ------
Total ........................ 31,256 15,628
======= ======
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2013 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1350)
(81067) ... 8,100,000 ............................. (re. $1,264,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Campus-wide critical maintenance
to various facilities .......... 2,000 1,000
Bronx Community College
Campus-wide critical maintenance
to various facilities .......... 2,850 1,425
Hostos Community College
Campus-wide critical maintenance
to various facilities .......... 3,500 1,750
Kingsborough Community College
Campus-wide critical maintenance
to various facilities .......... 1,650 825
LaGuardia Community College
Campus-wide critical maintenance
to various facilities .......... 2,000 1,000
Queensborough Community College
Campus-wide critical maintenance
to various facilities .......... 4,200 2,100
------- ------
88 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Total ........................ 16,200 8,100
======= ======
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2012 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1250)
(81067) ... 26,704,000 ........................... (re. $18,209,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Campus-wide critical maintenance
to various facilities .......... 14,400 7,200
Bronx Community College
Campus-wide critical maintenance
to various facilities .......... 6,000 3,000
Kingsborough Community College
Campus-wide critical maintenance
to various facilities .......... 7,500 3,750
Health Technologies Education
Center ......................... 4,908 2,454
LaGuardia Community College
Center 3 Facade Replacement .... 3,800 1,900
Campus-wide critical maintenance
to various facilities .......... 6,800 3,400
Queensborough Community College
Central Kitchen/Cafeteria ...... 2,400 1,200
Campus-wide critical maintenance
to various facilities .......... 7,600 3,800
------- ------
Total ........................ 55,408 26,704
======= ======
89 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2011 subject to
an annual plan developed by the city university and approved by the
state director of the budget which shall include projects in the
following schedule. Notwithstanding any other law to the contrary,
all or a portion of the amounts hereby appropriated may be suballo-
cated or transferred to the dormitory authority of the state of New
York for such purpose (30CC1150) (81067) ...........................
31,239,000 ....................................... (re. $19,925,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Theater Upgrades and
Equipment ...................... 3,400 1,700
Bronx Community College
Campus-wide Roofing,
Ph. I .......................... 4,068 2,034
Kingsborough Community College
Theater Upgrades and Sciences Bldg-
Infrastructure ................. 5,150 2,575
T2 Building Upgrades ........... 7,200 3,600
LaGuardia Community College
Center 3 Facade, Ph. I ......... 5,000 2,500
Center 3 Upgrades .............. 1,000 500
Campus Improvements ............ 10,000 5,000
Queensborough Community College
Central Kitchen/Dining Hall
Renovation ..................... 8,660 4,330
Upgrade Campus-wide Electrical
System, Ph. II ................. 18,000 9,000
------- ------
Total ........................ 62,478 31,239
======= ======
By chapter 53, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
90 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2010 subject to
an annual plan developed by the city university and approved by the
state director of the budget which shall include projects in the
following schedule. Notwithstanding any other law to the contrary,
all or a portion of the amounts hereby appropriated may be suballo-
cated or transferred to the dormitory authority of the state of New
York for such purpose (30CC1050) (81067) ...........................
34,563,000 ........................................ (re. $5,537,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Central Plant Upgrades,
199 Chambers Street .......... 14,000 7,000
Bronx Community College
Campus-wide Utility Upgrades,
Ph. I ........................ 18,626 9,313
Kingsborough Community College
Mechanical and Infrastructure
Improvements ................... 4,000 2,000
LaGuardia Community College
Conference Facility Space ...... 2,000 1,000
Center 3 Office Space and
Elevators .................... 2,500 1,250
Facility Upgrades .............. 10,000 5,000
Queensborough Community College
Upgrade Campus-wide Electrical
System, Ph. I ................ 18,000 9,000
------- ------
Total ........................ 69,126 34,563
======= ======
By chapter 53, section 1, of the laws of 2008:
State financial assistance to community colleges for alterations and
improvements to various facilities for minor rehabilitation, includ-
ing but not limited to capital design, construction, acquisition,
reconstruction, rehabilitation, and equipment; for health and safe-
ty, preservation of facilities, program improvement or program
91 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
change, environmental protection, energy conservation, accredi-
tation, facilities for the physically disabled, preventative mainte-
nance and related projects, including costs incurred prior to April
1, 2008, and subject to a plan submitted annually by the city
university of New York and approved by the director of the budget
(30110850) (15514) ... 2,750,000 .................. (re. $2,750,000)
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities for
capital critical maintenance and strategic initiatives, including
but not limited to capital design, construction, acquisition, recon-
struction, rehabilitation, and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2008, and subject to a plan developed and submitted annual-
ly by the city university of New York and approved by the director
of the budget, and which may include, but not be limited to,
projects in the following schedule. Notwithstanding any other law to
the contrary, all or a portion of the amounts hereby appropriated
may be suballocated or transferred to the dormitory authority of the
state of New York for such purpose (30090850) (15518) ..............
206,908,000 ...................................... (re. $40,816,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community
College
Fiterman Hall .................. 102,200 51,100
Bronx Community College
North Instructional Building ... 24,762 12,381
Backflow Prevention Devices .... 3,400 1,700
Campus-wide Roof Replacement ... 1,932 966
Hostos Community College
500 Grand Concourse ............ 18,446 9,223
Kingsborough Community College
Laboratories and Mechanical
Infrastructure Upgrade Phase I . 5,000 2,500
Medgar Evers College
Academic Building I ............ 68,346 34,173
Carroll Street Building ........ 12,000 6,000
University-wide
CUNY ERP (CUNY FIRST) .......... 27,600 13,800
92 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Administration ......... 15,430 7,715
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to the findings
of condition surveys for health
and safety needs ............... 35,000 17,500
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to the findings
of condition surveys for
preservation of facilities needs 35,000 17,500
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to ADA needs ...... 15,000 7,500
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to certificate of
occupancy/public assembly needs 18,000 9,000
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to energy
conservation needs ............. 18,000 9,000
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to science lab
upgrade needs .................. 7,200 3,600
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to educational
technology initiative needs .... 4,000 2,000
For university-wide critical main-
tenance or capital improvement
costs at community colleges
attributable to athletic
facilities upgrade needs ....... 2,500 1,250
------------ ------------
Total .......................... 413,816 206,908
============ ============
By chapter 53, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
93 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2007 subject to
an annual plan developed by the city university and approved by the
state director of the budget which shall include projects in the
following schedule. Notwithstanding any other law to the contrary,
all or a portion of the amounts hereby appropriated may be suballo-
cated or transferred to the dormitory authority of the state of New
York for such purpose (30660750) (81067) ...........................
40,800,000 ........................................ (re. $2,862,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough of Manhattan Community College
Fiterman Hall Replacement ...... 40,000 20,000
Bronx Community College
Mechanical Systems Upgrades .... 1,800 900
Medgar Evers
Academic Building I ............ 22,000 11,000
For University-wide critical
maintenance or capital im-
provement costs at community
colleges attributable to the
findings of condition sur-
veys for health and safety
needs .......................... 4,800 2,400
For university-wide critical
maintenance or capital im-
provement costs at community
colleges attributable to the
findings of condition sur-
veys for preservation of
facilities needs ............... 3,000 1,500
For university-wide critical
maintenance or capital im-
provement costs at community
colleges to correct defic-
iencies in the mechanical,
electrical and plumbing
infrastructure ................. 10,000 5,000
------- -------
Total .......................... 81,600 40,800
======= =======
94 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2006 subject to
an annual plan developed by the city university which shall include
projects in the following schedule. Notwithstanding any other law to
the contrary, all or a portion of the amounts hereby appropriated
may be suballocated or transferred to the dormitory authority of the
state of New York for such purpose (30660650) (81067) ..............
8,769,000 ......................................... (re. $1,474,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Medgar Evers College
Theater ........................ 3,450 1,725
Auditorium ..................... 14,088 7,044
------- ------
Total .......................... 17,538 8,769
======= ======
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
Additional advance for state financial assistance to community
colleges for alterations and improvements to various facilities
including capital design, construction, acquisition, reconstruction,
rehabilitation, equipment and personal service costs; for health and
safety, preservation of facilities, new facilities, program improve-
ment or program change, environmental protection, energy conserva-
tion, accreditation, facilities for the physically disabled and
related projects including costs incurred prior to April 1, 2006.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30660650) (81067) ... 66,580,000 ................ (re. $21,119,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
95 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Borough of Manhattan Community
College
Fiterman Hall Replacement ...... 15,000 7,500
Chambers Street Renovations
Phase II ....................... 14,000 7,000
Bronx Community College
Mechanical System Upgrades ..... 6,000 3,000
Hostos Community College
Renovations in 475 Grand Concourse 6,000 3,000
Kings Borough Community College
Air conditioning T5 ............ 218 109
Renovation of former auditorium T2
building as learning resource
center ......................... 2,000 1,000
Air conditioning T4 ............ 942 471
Mechanical System Upgrades ..... 6,000 3,000
Laguardia Community College
Renovations of Center 3 ........ 14,000 7,000
Acquisition and Renovation
of an Additional Educational
Building ....................... 55,000 27,500
Medgar Evers
Academic I ..................... 8,000 4,000
Queensborough Community College
Renovation of Science Building . 6,000 3,000
-------- --------
Total ........................ 133,160 66,580
======== ========
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2005 subject to
an annual plan developed by the city university which shall include
projects in the following schedule. Notwithstanding any other law to
the contrary, all or a portion of the amounts hereby appropriated
may be suballocated or transferred to the dormitory authority of the
state of New York for such purpose (30590550) (81067) ..............
105,849,000 ....................................... (re. $7,638,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
96 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Queensborough Community College
Holocaust Resource Center ......... 3,000 1,500
Instruction Building Planning
and Design Costs .................. 4,948 2,474
Upgrade Campus Wide Electric
System ............................ 1,000 500
Upgrade Campus Wide Drainage
System ............................ 1,000 500
Kingsborough Community College
Roof Replacement .................. 3,000 1,500
Additional Roof Replacement ....... 3,000 1,500
Fire Alarm Rehab .................. 6,256 3,128
Gymnasium ......................... 6,060 3,030
Marine/Academic Center ............ 5,050 2,525
Primary Arts Center ................. 850 425
Hostos Community College
475 Grand Concourse Renovation .... 4,948 2,474
Site Acquisition .................... 750 375
LaGuardia Community College
Center 3 Renovations, Phase II .... 5,346 2,673
Department of Humanities
Renovation ....................... 17,012 8,506
Department of Computer Information
Systems .......................... 21,000 10,500
Medgar Evers College
Athletic Fields ................... 1,960 980
Bronx Community College
North Instructional Building ..... 60,962 30,481
Mechanical Systems &
Infrastructure Upgrade Phase 1 .... 4,074 2,037
Borough Manhattan Community College
Training Program for Emergency
First Response ................... 21,400 10,700
North campus building ............. 2,000 1,000
Chambers Street Renovation Phase
II ................................ 5,506 2,753
Universitywide
For condition assessment: Health
and Safety ........................ 9,762 4,881
For condition assessment:
Facilities Preservation ........... 3,994 1,997
For condition assessment: ADA ..... 3,820 1,910
For construction, acquisition,
renovation or rehabilitation of
facilities including equipment and
other necessary incidental costs
related to the CUNY Incubator
97 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Network .......................... 15,000 7,500
------- -------
Total ......................... 211,698 105,849
======= =======
By chapter 53, section 1, of the laws of 2003:
State financial assistance to community colleges for alterations and
improvements to various facilities including services and expenses,
capital design, construction, acquisition, reconstruction, rehabili-
tation and equipment; for health and safety, preservation of facili-
ties, new facilities, program improvement or program change, envi-
ronmental protection, energy conservation, accreditation, facilities
for the physically disabled, preventive maintenance and related
projects, including costs incurred prior to April 1, 2003, and
subject to a plan submitted annually by the city university of New
York and approved by the state director of the budget (30020350)
(15514) ... 5,000,000 ............................. (re. $3,711,000)
By chapter 53, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including
services and expenses, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2003, subject
to an annual plan developed by the city university and approved by
the state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30050350)
(81067) ... 50,000,000 ........................... (re. $48,248,000)
Project Schedule
AMOUNT
--------------------------------------------
(thousands of dollars)
Medgar Evers College ................ 19,400
-Academic Building I
University-wide ..................... 30,600
-For university-wide crit-
ical maintenance or capi-
tal improvement costs
attributable to the find-
ings of condition surveys
for health and safety,
preservation of facilities
98 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and access for the phys-
ically disabled; code
compliance; asbestos
removal; emergencies;
energy conservation needs;
fire alarms, sprinklers,
electrical distribution
and heating and cooling
system requirements; and
other similar campus-wide
and system-wide needs
------------
Total ........................... 50,000
============
By chapter 53, section 1, of the laws of 1998, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including capital
design, construction, acquisition, reconstruction, rehabilitation
and equipment; for health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, and related projects according to the following
project schedule. Notwithstanding any other law to the contrary, all
or a portion of the amounts hereby appropriated may be suballocated
or transferred to the dormitory authority of the state of New York
for such purpose (303198C1) (81067) ................................
109,700,000 ...................................... (re. $14,375,000)
Project Schedule
AMOUNT
--------------------------------------------
(thousands of dollars)
For payment of up to one-
half of the total capital
costs for community
colleges for health and
safety projects based on
the results of building
condition surveys ............... 1,500
For payment of up to one-
half of the total capital
costs for community
colleges for asbestos
removal and abatement ........... 1,000
For payment of up to one-
half of the total capital
costs for community
colleges for preservation
99 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of facilities projects
based on the results of
building condition surveys ...... 2,000
For payment of up to one-
half of the total capital
costs for community
colleges for making
facilities accessible to the
physically disabled based
on the results of building
condition surveys ............... 1,000
For payment of up to one-
half of the total capital
costs for community
colleges for the
telecommunications initiative ... 2,000
For payment of up to one-
half of the total capital
costs for community
colleges for energy
conservation .................... 1,000
For payment of up to one-
half of the total capital
costs for community
colleges for the
educational technology
equipment initiative ............ 1,500
An additional advance for
state financial assistance
to community colleges for
alterations and
improvements to various
facilities including capital
design, construction,
acquisition, reconstruction,
rehabilitation and
equipment; for health and
safety, preservation of
facilities, new facilities,
program improvement or
program change, environ-
mental protection, energy
conservation, accredita-
tion, facilities for the
physically disabled, and
related projects according
to the following project
schedule (303198C1) ............ 99,700
--------------
Total ......................... 109,700
100 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
==============
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities, including services and expenses, capital design,
construction, reconstruction, rehabilitation and equipment; for
health and safety, preservation of facilities, new facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2022 subject to an annual plan developed by the city
university and approved by the state director of the budget.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the dormitory authority of the state of New York for such purpose
(30CC2203) (81067) ... 44,793,000 ................ (re. $44,793,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2021 subject to
an annual plan developed by the city university and approved by the
state director of the budget. Notwithstanding any other law to the
contrary, all or a portion of the amounts hereby appropriated may be
suballocated or transferred to the dormitory authority of the state
of New York for such purpose (30CC2103) (81067) ....................
35,482,000 ....................................... (re. $35,482,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2020 subject to
an annual plan developed by the city university and approved by the
state director of the budget. Notwithstanding any other law to the
contrary, all or a portion of the amounts hereby appropriated may be
101 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
suballocated or transferred to the dormitory authority of the state
of New York for such purpose (30CC2003) (81067) ....................
64,254,000 ....................................... (re. $64,254,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2019 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1903)
(81067) ... 68,293,000 ........................... (re. $65,085,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough Manhattan Community College
Childhood Center HVAC Upgrades ... 2,176 1,088
Door and Access Upgrades ......... 1,850 925
Bronx Community College
Alumni Gym HVAC and ADA Upgrades.. 6,000 3,000
Meister Hall Lab and Classroom
Upgrades ....................... 800 400
Hostos Community College
Classroom Upgrades ............... 3,000 1,500
500 Grand Concourse Upgrades ..... 4,000 2,000
Kingsborough Community College
Performing Arts Center Upgrades .. 4,000 2,000
LaGuardia Community College
Center 3 Infrastructure and
Program Upgrades ............... 62,000 31,000
Student Tutoring Hub ............. 8,200 4,100
Library Upgrades Ph. II .......... 300 150
Queensborough Community College
ASAP Facility Upgrades ........... 2,700 1,350
For university-wide community college
critical maintenance or capital
improvement costs attributable to
102 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
preservation of facilities ....... 34,284 17,142
For university-wide community college
critical maintenance or capital
improvement costs attributable to
the accelerated conservation and
efficiency program ............... 1,196 598
For university-wide community college
critical maintenance or capital
improvement costs attributable to
facilities which support the CUNY
in the Heights programs .......... 6,080 3,040
------- ------
Total .......................... 136,586 68,293
======= ======
By chapter 54, section 1, of the laws of 2018:
For services and expenses for state financial assistance to community
colleges for alterations and improvements to various facilities
including services and expenses, capital design, construction,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities program improvement or
program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2018 subject to
an annual plan developed by the city university and approved by the
state director of the budget, and which may include, but not be
limited to, projects in the following schedule. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the dormitory
authority of the state of New York for such purpose (30CC1803)
(81067) ... 48,483,000 ........................... (re. $44,856,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Borough Manhattan Community College
Lighting Upgrades .............. 2,650 1,325
Pedestrian Walkway Upgrades .... 1,800 900
Bronx Community College
Student Center Exterior Renovation 1,000 500
Goud Memorial Library Restoration. 4,000 2,000
Community Hall Renovation ...... 1,000 500
Student Center ADA Upgrades .... 800 400
Hostos Community College
Lighting Upgrade ............... 750 375
Electrical System Upgrades ..... 500 250
Kingsborough Community College
103 12554-05-3
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Marina Upgrades ................ 3,000 1,500
Roadway Upgrades ............... 1,500 750
LaGuardia Community College
Science Lab Renovations ........ 10,200 5,100
Queensborough Community College
Theater Upgrades ............... 2,200 1,100
Kitchen and Cafeteria Renovation 6,400 3,200
For university-wide community college
critical maintenance or capital
improvement costs attributable to
preservation of facilities ..... 58,166 29,083
For university-wide community college
critical maintenance or capital
improvement costs attributable to
facilities which support ASAP
programs ....................... 3,000 1,500
------- ------
Total ........................ 96,966 48,483
======= ======
104 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 481,242,000 1,130,747,000
---------------- ----------------
All Funds ........................ 481,242,000 1,130,747,000
================ ================
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................ 109,242,000
--------------
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (10FM23MO)
(81107) .................................... 109,242,000
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) ... 372,000,000
--------------
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Administration Purpose
For the preparation and review of plans,
specifications, estimates, studies, plant
evaluations, inspections, appraisals and
surveys, and legal claims relating to
existing or proposed facilities of the
department of corrections and community
supervision, and payment of personal
service and nonpersonal service, including
fringe benefits, related to the adminis-
tration and security of capital projects
provided by the department of corrections
and community supervision for new and
reappropriated projects (10502350) (81065)
............................................. 16,000,000
Capital Projects Funds - Other
105 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2023-24
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Environmental Protection or Improvements Purpose
Alterations and improvements, including
related departmental administrative costs,
for environmental protection or improve-
ments including liabilities incurred prior
to April 1, 2023 (10062306) (81062) ......... 23,000,000
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Health and Safety Purpose
Alterations and improvements, including
related departmental administrative costs,
for health and safety including liabil-
ities incurred prior to April 1, 2023
(10012301) (81028) .......................... 23,000,000
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Preservation of Facilities Purpose
Alterations and improvements, including
related departmental administrative costs,
for the preservation of facilities includ-
ing liabilities incurred prior to April 1,
2023 (10032303) (81010) .................... 205,000,000
Alterations and improvements, including
related departmental administrative costs,
for preventative maintenance that will
prolong the useful life of assets includ-
ing liabilities incurred prior to April 1,
2023 (10M32303) (81091) ..................... 15,000,000
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Program Improvement or Program Change Purpose
Alterations and improvements, including
related departmental administrative costs,
for program improvement or program change
including liabilities incurred prior to
April 1, 2023 (10082308) (81063) ............ 87,000,000
Alterations and improvements within the
correctional industries program, including
related departmental administrative costs,
for program improvement or program change
106 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2023-24
including liabilities incurred prior to
April 1, 2023 (10IN2308) (19701) ............. 3,000,000
107 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (10FM22MO) (81107) .....
107,100,000 ..................................... (re. $107,100,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (10FM21MO) (81107) .....
105,000,000 ....................................... (re. $2,306,000)
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Administration Purpose
By chapter 54, section 1, of the laws of 2022:
For the preparation and review of plans, specifications, estimates,
studies, plant evaluations, inspections, appraisals and surveys, and
legal claims relating to existing or proposed facilities of the
department of corrections and community supervision, and payment of
personal service and nonpersonal service, including fringe benefits,
related to the administration and security of capital projects
provided by the department of corrections and community supervision
for new and reappropriated projects (10502250) (81065) .............
16,000,000 ........................................ (re. $7,861,000)
By chapter 54, section 1, of the laws of 2021:
For the preparation and review of plans, specifications, estimates,
studies, plant evaluations, inspections, appraisals and surveys, and
legal claims relating to existing or proposed facilities of the
department of corrections and community supervision, and payment of
personal service and nonpersonal service, including fringe benefits,
related to the administration and security of capital projects
provided by the department of corrections and community supervision
for new and reappropriated projects (10502150) (81065) .............
16,000,000 ........................................... (re. $99,000)
108 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019:
For the preparation and review of plans, specifications, estimates,
studies, plant evaluations, inspections, appraisals and surveys, and
legal claims relating to existing or proposed facilities of the
department of corrections and community supervision, and payment of
personal service and nonpersonal service, including fringe benefits,
related to the administration and security of capital projects
provided by the department of corrections and community supervision
for new and reappropriated projects (10501950) (81065) .............
17,000,000 ........................................... (re. $74,000)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Environmental Protection or Improvements Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2022 (10062206) (81062)
... 23,000,000 ................................... (re. $23,000,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2021 (10062106) (81062)
... 23,000,000 ................................... (re. $18,094,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2020 (10062006) (81062)
... 23,000,000 ................................... (re. $10,135,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2019 (10061906) (81062)
... 24,000,000 .................................... (re. $2,774,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2018 (10061806) (81062)
... 24,000,000 ...................................... (re. $118,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2017 (10061706) (81062)
... 24,000,000 ...................................... (re. $587,000)
109 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2016 (10061606) (81062)
... 62,000,000 .................................... (re. $8,906,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2013 (10061306) (81062)
... 28,000,000 ...................................... (re. $142,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2012 (10061206) (81062)
... 24,000,000 ...................................... (re. $108,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements, including related departmental adminis-
trative costs, for environmental protection or improvements includ-
ing liabilities incurred prior to April 1, 2011 (10061106) (81062)
... 24,000,000 ........................................ (re. $5,000)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Facilities for the Physically Disabled Purpose
By chapter 54, section 1, of the laws of 2000:
Alterations and improvements, including related departmental adminis-
trative costs, of facilities for the physically disabled including
liabilities incurred prior to April 1, 2000 (10A40004) (81061)
2,000,000 ............................................ (re. $32,000)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2022 (10012201) (81028) ..........................
23,000,000 ....................................... (re. $22,981,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2021 (10012101) (81028) ..........................
23,000,000 ....................................... (re. $23,000,000)
110 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2020 (10012001) (81028) ..........................
23,000,000 ....................................... (re. $23,000,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2019 (10011901) (81028) ..........................
15,000,000 ....................................... (re. $14,917,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2018 (10011801) (81028) ..........................
15,000,000 ....................................... (re. $13,163,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2017 (10011701) (81028) ..........................
15,000,000 ........................................ (re. $3,732,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2016 (10011601) (81028) ..........................
23,000,000 ........................................... (re. $54,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2013 (10011301) (81028) ..........................
22,000,000 ............................................ (re. $2,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2011 (10011101) (81028) ..........................
16,000,000 ........................................... (re. $11,000)
By chapter 50, section 1, of the laws of 2009:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2009 (10010901) (81028) ..........................
16,000,000 ............................................ (re. $7,000)
By chapter 50, section 1, of the laws of 2007:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
111 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
prior to April 1, 2007 (10010701) (81028) ..........................
20,000,000 ............................................ (re. $4,000)
By chapter 50, section 1, of the laws of 2005:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2005 (10010501) (81028) ..........................
30,000,000 ............................................ (re. $1,000)
By chapter 50, section 1, of the laws of 2004:
Alterations and improvements, including related departmental adminis-
trative costs, for health and safety including liabilities incurred
prior to April 1, 2004 (10010401) (81028) ..........................
30,000,000 ........................................... (re. $26,000)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2022 (10032203) (81010) ...........
205,000,000 ..................................... (re. $204,931,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2022 (10M32203) (81091) ... 15,000,000 ........ (re. $14,993,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2021 (10032103) (81010) ...........
165,000,000 ..................................... (re. $147,973,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2021 (10M32103) (81091) ... 15,000,000 ........ (re. $14,945,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2020 (10032003) (81010) ...........
165,000,000 ...................................... (re. $67,788,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2020 (10M32003) (81091) ... 15,000,000 ......... (re. $9,036,000)
By chapter 54, section 1, of the laws of 2019:
112 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2019 (10031903) (81010) ...........
166,000,000 ...................................... (re. $56,827,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2019 (10M31903) (81091) ... 15,000,000 ......... (re. $7,813,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2018 (10031803) (81010) ...........
166,000,000 ...................................... (re. $13,287,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2018 (10M31803) (81091) ... 15,000,000 ........... (re. $795,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2017 (10031703) (81010) ...........
141,000,000 ...................................... (re. $25,080,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2017 (10M31703) (81091) ... 15,000,000 ......... (re. $1,717,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2016 (10031603) (81010) ...........
92,000,000 ........................................ (re. $2,311,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2016 (10M31603) (81091) ... 15,000,000 ............ (re. $27,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2013 (10031303) (81010) ...........
186,000,000 ....................................... (re. $2,303,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2013 (10M31303) (81091) ... 13,000,000 ........... (re. $334,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
113 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ities incurred prior to April 1, 2012 (10031203) (81010) ...........
174,000,000 ....................................... (re. $2,005,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2012 (10M31203) (81091) ... 15,000,000 ........... (re. $241,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2011 (10031103) (81010) ...........
174,000,000 ......................................... (re. $870,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2011 (10M31103) (81091) ... 15,000,000 ............. (re. $8,000)
By chapter 50, section 1, of the laws of 2010:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2010 (10031003) (81010) ...........
174,000,000 .......................................... (re. $50,000)
By chapter 50, section 1, of the laws of 2009:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2009 (10030903) (81010) ...........
165,000,000 .......................................... (re. $10,000)
By chapter 50, section 1, of the laws of 2008:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2008 (10030803) (81010) ...........
170,000,000 .......................................... (re. $82,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2008 (10M30803) (81091) ... 15,000,000 ............ (re. $20,000)
By chapter 50, section 1, of the laws of 2007:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2007 (10030703) (81010) ...........
147,000,000 ......................................... (re. $144,000)
By chapter 50, section 1, of the laws of 2006:
Alterations and improvements, including related departmental adminis-
trative costs, for the preservation of facilities including liabil-
ities incurred prior to April 1, 2006 (10030603) (81010) ...........
137,000,000 .......................................... (re. $31,000)
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
114 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
useful life of assets including liabilities incurred prior to April
1, 2006 (10M30603) (81091) ... 15,000,000 ............. (re. $1,000)
By chapter 50, section 1, of the laws of 2005:
Alterations and improvements, including related departmental adminis-
trative costs, for preventative maintenance that will prolong the
useful life of assets including liabilities incurred prior to April
1, 2005 (10M30503) (81091) ... 15,000,000 ............. (re. $1,000)
Capital Projects Funds - Other
Correctional Facilities Capital Improvement Fund
DOCS Rehabilitation Projects Account - 32352
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2022 (10082208) (81063) ...
87,000,000 ....................................... (re. $87,000,000)
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2022 (10IN2208) (19701) ..........................
3,000,000 ......................................... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2021 (10082108) (81063) ...
87,000,000 ....................................... (re. $84,348,000)
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2021 (10IN2108) (19701) ..........................
3,000,000 ......................................... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2020 (10082008) (81063) ...
87,000,000 ....................................... (re. $55,194,000)
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2020 (10IN2008) (19701) ..........................
3,000,000 ......................................... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2019 (10081908) (81063)
164,000,000 ...................................... (re. $21,378,000)
115 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2019 (10IN1908) (19701) ..........................
3,000,000 ......................................... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2018 (10081808) (81063)
95,000,000 ........................................ (re. $5,464,000)
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2018 (10IN1808) (19701) ..........................
3,000,000 ......................................... (re. $2,392,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2017 (10081708) (81063)
95,000,000 ........................................ (re. $2,030,000)
Alterations and improvements within the correctional industries
program, including related departmental administrative costs, for
program improvement or program change including liabilities incurred
prior to April 1, 2017 (10IN1708) (19701) ..........................
3,000,000 ........................................... (re. $634,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2016 (10081608) (81063)
69,000,000 .......................................... (re. $338,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2013 (10081308) (81063)
46,000,000 ........................................ (re. $2,964,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2012 (10081208) (81063)
56,000,000 ........................................... (re. $13,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2011 (10081108) (81063)
76,000,000 ........................................... (re. $20,000)
116 12554-05-3
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 50, section 1, of the laws of 2010:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2010 (10081008) (81063)
76,000,000 ............................................ (re. $5,000)
By chapter 50, section 1, of the laws of 2009:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2009 (10080908) (81063)
90,000,000 ........................................ (re. $1,024,000)
By chapter 50, section 1, of the laws of 2008:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2008 (10080808) (81063)
85,000,000 ........................................... (re. $80,000)
By chapter 50, section 1, of the laws of 2006:
Alterations and improvements, including related departmental adminis-
trative costs, for program improvement or program change including
liabilities incurred prior to April 1, 2006 (10080608) (81063)
44,000,000 ............................................ (re. $1,000)
117 12554-05-3
DIVISION OF CRIMINAL JUSTICE SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 153,000,000 160,000,000
---------------- ----------------
All Funds ........................ 153,000,000 160,000,000
================ ================
ADMINISTRATION (CCP) ........................................ 18,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expenses related to the
acquisition and development of technology,
including but not limited to equipment,
software, and services. Funds appropriated
herein may be suballocated to any other
state department to achieve the purpose of
this appropriation (CJSF2308) ............... 18,000,000
DISCOVER IMPLEMENTATION AND PRETRIAL SERVICES (CCP) ......... 50,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For grants to support capital investments
related to implementation of discovery,
including but not limited to administra-
tive support, computers, equipment,
digital evidence transmission, technology,
hardware and operating software, data
connectivity and technology enhancements.
Eligible entities shall include, but not
be limited to counties, cities with a
population of greater than one million,
and law enforcement and prosecutorial
entities within such counties and cities.
All or a portion of the funds appropriated
herein may be transferred or suballocated
to any state department or agency ........... 50,000,000
SAFETY AND SECURITY PROJECTS FOR AT RISK FACILITIES (CCP) ... 85,000,000
--------------
118 12554-05-3
DIVISION OF CRIMINAL JUSTICE SERVICES
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For competitive grants to provide safety and
security projects at nonprofit organiza-
tions or small businesses as defined by
section 131 of the economic development
law at risk of hate crimes or attacks
including, but not limited to, at a facil-
ity, virtually or on the internet because
of their ideology, beliefs or mission,
provided that $10,000,000 be made avail-
able for not-for-profit reproductive
health centers. Provided that an assess-
ment of facilities at risk may include,
but not be limited to, considerations of
the vulnerabilities of the organization
based on its location and membership, and
the potential consequences of a hate crime
or attack at the facility. Recipients of
such grants shall be entitled to use such
funds to purchase commodities, services,
and technology through centralized
contracts established by the office of
general services under section 163 of the
state finance law, and such recipients
shall be deemed for such purpose to be
authorized users within the meaning of
paragraph k of subdivision 1 of section
163 of the state finance law. All or a
portion of the funds appropriated herein
may be suballocated to any department or
agency (CJSS2308) (55970) ................... 35,000,000
For grants to support capital investments
related to innovative crime-reduction
strategies in communities affected by gun
violence. Recipients of such grants shall
be entitled to use such funds to purchase
commodities, services, and technology
through centralized contracts established
by the office of general services under
section 163 of the state finance law, and
such recipients shall be deemed for such
purpose to be authorized users within the
meaning of paragraph k of subdivision 1 of
section 163 of the state finance law. All
funds appropriated herein shall not be
subject to section 163 of the state
finance law or section 142 of the economic
development law, and a portion of the
funds appropriated herein may be suballo-
119 12554-05-3
DIVISION OF CRIMINAL JUSTICE SERVICES
CAPITAL PROJECTS 2023-24
cated to any department or agency
(CJGV2308) (60175) .......................... 50,000,000
120 12554-05-3
DIVISION OF CRIMINAL JUSTICE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
DISCOVERY IMPLEMENTATION AND PRETRIAL SERVICES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
To support capital investments related to statewide discovery data-
base, including but not limited to equipment, and technology
enhancements. All or a portion of the funds appropriated herein may
be transferred or suballocated to any state department, agency, or
the judiciary (CJDI2208) (60187) ... 25,000,000 .. (re. $25,000,000)
For payments to counties and nonprofit organizations to support capi-
tal investments related to pretrial, alternative to incarceration
services and reentry programs, including but not limited to equip-
ment, technology, and facility renovations. Funding under this
appropriation shall be pursuant to a plan developed by the commis-
sioner of division of criminal justice services and approved by the
director of the budget. All or a portion of the funds appropriated
herein may be suballocated to any department or agency (CJPS2208)
(60188) ... 10,000,000 ........................... (re. $10,000,000)
SAFETY AND SECURITY PROJECTS FOR AT RISK FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For competitive grants to provide safety and security projects at
nonprofit organizations at risk of hate crimes or attacks including,
but not limited to, at a facility, virtually or on the internet
because of their ideology, beliefs or mission. Provided that an
assessment of facilities at risk may include, but not be limited to,
considerations of the vulnerabilities of the organization based on
its location and membership, and the potential consequences of a
hate crime or attack at the facility. Recipients of such grants
shall be entitled to use such funds to purchase commodities,
services, and technology through centralized contracts established
by the office of general services under section 163 of the state
finance law, and such recipients shall be deemed for such purpose to
be authorized users within the meaning of paragraph k of subdivision
1 of section 163 of the state finance law. All or a portion of the
funds appropriated herein may be suballocated to any department or
agency (CJSS2208) (55970) ... 25,000,000 ......... (re. $25,000,000)
For competitive grants to support capital investments related to inno-
vative crime-reduction strategies in communities affected by gun
violence. Recipients of such grants shall be entitled to use such
funds to purchase commodities, services, and technology through
centralized contracts established by the office of general services
under section 163 of the state finance law, and such recipients
shall be deemed for such purpose to be authorized users within the
121 12554-05-3
DIVISION OF CRIMINAL JUSTICE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
meaning of paragraph k of subdivision 1 of section 163 of the state
finance law. All or a portion of the funds appropriated herein may
be suballocated to any department or agency (CJGV2208) (60175) .....
50,000,000 ....................................... (re. $50,000,000)
By chapter 54, section 1, of the laws of 2021:
For competitive grants to provide safety and security projects at
nonprofit organizations at risk of hate crimes or attacks including,
but not limited to, at a facility, virtually or on the internet
because of their ideology, beliefs or mission. Provided that an
assessment of facilities at risk may include, but not be limited to,
considerations of the vulnerabilities of the organization based on
its location and membership, and the potential consequences of a
hate crime or attack at the facility. Recipients of such grants
shall be entitled to use such funds to purchase commodities,
services, and technology through centralized contracts established
by the office of general services under section 163 of the state
finance law, and such recipients shall be deemed for such purpose to
be authorized users within the meaning of paragraph k of subdivision
1 of section 163 of the state finance law. All or a portion of the
funds appropriated herein may be suballocated to any department or
agency (CJSS2108) (55970) ... 25,000,000 ......... (re. $25,000,000)
By chapter 54, section 1, of the laws of 2020:
For competitive grants to provide safety and security projects at
nonprofit organizations at risk of hate crimes or attacks because of
their ideology, beliefs or mission. Provided that an assessment of
facilities at risk may include, but not be limited to, consider-
ations of the vulnerabilities of the organization based on its
location and membership, and the potential consequences of a hate
crime or attack at the facility. Recipients of such grants shall be
entitled to use such funds to purchase commodities, services, and
technology through centralized contracts established by the office
of general services under section 163 of the state finance law, and
such recipients shall be deemed for such purpose to be authorized
users within the meaning of paragraph k of subdivision 1 of section
163 of the state finance law. All or a portion of the funds appro-
priated herein may be suballocated to any department or agency
(CJSS2008) (55970) ... 25,000,000 ................ (re. $25,000,000)
122 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 128,823,000 3,487,489,000
---------------- ----------------
All Funds ........................ 128,823,000 3,487,489,000
================ ================
ADMINISTRATION (CCP) ......................................... 7,600,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For various minor rehabilitation projects to
keep facilities in a safe operating condi-
tion subject to a plan developed by the
education department and approved by the
director of the budget (11MR2303) (21860) .... 3,400,000
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (11PS2303)
(23304) ...................................... 4,200,000
LIBRARY CONSTRUCTION (CCP) .................................. 39,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For total approved project costs pursuant to
section 273-a of the education law, for
approved projects, excluding feasibility
studies, plans or similar activities, for
the acquisition of vacant land and the
acquisition, construction, renovation or
rehabilitation, including leasehold
improvements, of buildings of public
libraries and library systems chartered by
the regents of the state of New York or
established by an act of the legislature,
123 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2023-24
subject to distribution provisions in
subdivision 5 of section 273-a of the
education law on and upon approval by the
commissioner (11LC2308) (23486) ............. 14,000,000
For additional total approved project costs
pursuant to section 273-a of the education
law, for approved projects, excluding
feasibility studies, plans or similar
activities, for the acquisition of vacant
land and the acquisition, construction,
renovation or rehabilitation, including
projects related to health and safety and
the Americans with Disabilities Act of
1990 and leasehold improvements, of build-
ings of public libraries and library
systems chartered by the regents of the
state of New York or established by an act
of the legislature, subject to distrib-
ution provisions in subdivision 5 of
section 273-a of the education law on and
upon approval by the commissioner ........... 25,000,000
NON-PUBLIC SCHOOL HEALTH AND SAFETY PROJECTS (CCP) .......... 45,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
For services and expenses for nonpublic
schools of health and safety equipment,
security personnel, related assessments
and training needs, remediation of hazard-
ous conditions, and the repair and mainte-
nance of buildings, facilities, appurte-
nances, equipment and systems to maintain
the health and safety of school building
occupants, utilizing competitive and non-
competitive grants pursuant to a plan
developed by the commissioner of education
and approved by the director of the budget
(11SE2301) (55990) .......................... 45,000,000
OFFICE OF THE PROFESSIONS ELECTRONIC LICENSING SYSTEM
(CCP) ...................................................... 5,160,000
--------------
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Office of the Professions Electronic Licensing Account -
32222
Program Improvement/Change Purpose
124 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2023-24
For services and expenses related to the
development of an electronic licensing
system for the office of the professions,
including but not limited to equipment,
software, hardware and services, subject
to a plan developed by the education
department in conjunction with the office
of information technology services and
approved by the director of the budget.
Funds appropriated herein may be suballo-
cated to any other state department, agen-
cy, or public benefit corporation, to
achieve the purpose of this appropriation
(11EL2308) (55992) ........................... 5,160,000
SCHOOLS FOR NATIVE AMERICAN RESERVATIONS (CCP) .............. 20,099,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For various rehabilitation and renovation
projects to keep facilities at the stat-
eowned St. Regis Mohawk School, the Onon-
daga Nation School, and the Tuscarora
Nation School in a safe and satisfactory
operating condition subject to a plan
developed by the education department and
approved by the director of the budget
(11NA2308) (23368) .......................... 20,099,000
SCHOOL FOR THE BLIND (CCP) ................................... 4,470,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For various rehabilitation and renovation
projects to keep facilities at the School
for the Blind in a safe and satisfactory
operating condition subject to a plan
developed by the education department and
approved by the director of the budget
(11BB2308) (23369) ........................... 4,470,000
SCHOOL FOR THE DEAF (CCP) .................................... 2,994,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
125 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2023-24
For various rehabilitation and renovation
projects to keep facilities at the School
for the Deaf in a safe and satisfactory
operating condition subject to a plan
developed by the education department and
approved by the director of the budget
(11RD2308) (23370) ........................... 2,994,000
SPECIAL ACT SCHOOL HEALTH AND SAFETY PROJECTS ................ 4,500,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
For services and expenses for Special Act
schools of health and safety equipment,
security personnel, related assessments
and training needs, remediation of hazard-
ous conditions, and the repair and mainte-
nance of buildings, facilities, appurte-
nances, equipment and systems to maintain
the health and safety of school building
occupants, utilizing competitive and
noncompetitive grants pursuant to a plan
developed by the commissioner of education
and approved by the director of the budget ... 4,500,000
126 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ADMINISTRATION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11MR2203)
(21860) ... 6,000,000 ............................. (re. $5,695,000)
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (11PS2203) (23304) ...
4,200,000 ......................................... (re. $1,491,000)
By chapter 54, section 1, of the laws of 2021:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11MR2103)
(21860) ... 3,400,000 ............................. (re. $3,002,000)
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (11PS2103) (23304) ...
4,200,000 ......................................... (re. $1,532,000)
By chapter 54, section 1, of the laws of 2020:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11MR2003)
(21860) ... 3,400,000 ............................. (re. $2,643,000)
By chapter 54, section 1, of the laws of 2019:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11021903)
(21860) ... 3,400,000 ............................. (re. $2,226,000)
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (11PS1903) (23304) ...
4,100,000 ........................................... (re. $278,000)
By chapter 54, section 1, of the laws of 2018:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
127 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
department and approved by the director of the budget (11021803)
(21860) ... 3,400,000 ............................. (re. $1,144,000)
By chapter 54, section 1, of the laws of 2017:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11021703)
(21860) ... 3,400,000 ............................. (re. $1,316,000)
By chapter 55, section 1, of the laws of 2016:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11021603)
(21860) ... 3,400,000 ................................ (re. $12,000)
By chapter 54, section 1, of the laws of 2015:
For various minor rehabilitation projects to keep facilities in a safe
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11021503)
(21860) ... 3,400,000 ............................... (re. $501,000)
By chapter 54, section 1, of the laws of 2013:
For various minor rehabilitation projects to keep facilities in a safe
operating condition, including but not limited to fire alarm system
and security system upgrades at the School for the Blind at Batavia,
subject to a plan developed by the education department and approved
by the director of the budget (11021303) (21860) ...................
3,400,000 ........................................... (re. $120,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to the development and implementa-
tion of data systems for the education department, including but not
limited to facilities management, state aid, and special education
providers. Provided however that the use of funds appropriated here-
in shall be subject to a plan developed by the education department
in consultation with the office of information technology services
and approved by the director of the budget (11031708) (55968) ......
2,000,000 ........................................... (re. $120,000)
By chapter 100, section 2, of the laws of 2010, as amended by chapter
54, section 1, of the laws of 2011:
For services and expenses related to implementing a state longitudinal
data system including but not limited to the development and
purchase of computer hardware, software, and related equipment, such
amount shall include expenses to be made by the State University of
New York and the City University of New York provided that the
amount appropriated herein shall be subject to a plan developed by
the education department and approved by the director of the budget.
128 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any other provision of law to the contrary and subject
to the approval of the director of the budget, a portion of the
funds appropriated herein may be transferred to the State University
of New York and City University of New York to carry out the
purposes of this appropriation (11031008) (21861) ..................
20,400,000 ....................................... (re. $10,220,000)
BREAKFAST AFTER THE BELL EQUIPMENT GRANTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2018:
For grants to public elementary or secondary schools required to
implement the breakfast after the bell school breakfast program
beginning in the 2018-19 school year pursuant to a chapter of the
laws of 2018 for equipment purchases, provided, however, that such
grants shall be limited to no more than $5,000 per school, and shall
be awarded based on an application developed by the state education
department. Eligible equipment purchases shall include, but not be
limited to, equipment used for the storage, preservation, or
distribution of food (11BB1808) (55988) ............................
7,000,000 ......................................... (re. $2,291,000)
CULTURAL EDUCATION CENTER (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 53, section 1, of the laws of 2008:
For the construction of an alternate emergency exit in the cultural
education center (11010801) (21862) ... 2,250,000 .... (re. $17,000)
For fire safety system upgrades, environmental controls, and the reno-
vation of restrooms in the cultural education center (11030801)
(21864) ... 2,500,000 ............................... (re. $637,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 53, section 1, of the laws of 2004, as amended by chapter 62,
section 3, of the laws of 2005:
For minor rehabilitation projects to keep facilities in a safe operat-
ing condition subject to a plan developed by the education depart-
ment and approved by the director of the budget (11020403) (21865)
... 1,000,000 ........................................ (re. $37,000)
By chapter 53, section 1, of the laws of 2002, as amended by chapter 55,
section 1, of the laws of 2016:
129 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For renovation projects to preserve and revamp the collections and
exhibits of the state museum, library and archives subject to a plan
approved by the director of the budget (11030203) (23456) ..........
5,000,000 ......................................... (re. $4,475,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 53, section 1, of the laws of 2008:
An advance for projects to enhance the public display of the
collections and exhibits of the state museum, library and archives,
subject to a plan jointly submitted by the board of the cultural
education trust and the state education department and approved by
the director of the budget (11020808) (21868) ......................
15,000,000 ....................................... (re. $11,758,000)
For preservation and stewardship of collections in the cultural educa-
tion center, including environmental controls, the preservation of
records, and the purchase and installment of map and microform cabi-
nets, compact shelving, and museum cabinetry (11060808) (21866) ....
4,325,000 ........................................... (re. $580,000)
CULTURAL EDUCATION STORAGE FACILITY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 53, section 1, of the laws of 2007, as amended by chapter 55,
section 1, of the laws of 2016:
Cultural education storage facility. For costs of a new storage facil-
ity for the collections of the state museum, library and archives,
subject to a plan jointly submitted by the board of the cultural
education trust and the cultural education department and approved
by the division of the budget provided, however, that a portion of
the funds appropriated herein may be used to conduct a feasibility
study and a land review prior to the submission of such plan
(11010707) (21878) ... 60,000,000 ................ (re. $59,736,000)
EDUCATION BUILDING (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 53, section 1, of the laws of 2006:
For partial roof replacement of the education building and education
building addition to keep facilities in a safe operating condition
subject to a plan developed by the education department and approved
by the director of the budget (11030603) (23454) ...................
1,700,000 ........................................... (re. $160,000)
130 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
LIBRARY CONSTRUCTION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For total approved project costs pursuant to section 273-a of the
education law, for approved projects, excluding feasibility studies,
plans or similar activities, for the acquisition of vacant land and
the acquisition, construction, renovation or rehabilitation, includ-
ing leasehold improvements, of buildings of public libraries and
library systems chartered by the regents of the state of New York or
established by an act of the legislature, subject to distribution
provisions in subdivision 5 of section 273-a of the education law on
and upon approval by the commissioner (11LC2208) (23486) ...
[14,000,000] 34,000,000 .......................... (re. $34,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For total approved project costs pursuant to section 273-a of the
education law, for approved projects, excluding feasibility studies,
plans or similar activities, for the acquisition of vacant land and
the acquisition, construction, renovation or rehabilitation, includ-
ing leasehold improvements, of buildings of public libraries and
library systems chartered by the regents of the state of New York or
established by an act of the legislature, subject to distribution
provisions in subdivision 5 of section 273-a of the education law on
and upon approval by the commissioner (11LC2108) (23486) ...........
[14,000,000] 34,000,000 .......................... (re. $34,000,000)
By chapter 54, section 1, of the laws of 2020:
For total approved project costs pursuant to section 273-a of the
education law, for approved projects, excluding feasibility studies,
plans or similar activities, for the acquisition of vacant land and
the acquisition, construction, renovation or rehabilitation, includ-
ing leasehold improvements, of buildings of public libraries and
library systems chartered by the regents of the state of New York or
established by an act of the legislature, subject to distribution
provisions in subdivision 5 of section 273-a of the education law on
and upon approval by the commissioner (11LC2008) (23486) ...........
14,000,000 ........................................ (re. $1,257,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2021:
For total approved project costs pursuant to section 273-a of the
education law, for approved projects, excluding feasibility studies,
plans or similar activities, for the acquisition of vacant land and
the acquisition, construction, renovation or rehabilitation, includ-
131 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ing leasehold improvements, of buildings of public libraries and
library systems chartered by the regents of the state of New York or
established by an act of the legislature, subject to distribution
provisions in subdivision 5 of section 273-a of the education law on
and upon approval by the commissioner (11011908) (23486) ...........
34,000,000 ........................................ (re. $2,406,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For total approved project costs pursuant to section 273-a of the
education law, for approved projects, excluding feasibility studies,
plans or similar activities, for the acquisition of vacant land and
the acquisition, construction, renovation or rehabilitation, includ-
ing leasehold improvements, of buildings of public libraries and
library systems chartered by the regents of the state of New York or
established by an act of the legislature, subject to distribution
provisions in subdivision 5 of section 273-a of the education law on
and upon approval by the commissioner (11001808) (23486) ...........
34,000,000 ........................................ (re. $1,439,000)
NON-PUBLIC SCHOOL HEALTH AND SAFETY PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses for nonpublic schools of health and safety
equipment, security personnel, related assessments and training
needs, remediation of hazardous conditions, and the repair and main-
tenance of buildings, facilities, appurtenances, equipment and
systems to maintain the health and safety of school building occu-
pants, utilizing competitive and noncompetitive grants pursuant to a
plan developed by the commissioner of education and approved by the
director of the budget (11SE2201) (55990) ..........................
45,000,000 ....................................... (re. $45,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2022 (11SE2101) (55990) ... 15,000,000 ........... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2021 (11SE2001) (55990) ... 15,000,000 ........... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2019:
132 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2020 (11SE1901) (55990) ... 15,000,000 ............ (re. $9,822,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2019 (11SE1801) (55990) ... 15,000,000 ............ (re. $6,949,000)
By chapter 53, section 1, of the laws of 2017, as transferred by chapter
54, section 1, of the laws of 2018:
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2018 (11SE1701) (55990) ... 15,000,000 ............ (re. $4,315,000)
By chapter 53, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2019:
For services and expenses of health and safety equipment, security
personnel and related assessments and training needs for Nonpublic
Schools, provided, however, that no more than $4,500,000 of the
funds appropriated herein shall be made available prior to April 1,
2017 (11SE1601) (55990) ... 10,768,000 ............ (re. $2,835,000)
By chapter 53, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2019:
For services and expenses of Safety Equipment for Nonpublic Schools
(11SE1501) (55990) ... 1,383,000 .................... (re. $441,000)
By chapter 53, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2019:
For services and expenses of Safety Equipment for Nonpublic Schools
(11SE1401) (55990) ... 1,325,000 .................... (re. $537,000)
By chapter 53, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2019:
For services and expenses of Safety Equipment for Nonpublic Schools
(11SE1301) (55990) ... 806,000 ...................... (re. $526,000)
NON-PUBLIC SCHOOL TECHNOLOGY PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2017:
133 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the costs of capital projects undertaken by or on
behalf of school districts for the acquisition of smart schools
classroom technology to be loaned to children attending a nonpublic
school located in the school district, except a nonpublic school to
which tuition is paid under articles 85 or 89 of the education law,
in accordance with the requirements of section 755 of the education
law and guidelines developed by the commissioner of education, in
connection with the smart schools investment plans first submitted
to the education department prior to April 15, 2017 and approved by
the smart schools review board pursuant to subdivision 16 of section
3641 of the education law.
Each school district shall be eligible to receive an allocation from
the funds appropriated herein equal to the product of the enrollment
of all such nonpublic schools in the 2014-15 school year multiplied
by the per pupil amount, provided that the liability of the state
and the amount to be distributed or otherwise expended by the state
to provide such loans shall be limited to the amount appropriated
herein. The per pupil amount shall equal the quotient of (i) the
amount budgeted by such school district in its approved smart
schools investment plan for servers, wireless access points and
other portable connectivity devices to be acquired as part of a
school connectivity project, divided by (ii) the total public and
nonpublic school enrollment in such school district in the 2014-15
school year.
Provided further that no school district shall be eligible to receive
an allocation to support the loan of smart schools classroom tech-
nology in an aggregate amount greater than $250 multiplied by the
nonpublic school enrollment in the 2014-15 school year.
Notwithstanding paragraph b of subdivision 16 of section 3641 of the
education law, the commissioner of education shall distribute funds
appropriated pursuant to this paragraph upon approval of an applica-
tion made by the school district. Requests to the school district
for loan of smart schools classroom technology to be acquired with
the funds appropriated herein shall be made in accordance with the
requirements of subdivision 3 of section 755 of the education law
(11NP1708) (55959) ... 25,000,000 ................ (re. $23,437,000)
OFFICE OF THE PROFESSIONS ELECTRONIC LICENSING SYSTEM (CCP)
Capital Projects Fund - Other
Miscellaneous Capital Projects Fund
Office of the Professions Electronic Licensing Account - 32222
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to the development of an electronic
licensing system for the office of the professions, including but
not limited to equipment, software, hardware and services, subject
to a plan developed by the education department in conjunction with
the office of information technology services and approved by the
director of the budget.
134 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Funds appropriated herein may be suballocated to any other state
department, agency, or public benefit corporation, to achieve the
purpose of this appropriation (11EL2208) (55992) ...................
7,790,000 ......................................... (re. $7,783,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to the development of an electronic
licensing system for the office of the professions, including but
not limited to equipment, software, hardware and services, subject
to a plan developed by the education department in conjunction with
the office of information technology services and approved by the
director of the budget.
Funds appropriated herein may be suballocated to any other state
department, agency, or public benefit corporation, to achieve the
purpose of this appropriation (11EL2108) (55992) ...................
7,850,000 ......................................... (re. $3,302,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to the development of an electronic
licensing system for the office of the professions, including but
not limited to equipment, software, hardware and services, subject
to a plan developed by the education department in conjunction with
the office of information technology services and approved by the
director of the budget. Funds appropriated herein may be suballo-
cated to any other state department, agency, or public benefit
corporation, to achieve the purpose of this appropriation (11EL2008)
(55992) ... 25,390,000 ........................... (re. $19,426,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to the development of an electronic
licensing system for the office of the professions, including but
not limited to equipment, software, hardware and services, subject
to a plan developed by the education department in conjunction with
the office of information technology services and approved by the
director of the budget. Funds appropriated herein may be suballo-
cated to any other state department, agency, or public benefit
corporation, to achieve the purpose of this appropriation (11EL1908)
(55992) ... 7,200,000 ............................... (re. $174,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to the development of an electronic
licensing system for the office of the professions, including but
not limited to equipment, software, hardware and services, subject
to a plan developed by the education department in conjunction with
the office of information technology services and approved by the
director of the budget. Funds appropriated herein may be suballo-
cated to any other state department, agency, or public benefit
corporation, to achieve the purpose of this appropriation (11EL1808)
(55992) ... 4,300,000 ............................... (re. $789,000)
SAFETY AND SECURITY PROJECTS FOR AT RISK FACILITIES (CCP)
135 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Project Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
For a competitive grant program to provide safety and security
projects at nonpublic schools and day camps at risk of hate crimes
or attacks because of their ideology, beliefs or mission. Provided
that an assessment of facilities at risk may include, but not be
limited to, considerations of the vulnerabilities of the organiza-
tion based on its location and membership, and the potential conse-
quences of a hate crime or attack at the facility. Provided further
that recipients of such grants may be required to commit to under-
take matching safety and security projects in an amount established
in the request for applications for such grants, and provided
further that recipients of such grants shall be entitled to use such
funds to purchase commodities, services, and technology through
centralized contracts established by the office of general services
under section 163 of the state finance law, and such recipients
shall be deemed for such purposes to be "authorized users" within
the meaning of paragraph k of subdivision 1 of section 163 of the
state finance law. Notwithstanding section 93 of the state finance
law or any provision of law to the contrary, the amount appropriated
herein may be transferred or suballocated to the division of home-
land security and emergency services to accomplish the intent of
this appropriation or interchanged with any other appropriation
within the safety and security for at-risk facilities comprehensive
construction program (11MG1908) ... 20,000,000 ... (re. $19,705,000)
For competitive grants to provide safety and security projects at
nonpublic schools, community centers, residential camps, and day
care facilities at risk of hate crimes or attacks because of their
ideology, beliefs or mission. Provided that an assessment of facili-
ties at risk may include, but not be limited to, considerations of
the vulnerabilities of the organization based on its location and
membership, and the potential consequences of a hate crime or attack
at the facility, and provided further that recipients of such grants
shall be entitled to use such funds to purchase commodities,
services, and technology through centralized contracts established
by the office of general services under section 163 of the state
finance law, and such recipients shall be deemed for such purposes
to be "authorized users" within the meaning of paragraph k of subdi-
vision 1 of section 163 of the state finance law. Notwithstanding
section 93 of the state finance law or any provision of law to the
contrary, the amount appropriated herein may be transferred or
suballocated to the division of homeland security and emergency
services to accomplish the intent of this appropriation or inter-
changed with any other appropriation within the safety and security
for at-risk facilities comprehensive construction program (11HS1908)
(55970) ... 25,000,000 ........................... (re. $24,588,000)
136 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
For competitive grants to provide safety and security projects at
nonpublic schools, community centers and day care facilities at risk
of hate crimes or attacks because of their ideology, beliefs or
mission. Provided that an assessment of facilities at risk may
include, but not be limited to, considerations of the vulnerabili-
ties of the organization based on its location and membership, and
the potential consequences of a hate crime or attack at the facili-
ty, and provided further that recipients of such grants shall be
entitled to use such funds to purchase commodities, services, and
technology through centralized contracts established by the office
of general services under section 163 of the state finance law, and
such recipients shall be deemed for such purposes to be "authorized
users" within the meaning of paragraph k of subdivision 1 of section
163 of the state finance law. The amount appropriated herein may be
transferred or suballocated to the division of homeland security and
emergency services to accomplish the intent of this appropriation
(11HS1708) (55970) ... 25,000,000 ................. (re. $7,011,000)
SCHOOLS FOR NATIVE AMERICAN RESERVATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 53, section 1, of the laws of 2009:
For various rehabilitation and renovation projects to keep facilities
at the St. Regis Mohawk Elementary School in a safe operating condi-
tion subject to a plan developed by the education department and
approved by the director of the budget (11020901) (23464) ..........
4,000,000 ............................................ (re. $88,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 53, section 1, of the laws of 2004:
For various rehabilitation and renovation projects to keep facilities
at the St. Regis Mohawk Elementary School in a safe operating condi-
tion subject to a plan developed by the education department and
approved by the director of the budget (11040403) (21876) ..........
4,500,000 ............................................. (re. $2,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For various rehabilitation and renovation projects to keep facilities
at the state-owned St. Regis Mohawk School, the Onondaga Nation
School, and the Tuscarora Nation School in a safe and satisfactory
137 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
operating condition subject to a plan developed by the education
department and approved by the director of the budget (11NA2208)
(23368) ... 35,700,000 ........................... (re. $35,700,000)
SCHOOL FOR THE BLIND (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For various rehabilitation and renovation projects to keep facilities
at the School for the Blind in a safe and satisfactory operating
condition subject to a plan developed by the education department
and approved by the director of the budget (11BB2208) (23468) ......
3,200,000 ......................................... (re. $3,200,000)
SCHOOL FOR THE BLIND - BATAVIA (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 53, section 1, of the laws of 2009:
For various rehabilitation and renovation projects to keep facilities
at the School for the Blind in a safe operating condition subject to
a plan developed by the education department and approved by the
director of the budget (11030901) (23468) ... 800,000 . (re. $1,000)
By chapter 53, section 1, of the laws of 2008:
For security and fire alarm system upgrades, physical plant improve-
ments to infrastructure around Severne Hall, backflow prevention
devices, and roof replacement on Knight Hall and Hamilton Hall
(11050801) (21870) ... 2,330,000 .................... (re. $670,000)
SCHOOL FOR THE DEAF (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For various rehabilitation and renovation projects to keep facilities
at the School for the Deaf in a safe and satisfactory operating
condition subject to a plan developed by the education department
and approved by the director of the budget (11RD2208) (23468) ......
1,800,000 ......................................... (re. $1,800,000)
SCHOOL FOR THE DEAF - ROME (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
138 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Health and Safety Purpose
By chapter 53, section 1, of the laws of 2008:
For dormitory environmental controls and the replacement of paver
stones, manhole covers and catch basins (11040801) (21871) .........
650,000 ............................................. (re. $138,000)
SMART SCHOOLS BOND ACT (CCP)
Capital Projects Funds - Other
Smart Schools Bond Fund
Smart Schools Bond Fund Account - 30710
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 2014:
The sum of $2,000,000,000, or so much thereof as may be necessary and
available, is hereby appropriated from the smart schools bond fund
as established by section 97-oooo of the state finance law in
accordance with the provisions of such section, for payment to the
capital projects fund in order to reimburse such fund for disburse-
ments certified by the state comptroller as bondable under the
provisions of the smart schools bond act of 2014.
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the capital
projects fund for purposes for which smart schools bond fund expend-
itures are authorized. The state comptroller shall at the commence-
ment of each month certify to the director of the budget, the chair-
man of the senate finance committee, and the chairman of the
assembly ways and means committee, the amounts disbursed from the
appropriations so designated by the director of the budget from the
capital projects fund for such purposes for the month preceding such
certification and such certifications shall not exceed in the aggre-
gate the moneys hereby appropriated. A copy of each such certificate
shall also be delivered to departments, agencies and public authori-
ties to which such capital projects fund appropriations are made
available.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the smart schools bond fund until a
certificate of approval of availability shall have been issued by
the director of the budget, and a copy of such certificate of
approval filed with the state comptroller, the chairman of the
senate finance committee and the chairman of the assembly ways and
means committee. Such certificate may be amended from time to time
by the director of the budget, and a copy of each such amendment
shall be filed with the state comptroller, the chairman of the
senate finance committee and the chairman of the assembly ways and
means committee (11SS1410) (80912) .................................
2,000,000,000 ................................. (re. $1,597,482,000)
SMART SCHOOLS IMPLEMENTATION (CCP)
Capital Projects Funds - Other
139 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Fund - Smart Schools (Bondable) - 30000
Educational Purpose
By chapter 54, section 1, of the laws of 2014:
For payment of the costs of capital projects undertaken by or on
behalf of school districts as part of such school districts' smart
schools investment plans as approved by the smart schools review
board, pursuant to the smart schools bond act of 2014 and subdivi-
sion 16 of section 3641 of the education law, both enacted as legis-
lation submitted by the governor pursuant to article VII of the New
York constitution, to be reimbursed from bond fund proceeds for
acquisition or installation of educational technology equipment or
for design, planning, site acquisition, construction, reconstruction
or rehabilitation of pre-kindergarten classroom space; instructional
space to replace transportable classroom units, or for high-tech
school safety and security projects.
Costs of such smart schools projects may include but not be limited to
interactive whiteboards; computer servers; desktop, laptop and
tablet computers; grants for high-speed broadband and wireless
internet connectivity for schools and communities within the school
district for enhanced educational opportunity; classroom space to
accommodate pre-kindergarten programs; instructional space to
replace transportable classroom units; and high-tech school safety
and security projects. Pursuant to school districts' approved smart
schools investment plans, all or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority.
No part of this appropriation shall be made available prior to
approval of the smart schools bond act of 2014 by the voters at the
general election to be held in November of 2014 (11SR14ED) (56144)
... 2,000,000,000 ............................. (re. $1,360,163,000)
SMART SCHOOLS SPECIAL EDUCATION PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Educational Purpose
By chapter 54, section 1, of the laws of 2014:
For payment of the costs of capital projects undertaken by or on
behalf of special act school districts, state-supported schools for
the blind and deaf and approved private special education schools,
pursuant to investment plans approved by the smart schools review
board established by subdivision 16 of section 3641 of the education
law, for acquisition or installation of educational technology
equipment. Costs of such projects may include but not be limited to
interactive whiteboards; computer servers; desktop, laptop and
tablet computers; and high-speed broadband and wireless Internet
connectivity; design, planning, site acquisition, construction,
reconstruction or rehabilitation of instructional space to replace
transportable classroom units; and high-tech school safety and secu-
rity projects. This appropriation shall be made available to the
140 12554-05-3
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
same extent as funds are authorized and made available pursuant to
the smart schools bond act of 2014 (110014ED) (56156) ..............
5,000,000 ......................................... (re. $2,537,000)
STATE AID DATA SYSTEM (CCP)
Capital Projects Fund - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to the development of a modernized
state aid data system, including but not limited to equipment, soft-
ware, hardware and services, subject to a plan developed by the
education department in conjunction with the office of information
technology services and approved by the director of the budget.
Funds appropriated herein may be suballocated to any other state
department, agency, or public benefit corporation, to achieve the
purpose of this appropriation subject to approval by the director of
the budget (11SA2108) (23343) ... 41,000,000 ..... (re. $40,867,000)
STATE SUPPORTED SCHOOLS FOR THE BLIND AND DEAF (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2021:
For alteration, rehabilitation and improvement of various facilities
operated by the state-supported schools for the blind and deaf
authorized under article 85 of the education law, provided that such
funds shall be prioritized for health and safety needs and appor-
tioned based on a plan developed by the education department and
approved by the director of the budget (11422101) (23303) ..........
30,000,000 ....................................... (re. $30,000,000)
By chapter 54, section 1, of the laws of 2019:
For alteration, rehabilitation and improvement of various facilities
operated by the state-supported schools for the blind and deaf
authorized under article 85 of the education law, provided that such
funds shall be prioritized for health and safety needs and appor-
tioned based on a plan developed by the education department and
approved by the director of the budget (11421901) (23303) ..........
30,000,000 ....................................... (re. $28,409,000)
141 12554-05-3
STATE BOARD OF ELECTIONS
CAPITAL PROJECTS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 15,000,000 39,969,000
---------------- ----------------
All Funds ........................ 15,000,000 39,969,000
================ ================
PROGRAM IMPROVEMENTS OR CHANGE (CCP) ........................ 15,000,000
--------------
Capital Project Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
The amounts appropriated herein, shall be
made available to local boards of
elections for software and technology
upgrades and equipment ...................... 15,000,000
142 12554-05-3
STATE BOARD OF ELECTIONS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PROGRAM IMPROVEMENTS OR CHANGE (CCP)
Capital Project Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2021:
The amounts appropriated herein, shall be made available to the state
and local boards of elections, including the New York city board of
elections for software and technology upgrades and equipment. The
state board of elections shall develop a plan for the distribution
of such funds which may include up to $5,000,000 needed for state
board of elections capital costs and implementation costs. The
remaining funds, of at least $20,000,000 shall be made available to
local boards of elections for reimbursement of eligible costs,
including, but not limited to, the replacement of voting systems and
equipment, absentee ballot scanners, mail processing equipment, and
infrastructure to protect the connectivity and security of county
elections software, including assistance for areas unserved and
underserved by broadband service, provided that such reimbursement
shall be apportioned based on the number of registered voters in a
county (EL012108) (23527) ... 25,000,000 ......... (re. $23,996,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services, which will support the implementation of the voter enfran-
chisement modernization act of 2019, including costs incurred prior
to April 1, 2020. A portion of these funds shall be used, as allow-
able, to satisfy the state match requirement of the 2020 federal
HAVA funding. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (EL012008) (23523) ............................
16,000,000 ....................................... (re. $15,230,000)
By chapter 54, section 1, of the laws of 2019:
The amounts appropriated herein, shall be made available to the state
and local boards of elections, including the New York city board of
elections for initial technology costs of electronic poll books as
authorized in 2019 voter reform legislation. The state board of
elections shall develop a plan for the distribution of such funds
which may include amounts needed for state board of elections imple-
mentation costs. The remaining funds shall be made available to
local boards of elections for reimbursement of eligible costs,
including, but not limited to, electronic poll books and associated
software, on-demand ballot printers and cyber security software
required to implement early voting provided that such reimbursement
shall be apportioned based on the number of registered voters in a
county. The plan shall include a listing of allowable costs and
details of the reimbursement claims process and timeframes, provided
that local boards of election claims shall include such information
as necessary to support state financing mechanisms. Notwithstanding
143 12554-05-3
STATE BOARD OF ELECTIONS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
any other law to the contrary, all or a portion of the amounts here-
by appropriated may be suballocated or transferred to any depart-
ment, agency or public authority (EL011908) (23523) ................
14,700,000 .......................................... (re. $743,000)
144 12554-05-3
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 25,800,000 31,476,000
---------------- ----------------
All Funds ........................ 25,800,000 31,476,000
================ ================
WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP) ....... 25,800,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Western New York Nuclear Service Center Program Purpose
For services and expenses required to meet
the New York state energy research and
development authority obligations for the
western New York nuclear service center,
including obligations pursuant to the West
Valley demonstration project act (Pub. L.
96-368)(03WV23G6) (44406) ................... 25,800,000
145 12554-05-3
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
CLEANER, GREENER COMMUNITIES PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environmental Protection Purpose
By chapter 54, section 1, of the laws of 2013:
For capital grants for the cleaner, greener communities program
(03CG1306) (44408) ... 25,000,000 ................. (re. $7,876,000)
WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Western New York Nuclear Service Center Program Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses required to meet the New York state energy
research and development authority obligations for the western New
York nuclear service center, including obligations pursuant to the
West Valley demonstration project act (Pub. L. 96-368)(03WV22G6)
(44406) ... 23,600,000 ........................... (re. $23,600,000)
146 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,610,300,000 15,862,024,000
Capital Projects Funds - Federal ... 590,000,000 1,086,425,000
Special Revenue Funds - Other ...... 0 97,000
---------------- ----------------
All Funds ........................ 2,200,300,000 16,948,546,000
================ ================
ADMINISTRATION (CCP) ........................................ 95,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
For employee fringe benefits and indirect
costs related to employees paid from
department capital projects funds and
capital accounts (09FG2350) (25729) ......... 20,000,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
ENCON Capital Miscellaneous Gifts Account - 32224
Operational Services Purposes
For services and expenses for projects in
support of the department's mission in
accordance with section 3-0321 of the
environmental conservation law (09GI2351)
(25613) ...................................... 5,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund - 31364
ENCON Federal Infrastructure and Jobs Act
Administration Projects Purpose
For the expenditure of federal funds includ-
ing but not limited to those funds
provided for in the Infrastructure Invest-
ment and Jobs Act made available to the
department of environmental conservation,
from any federal agency under any federal
programs, for environmental purposes
including but not limited to construction,
reconstruction, preservation, and operat-
ing costs. Any portion of this appropri-
ation may be transferred to state oper-
147 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
ations and aid to localities.
Notwithstanding any other inconsistent
provisions of law, funding appropriated
herein is authorized for suballocation or
transfer to other state departments, agen-
cies, and authorities, and may be trans-
ferred or interchanged within the depart-
ment of environmental conservation, as
necessary to accomplish the intended
purpose of the federal funds (09IJ2350)
(62014) ..................................... 70,000,000
ENVIRONMENT AND RECREATION (CCP) ........................... 500,000,000
--------------
Capital Projects Funds - Other
Environmental Protection Fund
Climate Change Mitigation and Adaptation Account - 30455
Environment and Recreation Purpose
For services and expenses of projects and
purposes authorized by section 92-s of the
state finance law to receive funding from
the climate change mitigation and adapta-
tion account in accordance with a program-
matic and financial plan to be approved by
the director of the budget, including
suballocation to other state departments
and agencies, according to the following:
Notwithstanding any law to the contrary, to
address greenhouse gas emissions outside
of the power sector including but not
limited to the development of statewide
greenhouse gas inventories, demonstration
projects, community engagement and applied
research related to the transportation
sector or methane and other short-lived
climate pollutant sources; including up to
$500,000 for the regenerate NY grant
program; $500,000 to the North American
Sustainable Refrigeration Council for the
purpose of establishing a natural refrig-
eration demonstration project in a disad-
vantaged community; up to $1,000,000 for:
grants to municipalities for acquisition
of community forests (09GG23ER) (25706) ...... 4,500,000
Notwithstanding any law to the contrary, (a)
for the department of environmental
conservation to enter into a contract or
contracts for the development of local
climate resiliency plans and adaptation
projects, and (b) up to $200,000 to the
148 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
department of agriculture and markets for
services and expenses of the wood products
development council, including suballo-
cation to other state departments and
agencies; $2,000,000 for climate coordina-
tors; and $2,100,000 to the State Univer-
sity of New York College of Environmental
Science and Forestry for the Timbuctoo
pipeline summer climate and careers insti-
tute; $500,000 for a resiliency planting
program; $25,000 to the Nature Conservancy
in New York to support the Staying
Connected Initiative; and $500,000 for
public television stations for the
creation and distribution of climate
change digital teaching tools, in consul-
tation with the department of environ-
mental conservation; and $1,000,000 to the
State University of New York College of
Environmental Science and Forestry,
directly or through its Climate and
Applied Forestry Research Institute, to
support research and development of fores-
try and forest products (09SV23ER) (25711)
............................................. 10,000,000
Notwithstanding any law to the contrary,
smart growth program state assistance
payments, provided on a competitive basis,
to counties, cities, towns, or villages to
establish, update or implement comprehen-
sive plans in a manner consistent with
smart growth; provided, however, that up
to 25 percent of such payments may be
awarded to not-for-profit organizations
for such purposes (09SG23ER) (24824) ......... 5,000,000
Notwithstanding any law to the contrary for
the New York state soil and water conser-
vation committee in conjunction with the
department of agriculture and markets to
develop a pilot climate resilient farms
program consistent with agriculture and
markets law article 11-A and 11-B, agri-
cultural environmental management program
including up to $500,000 for the Cornell
Soil Health Program for research and
education to improve soil resiliency to
climate variations and mitigate greenhouse
gas emissions by carbon sequestration; and
$15,250,000 for grants to preserve forests
and woodlands located on agricultural land
for the purpose of carbon sequestration
and land preservation, which includes
149 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
affirmative practices such as selective
cutting and expansion of woodlands and
forests, funding to be commensurate with
the timeframe and practices used to ensure
undeveloped farmland remains dedicated for
agricultural and environmental purposes,
any land receiving a grant for this
purpose will be encumbered for the time
frame allotted in grant award, practices
and time frames determined by the Depart-
ment of Agriculture and Markets (09CR23ER)
(25718) ..................................... 30,000,000
Climate smart communities projects pursuant
to title 15 of article 54 of the environ-
mental conservation law including clean
vehicle projects(09CS23ER) (25701) .......... 18,000,000
Capital Projects Funds - Other
Environmental Protection Fund
Open Space Account - 30454
Environment and Recreation Purpose
For services and expenses of projects and
purposes authorized by section 92-s of the
state finance law to receive funding from
the open space account in accordance with
a programmatic and financial plan to be
approved by the director of the budget,
including suballocation to other state
departments and agencies, according to the
following:
Costs related to the acquisition of the
following properties: Atlantic Coast, Long
Island Sound, Long Island South Shore
Estuary Reserve, Peconic Pinelands Mari-
time Reserve Projects, Central Pine
Barrens, Shoreham Parcel, Western
Suffolk/Nassau Special Groundwater
Protection Areas, Mott Haven-Port Morris
Waterfront, Bronx River Greenway, Inner
City/Underserved Community Parks, Long
Pond, Staten Island Greenbelt, Staten
Island Bluebelt, Staten Island Wet Woods,
Great Swamp, Plutarch/Black Creek Wetlands
Complex, New York Highlands, Shawangunk
Mountains Region, Delaware River High-
lands, Hudson River Corridor/Hudson River
Estuary and Greenway Trail/Hudson River
School Art Trail, Hudson Valley/New York
City Foodshed, Catskill Unfragmented
Forest, Catskill River and Road Corridors,
New York City Watershed Lands, Taconic
150 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education
Center, Lake George watershed, Lake Cham-
plain watershed, Boeselager forestry,
Rensselaer Plateau, Oomsdale Farm and
Surrounding Landscape, Turtle Conservation
Sites, Region 4 Rail Trail Projects,
Susquehanna River Valley Corridor, Sarato-
ga County, Hudson River Projects, Follens-
by Park, Washington County, Rome Sand
Plains, Black Creek Watershed, Tug Hill
Core Forests and Headwater Streams, Nelson
Swamp, State Park Battlefields, Genny
Green Trail/Link Trail, Onondaga Escarp-
ment, State Parks Greenbelt/Tompkins Coun-
ty, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River
Corridor, Seneca Army Depot Conservation
Area, Lake Erie Tributary Gorges, Buffalo
River Watershed, Catharine Valley Complex,
High-Tor/Bristol Hills/Bare Hill State
Unique Area, Lake Ontario and Lake Erie
Shorelines, Islands and Niagara River,
Long Island Trails and Greenways, Bronx
Harlem Greenway, Harbor Herons Wildlife
Complex, Schunnemunk Mountain/Moodna
Creek/Woodcock Mountain/Hudson Highlands
Connectivity Project, Helderbergs, and
Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area,
Northern Flow River Corridors, Black River
Valley Corridor, Fort Drum Army Compatible
Use Buffer Project, Herkimer Home
Viewshed, Inman Gulf, Massawepie Mire,
Moose River Corridor, St. Lawrence River
Islands, Shoreline and Wetlands, Southern
Skaneateles Lake Forest and Shoreline,
Salmon River Corridor, Emerald Necklace,
Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the
Impacts of Storms, Storm Surges and Flood-
ing on Human and Natural Communities, Long
Distance Trail Corridors, Statewide Small
Projects, State Forest, Unique Area Wild-
life Management Area Protection, Working
Forest Lands, State Park and State Histor-
ic Site Protection, (a) notwithstanding
any law to the contrary, $3,200,000 from
the land acquisition allocation for urban
forestry projects provided that no less
than $500,000 shall be made available for
such programs in cities and towns with
151 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
populations of 65,000 or more; (b)
notwithstanding any law to the contrary,
$3,000,000 from the land acquisition allo-
cation to the land trust alliance for the
purpose of awarding grants on a compet-
itive basis to local land trusts, provided
that up to ten percent of such amount may
be made available for administrative costs
and/or technical assistance; (c) notwith-
standing any law to the contrary, not less
than $4,000,000 for land acquisition in
department of environmental conservation
regions 1, 2 and 3; (d) $5,000,000 to the
land trust alliance for the purpose of
awarding grants on a competitive basis to
local land trusts to purchase conservation
easements, provided that up to ten percent
of such amount may be made available for
administrative costs and/or technical
assistance; and (e) Notwithstanding any
law to the contrary, up to $300,000 to the
Village of Lake Placid for the purchase of
land associated with the Adirondack rail
trail parking area (09LA23ER) (24703) ....... 47,625,000
Albany Pine Bush Preserve Commission
(09AP23ER) (24828) ........................... 4,500,000
Long Island Central Pine Barrens Planning
(09LP23ER) (24829) ........................... 2,500,000
Long Island South Shore Estuary Reserve
(09SE23ER) (24831) ........................... 5,000,000
Agricultural non-point source abatement and
control projects, notwithstanding any law
to the contrary, including projects to
combat harmful algal blooms; (a)
$2,000,000 shall be made available for
services and expenses of the Cornell
University Integrated Pest Management
program; (b) $500,000 shall be made avail-
able to the Cornell Cooperative Extension
of Suffolk County for nutrient management
planning and implementation activities;
and (c) $250,000 shall be made available
to Cornell for the pesticide management
education program to support training and
certification (09AN23ER) (24832) ............ 22,000,000
Non-agricultural non-point source abatement
and control projects notwithstanding any
law to the contrary, $1,000,000 of such
amount shall be made available for Cornell
community integrated pest management
(09NP23ER) (24833) ........................... 7,000,000
152 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
Agriculture and farmland protection activ-
ities, notwithstanding any law to the
contrary, up to $1,000,000 shall be made
available to the tug hill tomorrow land
trust for army compatible use buffer
program projects around Fort Drum, and up
to $97,000 shall be made available to
Cornell University for services and
expenses of land classification, agricul-
ture district mapping and master list of
soils (09FP23ER) (24825) .................... 25,000,000
Biodiversity stewardship and research;
including funding for public New York
universities to conduct field studies and
research on biodiversity issues and up to
$500,000 of this amount to support polli-
nator diversity, up to $300,000 of which
may be allocated to Cornell University,
including research related to the poten-
tial adverse impacts of pesticides such as
neonicitinoids, pursuant to a contract
with the department of agriculture and
markets, including the development of bee
husbandry best management practices such
as pest and pathogen controls; creating
diversity of pollinator habitats; research
to understand, prevent and recover from
pollinator losses; and outreach and educa-
tion; and including $100,000 for the Cary
Institute of Ecosystem Studies to support
the Catskill environmental research and
monitoring program (09BD23ER) (24827) ........ 2,000,000
Notwithstanding any law to the contrary, for
the Hudson River Estuary Management Plan
prepared pursuant to section 11-0306 of
the environmental conservation law,
including projects to combat harmful algal
blooms some or all of which may be allo-
cated to the New England Interstate Water
Pollution Control Commission or Cornell
water resources institute or department of
natural resources for the purposes of
implementing the Hudson River Estuary
Action agenda, $1,000,000 of which shall
be for the Mohawk river action plan
(09HE23ER) (24836) ........................... 8,500,000
Notwithstanding any law to the contrary, for
the Finger Lakes-Lake Ontario Watershed
Protection Alliance (09FL23ER) (24835) ....... 3,000,000
Notwithstanding any law to the contrary, to
the Erie County Soil and Water Conserva-
153 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
tion District for the Lake Erie Watershed
Protection Alliance (09LE23ER) (25764) ......... 250,000
Notwithstanding any law to the contrary, for
the state share of costs of wastewater
treatment improvement projects undertaken
by municipalities to upgrade municipal
systems to meet stormwater, combined sewer
overflow, sanitary sewer overflow and
wastewater treatment discharge require-
ments with priority given to systems that
are in violation of title 8 of article 17
of the environmental conservation law and
aquatic habitat restoration projects
undertaken by municipalities and not-for-
profit corporations for aquatic habitat
restoration projects as defined in subdi-
vision 1 of section 56-0101 of the envi-
ronmental conservation law and including
projects to combat harmful algal blooms;
including up to $3,000,000 to Suffolk
county to provide a 50 percent match for a
program developed in consultation with the
department for research, development and
pilot projects to develop cost effective
methods to address nitrogen and pathogen
loading from septic system or cesspool
effluent or other sources or to support
such efforts without a match at the state
university of Stony Brook directly or
through its research foundation and
$1,500,000 for Suffolk county for sewer
improvement projects; and including
$5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall
pipe, associated conveyance systems,
nitrogen abatement treatment works, ocean
outfall and/or connections, and/or for
costs incurred by Nassau County for the
project to connect the Long Beach waste
water treatment plant collection system to
the Bay Park wastewater treatment plant
and including $250,000 from such amount to
the Long Island regional planning council
for services and expenses related to the
Long Island Nitrogen Action Plan; and
including $5,000,000 to update source
water assessment plans and develop associ-
ated water protection programs some or all
of which may be allocated to the United
States Geological Survey or the New
England Interstate Water Pollution Control
Commission; $150,000 for the Chautauqua
154 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
Lake Association; $95,000 for the Chautau-
qua Lake Partnership; and $1,000,000 to
the State University of New York at Stony
Brook directly or through its research
foundation, to support research develop-
ment and any associated testing or pilot
projects towards improved septic and
wastewater treatment systems to remove
phosphorus; and $25,000 to the Ossi Sports
Club, Inc. for the restoration of Lake
Ossi; and $500,000 to Save the Great South
Bay, Inc. to revitilize the Great South
Bay (09WQ23ER) (24837) ...................... 25,000,000
Notwithstanding any law to the contrary for
New York ocean and Great Lakes ecosystem
conservation projects, consistent with the
policy articulated in article 14 of the
environmental conservation law including
projects to combat harmful algal blooms;
including $450,000 for the Peconic Estuary
Partnership; and $500,000 to the Billion
Oyster Project, Inc. for the construction
of the Head of Bay Oyster Reef(09GL23ER)
(24830) ..................................... 25,000,000
Notwithstanding any law to the contrary, for
the implementation of the recommendations
of the invasive species task force
prepared pursuant to chapter 324 of the
laws of 2003 and for the purposes set
forth in chapter 674 of the laws of 2007,
including not less than $120,000 for
Cornell University for the plant certif-
ication program, provided that not less
than $5,750,000 be made available for
invasive species eradication, including
but not limited to southern pine beetle,
including up to $500,000 to Cornell
University for the control of hemlock
wooly adelgid, and including grants
related to the control and management of
invasive species, and $500,000 to address
the southern pine beetle including up to
$250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the
implementation and administration of a
prescribed fire program. Such funding for
grants shall be provided on a competitive
basis in consultation with the New York
Invasive Species Council (09IS23ER)
(24704) ..................................... 22,000,000
Notwithstanding any law to the contrary, for
Soil and Water Conservation District
155 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
activities as authorized for reimbursement
and funding in section 11-a of the soil
and water conservation districts law
including projects to combat harmful algal
blooms (09SW23ER) (24834) ................... 18,500,000
Notwithstanding any law to the contrary, for
Agricultural Waste Management projects,
including up to $700,000 to Cornell
University, in consultation with the
department, to continue implementing the
dairy acceleration program (09AW23ER)
(24826) ...................................... 1,500,000
Lake George Park Commission (09LG23ER) ......... 900,000
Capital Projects Funds - Other
Environmental Protection Fund
Parks, Recreation and Historic Preservation Account -
30453
Environment and Recreation Purpose
For services and expenses of projects and
purposes authorized by section 92-s of the
state finance law to receive funding from
the parks, recreation and historic preser-
vation account in accordance with a
programmatic and financial plan to be
approved by the director of the budget,
including suballocation to other state
departments and agencies, according to the
following:
Local waterfront revitalization programs,
notwithstanding any law to the contrary,
not less than, $10,500,000 for waterfront
revitalization projects which are in or
primarily serve areas where demographic
and other relevant data for such areas
demonstrate that the areas are densely
populated and have sustained physical
deterioration, decay, neglect, or disin-
vestment, or where a substantial propor-
tion of the residential population is of
low income or is otherwise disadvantaged
and is underserved with respect to the
existing recreational opportunities in the
area including up to $2,000,000 for
updates to existing local waterfront revi-
talization program plans to mitigate
future physical climate risks; and
$500,000 for the Niagara River greenway
commission (09WR23ER) (24700) ............... 18,000,000
Parks, recreation and historic preservation
projects, notwithstanding any law to the
156 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
contrary, not less than, $13,000,000 for
municipal parks projects which are in or
primarily serve areas where demographic
and other relevant data for such areas
demonstrate that the areas are densely
populated and have sustained physical
deterioration, decay, neglect or disin-
vestment or where a substantial proportion
of the residential population is of low
income or is otherwise disadvantaged and
is underserved with respect to the exist-
ing recreational opportunities in the
area; and including $250,000 for Tivoli
Park; $500,000 for the Hudson River Valley
Trail Grants; $150,000 to the State
University of New York college of environ-
mental science and forestry; $225,000 to
Paul Smith's College for the support of
the Adirondack Park interpretive centers;
$300,000 to the Catskill Center for
conservation and development, including
$100,000 for the stewardship program, for
the support of the Catskill Visitors
Center; and $3,000,000 for the connect
kids program facilitating access in title
1 school districts, municipalities, and
not-for-profit organizations to outdoor
recreational activities, public lands and
parks and providing environmental educa-
tion opportunities in environmental
justice, inner city and underserved commu-
nities; $225,000 to the Western New York
Land Conservancy for the Riverline nature
trail and greenway; $100,000 to Catskill
Mountainkeeper for its stewardship
program; $250,000 to the town of Amherst
for a splash pad; and $200,000 to the
Huguenot Historical Society for the resto-
ration of the Bevier-Elting House
(09MP23ER) (24701) .......................... 30,000,000
Notwithstanding any law to the contrary, for
state parks and land and easement infras-
tructure, access and stewardship projects
which shall include capital projects: (i)
on state parks and state lands pursuant to
sections 54-0303 and 56-0307 of the envi-
ronmental conservation law; (ii) on state
parks or state owned lands and easements
under the jurisdiction of the department
of environmental conservation or the
office of parks, recreation and historic
preservation for access opportunities for
157 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
people with disabilities; access to the
State Forest Preserve, State reforesta-
tion, Wildlife Management areas and
conservation easement lands; recreational
trail construction and maintenance:
including but not limited to sustainable
trail crews or other activities related to
sustainable use of the forest preserve and
other state lands that are threatened by
overuse; Catskill and Adirondack camp
ground improvements to public access and
sanitation facilities; environmental
education; facility improvements; archeo-
logical, historic, cultural and natural
resource surveys, forest health surveys,
interpretation, and inventories, and
response to forest pests including south-
ern pine beetle; Forest Preserve and state
forest unit management planning; invasive
species management; conservation easement
public recreation planning; habitat resto-
ration and enhancement; state fish hatch-
ery improvements; state tree nursery
improvements; safety equipment; water
access facilities and safety improvements;
public beach facility development and
improvement; public access improvements at
day use areas; state historic site exteri-
or restoration; and cabin area and camping
facility development, restoration and
reconstruction; (iii) $1,000,000 for
Belleayre Mountain ski center projects;
(iv) $2,000,000 from the public access and
stewardship allocation to Parks & Trails
New York for the purpose of awarding
grants on a competitive basis to local
parks and department of environmental
conservation friends groups, provided that
up to ten percent of such amount may be
made available for administrative costs
and/or technical assistance; (v) public
protection and emergency preparedness
purposes; and (vi) $18,000 to New York
Natural Heritage to update the New York
Protected Areas Database; $10,000,000 for
Adirondack and Catskill visitor safety and
wilderness protection activities to
address issues relating to overuse;
$600,000 to the Adirondack Architectural
Heritage for the management of the Camp
Santononi Historic Area; $100,000 to the
Adirondack Mountain Club for the High
158 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
Peaks Information Center; and $5,500,000
million for research and long-term data
monitoring of lakes in the Adirondack
Park, including $4,500,000 dedicated to
academic partners, including, but not
limited to, Cornell University, Rensselaer
Polytechnic Institute, Syracuse Universi-
ty, and $1,000,000 dedicated to the Ausa-
ble River Association for the Adirondack
Lake Survey Corporation (09ST23ER) (24702)
............................................. 70,000,000
Notwithstanding subdivision 7 of section
92-s of the state finance law or any other
law to the contrary, for services and
expenses of the Hudson River Park Trust
for projects related to the development of
the Hudson River Park consistent with
provisions of chapter 592 of the laws of
1998, including but not limited to utility
infrastructure improvements; provided,
however, such funds shall not be available
for suballocation to any public benefit
corporation or public authority with the
exception of the Hudson River Park Trust
and shall be available solely for the
liabilities incurred by the Hudson River
Park Trust or by other state departments
or agencies on behalf of the Hudson River
Park Trust on or after April 1, 1999.
Provided further that, the comptroller is
hereby authorized and directed to release
monies to the Hudson River Park Trust in
amounts set forth in a schedule approved
by the director of the budget (09HR23ER)
(24820) ...................................... 3,700,000
Notwithstanding any law to the contrary, for
zoos, botanical gardens and aquaria
program (09ZB23ER) (24823) .................. 25,000,000
Notwithstanding any other provisions of law,
for the administration of the programs of
section 79-b of the navigation law
(09NV23ER) (25719) ........................... 2,300,000
Capital Projects Funds - Other
Environmental Protection Fund
Solid Waste Account - 30452
Environment and Recreation Purpose
For services and expenses of projects and
purposes authorized by section 92-s of the
state finance law to receive funding from
the solid waste account in accordance with
159 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
a programmatic and financial plan to be
approved by the director of the budget,
including suballocation to other state
departments and agencies, according to the
following:
Non-hazardous landfill closure projects
(09LC23ER) (24813) ............................. 300,000
Municipal waste reduction or recycling
projects, including developing secondary
recycling markets in New York state, and
$2,500,000 of such amount shall be made
available for municipalities and not-for-
profit food banks for projects for food
donation and the recycling of food scraps;
and $3,000,000 to the Onondaga County
Resource Recovery Agency to build solid
waste capacity and reduce the waste stream
(09MR23ER) (24814) .......................... 20,000,000
Secondary materials regional marketing
assistance (09SM23ER) (24816) .................. 650,000
Pesticide program, not less than $200,000 of
which shall be for activities related to
Long Island pesticide pollution prevention
(09PD23ER) (24818) ........................... 1,500,000
Notwithstanding any law to the contrary, for
the payment of the costs associated with
environmental justice projects and
programs, including but not limited to:
monitoring of air quality; education and
outreach; $4,000,000 of such amount shall
be made available for community impact and
job training grants; including $500,000 of
such amount shall be made available to a
not-for-profit organization for the
purpose of awarding grants on a compet-
itive basis to community groups to build
the capacity of such groups, provided that
up to ten percent may be made available
for administrative costs and/or technical
assistance. Community impact and job
training grants shall be in or affecting
environmental justice communities in an
amount of up to $100,000 for community
groups for projects that address an envi-
ronmental justice community's exposure to
multiple environmental harms and risks,
including lead exposure and shall include
implementation, studies, including air
monitoring, to investigate the environ-
ment, or related public health issues of
the community, research that will be used
to expand the knowledge or understanding
160 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
of the affected community and ways to
improve the resiliency of the affected
community. The results of the investi-
gation shall be disseminated to members of
the affected community. Community groups
eligible for funding must provide services
within the same community as the environ-
mental and/or related public health issues
to be addressed by the project. Such
groups shall be primarily focused on
addressing the environmental and/or
related public health issues of the resi-
dents of the affected community and shall
be comprised primarily of members of the
affected community; and $746,000 for the
college of environmental science and
forestry center for native peoples and the
environment (09EJ23ER) (24713) .............. 15,000,000
Notwithstanding any law to the contrary, for
assessment and recovery of any natural
resource damages (09RD23ER) (24817) .......... 1,775,000
Notwithstanding any law to the contrary, for
the pollution prevention institute, and
including $250,000 for the department to
contract with the Northeast waste manage-
ment officials' association for the Inter-
state Chemicals Clearing house (09PP23ER)
(24815) ...................................... 5,000,000
Environmental health for assessments, test-
ing and actions including but not limited
to abatement to address suspected human
exposure to chemical, physical and micro-
biological agents, including contaminants
in drinking water, including projects to
combat harmful algal blooms, including
vector control for tick-borne illnesses
such as lyme disease; including up to
$500,000 for the CleanSweepNY program; and
$4,000,000 for children's environmental
health centers, including school and
community childhood lead exposure assess-
ment conducted by such centers; and not
more than $3,850,000 for programs to
expand and improve access to local, fresh,
nutritional food to nutritionally under-
served neighborhoods, including but not
limited to the New York State Fresh
Connect Program, expanded Supplemental
Nutrition Assistance Program access,
expanded community supported agriculture
program benefits, and the development of
expanded technological access for these
161 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
communities; $1,000,000 to the State
University of New York at Stony Brook
directly or through its research founda-
tion, to support research development and
any associated testing or pilot projects
towards wastewater and the treatment of
water to remove 1,4 dioxane; and
$1,500,000 to the United States Geological
Survey for the Long Island Ground Water
study (09EH23ER) (25703) .................... 15,000,000
Brownfield opportunity area grants as
authorized pursuant to section 970-r of
the general municipal law (09BO23ER)
(25702) ...................................... 4,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 6,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs (09FM23MO) (81107) ..................... 6,000,000
FISH AND WILDLIFE (CCP) ...................................... 6,500,000
--------------
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Habitat Conservation and Access Account - 32217
Fish and Wildlife Purpose
For services and expenses, including
personal service, nonpersonal service,
fringe benefits and indirect costs related
to management, protection and restoration
fish and wildlife habitat, and improvement
and development of public access for fish
and wildlife related recreation (09HC2354)
(24718) ...................................... 1,500,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Endangered and Threatened Species Mitigation Bank Fund
Fish and Wildlife Purpose
For services and expenses, related to the
projects undertaken to facilitate a net
conservation benefit to endangered and
162 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
threatened species potentially impacted by
a major renewable energy facility as put
forth in section 11-0535-c of environ-
mental conservation law, including subal-
location to other state departments and
agencies (09ES2354) .......................... 5,000,000
LANDS AND FORESTS (CCP) ..................................... 65,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Lands and Forests Purpose
For services and expenses, including
personal service, nonpersonal service,
indirect costs and fringe benefits related
to the stewardship of newly acquired and
existing state lands, for the implementa-
tion of Unit Management Plans, costs
related to invasive species management
activities and for the development and
implementation of Green Certification for
state forests, including suballocation to
other state departments and agencies
(09LF2353) (25766) ........................... 4,000,000
For the purchase and replacement of equip-
ment and facility improvements, including
air monitoring, maintenance of facilities
and emergency response in support of
public safety, including personal
services, fringe benefits and indirect
costs (09PS2353) (24846) ..................... 1,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Lands and Forests Purpose
For the federal share of capital projects
pursuant to lands and forests resources
purposes including the costs associated
with the acquisition of lands under the
forest legacy program, including suballo-
cation to other state departments and
agencies (09FL2353) (24847) ................. 60,000,000
MARINE RESOURCES (CCP) ..................................... $20,000,000
--------------
Capital Projects Funds - Federal
Federal Capital Projects Fund
163 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
ENCON Federal Capital Account - 31364
Marine Projects Purpose
For the federal share of capital projects
undertaken pursuant to fish and wildlife
and marine resources purposes including
the acquisition of property including
suballocation to other state departments
and agencies (09MR23A1) (24708) ............. 20,000,000
NEW YORK WORKS (CCP) ........................................ 90,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Operational Services Purpose
For services, expenses, and indirect costs
related to New York Works projects includ-
ing but not limited to air monitoring
infrastructure investments; remediation of
legacy environmental contamination;
investments in information technology; dam
safety projects and the demolition of
unsafe structures on state-owned land;
state-owned flood protection projects;
shore protection projects; state land
stewardship, public access and environ-
mental and recreation infrastructure
projects, vehicles and equipment; water
quality improvement projects, fish hatch-
eries; rehabilitation and improvements of
various department facilities and systems;
and well plugging; up to $20,000,000 for
the Conklingville, Sixth Lake and Old
Forge Dams; including personal service,
nonpersonal service and fringe benefits,
including suballocation to other state
departments and agencies (09NY2351)
(25768) ..................................... 90,000,000
OPERATIONS (CCP) ............................................ 73,700,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Operational Services Purpose
For rehabilitation and improvements of vari-
ous facilities and systems; including but
not limited to services and expenses of
the Department for payment of various
164 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
liabilities accrued heretofore and here-
after to accrue, pursuant to Articles 15,
17, and 27 of the Environmental Conserva-
tion Law; including personal service and
fringe benefits and indirect costs in
accordance with a programmatic and finan-
cial plan to be approved by the director
of the budget including suballocation to
other state departments and agencies
(09RI2351) (24855) .......................... 41,000,000
For services and expenses, including
personal service, fringe benefits, and
non-personal services necessary for reme-
dial activities to plug or replug aban-
doned oil and gas wells including the
surface restoration of the affected land
pursuant to article 23 of the environ-
mental conservation law (09OG2351) (25767) ..... 500,000
For dam safety and the demolition of unsafe
structures on state-owned land, and for
various dam safety projects including
personal service and fringe benefits
(09DS2351) (24857) ........................... 2,000,000
For replacement of vehicles and heavy duty
construction equipment (09EQ2351) (24856) .... 1,200,000
Capital Projects Funds - Other
Natural Resource Damages Fund
Natural Resource Damages Account - 31900(M)
Operational Services Purpose
For services and expenses related to resto-
ration projects, replacement acquisition
projects or combinations thereof resulting
from successful natural resource damages
claims including suballocation to other
state departments and agencies (09442351)
(24860) ..................................... 26,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Operational Services Purpose
For the federal share of capital projects
undertaken pursuant to Operational
Services purposes including suballocation
to other state departments and agencies
(09OF2351) ................................... 3,000,000
165 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP) ................. 130,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Hazardous Waste Purpose
For payment by the state, as reimbursement
or as an advance from responsible parties
or volunteers for remedial and monitoring
work at sites contaminated with hazardous
waste. No portion of this appropriation
shall be available for expenditure until a
party or parties either responsible for a
site or volunteering to cleanup a site
have entered into an agreement with the
commissioner of the department of environ-
mental conservation or the commissioner's
designee, and which agreement is approved
by the director of the budget, providing
for repayment to the state of an amount
equal to the amount disbursed from this
appropriation. A copy of such agreement
shall be filed with the state comptroller,
the chairman of the senate finance commit-
tee and chairman of the assembly ways and
means committee.
Notwithstanding any other provision of law
to the contrary, the comptroller is
authorized to repay settlements or
advances for specified remedial and moni-
toring projects from this fund with monies
of the hazardous waste remedial fund
received for such projects pursuant to
consent orders and agreements to address
sites contaminated with hazardous waste.
The director of the budget shall certify to
the comptroller the specific portions of
this appropriation for which monies have
been received pursuant to such consent
orders and agreements (09AD23F7) (24868) .... 20,000,000
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Cleanup Account - 31506
Hazardous Waste Purpose
For payment of the state share of the costs
of hazardous waste site remediation
projects, in accordance with title 13 of
article 27 of the environmental conserva-
tion law and section 97-b of the state
finance law, for projects, and for payment
166 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
of state costs associated with the remedi-
ation of offsite contamination at signif-
icant threat sites as provided for in
section 27-1411 of the environmental
conservation law, including personal
service and fringe benefits of the depart-
ments of environmental conservation,
health and law and including suballo-
cations to the departments of health and
law and including costs incidental and
appurtenant thereto, provided that a
portion of such amount may be available
for environmental restoration projects in
accordance with title 5 of article 56 of
the environmental conservation law. None
of this appropriation may be expended for
any purposes authorized in title 12 of
article 27 of the environmental conserva-
tion law (09HB23F7) (24863) ................ 100,000,000
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Remediation Oversight and Assistance
Account - 31505
Hazardous Waste Purpose
For the personal services and fringe bene-
fits of the department of environmental
conservation including suballocation to
the department of health related to the
brownfield cleanup program pursuant to
title 14 of article 27 of the environ-
mental conservation law and the voluntary
cleanup program including costs incurred
prior to April 1, 2023 (09BC23F7) (24867) ... 10,000,000
SOLID WASTE MANAGEMENT (CCP) ................................ 29,200,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Solid Waste Management Purpose
For services and capital expenses related to
the waste management and cleanup program
as put forth in section 27-1915 of envi-
ronmental conservation law, including
suballocation to other state departments
and agencies (09WT2356) (25730) .............. 4,000,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
167 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
New York Environmental Protection and Spill Remediation
Account - 32219
Solid Waste Management Purpose
For services and capital expenses associated
with costs incurred under Article 12 of
the Navigation Law, and for cleanup,
investigation, and removal of petroleum
spills, including prior year liabilities
(09OS2356) (25720) .......................... 21,200,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Hazardous Waste Purpose
For the federal share of the cleanup of
hazardous waste sites pursuant to the
provision of the federal comprehensive
environmental response, compensation and
liability act of 1980 reauthorization or
amendments thereto including suballocation
to other state departments and agencies
(09FS23F7) (24873) ........................... 1,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Solid Waste Management Purpose
For the federal share of capital projects
undertaken pursuant to materials manage-
ment resources purposes including suballo-
cation to other state departments and
agencies (09MF2356) .......................... 3,000,000
WATER RESOURCES (CCP) .................................... 1,184,900,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Flood Control Purpose
For the state's share including personal
service, nonpersonal service, fringe bene-
fits and indirect costs of various shore
protection projects including suballo-
cation to other state departments and
agencies (09W12363) (24880) .................. 1,700,000
For various new and existing flood
protection projects including the state
share of federal sponsored flood control
168 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
projects, and the maintenance of existing
flood control projects; for coastal
erosion hazard area mapping of the state's
Atlantic Ocean and Great Lakes coastlines
and the state share of costs associated
with matching federal funds for a state-
wide flood plain map modernization
program; for the state share of costs
associated with the installation and/or
reinstallation, upgrade, monitoring and
maintenance of a statewide network of
stream flow gauges, including personal
service, nonpersonal service, fringe bene-
fits and indirect costs, including subal-
location to other state departments and
agencies (09FL2363) (24881) .................. 5,000,000
For an advance payment by the state for the
local costs of various shore protection
projects. No portion of this appropriation
shall be available until the respective
municipality has entered into an agreement
with the commissioner of the department of
environmental conservation, and such
agreement is approved by the director of
the budget (09AD2363) (24887) ................ 5,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
An advance for costs incurred relating to
work required for the safety of dams and
other structures impounding water, to be
reimbursed in accordance with section
15-0507 of the environmental conservation
law (09DA2357) (24878) ......................... 500,000
For payment of a portion of the state's
match for federal capitalization grants
for the water pollution control revolving
fund (09RF2357) (24874) ..................... 60,000,000
For services and expenses including personal
service, fringe benefits, and nonpersonal
service for the water pollution control
revolving fund and related water quality
activities including suballocation to
other state departments and agencies
(09SR2357) (25707) ........................... 5,500,000
For services and expenses including personal
service, fringe benefits, and nonpersonal
service for the Excelsior Conservation
Corps program including suballocation to
169 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
other state departments and agencies
(09CC2357) (25708) ............................. 200,000
For the state's share of shore protection or
coastal erosion projects, including the
Army Corp of Engineers South Shore of
Staten Island Project (09SI2357) (25721) .... 74,000,000
The sum of $500,000,000 is hereby appropri-
ated for the costs of clean water infras-
tructure projects, including services,
expenses, and indirect costs, including
but not limited to the following: projects
as authorized by the New York state water
infrastructure improvement act of 2017;
for New York state intermunicipal water
infrastructure projects pursuant to
section 1285-s of the public authorities
law; for water quality improvement
projects, including nonagricultural
nonpoint source abatement and control
projects, municipal wastewater treatment
projects, and municipal separate storm
sewer system projects, and for the proper
management of road salt; for green infras-
tructure projects; for land acquisition
projects, including projects for source
water protection pursuant to title 33 of
article 15 of the environmental conserva-
tion law; for state assistance payments,
services, and expenses to soil and water
conservation districts for the cost of
water quality protection projects awarded
on a competitive basis prioritizing finan-
cial need and hardship, intended to assist
concentrated animal feeding operations;
for the remediation of sites, including
for investigation, mitigation and remedi-
ation of solid waste sites, pursuant to
titles 12 and 13 of article 27 of the
environmental conservation law and
consistent with the provisions of section
97-b of the state finance law, provided
however that no more than $5,000,000 of
such appropriation may be expended for
investigation, mitigation and remediation
of solid waste sites; for replacement of
lead drinking water service lines pursuant
to section 1114 of the public health law;
for New York City for water quality
projects located within the New York City
watershed; for a program to upgrade or
replace septic systems and cesspools
pursuant to section 1285-u of the public
170 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2023-24
authorities law; for water infrastructure
emergency assistance pursuant to section
1285-t of the public authorities law; to
support municipal water quality infras-
tructure programs which may otherwise not
qualify for state support, or may require
additional state support; for the develop-
ment of information technology systems
related to water quality pursuant to
section 3-0315 of the environmental
conservation law; no less than $50,000,000
for the lead service line replacement
program; and no less than $50,000,000 for
the septic system replacement fund. All
or a portion of the appropriation may be
provided to the environmental facilities
corporation or suballocated to any other
department or state agency (09CW2357)
(25722) .................................... 500,000,000
For additional services and expenses for the
costs of clean water infrastructure
projects, whereas $100,000,000 shall be
provided for the Safe Water Infrastructure
Action Program, pursuant to section 3-0322
of the environmental conservation law ...... 100,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
SRF Capitalization Grants Account - 31359
Water Resources Purpose
For federal capitalization grants for the
water pollution control revolving fund
(09SF2357) (24876) ......................... 430,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Water Resources Purpose
For the federal share of capital projects
undertaken pursuant to water resources
purposes including suballocation to other
state departments and agencies (09WF2357) .... 3,000,000
171 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ADMINISTRATION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 54, section 1, of the laws of 2022:
For employee fringe benefits and indirect costs related to employees
paid from department capital projects funds and capital accounts
(09FG2250) (25729) ... 20,000,000 ................ (re. $12,496,000)
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software, and
services. Funds appropriated herein may be suballocated to any other
state department to achieve the purpose of this appropriation
(09CS2250) (24807) ... 18,000,000 ................ (re. $17,591,000)
By chapter 54, section 1, of the laws of 2021:
For employee fringe benefits and indirect costs related to employees
paid from department capital projects funds and capital accounts
(09FG2150) (25729) ... 24,700,000 ................. (re. $9,407,000)
By chapter 54, section 1, of the laws of 2020:
For employee fringe benefits and indirect costs related to employees
paid from department capital projects funds and capital accounts
(09FG2050) (25729) ... 24,700,000 ................. (re. $9,776,000)
By chapter 54, section 1, of the laws of 2019:
For employee fringe benefits and indirect costs related to employees
paid from department capital projects funds and capital accounts
(09FG1950) (25729) ... 24,700,000 ................. (re. $8,846,000)
By chapter 54, section 1, of the laws of 2017:
For alterations, rehabilitation and improvements at education camps
and centers including personal service, fringe benefits and indirect
costs (09ED1750) (24806) ... 500,000 ................ (re. $500,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2015:
For services and expenses including personal service, fringe benefits
and indirect costs relating to the maintenance and upgrade of the
department's information technology infrastructure, including but
not limited to the improved resiliency of the existing computer
systems environment, business continuance, equipment and infrastruc-
ture related to the DEC automated licensing system (DECALS) and
improvements necessary for compliance with statewide cyber security
requirements including suballocation to other state departments and
agencies (09CS1450) (24807) ... 2,000,000 ......... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2013:
For alterations, rehabilitation and improvements at education camps
and centers including personal service, fringe benefits and indirect
costs (09ED1350) (24806) ... 1,000,000 .............. (re. $469,000)
172 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2015:
For services and expenses including personal service, fringe benefits
and indirect costs relating to the maintenance and upgrade of the
department's information technology infrastructure, including but
not limited to the improved resiliency of the existing computer
systems environment, business continuance, equipment and infrastruc-
ture related to the DEC automated licensing system (DECALS) and
improvements necessary for compliance with statewide cyber security
requirements including suballocation to other state departments and
agencies (09CS1350) (24807) ... 4,000,000 ......... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2015:
For services and expenses including personal service, fringe benefits
and indirect costs relating to the maintenance and upgrade of the
department's information technology infrastructure, including but
not limited to the improved resiliency of the existing computer
systems environment, business continuance, equipment and infrastruc-
ture related to the DEC automated licensing system (DECALS) and
improvements necessary for compliance with statewide cyber security
requirements including suballocation to other state departments and
agencies (09CS1250) (24807) ... 1,000,000 ......... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2015:
For services and expenses including personal services and fringe bene-
fits and indirect costs relating to the maintenance and upgrade of
the department's information technology infrastructure, including
but not limited to the improved resiliency of the existing computer
systems environment, business continuance, equipment and infrastruc-
ture related to the DEC automated licensing system (DECALS) and
improvements necessary for compliance with statewide cyber security
requirements including suballocation to other state departments and
agencies (09CS0950) (24807) ... 3,500,000 ......... (re. $1,734,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund - 31364
ENCON Federal Infrastructure and Jobs Act
Administration Projects Purpose
By chapter 54, section 1, of the laws of 2022:
For the expenditure of federal funds including but not limited to
those funds provided for in the Infrastructure Investment and Jobs
Act made available to the department of environmental conservation,
from any federal agency under any federal programs, for environ-
mental purposes including but not limited to construction, recon-
struction, preservation, and operating costs. Any portion of this
appropriation may be transferred to state operations and aid to
localities. Notwithstanding any other inconsistent provisions of
law, funding appropriated herein is authorized for suballocation or
transfer to other state departments, agencies, and authorities, and
173 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
may be transferred or interchanged within the department of environ-
mental conservation, as necessary to accomplish the intended purpose
of the federal funds (09IJ2250) (62014) ............................
50,000,000 ....................................... (re. $25,000,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
ENCON Capital Miscellaneous Gifts Account - 32224
Operational Services Purposes
By chapter 54, section 1, of the laws of 2020:
For services and expenses for projects in support of the department's
mission in accordance with section 3-0321 of the environmental
conservation law (09GI2051) (25613) ................................
1,000,000 ......................................... (re. $1,000,000)
AIR RESOURCES (CCP)
Special Revenue Funds - Other
Clean Air Fund
Mobile Source Account
Air Resources Purpose
By chapter 55, section 1, of the laws of 1999:
For services and expenses relating to the implementation and adminis-
tration of the clean air mobile source program (09MO9955) (24808)
... 3,000,000 ........................................ (re. $97,000)
AIR RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Air Resources Purpose
Air Quality Improvement Projects
By chapter 54, section 1, of the laws of 2002:
For state assistance payments for the state share of the costs of air
quality/green growth projects in accordance with the provisions of
title 6 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Air Quality Project Disbursements". The moneys appropriated herein
may be suballocated to any state department or agency. Further,
moneys herein appropriated may be suballocated only to public
authorities and public benefit corporations specifically authorized
by title 6 of article 56 of the environmental conservation law to
enter into contracts for state assistance payments for the state
share of costs for air quality projects, provided however, that
moneys herein appropriated pursuant to subdivision 1 of section
174 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
56-0603 of the environmental conservation law for state clean-fueled
vehicles projects may be suballocated to any public authority or
public benefit corporation and moneys herein appropriated pursuant
to section 56-0607 of the environmental conservation law for other
air quality projects may be suballocated to the environmental facil-
ities corporation. Notwithstanding any other provision of law to the
contrary, the moneys hereby appropriated shall be available for
state air quality improvement projects in accordance with title 6 of
article 56 of the environmental conservation law upon the issuance
of a certificate of approval of availability by the director of the
division of the budget. The state comptroller shall at the commence-
ment of each month certify to the director of the division of the
budget, the commissioner of environmental conservation, the chairman
of the senate finance committee, and the chairman of the assembly
ways and means committee, the amounts disbursed from this appropri-
ation for "Air Quality Improvement Disbursements" for the month
preceding such certification (09BA0255) (24809) ....................
6,000,000 ......................................... (re. $1,588,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Clean-fueled buses projects .......... 4,000
State clean-fueled vehicles
projects ........................... 2,000
--------------
Total ............................ 6,000
==============
By chapter 55, section 1, of the laws of 2000:
For state assistance payments for the state share of the costs of air
quality/green growth projects in accordance with the provisions of
title 6 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Air Quality Project Disbursements". The moneys appropriated herein
may be suballocated to any state department or agency. Further,
moneys herein appropriated may be suballocated only to public
authorities and public benefit corporations specifically authorized
by title 6 of article 56 of the environmental conservation law to
enter into contracts for state assistance payments for the state
share of costs for air quality projects, provided however, that
moneys herein appropriated pursuant to subdivision 1 of section
56-0603 of the environmental conservation law for state clean-fueled
vehicles projects may be suballocated to any public authority or
public benefit corporation and moneys herein appropriated pursuant
to section 56-0607 of the environmental conservation law for other
air quality projects may be suballocated to the environmental facil-
ities corporation. Notwithstanding any other provision of law to the
175 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
contrary, the moneys hereby appropriated shall be available for
state air quality improvement projects in accordance with title 6 of
article 56 of the environmental conservation law upon the issuance
of a certificate of approval of availability by the director of the
division of the budget. The state comptroller shall at the commence-
ment of each month certify to the director of the division of the
budget, the commissioner of environmental conservation, the chairman
of the senate finance committee, and the chairman of the assembly
ways and means committee, the amounts disbursed from this appropri-
ation for "Air Quality Improvement Disbursements" for the month
preceding such certification (09BA0055) (24809) ....................
26,000,000 .......................................... (re. $102,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
State clean-fueled vehicles
projects ........................... 2,000
Clean-fueled buses projects .......... 4,000
Clean air for schools projects ...... 20,000
--------------
Total ............................. 26,000
==============
By chapter 55, section 1, of the laws of 1999:
For state assistance payments for the state share of the costs of air
quality/green growth projects in accordance with the provisions of
title 6 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Air Quality Project Disbursements". The moneys appropriated herein
may be suballocated to any state department or agency. Further,
moneys herein appropriated may be suballocated only to public
authorities and public benefit corporations specifically authorized
by title 6 of article 56 of the environmental conservation law to
enter into contracts for state assistance payments for the state
share of costs for air quality projects, provided however, that
moneys herein appropriated pursuant to subdivision 1 of section
56-0603 of the environmental conservation law for state clean-fueled
vehicles projects may be suballocated to any public authority or
public benefit corporation and moneys herein appropriated pursuant
to section 56-0607 of the environmental conservation law for other
air quality projects may be suballocated to the environmental facil-
ities corporation. Notwithstanding any other provision of law to the
contrary, the moneys hereby appropriated shall be available for
state air quality improvement projects in accordance with title 6 of
article 56 of the environmental conservation law upon the issuance
of a certificate of approval of availability by the director of the
division of the budget. The state comptroller shall at the commence-
176 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment of each month certify to the director of the division of the
budget, the commissioner of environmental conservation, the chairman
of the senate finance committee, and the chairman of the assembly
ways and means committee, the amounts disbursed from this appropri-
ation for "Air Quality Improvement Disbursements" for the month
preceding such certification (09BA9955) (24809) ....................
37,000,000 ........................................... (re. $38,000)
Project Schedule
PROJECT AMOUNT
-------------------------------------------
(thousands of dollars)
State clean-fueled vehicles
projects ........................... 4,000
Clean-fueled buses projects .......... 8,000
Clean air for schools projects ...... 25,000
--------------
Total ............................. 37,000
==============
By chapter 55, section 1, of the laws of 1998:
For state assistance payments for the state share of the costs of air
quality/green growth projects in accordance with the provisions of
title 6 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Air Quality Project Disbursements". The moneys appropriated herein
may be suballocated to any state department or agency. Further,
moneys herein appropriated may be suballocated only to public
authorities and public benefit corporations specifically authorized
by title 6 of article 56 of the environmental conservation law to
enter into contracts for state assistance payments for the state
share of costs for air quality projects, provided however, that
moneys herein appropriated pursuant to paragraph one of section
56-0603 of the environmental conservation law for state clean-fueled
vehicles projects may be suballocated to any public authority or
public benefit corporation and moneys herein appropriated pursuant
to section 56-0607 of the environmental conservation law for other
air quality projects may be suballocated to the environmental facil-
ities corporation. Notwithstanding the provisions of any general or
special law, the moneys hereby appropriated shall be available for
state air quality improvement projects in accordance with title 6 of
article 56 of the environmental conservation law upon the issuance
of a certificate of approval of availability by the director of the
division of the budget. The state comptroller shall at the commence-
ment of each month certify to the director of the division of the
budget, the commissioner of environmental conservation, the chairman
of the senate finance committee, and the chairman of the assembly
ways and means committee the amounts disbursed from this appropri-
ation for "Air Quality Improvement Disbursements" for the month
177 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
preceding such certification (09BA9855) (24809) ....................
44,000,000 ........................................ (re. $3,121,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
State clean-fueled vehicles
projects ........................... 6,000
Clean-fueled buses projects ......... 10,000
Other air quality projects ........... 3,000
Clean air for schools projects ...... 10,000
Clean air for schools projects ...... 15,000
--------------
Total ............................. 44,000
==============
By chapter 55, section 1, of the laws of 1997:
For state assistance payments for the state share of the costs of air
quality/green growth projects in accordance with the provisions of
title 6 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Air Quality Project Disbursements". The moneys appropriated herein
may be suballocated to any state department or agency. Further,
moneys herein appropriated may be suballocated only to public
authorities and public benefit corporations specifically authorized
by title 6 of article 56 of the environmental conservation law to
enter into contracts for state assistance payments for the state
share of costs for air quality projects, provided however, that
moneys herein appropriated pursuant to paragraph one of section
56-0603 of the environmental conservation law for state clean-fueled
vehicles projects may be suballocated to any public authority or
public benefit corporation and moneys herein appropriated pursuant
to section 56-0607 of the environmental conservation law for other
air quality projects may be suballocated to the environmental facil-
ities corporation. Notwithstanding the provisions of any general or
special law, the moneys hereby appropriated shall be available for
state air quality improvement projects in accordance with title 6 of
article 56 of the environmental conservation law upon the issuance
of a certificate of approval of availability by the director of the
division of the budget. The state comptroller shall at the commence-
ment of each month certify to the director of the division of the
budget, the commissioner of environmental conservation, the chairman
of the senate finance committee, and the chairman of the assembly
ways and means committee the amounts disbursed from this appropri-
ation for "Air Quality Improvement Disbursements" for the month
preceding such certification (09BA9755) (24809) ....................
80,000,000 ....................................... (re. $22,568,000)
178 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
State clean-fueled vehicles
projects ........................... 4,000
Clean-fueled buses projects .......... 4,000
Other air quality projects .......... 17,000
Clean air for schools projects ...... 25,000
Environmental compliance
assistance projects - air
quality .......................... 30,000
--------------
Total ............................ 80,000
==============
AIR RESOURCES - EQBA (CCP)
Capital Projects Funds - Other
Capital Projects Fund - EQBA (Bondable) - 30000
Air Resources Purpose
Municipal Air Quality Improvement Projects
By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
section 1, of the laws of 2003:
For payment of the costs of state air quality improvement projects
including suballocation to other state departments and agencies
(09720255) (24810) ... 5,810,000 .................. (re. $5,782,000)
By chapter 54, section 1, of the laws of 1983, as amended by chapter 55,
section 1, of the laws of 1996:
For the state share of the cost of municipal air quality improvement
projects, including the payment of liabilities incurred prior to
April one, nineteen hundred eighty-three (02878655) (24810) ...
15,689,000 ............................................ (re. $8,000)
By chapter 54, section 3, of the laws of 1981, as amended by chapter 54,
section 3, of the laws of 1993:
For the state share of the cost of municipal air quality improvement
projects, including the payment of liabilities incurred prior to
April 1, 1981 (00333755) (24810) ... .............................
20,222,000 ............................................ (re. $2,000)
By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
section 3, of the laws of 1982, for: The state share of the cost of
municipal air quality improvement projects, including the payment of
liabilities incurred prior to April 1, 1975 (00320655) (24810)
... ................................................. (re. $2,000)
By chapter 54, section 1, of the laws of 1974, as amended by chapter 54,
section 3, of the laws of 1988, for: The state share of the cost of
179 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
municipal air quality improvement projects including the payment of
liabilities incurred prior to April 1, 1974 (00319455) (24810)
... ..... 15,483,930 ................................ (re. $1,000)
By chapter 673, section 4, of the laws of 1973, as amended by chapter
54, section 3, of the laws of 1989, for: The state share of the cost
of municipal air quality improvement projects (00319055) (24810)
... ..... 15,230,931 .............................. (re. $342,000)
State Air Quality Improvement Projects
By chapter 54, section 1, of the laws of 1987:
For payment of the cost of State air quality improvement projects,
including the payment of liabilities incurred prior to April 1, 1987
(09A18755) (24811) .................................................
2,588,000 ........................................... (re. $528,000)
CLEAN WATER/CLEAN AIR BOND FUND (CCP)
Capital Projects Funds - Other
Clean Water/Clean Air Bond Fund
Clean Water/Clean Air Bond Fund Account - 30690
Bond Proceeds Purpose
By chapter 55, section 1, of the laws of 1997:
The sum of $1,475,000,000 or so much thereof as may be necessary is
hereby appropriated from the clean water/clean air bond fund as
established by section 97-aaa of the state finance law for payment
to the capital projects fund for disbursements from such fund as
certified by the state comptroller as: "Safe Drinking Water Project
Disbursements", "Clean Water Project Disbursements", "Solid Waste
Project Disbursements", "Environmental Restoration Project Disburse-
ments", and "Air Quality Project Disbursements".
The director of the budget shall designate to the state comptroller
appropriations made from the capital projects fund which are eligi-
ble for reimbursement from the clean air/clean water bond fund. The
state comptroller shall at the commencement of each month certify to
the director of the budget, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee, the amounts disbursed from such appropriations.
No moneys shall be available from the clean water/clean air bond fund
until a certificate of approval of availability shall have been
issued by the director of the budget, and a copy of such certificate
of approval filed with the chairman of the senate finance committee
and the chairman of the assembly ways and means committee (09019710)
(80913) ... 1,475,000,000 ....................... (re. $105,531,000)
CLEAN WATER/CLEAN AIR IMPLEMENTATION (CCP)
Capital Projects Funds - Other
Clean Water/Clean Air Implementation Fund
Clean Water/Clean Air Implementation-DEC Account - 30501
180 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Clean Water/Clean Air Implementation Purpose
By chapter 55, section 1, of the laws of 2009:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act
(09BA09WI) (81044) ... 1,050,000 .................. (re. $1,050,000)
By chapter 55, section 1, of the laws of 2008:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act
(09BA08WI) (81044) ... 1,050,000 .................. (re. $1,050,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act
(09BA07WI) (81044) ... 1,050,000 .................. (re. $1,050,000)
By chapter 55, section 1, of the laws of 2006:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act
(09BA06WI) (81044) ... 1,050,000 .................... (re. $348,000)
By chapter 55, section 1, of the laws of 2005:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act
(09BA05WI) (81044) ... 1,050,000 .................. (re. $1,050,000)
By chapter 55, section 1, of the laws of 2004:
For services and expenses including personal services and fringe bene-
fits necessary to implement the clean water/clean air bond act in
accordance with the purpose included in the following project sched-
ule (09BA04WI) (81044) ... 2,527,000 .............. (re. $1,857,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Clean Water .......................... 1,071
Environmental Restoration ............ 1,138
Solid Waste ............................ 318
--------------
Total ............................. 2,527
==============
CLEAN WATER, CLEAN AIR, AND GREEN JOBS ENVIRONMENTAL BOND ACT (CCP)
Capital Projects Fund - Other
Capital Projects Fund - Clean Water, Clean Air, And Green Jobs
Environmental Bond Act (Bondable) - 30000
Clean Water, Clean Air, And Green Jobs Environmental Bond Act Purpose
By chapter 54, section 1, of the laws of 2022:
181 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of the costs of capital projects, pursuant to the
environmental bond act of 2022 and section 58-0303 of the environ-
mental conservation law, to be reimbursed from bond proceeds for
capital projects for restoration and flood risk reduction, including
not more than $250,000,000 for a voluntary real property buy-out
program, not less than $100,000,000 for shoreline protection, and
not less than $100,000,000 for inland flooding and the local water-
front revitalization program.
Costs of such projects may include but not be limited to appraisal,
surveying, planning, engineering and architectural services, plans
and specifications, consultation and legal services, site prepara-
tion, demolition, construction, and other direct expenses incident
to such project, including personal services, fringe benefits, and
indirect costs necessary for implementation. All or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority including but not limited to
the environmental facilities corporation and New York state energy
research and development authority.
No part of this appropriation shall be made available prior to the
approval of the environmental bond act of 2022 by the voters at the
general election to be held in November of 2022 (09FR22RM)
(62016) ... 1,100,000,000 ..................... (re. $1,100,000,000)
For the payment of the costs of capital projects, pursuant to the
environmental bond act of 2022 and section 58-0503 of the environ-
mental conservation law, to be reimbursed from bond proceeds for
capital projects for open space land conservation and recreation
including not more than $75,000,000 for fish hatcheries, not less
than $300,000,000 for open space, and not less than $150,000,000 for
farmland protection.
Costs of such projects may include but not be limited to appraisal,
surveying, planning, engineering and architectural services, plans
and specifications, consultation and legal services, site prepara-
tion, demolition, construction, and other direct expenses incident
to such project, including personal services, fringe benefits, and
indirect costs necessary for implementation. All or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority including but not limited to
the environmental facilities corporation and New York state energy
research and development authority.
No part of this appropriation shall be made available prior to the
approval of the environmental bond act of 2022 by the voters at the
general election to be held in November of 2022 (09OP22RM) (62017)
... 650,000,000 ................................. (re. $650,000,000)
For the payment of the costs of capital projects, pursuant to the
environmental bond act of 2022 and section 58-0703 of the environ-
mental conservation law, to be reimbursed from bond proceeds for
capital projects for climate change mitigation, including not less
than $400,000,000 for green buildings, not less than $500,000,000
for zero emission transportation, including the purchase or conver-
sion of zero emission school buses, and supporting infrastructure,
not less than $100,000,000 for climate adaptation and mitigation
projects, and not less than $200,000,000 for disbursement to reduce
182 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or eliminate water pollution or air pollution affecting disadvan-
taged communities.
Costs of such projects may include but not be limited to appraisal,
surveying, planning, engineering and architectural services, plans
and specifications, consultation and legal services, site prepara-
tion, demolition, construction, and other direct expenses incident
to such project, including personal services, fringe benefits, and
indirect costs necessary for implementation. All or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority including but not limited to
the environmental facilities corporation and New York state energy
research and development authority.
No part of this appropriation shall be made available prior to the
approval of the environmental bond act of 2022 by the voters at the
general election to be held in November of 2022 (09CC22RM) (62018)
... 1,500,000,000 ............................. (re. $1,500,000,000)
For the payment of the costs of capital projects, pursuant to the
environmental bond act of 2022 and section 58-0903 of the environ-
mental conservation law, to be reimbursed from bond proceeds for
capital projects for water quality improvement and resilient infras-
tructure, including not less than $200,000,000 for water infrastruc-
ture improvement act projects and not less than $250,000,000 for
municipal stormwater grants.
Costs of such projects may include but not be limited to appraisal,
surveying, planning, engineering and architectural services, plans
and specifications, consultation and legal services, site prepara-
tion, demolition, construction, and other direct expenses incident
to such project, including personal services, fringe benefits, and
indirect costs necessary for implementation. All or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority including but not limited to
the environmental facilities corporation and New York state energy
research and development authority.
No part of this appropriation shall be made available prior to the
approval of the environmental bond act of 2022 by the voters at the
general election to be held in November of 2022 (09WQ22RM) (62019)
... 650,000,000 ................................. (re. $650,000,000)
For the payment of the costs of capital projects, pursuant to the
environmental bond act of 2022 and article 58 the environmental
conservation law, to be reimbursed from bond proceeds for capital
projects that preserve, enhance, and restore New York's natural
resources and reduce the impact of climate change.
Costs of such projects may include but not be limited to appraisal,
surveying, planning, engineering and architectural services, plans
and specifications, consultation and legal services, site prepara-
tion, demolition, construction, and other direct expenses incident
to such project, including personal services, fringe benefits, and
indirect costs necessary for implementation. All or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority including but not limited to
the environmental facilities corporation and New York state energy
research and development authority.
183 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
No part of this appropriation shall be made available prior to the
approval of the environmental bond act of 2022 by the voters at the
general election to be held in November of 2022 (09RS22RM) (62020)
... 300,000,000 ................................. (re. $300,000,000)
Capital Projects Fund - Other
Clean Water, Clean Air, and Green Jobs Environmental Bond Act
Bond Fund
Clean Water, Clean Air, and Green Jobs Environmental Bond Act
Bond Fund Account - 30720
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 2022:
The sum of $4,200,000,000, or so much thereof as may be necessary and
available, is hereby appropriated from the clean water, clean air,
and green jobs environmental bond act bond fund as established by
section 97-tttt of the state finance law in accordance with the
provisions of such section, as added by a chapter of the laws of
2022, for payment to the capital projects fund in order to reimburse
such fund for disbursements certified by the state comptroller as
bondable under the provisions of the environmental bond act of 2022
"clean water, clean air, and green jobs environmental bond act".
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the capital
projects fund for purposes for which clean water, clean air, and
green jobs environmental bond act expenditures are authorized. The
state comptroller shall at the commencement of each month certify to
the director of the budget, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee, the amounts disbursed from the appropriations so designated by
the director of the budget from the capital projects fund for such
purposes for the month preceding such certification and such certif-
ication shall not exceed in the aggregate the moneys hereby appro-
priated. A copy of each such certificate shall also be delivered to
departments, agencies, and public authorities to which such capital
project fund appropriations are made available.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the clean water, clean air, and green
jobs environmental bond act bond fund until a certificate of
approval of availability shall have been issued by the director of
the budget, and a copy of such certificate of approval filed with
the state comptroller, the chairman of the senate finance committee,
and the chairman of the assembly ways and means committee. Such
certificate may be amended from time to time by the director of the
budget, and a copy of each such amendment shall be filed with the
state comptroller, the chairman of the senate finance committee, and
the chairman of the assembly ways and means committee (09RM2210) ...
4,200,000,000 ................................. (re. $4,200,000,000)
ENVIRONMENT AND RECREATION (CCP)
Capital Projects Funds - Other
184 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Environmental Protection Fund
Climate Change Mitigation and Adaptation Account - 30455
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other shortlived climate
pollutant sources; including up to $500,000 for the regenerate NY
grant program; $250,000 to the North American Sustainable Refriger-
ation Council for the purpose of establishing a natural refriger-
ation demonstration project in a disadvantaged community (09GG22ER)
(25706) ... 2,500,000 ............................. (re. $2,500,000)
Notwithstanding any law to the contrary, (a) for the department of
environmental conservation to enter into a contract or contracts for
the development of local climate resiliency plans and adaptation
projects, and (b) up to $200,000 to the department of agriculture
and markets for services and expenses of the wood products develop-
ment council, including suballocation to other state departments and
agencies; $1,750,000 for climate coordinators; and $2,100,000 to the
State University of New York College of Environmental Science and
Forestry for the Timbuctoo pipeline summer climate and careers
institute; and $500,000 to the State University of New York College
of Environmental Science and Forestry, directly or through its
Climate and Applied Forestry Research Institute, to support research
and development of forestry and forest products (09SV22ER) (25711)
... 5,300,000 ..................................... (re. $5,300,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG22ER) (24824)
... 3,000,000 ..................................... (re. $3,000,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-A and 11-B, agricultural environmental management program includ-
ing up to $500,000 for the Cornell Soil Health Program for research
and education to improve soil resiliency to climate variations and
mitigate greenhouse gas emissions by carbon sequestration (09CR22ER)
(25718) ... 16,750,000 ........................... (re. $16,750,000)
185 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program; up to $500,000 for:
grants to municipalities for acquisition of community forests;
$1,000,000 for municipal pilot programs for publicly accessible
electric vehicle fast chargers installed on municipal infrastructure
including for curbside charging stations (09CS22ER) (25701) ........
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other short-lived
climate pollutant sources; including up to $500,000 for the regener-
ate NY grant program (09GG21ER) (25706) ............................
1,500,000 ......................................... (re. $1,500,000)
Notwithstanding any law to the contrary, (a) for the department of
environmental conservation to enter into a contract or contracts for
the development of local climate resiliency plans and adaptation
projects, and (b) up to $200,000 to the department of agriculture
and markets for services and expenses of the wood products develop-
ment council, including suballocation to other state departments and
agencies (09SV21ER) (25711) ... 800,000 ............. (re. $800,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG21ER) (24824)
... 2,000,000 .................................... (re. $2,000,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-A, agricultural environmental management program including up to
$200,000 for the Cornell Soil Health Program for research and educa-
tion to improve soil resiliency to climate variations and mitigate
greenhouse gas emissions by carbon sequestration (09CR21ER) (25718)
... 4,500,000 .................................... (re. $4,237,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program; up to $500,000 for:
186 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
grants to municipalities for acquisition of community forests; and
not less than $1,000,000 for municipal pilot programs for publicly
accessible electric vehicle fast chargers installed on municipal
infrastructure (09CS21ER) (25701) ..................................
10,300,000 ....................................... (re. $10,300,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other short-lived
climate pollutant sources; including up to $500,000 for the regener-
ate NY grant program (09GG20ER) (25706) ............................
1,500,000 ......................................... (re. $1,491,000)
Notwithstanding any law to the contrary, (a) for the department of
environmental conservation to enter into a contract or contracts for
the development of local climate resiliency plans and adaptation
projects, and (b) up to $200,000 to the department of agriculture
and markets for services and expenses of the wood products develop-
ment council, including suballocation to other state departments and
agencies (09SV20ER) (25711) ... 1,000,000 ......... (re. $1,000,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG20ER)
(24824) ... 2,000,000 ............................. (re. $2,000,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-a, agricultural environmental management program including up to
$200,000 for the Cornell Soil Health Program for research and educa-
tion to improve soil resiliency to climate variations and mitigate
greenhouse gas emissions by carbon sequestration (09CR20ER)
(25718) ... 4,500,000 ............................. (re. $4,300,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program; $50,000 to Groundwork
Hudson Valley; and up to $500,000 for: grants to municipalities for
aquisition of community forests (09CS20ER) (25701) .................
10,150,000 ........................................ (re. $9,921,000)
187 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other short-lived
climate pollutant sources; (a) up to $500,000 for the regenerate NY
grant program; and (b) up to $500,000 for Cornell for the natural
working lands agricultural inventory (09GG19ER) (25706) ............
1,500,000 ......................................... (re. $1,255,000)
Notwithstanding any law to the contrary, (a) for the department of
environmental conservation to enter into a contract or contracts for
the development of local climate resiliency plans and adaptation
projects, and (b) up to $200,000 to the department of agriculture
and markets for services and expenses of the wood products develop-
ment council, including suballocation to other state departments and
agencies (09SV19ER) (25711) ... 2,000,000 ......... (re. $1,803,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG19ER)
(24824) ... 2,000,000 ............................. (re. $1,751,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-a, agricultural environmental management program including up to
$200,000 for the Cornell Soil Health Program for research and educa-
tion to improve soil resiliency to climate variations and mitigate
greenhouse gas emissions by carbon sequestration, and up to $400,000
for the Dutchess county soil and water conservation district to
implement a Hudson Valley Carbon Farming Pilot project to study the
carbon and other greenhouse gas sequestration potential of on-farm
best management practices in cooperation with the Columbia, Ulster,
Sullivan, and Orange county soil and water conservation districts.
Such study shall consist of no less than eight commercial farms and
orchards, and shall be no longer than two years in duration, with
soil testing for carbon content and water holding capacity at six
month intervals (09CR19ER) (25718) ... 4,500,000 .. (re. $2,658,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program (09CS19ER) (25701) ......
10,650,000 ....................................... (re. $10,266,000)
188 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other short-lived
climate pollutant sources (09GG18ER) (25706) .......................
1,000,000 ........................................... (re. $979,000)
Notwithstanding any law to the contrary, for the department of envi-
ronmental conservation to enter into a contract or contracts for the
development of local climate resiliency plans and adaptation
projects (09SV18ER) (25711) ... 3,000,000 ......... (re. $1,896,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG18ER) (24824)
... 2,000,000 .................................... (re. $1,392,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-a, agricultural environmental management program including up to
$200,000 for the Cornell Soil Health Program for research and educa-
tion to improve soil resiliency to climate variations and mitigate
greenhouse gas emissions by carbon sequestration (09CR18ER) (25718)
... 2,500,000 .................................... (re. $1,086,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program (09CS18ER) (25701) ......
10,650,000 ........................................ (re. $9,632,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of statewide greenhouse gas inventories, demon-
stration projects, community engagement and applied research related
to the transportation sector or methane and other short-lived
189 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
climate pollutant sources (09GG17ER) (25706) .......................
1,700,000 ......................................... (re. $1,700,000)
Notwithstanding any law to the contrary, for the department of envi-
ronmental conservation to fund climate adaptation projects and to
provide up to $750,000 to support municipalities incorporation of
guidance developed under the community risk and resiliency act into
their local planning and ordinances (09SV17ER) (25711) .............
750,000 ............................................. (re. $711,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG17ER) (24824)
... 2,000,000 .................................... (re. $1,333,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-a, agricultural environmental management program including up to
$400,000 for the Cornell Soil Health Program for research and educa-
tion to improve soil resiliency to climate variations and mitigate
greenhouse gas emissions by carbon sequestration; and up to $50,000
in consultation with the department of taxation and finance, the
department of agriculture and markets and the empire state develop-
ment corporation, for the study of incentives for carbon sequester-
ing farming practices which may include tax credits and grants and
systems or methods of quantifying carbon sequestration for such
incentives (09CR17ER) (25718) ... 2,500,000 ......... (re. $576,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law including clean vehicle
projects; notwithstanding any law to the contrary, including
$500,000 for a resiliency planting program; and including $500,000
to implement easily replicated renewable energy projects, including
solar arrays, heat pumps, and wind turbines across the state in
public low income housing in suburban, urban, and rural areas with
the goal of advancing employment opportunities for individuals
living in environmental justice communities and individuals who have
been discharged from state correctional facilities or local jails
(09CS17ER) (25701) ... 12,000,000 ................. (re. $9,107,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
climate change mitigation and adaptation account in accordance with
a programmatic and financial plan to be approved by the director of
the budget, including suballocation to other state departments and
agencies, according to the following:
Notwithstanding any law to the contrary, to address greenhouse gas
emissions outside of the power sector including but not limited to
the development of inventories, demonstration projects and applied
190 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
research related to the transportation sector or methane sources
(09GG16ER) (25706) ... 1,000,000 .................... (re. $576,000)
Notwithstanding any law to the contrary, smart growth program state
assistance payments, provided on a competitive basis, to counties,
cities, towns, or villages to establish, update or implement compre-
hensive plans in a manner consistent with smart growth; provided,
however, that up to 25 percent of such payments may be awarded to
not-for-profit organizations for such purposes (09SG16ER) (24824)
... 2,000,000 ...................................... (re. $942,000)
Notwithstanding any law to the contrary for the New York state soil
and water conservation committee in conjunction with the department
of agriculture and markets to develop a pilot climate resilient
farms program consistent with agriculture and markets law article
11-a, agricultural environmental management program (09CR16ER)
(25718) ... 2,500,000 ............................... (re. $462,000)
Climate smart communities projects pursuant to title 15 of article 54
of the environmental conservation law (09CS16ER) (25701) ...........
14,000,000 ........................................ (re. $4,986,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2017:
Notwithstanding any law to the contrary, to conduct state vulnerabili-
ty assessments (09SV16ER) (25711) ... 2,500,000 ... (re. $1,613,000)
Capital Projects Funds - Other
Environmental Protection Fund
Open Space Account - 30454
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlantic
Coast, Long Island Sound, Long Island South Shore Estuary Reserve,
Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
Shoreham Parcel, Western Suffolk/Nassau Special Groundwater
Protection Areas, Mott Haven-Port Morris Waterfront, Bronx River
Greenway, Inner City/Underserved Community Parks, Long Pond, Staten
Island Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods,
Great Swamp, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Shawangunk Mountains Region, Delaware River Highlands, Hudson
River Corridor/Hudson River Estuary and Greenway Trail/Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
191 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, HighTor/Bristol Hills/Bare Hill
State Unique Area, Lake Ontario and Lake Erie Shorelines, Islands
and Niagara River, Long Island Trails and Greenways, Bronx Harlem
Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $3,200,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more, and including up to $200,000 for munici-
pal grants for retreeing public lands impacted by invasive species;
(b) notwithstanding any law to the contrary, $3,000,000 from the
land acquisition allocation to the land trust alliance for the
purpose of awarding grants on a competitive basis to local land
trusts, provided that up to ten percent of such amount may be made
available for administrative costs and/or technical assistance; (c)
notwithstanding any law to the contrary, not less than $4,000,000
for land acquisition in department of environmental conservation
regions 1, 2 and 3; (d) $1,500,000 to the land trust alliance for
the purpose of awarding grants on a competitive basis to local land
trusts to purchase conservation easements, provided that up to ten
percent of such amount may be made available for administrative
costs and/or technical assistance (09LA22ER) (24703) ...............
40,000,000 ....................................... (re. $40,000,000)
Albany Pine Bush Preserve Commission (09AP22ER) (24828) ..............
3,000,000 ......................................... (re. $3,000,000)
Long Island Central Pine Barrens Planning (09LP22ER) (24829) .........
2,500,000 ......................................... (re. $2,500,000)
Notwithstanding any law to the contrary, for services and expenses of
the following commissions: $259,000 for Susquehanna river basin
commission; $359,500 for the Delaware river basin commission;
$14,100 for the Ohio river basin commission; $41,600 for the Inter-
state environmental commission; and $38,000 for the New England
192 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Interstate commission; and $373,000 for the college of environmental
science and forestry center for native peoples and the environment
(09EC22ER) (25705) ... 1,085,200 .................... (re. $993,000)
Long Island South Shore Estuary Reserve (09SE22ER) (24831) ...........
1,000,000 ......................................... (re. $1,000,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, including projects to combat harm-
ful algal blooms; (a) $2,000,000 shall be made available for
services and expenses of the Cornell University Integrated Pest
Management program; (b) $500,000 shall be made available to the
Cornell Cooperative Extension of Suffolk County for nutrient manage-
ment planning and implementation activities; and (c) $250,000 shall
be made available to Cornell for the pesticide management education
program to support training and certification (09AN22ER) (24832) ...
20,000,000 ....................................... (re. $20,000,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $1,000,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP22ER) (24833) ... 6,200,000 ....... (re. $6,200,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $96,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP22ER) (24825) ... 21,000,000 ................ (re. $21,000,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on
biodiversity issues and up to $500,000 of this amount to support
pollinator diversity, up to $300,000 of which may be allocated to
Cornell University, including research related to the potential
adverse impacts of pesticides such as neonicitinoids, pursuant to a
contract with the department of agriculture and markets, including
the development of bee husbandry best management practices such as
pest and pathogen controls; creating diversity of pollinator habi-
tats; research to understand, prevent and recover from pollinator
losses; and outreach and education; and including $100,000 for the
Cary Institute of Ecosystem Studies to support the Catskill environ-
mental research and monitoring program (09BD22ER) (24827) ...
1,750,000 ......................................... (re. $1,750,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, including projects to combat harmful algal
blooms some or all of which may be allocated to the New England
Interstate Water Pollution Control Commission or Cornell water
resources institute or department of natural resources for the
purposes of implementing the Hudson River Estuary Action agenda,
$1,000,000 of which shall be for the Mohawk river action plan
(09HE22ER) (24836) ... 7,500,000 .................. (re. $7,372,000)
Notwithstanding any law to the contrary, for the Finger Lakes-Lake
Ontario Watershed Protection Alliance (09FL22ER) (24835) ...........
2,500,000 ......................................... (re. $2,500,000)
193 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any law to the contrary, for the Friends of the Upper
Delware River to implement the Delaware River Basin Restoration
Program, including up to $100,000 for operational expenses
(09UD22ER) (62028) ... 300,000 ...................... (re. $300,000)
Notwithstanding any law to the contrary, to the Erie County Soil and
Water Conservation District for the Lake Erie Watershed Protection
Alliance (09LE22ER) (25764) ... 250,000 ............. (re. $250,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and including projects to combat
harmful algal blooms; including up to $3,000,000 to Suffolk county
to provide a 50 percent match for a program developed in consulta-
tion with the department for research, development and pilot
projects to develop cost effective methods to address nitrogen and
pathogen loading from septic system or cesspool effluent or other
sources or to support such efforts without a match at the state
university of Stony Brook directly or through its research founda-
tion and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, and/or for costs incurred by Nassau County for the
project to connect the Long Beach waste water treatment plant
collection system to the Bay Park wastewater treatment plant and
including $250,000 from such amount to the Long Island regional
planning council for services and expenses related to the Long
Island Nitrogen Action Plan; and including $5,000,000 to update
source water assessment plans and develop associated water
protection programs some or all of which may be allocated to the
United States Geological Survey or the New England Interstate Water
Pollution Control Commission; $150,000 for the Chautauqua Lake Asso-
ciation; $95,000 for the Chautauqua Lake Partnership; and $1,000,000
to the State University of New York at Stony Brook directly or
through its research foundation, to support research develop- ment
and any associated testing or pilot projects towards improved septic
and wastewater treatment systems to remove phosphorus; and $500,000
to the City of Long Beach for a salt storage dome (09WQ22ER) (24837)
... 22,000,000 ... ............................... (re. $22,000,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
including projects to combat harmful algal blooms; including
$450,000 for the Peconic Estuary Partnership, including $60,000 for
the Great Lakes commission (09GL22ER) (24830) ......................
22,500,000 ....................................... (re. $22,434,000)
194 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $900,000 for
Lake George, including not less than $120,000 for Cornell University
for the plant certification program, provided that not less than
$5,750,000 be made available for invasive species eradication,
including but not limited to southern pine beetle, including up to
$500,000 to Cornell University for the control of hemlock wooly
adelgid, and including grants related to the control and management
of invasive species, and $500,000 to address the southern pine
beetle including up to $250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the implementation and adminis-
tration of a prescribed fire program; and $100,000 to Onondaga Coun-
ty for the mitigation and eradication of the water chestnut. Such
funding for grants shall be provided on a competitive basis in
consultation with the New York Invasive Species Council (09IS22ER)
(24704) ... 17,000,000 ........................... (re. $16,697,000)
Notwithstanding any law to the contrary, for Soil and Water Conserva-
tion District activities as authorized for reimbursement and funding
in section 11-a of the soil and water conservation districts law
including projects to combat harmful algal blooms (09SW22ER) (24834)
... 14,500,000 ................................... (re. $14,500,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW22ER) (24826) ......................
1,500,000 ......................................... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2021, as amended by chapter 54,
section 1, of the laws of 2022:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlantic
Coast, Long Island Sound, Long Island South Shore Estuary Reserve,
Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
Shoreham Parcel, Western Suffolk/Nassau Special Groundwater
Protection Areas, Mott Haven-Port Morris Waterfront, Bronx River
Greenway, Inner City/Underserved Community Parks, Long Pond, Staten
Island Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods,
Great Swamp, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Shawangunk Mountains Region, Delaware River Highlands, Hudson
River Corridor/Hudson River Estuary and Greenway Trail/Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
195 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
Islands and Niagara River, Long Island Trails and Greenways, Bronx
Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $1,000,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more; (b) notwithstanding any law to the
contrary, $2,500,000 from the land acquisition allocation to the
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts, provided that up to ten percent of
such amount may be made available for administrative costs and/or
technical assistance; (c) notwithstanding any law to the contrary,
not less than $1,500,000 for land acquisition in department of envi-
ronmental conservation regions 1, 2 and 3; (d) $1,500,000 to the
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts to purchase conservation easements,
provided that up to ten percent of such amount may be made available
for administrative costs and/or technical assistance; (e) $100,000
for land acquisition in department of environmental conservation
region 9 pursuant to chapter 55 of the laws of 2021 related to ease-
ments on state forest land (09LA21ER) (24703) ......................
30,000,000 ....................................... (re. $29,745,000)
Long Island Central Pine Barrens Planning (09LP21ER) (24829) .........
2,000,000 ........................................... (re. $156,000)
Notwithstanding any law to the contrary, for services and expenses of
the following commissions: $259,000 for Susquehanna river basin
commission; $359,500 for the Delaware river basin commission;
$14,100 for the Ohio river basin commission; $41,600 for the Inter-
state environmental commission; and $38,000 for the New England
196 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Interstate commission; and $373,000 for the college of environmental
science and forestry center for native peoples and the environment
(09EC21ER) (25705) ... 1,085,200 .................... (re. $373,000)
Long Island South Shore Estuary Reserve (09SE21ER) (24831) ...........
900,000 ............................................. (re. $900,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, including projects to combat harm-
ful algal blooms; (a) $1,000,000 shall be made available for
services and expenses of the Cornell University Integrated Pest
Management program; (b) $500,000 shall be made available to the
Cornell Cooperative Extension of Suffolk County for nutrient manage-
ment planning and implementation activities; and (c) $250,000 shall
be made available to Cornell for the pesticide management education
program to support training and certification (09AN21ER) (24832) ...
18,000,000 ....................................... (re. $17,956,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP21ER) (24833) ... 5,750,000 ....... (re. $5,493,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $95,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP21ER) (24825) ... 18,000,000 ................ (re. $18,000,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on
biodiversity issues and up to $500,000 of this amount to support
pollinator diversity, up to $300,000 of which may be allocated to
Cornell University, including research related to the potential
adverse impacts of pesticides such as neonicitinoids, pursuant to a
contract with the department of agriculture and markets, including
the development of bee husbandry best management practices such as
pest and pathogen controls; creating diversity of pollinator habi-
tats; research to understand, prevent and recover from pollinator
losses; and outreach and education; and including $100,000 for the
Cary Institute of Ecosystem Studies to support the Catskill environ-
mental research and monitoring program (09BD21ER) (24827) ..........
1,350,000 ......................................... (re. $1,350,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, including projects to combat harmful algal
blooms some or all of which may be allocated to the New England
Interstate Water Pollution Control Commission or Cornell water
resources institute or department of natural resources for the
purposes of implementing the Hudson River Estuary Action agenda,
$1,000,000 of which shall be for the Mohawk river action plan
(09HE21ER) (24836) ... 6,500,000 .................. (re. $6,011,000)
Notwithstanding any law to the contrary, for the Finger Lakes-Lake
Ontario Watershed Protection Alliance (09FL21ER) (24835) ...........
2,300,000 ......................................... (re. $2,300,000)
197 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any law to the contrary, to the Erie County Soil and
Water Conservation District for the Lake Erie Watershed Protection
Alliance (09LE21ER) (25764) ... 250,000 ............. (re. $250,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and including projects to combat
harmful algal blooms; including up to $4,500,000 to Suffolk county
to provide a 50 percent match for a program developed in consulta-
tion with the department for research, development and pilot
projects to develop cost effective methods to address nitrogen and
pathogen loading from septic system or cesspool effluent or other
sources or to support such efforts without a match at the state
university of Stony Brook directly or through its research founda-
tion and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, and including $250,000 from such amount to the Long
Island regional planning council for services and expenses related
to the Long Island Nitrogen Action Plan; and including $5,000,000 to
update source water assessment plans and develop associated water
protection programs some or all of which may be allocated to the
United States Geological Survey or the New England Interstate Water
Pollution Control Commission; $150,000 for the Chautauqua Lake Asso-
ciation; $95,000 for the Chautauqua Lake Partnership; $500,000 for
the City of Long Beach for water quality projects; and $150,000 for
the East of Hudson Watershed Corporation (09WQ21ER) (24837) ........
18,000,000 ....................................... (re. $17,829,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
including projects to combat harmful algal blooms; including
$450,000 for the Peconic Estuary Partnership, including $60,000 for
the Great Lakes commission (09GL21ER) (24830) ......................
18,500,000 ....................................... (re. $17,598,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, including not less than $120,000 for Cornell University
for the plant certification program, provided that not less than
$5,750,000 be made available for invasive species eradication,
including but not limited to southern pine beetle, including up to
$500,000 to Cornell University for the control of hemlock wooly
adelgid, and including grants related to the control and management
198 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of invasive species, and $500,000 to address the southern pine
beetle including up to $250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the implementation and adminis-
tration of a prescribed fire program. Such funding for grants shall
be provided on a competitive basis in consultation with the New York
Invasive Species Council (09IS21ER) (24704) ........................
13,238,000 ....................................... (re. $12,623,000)
Notwithstanding any law to the contrary, for Soil and Water Conserva-
tion District activities as authorized for reimbursement and funding
in section 11-a of the soil and water conservation districts law
including projects to combat harmful algal blooms (09SW21ER) (24834)
... 11,000,000 ...................................... (re. $11,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW21ER) (24826) ......................
1,500,000 ......................................... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlantic
Coast, Long Island Sound, Long Island South Shore Estuary Reserve,
Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
Shoreham Parcel, Western Suffolk/Nassau Special Groundwater
Protection Areas, Mott Haven-Port Morris Waterfront, Bronx River
Greenway, Inner City/Underserved Community Parks, Long Pond, Staten
Island Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods,
Great Swamp, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Shawangunk Mountains Region, Delaware River Highlands, Hudson
River Corridor/Hudson River Estuary and Greenway Trail/Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
Islands and Niagara River, Long Island Trails and Greenways, Bronx
199 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $1,000,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more; (b) notwithstanding any law to the
contrary, $2,500,000 from the land acquisition allocation to the
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts, provided that up to ten percent of
such amount may be made available for administrative costs and/or
technical assistance; (c) notwithstanding any law to the contrary,
not less than $3,000,000 for land acquisition in department of envi-
ronmental conservation regions 1, 2 and 3; (d) $200,000 for the Lake
George Park Commission for facilities construction and upgrades; and
(e) $1,500,000 to the land trust alliance for the purpose of award-
ing grants on a competitive basis to local land trusts to purchase
conservation easements, provided that up to ten percent of such
amount may be made available for administrative costs and/or techni-
cal assistance (09LA20ER) (24703) ..................................
31,000,000 ....................................... (re. $26,392,000)
Albany Pine Bush Preserve Commission (09AP20ER) (24828) ..............
2,675,000 ........................................... (re. $917,000)
Notwithstanding any law to the contrary, for service and expenses of
the following commissions: $259,000 for Susquehanna river basin
commission; $359,500 for the Delaware river basin commission;
$14,100 for the Ohio river basin commission; $41,600 for the Inter-
state environmental commission; and $38,000 for the New England
Interstate commission; and $373,000 for the college of environmental
science and forestry center for native peoples and the environment
(09EC20ER) (25705) ... 1,086,000 .................... (re. $374,000)
Long Island South Shore Estuary Reserve (09SE20ER) (24831) ...........
900,000 ............................................. (re. $900,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, including projects to combat harm-
ful algal blooms; (a) $1,000,000 shall be made available for
services and expenses of the Cornell University Integrated Pest
Management program; (b) $500,000 shall be made available to the
Cornell Cooperative Extension of Suffolk County for nutrient manage-
ment planning and implementation activities; and (c) $250,000 shall
be made available to Cornell for the pesticide management education
200 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
program to support training and certification (09AN20ER) (24832) ...
18,000,000 ....................................... (re. $17,177,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP20ER) (24833) ... 6,000,000 ....... (re. $5,535,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $95,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP20ER) (24825) ... 18,000,000 ................ (re. $12,000,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on
biodiversity issues and up to $500,000 of this amount to support
pollinator diversity, up to $300,000 of which may be allocated to
Cornell University, including research related to the potential
adverse impacts of pesticides such as neonicitinoids, pursuant to a
contract with the department of agriculture and markets, including
the development of bee husbandry best management practices such as
pest and pathogen controls; creating diversity of pollinator habi-
tats; research to understand, prevent and recover from pollinator
losses; and outreach and education; and including $100,000 for the
Cary Institute of Ecosystem Studies to support the Catskill environ-
mental research and monitoring program (09BD20ER) (24827) ..........
1,350,000 ........................................... (re. $597,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, including projects to combat harmful algal
blooms some or all of which may be allocated to the New England
Interstate Water Pollution Control Commission or Cornell water
resources institute or department of natural resources for the
purposes of implementing the Hudson River Estuary Action agenda,
$1,000,000 of which shall be for the Mohawk river action plan
(09HE20ER) (24836) ... 6,500,000 .................. (re. $2,002,000)
Notwithstanding any law to the contrary, to the Erie County Soil and
Water Conservation District for the Lake Erie Watershed Protection
Alliance (09LE20ER) (25764) ... 250,000 .............. (re. $62,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and including projects to combat
harmful algal blooms; including up to $3,000,000 to Suffolk county
to provide a 50 percent match for a program developed in consulta-
tion with the department for research, development and pilot
201 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects to develop cost effective methods to address nitrogen and
pathogen loading from septic system or cesspool effluent or other
sources or to support such efforts without a match at the state
university of Stony Brook directly or through its research founda-
tion and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, and including $250,000 from such amount to the Long
Island regional planning council for services and expenses related
to the Long Island Nitrogen Action Plan; and including $5,000,000 to
update source water assessment plans and develop associated water
protection programs some or all of which may be allocated to the
United States Geological Survey or the New England Interstate Water
Pollution Control Commission; $350,000 for the costs of rehabili-
tation and improvements to the Town of Hempstead Marine laboratory;
$1,000,000 for activities related to the cleanup of Scajaquada
Creek; $150,000 for the Chautauqua Lake Association; and $95,000 for
the Chautauqua Lake Partnership (09WQ20ER) (24837) .................
18,600,000 ....................................... (re. $10,970,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
including projects to combat harmful algal blooms; including
$200,000 to Suffolk county for the Peconic Bay Estuary Program,
including $60,000 for the Great Lakes commission (09GL20ER) (24830)
... 18,750,000 .................................. (re. $14,975,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, including not less than $120,000 for Cornell University
for the plant certification program, provided that not less than
$5,750,000 be made available for invasive species eradication,
including but not limited to southern pine beetle, including up to
$500,000 to Cornell University for the control of hemlock wooly
adelgid, and including grants related to the control and management
of invasive species, and $500,000 to address the southern pine
beetle including up to $250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the implementation and adminis-
tration of a prescribed fire program, and $300,000 to the county of
Nassau for the purchase of an aquatic weed harvester. Such funding
for grants shall be provided on a competitive basis in consultation
with the New York Invasive Species Council (09IS20ER) (24704) ......
13,238,000 ....................................... (re. $12,257,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW20ER) (24826) ......................
1,500,000 ......................................... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2019:
202 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlantic
Coast, Long Island Sound, Long Island South Shore Estuary Reserve,
Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
Shoreham Parcel, Western Suffolk/Nassau Special Groundwater
Protection Areas, Mott Haven-Port Morris Waterfront, Bronx River
Greenway, Inner City/Underserved Community Parks, Long Pond, Staten
Island Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods,
Great Swamp, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Shawangunk Mountains Region, Delaware River Highlands, Hudson
River Corridor/Hudson River Estuary and Greenway Trail/Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
Islands and Niagara River, Long Island Trails and Greenways, Bronx
Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $1,000,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more; (b) notwithstanding any law to the
contrary, $2,500,000 from the land acquisition allocation to the
203 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts, provided that up to ten percent of
such amount may be made available for administrative costs and/or
technical assistance; (c) notwithstanding any law to the contrary,
not less than $3,000,000 for land acquisition in department of envi-
ronmental conservation regions 1, 2 and 3; and (d) $200,000 for the
Lake George Park Commission for facilities construction (09LA19ER)
(24703) ... 33,087,000 ........................... (re. $16,490,000)
Notwithstanding any law to the contrary, for service and expenses of
the following commissions: $259,000 for Susquehanna river basin
commission; $359,500 for the Delaware river basin commission;
$14,100 for the Ohio river basin commission; $41,600 for the Inter-
state environmental commission; and $38,000 for the New England
Interstate commission; and $350,000 for the college of environmental
science and forestry center for native peoples and the environment
(09EC19ER) (25705) ... 1,063,000 .................... (re. $176,000)
Long Island South Shore Estuary Reserve (09SE19ER) (24831) ...........
900,000 ............................................. (re. $900,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, including projects to combat harm-
ful algal blooms; (a) $1,000,000 shall be made available for
services and expenses of the Cornell University Integrated Pest
Management program; (b) $500,000 shall be made available to the
Cornell Cooperative Extension of Suffolk County for nutrient manage-
ment planning and implementation activities; and (c) $250,000 shall
be made available to Cornell for the pesticide management education
program to support training and certification (09AN19ER) (24832) ...
18,000,000 ....................................... (re. $11,406,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP19ER) (24833) ... 7,000,000 ....... (re. $5,749,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $95,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP19ER) (24825) ... 18,000,000 ................ (re. $17,704,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on
biodiversity issues and up to $500,000 of this amount to support
pollinator diversity, up to $300,000 of which may be allocated to
Cornell University, including research related to the potential
adverse impacts of pesticides such as neonicitinoids, pursuant to a
contract with the department of agriculture and markets, including
the development of bee husbandry best management practices such as
pest and pathogen controls; creating diversity of pollinator habi-
tats; research to understand, prevent and recover from pollinator
losses; and outreach and education; and including $100,000 for the
Cary Institute of Ecosystem Studies to support the Catskill environ-
204 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental research and monitoring program (09BD19ER) (24827) ..........
1,350,000 ............................................. (re. $1,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, including projects to combat harmful algal
blooms some or all of which may be allocated to the New England
Interstate Water Pollution Control Commission or Cornell water
resources institute or department of natural resources for the
purposes of implementing the Hudson River Estuary Action agenda,
$1,000,000 of which shall be for the Mohawk river action plan
(09HE19ER) (24836) ... 6,500,000 .................. (re. $1,599,000)
Notwithstanding any law to the contrary, for the Finger Lakes-Lake
Ontario Watershed Protection Alliance (09FL19ER) (24835) ...........
2,300,000 ........................................... (re. $138,000)
Notwithstanding any law to the contrary, to the Erie County Soil and
Water Conservation District for the Lake Erie Watershed Protection
Alliance (09LE19ER) (25764) ... 250,000 .............. (re. $50,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and including projects to combat
harmful algal blooms; including up to $3,000,000 to Suffolk county
to provide a 50 percent match for a program developed in consulta-
tion with the department for research, development and pilot
projects to develop cost effective methods to address nitrogen and
pathogen loading from septic system or cesspool effluent or other
sources or to support such efforts without a match at the state
university of Stony Brook directly or through its research founda-
tion and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, and including $250,000 from such amount to the Long
Island regional planning council for services and expenses related
to the Long Island Nitrogen Action Plan; and including $5,000,000 to
update source water assessment plans and develop associated water
protection programs some or all of which may be allocated to the
United States Geological Survey or the New England Interstate Water
Pollution Control Commission; and including up to $100,000 for the
removal and appropriate disposal of firefighting foam containing
regulated perfluoronated compounds from municipal fire and emergency
response departments; $350,000 for the costs of rehabilitation and
improvements to the Town of Hempstead Marine laboratory (09WQ19ER)
(24837) ... 17,750,000 ............................ (re. $6,672,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
205 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
articulated in article 14 of the environmental conservation law
including projects to combat harmful algal blooms; including
$200,000 to Suffolk county for the Peconic Bay Estuary Program,
including $60,000 for the Great Lakes commission (09GL19ER) (24830)
... 17,250,000 ................................... (re. $7,712,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, including not less than $120,000 for Cornell University
for the plant certification program, provided that not less than
$6,050,000 be made available for invasive species eradication,
including but not limited to southern pine beetle, including up to
$500,000 to Cornell University for the control of hemlock wooly
adelgid, and including grants related to the control and management
of invasive species, and $500,000 to address the southern pine
beetle including up to $250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the implementation and adminis-
tration of a prescribed fire program. Such funding for grants shall
be provided on a competitive basis in consultation with the New York
Invasive Species Council (09IS19ER) (24704) ........................
13,300,000 ........................................ (re. $5,724,000)
Notwithstanding any law to the contrary, for Soil and Water Conserva-
tion District activities as authorized for reimbursement and funding
in section 11-a of the soil and water conservation districts law
including projects to combat harmful algal blooms (09SW19ER) (24834)
... 10,500,000 ....................................... (re. $1,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW19ER) (24826) ......................
1,500,000 ........................................... (re. $964,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound, Long Island South Shore Estuary
Reserve, Peconic Pinelands Maritime Reserve Projects, Central Pine
Barrens, Western Suffolk/Nassau Special Groundwater Protection
Areas, Mott Haven-Port Morris Waterfront, Bronx River Greenway,
Inner City/Underserved Community Parks, Long Pond, Staten Island
Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods, Great
Swamp, Plutarch/Black Creek Wetlands Complex, New York Highlands,
Shawangunk Mountains Region, Delaware River Highlands, Hudson River
Corridor/Hudson River Estuary and Greenway Trail/ Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
206 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
Islands and Niagara River, Long Island Trails and Greenways, Bronx
Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $1,000,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more; (b) notwithstanding any law to the
contrary, $2,500,000 from the land acquisition allocation to the
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts, provided that up to ten percent of
such amount may be made available for administrative costs and/or
technical assistance; (c) notwithstanding any law to the contrary,
not less than $3,000,000 for land acquisition in department of envi-
ronmental conservation regions 1, 2 and 3; (d) including $1,000,000
for Adirondack infrastructure and environmental improvements for the
towns of Long Lake, North Hudson, Minerva, Indian Lake, and Newcomb;
and (e) $700,000 for the Lake George Park Commission for facilities
construction (09LA18ER) (24703) ... 35,000,000 .... (re. $7,889,000)
Long Island South Shore Estuary Reserve (09SE18ER) (24831) ...........
900,000 ............................................. (re. $352,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, including projects to combat harm-
ful algal blooms; (a) $1,000,000 shall be made available for
services and expenses of the Cornell University Integrated Pest
Management program; (b) $500,000 shall be made available to the
Cornell Cooperative Extension of Suffolk County for nutrient manage-
207 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment planning and implementation activities; and (c) $250,000 shall
be made available to Cornell for the pesticide management education
program to support training and certification (09AN18ER) (24832) ...
17,000,000 ........................................ (re. $4,541,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP18ER) (24833) ... 7,000,000 ....... (re. $4,040,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $90,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP18ER) (24825) ... 18,000,000 ................ (re. $15,316,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on
biodiversity issues and up to $500,000 of this amount to support
pollinator diversity, up to $300,000 of which may be allocated to
Cornell University, including research related to the potential
adverse impacts of pesticides such as neonicitinoids, pursuant to a
contract with the department of agriculture and markets, including
the development of bee husbandry best management practices such as
pest and pathogen controls; creating diversity of pollinator habi-
tats; research to understand, prevent and recover from pollinator
losses; and outreach and education; and including $100,000 for the
Cary Institute of Ecosystem Studies to support the Catskill environ-
mental research and monitoring program (09BD18ER) (24827) ..........
1,350,000 ............................................ (re. $73,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, including projects to combat harmful algal
blooms some or all of which may be allocated to the New England
Interstate Water Pollution Control Commission or Cornell water
resources institute or department of natural resources for the
purposes of implementing the Hudson River Estuary Action agenda,
$1,000,000 of which shall be for the Mohawk river action plan
(09HE18ER) (24836) ... 6,500,000 .................. (re. $1,365,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and including projects to combat
harmful algal blooms; including up to $3,000,000 to Suffolk county
to provide a 50 percent match for a program developed in consulta-
tion with the department for research, development and pilot
projects to develop cost effective methods to address nitrogen and
208 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
pathogen loading from septic system or cesspool effluent or other
sources or to support such efforts without a match at the state
university of Stony Brook directly or through its research founda-
tion and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, including up to $400,000 from such amount for testing
of monitoring wells in Nassau County and including $250,000 from
such amount to the Long Island regional planning council for
services and expenses related to the Long Island Nitrogen Action
Plan; and including $1,000,000 to maximize the availability of drug
collection programs for communities throughout the state, including
for the purchase and distribution of tamper proof drug collection
boxes, and other federally approved drug collection programs
provided that participating in the department of environmental
conservation's self-audit program shall not be required; and includ-
ing $5,000,000 to update source water assessment plans and develop
associated water protection programs some or all of which may be
allocated to the United States Geological Survey or the New England
Interstate Water Pollution Control Commission; and including up to
$100,000 for the removal and appropriate disposal of firefighting
foam containing regulated perfluoronated compounds from municipal
fire and emergency response departments (09WQ18ER) (24837) .........
20,250,000 ........................................ (re. $7,224,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
including projects to combat harmful algal blooms; including
$200,000 to Suffolk county for the Peconic Bay Estuary Program,
including $60,000 for the Great Lakes commission, and including
$50,000 for the State University of New York at Brockport for resi-
liency monitoring, and including $250,000 for the State University
of New York Stony Brook for a study of the feasibility, costs,
location, and impacts of a seagate to act as a storm surge barrier
for the south shore of Long Island (09GL18ER) (24830) ..............
17,250,000 ........................................ (re. $5,062,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, including not less than $120,000 for Cornell University
for the plant certification program, provided that not less than
$6,050,000 be made available for invasive species eradication,
including but not limited to southern pine beetle, including up to
$500,000 to Cornell University for the control of hemlock wooly
adelgid, and including grants related to the control and management
of invasive species, and $500,000 to address the southern pine
beetle including up to $250,000 to the Central Pine Barrens Joint
Planning and Policy Commission for the implementation and adminis-
tration of a prescribed fire program. Such funding for grants shall
be provided on a competitive basis in consultation with the New York
209 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Invasive Species Council (09IS18ER) (24704) ........................
13,300,000 ........................................ (re. $1,700,000)
Notwithstanding any law to the contrary, for Soil and Water Conserva-
tion District activities as authorized for reimbursement and funding
in section 11-a of the soil and water conservation districts law
including projects to combat harmful algal blooms; including up to
$270,000 for the Schuyler and Chemung County SWCD Shared Services
Infrastructure; and up to $85,000 for the Steuben County SWCD Public
Education Outreach and Policy (09SW18ER) (24834) ...................
10,000,000 ........................................... (re. $64,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW18ER) (24826) ......................
1,500,000 ........................................... (re. $906,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound, Long Island South Shore Estuary
Reserve, Peconic Pinelands Maritime Reserve Projects, Central Pine
Barrens, Western Suffolk/Nassau Special Groundwater Protection
Areas, Mott Haven-Port Morris Waterfront, Bronx River Greenway,
Inner City/Underserved Community Parks, Long Pond, Staten Island
Greenbelt, Staten Island Bluebelt, Staten Island Wet Woods, Great
Swamp, Plutarch/Black Creek Wetlands Complex, New York Highlands,
Shawangunk Mountains Region, Delaware River Highlands, Hudson River
Corridor/Hudson River Estuary and Greenway Trail/ Hudson River
School Art Trail, Hudson Valley/New York City Foodshed, Catskill
Unfragmented Forest, Catskill River and Road Corridors, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Lake George watershed,
Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
Saratoga County, Hudson River Projects, Follensby Park, Washington
County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
Forests and Headwater Streams, Nelson Swamp, State Park Battle-
fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
Islands and Niagara River, Long Island Trails and Greenways, Bronx
Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
210 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
Protection Projects Aimed at Reducing the Impacts of Storms, Storm
Surges and Flooding on Human and Natural Communities, Long Distance
Trail Corridors, Statewide Small Projects, State Forest, Unique Area
Wildlife Management Area Protection, Working Forest Lands, State
Park and State Historic Site Protection, (a) notwithstanding any law
to the contrary, $1,000,000 from the land acquisition allocation for
urban forestry projects provided that no less than $500,000 shall be
made available for such programs in cities and towns with popu-
lations of 65,000 or more; (b) notwithstanding any law to the
contrary, $2,500,000 from the land acquisition allocation to the
land trust alliance for the purpose of awarding grants on a compet-
itive basis to local land trusts, provided that up to ten percent of
such amount may be made available for administrative costs and/or
technical assistance; (c) notwithstanding any law to the contrary,
not less than $3,000,000 for land acquisition in department of envi-
ronmental conservation regions 1, 2 and 3 (09LA17ER) (24703) .......
36,349,000 ........................................ (re. $8,370,000)
Albany Pine Bush Preserve Commission, with $50,000 to the city of
Schenectady for the Woodlawn Preserve (09AP17ER) (24828) ...........
2,675,000 ............................................. (re. $8,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, (a) $1,000,000 shall be made
available for services and expenses of the Cornell University Inte-
grated Pest Management program; and (b) $500,000 shall be made
available to the Cornell Cooperative Extension of Suffolk County for
nutrient management planning and implementation activities
(09AN17ER) (24832) ... 17,000,000 ................. (re. $3,332,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management (09NP17ER) (24833) ... 7,000,000 ....... (re. $2,240,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, up to $1,000,000 shall be made available to the
tug hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and up to $87,000 shall be made available
to Cornell University for services and expenses of land classifica-
tion, agriculture district mapping and master list of soils
(09FP17ER) (24825) ... 20,000,000 ................ (re. $19,614,000)
Biodiversity stewardship and research; including funding for public
New York universities to conduct field studies and research on bidi-
versity issues and up to $500,000 of this amount to support pollina-
tor diversity, up to $300,000 of which may be allocated to Cornell
University, including research related to the potential adverse
impacts of pesticides such as neonicitinoids, pursuant to a contract
with the department of agriculture and markets, including the devel-
211 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
opment of bee husbandry best management practices such as pest and
pathogen controls; creating diversity of pollinator habitats;
research to understand, prevent and recover from pollinator losses;
and outreach and education (09BD17ER) (24827) ......................
1,000,000 ........................................... (re. $111,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, $1,000,000 of which shall be for the Mohawk
river action plan (09HE17ER) (24836) ...............................
5,500,000 ......................................... (re. $1,069,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law; including up to $3,000,000 to
Suffolk county to provide a 50 percent match for a program developed
in consultation with the department for research, development and
pilot projects to develop cost effective methods to address nitrogen
and pathogen loading from septic system or cesspool effluent or
other sources or to support such efforts without a match at the
state university of Stony Brook directly or through its research
foundation and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections, including up to $400,000 from such amount for testing
of monitoring wells in Nassau County and including $250,000 from
such amount to the Long Island regional planning council for
services and expenses related to the Long Island Nitrogen Action
Plan; and including $1,000,000 to maximize the availability of drug
collection programs for communities throughout the state, including
for the purchase and distribution of tamper proof drug collection
boxes, and other federally approved drug collection programs
provided that participating in the department of environmental
conservation's self-audit program shall not be required; and includ-
ing $5,000,000 to update source water assessment plans and develop
associated water protection programs some or all of which may be
allocated to the United States Geological Survey or the New England
Interstate Water Pollution Control Commission; and including up to
$500,000 for the removal and appropriate disposal of firefighting
foam containing regulated perfluoronated compounds from municipal
fire and emergency response departments; and $1,000,000 for activ-
ities related to the cleanup of Scajaquada Creek (09WQ17ER) (24837)
... 20,250,000 .................................... (re. $6,536,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law;
212 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including $200,000 to Suffolk county for the Peconic Bay Estuary
Program and including $60,000 for the Great Lakes commission; and
including $250,000 for the Long Island Commission for aquifer
protection (09GL17ER) (24830) ... 15,000,000 ...... (re. $3,371,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, provided that not less than $6,050,000 be made avail-
able for invasive species eradication, including but not limited to
southern pine beetle, including up to $500,000 to Cornell University
for the control of hemlock wooly adelgid and including grants
related to the control and management of invasive species. Such
funding for grants shall be provided on a competitive basis in
consultation with the New York Invasive Species Council (09IS17ER)
(24704) ... 13,000,000 ............................ (re. $2,611,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects, including up to $700,000 to Cornell University,
in consultation with the department, to continue implementing the
dairy acceleration program (09AW17ER) (24826) ......................
1,500,000 ........................................... (re. $547,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
Special Groundwater Protection Areas, Mott Haven-Port Morris Water-
front, Bronx River Greenway, Inner City/Underserved Community Parks,
Long Pond/Butler Woods, Staten Island Greenbelt, Staten Island Blue-
belt, Staten Island Wet Woods, Great Swamp, Neversink Highlands,
Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
Forest, Catskill River and Road Corridors, Long Path, New York City
Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
ga National Historic Park View shed, Washington County Agricultural
Lands-Saratoga National Historic Park View shed, Lake George
watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
and Wetlands, Saratoga County, State Forest and Wildlife Management
Area Protection, Follensby Park, Undeveloped Lake George Shore,
Whitney Park, Finch Woodlands, Washington County, Washington County
213 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Grasslands, Recreational Trail Linkages and Networks, Rome Sand
Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
Forests and Headwater Streams, Tioga County Park Opportunities,
Nelson Swamp, Clark Reservation State Park, State Parks
Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
Erie Tributary Gorges, Two Rivers State Park, Buffalo River
Watershed, Braddock Bay, Catharine Valley Complex, Genesee
Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
Great Lakes Shorelines and Niagara River, Long Island Trail and
Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
Canadice & Honeoye, Hand Hollow Conservation Area, Northern Flow
River Corridors, Black River Valley Corridor, Fort Drum Conservation
Partnership Project, Herkimer Home Viewshed, Inman Gulf, Massawepie
Mire, Moose River Corridor, St. Lawrence River Islands, Shoreline
and Wetlands, Carpenter Falls/Bear Swamp Creek Corridor, Salmon
River Corridor, Emerald Necklace, Finger Lakes Shorelines, Long
Distance Trail Corridors, Statewide Small Projects, Working Forest
Lands, State Park and State Historic Site Protection, (a) notwith-
standing any law to the contrary, $1,000,000 from the land acquisi-
tion allocation for urban forestry projects provided that no less
than $500,000 shall be made available for such programs in cities
and towns with populations of 65,000 or more; (b) notwithstanding
any law to the contrary, $2,000,000 from the land acquisition allo-
cation to the land trust alliance for the purpose of awarding grants
on a competitive basis to local land trusts, provided that up to ten
percent of such amount may be made available for administrative
costs and/or technical assistance; (c) notwithstanding any law to
the contrary, not less than $3,000,000 for land acquisition in
department of environmental conservation regions 1, 2 and 3;
$500,000 for a resiliency planting program (09LA16ER) (24703) ......
40,000,000 ....................................... (re. $20,230,000)
Albany Pine Bush Preserve Commission, with $50,000 to the city of
Schenectady for the Woodlawn Preserve (09AP16ER) (24828) ...........
2,675,000 ............................................. (re. $2,000)
Agricultural non-point source abatement and control projects, notwith-
standing any law to the contrary, (a) $1,000,000 shall be made
available for services and expenses of the Cornell University Inte-
grated Pest Management program; and (b) $500,000 shall be made
available to the Cornell Cooperative Extension of Suffolk County for
nutrient management planning and implementation activities
(09AN16ER) (24832) ... 19,000,000 ................. (re. $5,364,000)
Non-agricultural non-point source abatement and control projects
notwithstanding any law to the contrary, $550,000 of such amount
shall be made available for Cornell community integrated pest
management and including $250,000 to the county of Rockland for the
development of a long-term water conservation strategy (09NP16ER)
(24833) ... 8,000,000 ............................. (re. $3,437,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, $1,000,000 shall be made available to the tug
214 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
hill tomorrow land trust for army compatible use buffer program
projects around Fort Drum, and $70,000 shall be made available to
Cornell University for services and expenses of land classification
and master list of soils (09FP16ER) (24825) ........................
20,000,000 ....................................... (re. $15,925,000)
Biodiversity stewardship and research; notwithstanding any law to the
contrary, any or all of this amount shall be used for the New York
state landowner incentive program to offer grants awarded on a
competitive basis to landowners for the implementation of habitat
conservation plans and up to $500,000 of this amount to support
pollinator diversity, including the development of bee husbandry
best management practices such as pest and pathogen controls; creat-
ing diversity of pollinator habitats; research to understand,
prevent and recover from pollinator losses; and outreach and educa-
tion (09BD16ER) (24827) ... 1,000,000 ................. (re. $8,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, $800,000 of which shall be for the Mohawk
river action plan (09HE16ER) (24836) ... 5,000,000 .. (re. $471,000)
Notwithstanding any law to the contrary, to the Erie County Soil and
Water Conservation District for the Lake Erie Watershed Protection
Alliance (09LE16ER) (25764) ... 250,000 ............. (re. $200,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law; including up to $3,000,000 to
Suffolk county to provide a 50 percent match for a program developed
in consultation with the department for research, development and
pilot projects to develop cost effective methods to address nitrogen
and pathogen loading from septic system or cesspool effluent or
other sources or to support such efforts without a match at the
state university of Stony Brook directly or through its research
foundation and $1,500,000 for Suffolk county for sewer improvement
projects; and including $5,000,000 for Nassau county for the Bay
park wastewater treatment plant outfall pipe, associated conveyance
systems, nitrogen abatement treatment works, ocean outfall and/or
connections; including $1,000,000 to maximize the availability of
drug collection programs for communities throughout the state,
including to local law enforcement agencies for the purchase and
distribution of tamper proof drug collection boxes, and other feder-
ally approved drug collection programs, and including $750,000 for
the city of Corning Denison Park stormwater outfall pipe (09WQ16ER)
(24837) ... 20,000,000 ............................ (re. $4,291,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law;
215 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including $200,000 to Suffolk county for the Peconic Bay Estuary
Program (09GL16ER) (24830) ... 15,000,000 ......... (re. $3,122,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, provided that not less than $5,550,000 be made avail-
able for invasive species eradication, including but not limited to
southern pine beetle, emerald ash borer, and hydrilla and including
grants related to the control and management of invasive species.
Such funding for grants shall be provided on a competitive basis in
consultation with the New York Invasive Species Council (09IS16ER)
(24704) ... 12,000,000 ............................ (re. $1,909,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects (09AW16ER) (24826) .............................
1,500,000 ........................................... (re. $424,000)
Notwithstanding any law to the contrary, for a public waterway recon-
struction program to be established and administered by the depart-
ment of state, at the request of any county, city, town, village or
other governmental entity, for projects to dredge, clear, and repair
public waterways, according to best practices, that allow for proac-
tively managing public waterways. Funds appropriated herein shall
provide fifty percent reimbursement to such localities for author-
ized expenditures (09DR16ER) (25704) ...............................
1,000,000 ......................................... (re. $1,000,000)
Notwithstanding any law to the contrary, and within amounts appropri-
ated, for a free water testing pilot program to be established and
administered by the department of health, or pursuant to contracts
with laboratories, within one hundred and twenty days whereby, at
the request of any individual, public water system, or school
district, the department shall cause to be provided to such individ-
ual, public water system, or school district a container or contain-
ers for the collection of a sample of drinking water and the means
to forward such sample to a laboratory to be tested for contam-
inants. The results of such test shall be forwarded to the individ-
ual, public water system, or school district by the laboratory as
soon as practicable (09WT16ER) (25710) .............................
1,500,000 ........................................... (re. $814,000)
By chapter 54, section 1, of the laws of 2015:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
Special Groundwater Protection Areas, Mott Haven-Port Morris Water-
front, Bronx River Greenway, Inner City/Underserved Community Parks,
216 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Long Pond/Butler Woods, Staten Island Greenbelt, Staten Island Blue-
belt, Staten Island Wet Woods, Great Swamp, Neversink Highlands,
Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
Forest, Catskill River and Road Corridors, Long Path, New York City
Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
ga National Historic Park View shed, Washington County Agricultural
Lands-Saratoga National Historic Park View shed, Lake George
watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
and Wetlands, Saratoga County, State Forest and Wildlife Management
Area Protection, Follensby Park, Undeveloped Lake George Shore,
Whitney Park, Finch Woodlands, Washington County, Washington County
Grasslands, Recreational Trail Linkages and Networks, Rome Sand
Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
Forests and Headwater Streams, Tioga County Park Opportunities,
Nelson Swamp, Clark Reservation State Park, State Parks
Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
Erie Tributary Gorges, Two Rivers State Park, Buffalo River
Watershed, Braddock Bay, Catharine Valley Complex, Genesee
Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
Great Lakes Shorelines and Niagara River, Long Island Trail and
Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
Canadice & Honeoye, Long Distance Trail Corridors, Statewide Small
Projects, Working Forest Lands, State Park and State Historic Site
Protection, (a) notwithstanding any law to the contrary, $1,000,000
from the land acquisition allocation for urban forestry projects
provided that no less than $500,000 shall be made available for such
programs in cities and towns with populations of 65,000 or more; (b)
notwithstanding any law to the contrary, $2,000,000 from the land
acquisition allocation to the land trust alliance for the purpose of
awarding grants on a competitive basis to local land trusts,
provided that up to ten percent of such amount may be made available
for administrative costs and/or technical assistance; (c) $250,000
for a resiliency planting program; and, notwithstanding any law to
the contrary, not less than $1,000,000 for land acquisition in
department of environmental conservation regions 1, 2 and 3
(09LA15ER) (24703) ... 26,550,000 ................. (re. $3,649,000)
Agricultural non-point source abatement and control projects
(09AN15ER) (24832) ... 14,200,000 ................. (re. $4,945,000)
Non-agricultural non-point source abatement and control projects
(09NP15ER) (24833) ... 4,800,000 .................... (re. $961,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, $1,000,000 shall be made available to the tug
hill tomorrow land trust for army compatible use buffer program
217 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects around Fort Drum (09FP15ER) (24825) .......................
15,000,000 ........................................ (re. $9,561,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, $800,000 of which shall be for the Mohawk
river action plan and $200,000 of which shall be for the Peconic Bay
Estuary Program (09HE15ER) (24836) ... 4,700,000 .... (re. $469,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG15ER) (24824) ... 600,000 ............. (re. $351,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law; including up to $3,000,000 to
Suffolk county to provide a 50 percent match for a program developed
in consultation with the department for research, development and
pilot projects to develop cost effective methods to address nitrogen
and pathogen loading from septic system or cesspool effluent or
other sources or to support such efforts without a match at the
state university of Stony Brook directly or through its research
foundation (09WQ15ER) (24837) ... 8,000,000 ......... (re. $121,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL15ER) (24830) ... 6,050,000 .................. (re. $1,139,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $450,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS15ER) (24704) ...........
5,850,000 ........................................... (re. $375,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects (09AW15ER) (24826) .............................
1,500,000 ............................................ (re. $25,000)
By chapter 54, section 1, of the laws of 2014:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
218 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
Special Groundwater Protection Areas, Inner City/Underserved Commu-
nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
Mountain/ Delaware River Region, Beaverkill/ Willowemoc, Hudson
River Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor,
Catskill Unfragmented Forest, Catskill River and Road Corridors,
Long Path, New York City Watershed Lands, Taconic Ridge/Harlem
Valley, Albany Pine Bush, Five Rivers Environmental Education
Center, Batten Kill Watershed-Saratoga National Historic Park View
shed, Washington County Agricultural Lands-Saratoga National Histor-
ic Park View shed, Lake George watershed, Lake Champlain watershed,
Boeselager forestry, Rensselaer plateau, Oomsdale Farm and Surround-
ing Landscape, Hudson River Gorge, Susquehanna River Valley Corri-
dor, Lake Champlain Shoreline and Wetlands, Saratoga County, State
Forest and Wildlife Management Area Protection, Follensby Park,
Undeveloped Lake George Shore, Whitney Park, Finch Woodlands, Wash-
ington County, Washington County Grasslands, Recreational Trail
Linkages and Networks, Rome Sand Plains, Black Creek Watershed,
Portaferry Lake, Tug Hill Core Forests and Headwater Streams, Tioga
County Park Opportunities, Nelson Swamp, Clark Reservation State
Park, State Parks Greenbelt/Tompkins County, Cattaraugus Creek and
tributaries, Northern Montezuma Wetlands, Lake Erie Tributary Gorg-
es, Two Rivers State Park, Buffalo River Watershed, Braddock Bay,
Catharine Valley Complex, Genesee Greenway/Recreationway, Hi
Tor/Bristol Hills, Allegany State Park, Great Lakes Shorelines and
Niagara River, Long Island Trail and Greenway System, Bronx Harlem
Greenway, Harbor Herons Wildlife Complex, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain, Helderberg Escarpment, and
Western Finger Lakes: Conesus, Hemlock, Canadice & Honeoye, Long
Distance Trail Corridors, Statewide Small Projects, Working Forest
Lands, State Park and State Historic Site Protection, (a) notwith-
standing any law to the contrary, $1,000,000 from the land acquisi-
tion allocation for urban forestry projects provided that no less
than $250,000 shall be made available for such programs in cities
and towns with populations of 65,000 or more; (b) notwithstanding
any law to the contrary, $2,000,000 from the land acquisition allo-
cation to the land trust alliance for the purpose of awarding grants
on a competitive basis to local land trusts, provided that up to ten
percent of such amount may be made available for administrative
costs and/or technical assistance; (c) $250,000 for a resiliency
planting program; (d) notwithstanding any law to the contrary,
$1,500,000 for land acquisition in Department of Environmental
219 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Conservation Regions 1, 2 and 3 (09LA14ER) (24703) .................
21,650,000 ........................................ (re. $1,289,000)
Agricultural non-point source abatement and control projects
(09AN14ER) (24832) ... 14,200,000 ................. (re. $2,607,000)
Non-agricultural non-point source abatement and control projects
(09NP14ER) (24833) ... 4,500,000 .................... (re. $580,000)
Agriculture and farmland protection activities, notwithstanding any
law to the contrary, not less than $1,000,000 shall be made avail-
able to the tug hill tomorrow land trust for army compatible use
buffer program projects around Fort Drum (09FP14ER) (24825) ........
14,000,000 ........................................ (re. $7,199,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, $800,000 of which shall be for the Mohawk
river action plan (09HE14ER) (24836) ... 3,800,000 ... (re. $64,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law; including up to $3,000,000 to be
allocated to Suffolk county to provide a 50 percent match for a
program developed in consultation with the department for research,
development and pilot projects to develop cost effective methods to
address nitrogen and pathogen loading from septic system or cesspool
effluent or other sources and the county may transfer a portion of
such funds to the town of Southampton or the state university of
Stonybrook (09WQ14ER) (24837) ... 7,800,000 ......... (re. $309,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL14ER) (24830) ... 5,050,000 .................... (re. $364,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $550,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS14ER) (24704) ...........
4,700,000 ........................................... (re. $158,000)
Notwithstanding any law to the contrary, for Agricultural Waste
Management projects (09AW14ER) (24826) .............................
1,500,000 ............................................ (re. $35,000)
By chapter 54, section 1, of the laws of 2013:
220 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
Special Groundwater Protection Areas, Inner City/Underserved Commu-
nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
kill Unfragmented Forest, Catskill River and Road Corridors, Long
Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
Albany Pine Bush, Five Rivers Environmental Education Center, Batten
Kill Watershed-Saratoga National Historic Park View shed, Washington
County Agricultural Lands-Saratoga National Historic Park View shed,
Lake George watershed, Lake Champlain watershed, Boeselager fores-
try, Rensselaer plateau, Oomsdale Farm and Surrounding Landscape,
Hudson River Gorge, Susquehanna River Valley Corridor, Lake Cham-
plain Shoreline and Wetlands, Saratoga County, State Forest and
Wildlife Management Area Protection, Follensby Park, Undeveloped
Lake George Shore, Whitney Park, Finch Woodlands, Washington County,
Washington County Grasslands, Recreational Trail Linkages and
Networks, Rome Sand Plains, Black Creek Watershed, Portaferry Lake,
Tug Hill Core Forests and Headwater Streams, Tioga County Park
Opportunities, Nelson Swamp, Clark Reservation State Park, State
Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
Northern Montezuma Wetlands, Lake Erie Tributary Gorges, Two Rivers
State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
Complex, Genesee Greenway/Recreationway, Hi Tor/Bristol Hills, Alle-
gany State Park, Great Lakes Shorelines and Niagara River, Long
Island Trail and Greenway System, Bronx Harlem Greenway, Harbor
Herons Wildlife Complex, Schunnemunk Mountain/Moodna Creek/Woodcock
Mountain, Helderberg Escarpment, and Western Finger Lakes: Conesus,
Hemlock, Canadice & Honeoye, Long Distance Trail Corridors, State-
wide Small Projects, Working Forest Lands, State Park and State
Historic Site Protection, (a) notwithstanding any law to the contra-
ry, $500,000 from the land acquisition allocation for urban forestry
projects provided that no less than $250,000 shall be made available
for such programs in cities and towns with populations of 65,000 or
more; (b) notwithstanding any law to the contrary, $1,575,000 from
the land acquisition allocation to the land trust alliance for the
purpose of awarding grants on a competitive basis to local land
trusts, provided that up to ten percent of such amount may be made
available for administrative costs and/or technical assistance; (c)
notwithstanding any law to the contrary, $1,000,000 for land acqui-
221 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sition in department of environmental conservation regions 1, 2 and
3 (09LA13ER) (24703) ... 20,000,000 .................. (re. $37,000)
Agricultural non-point source abatement and control projects
(09AN13ER) (24832) ... 14,200,000 ................. (re. $4,119,000)
Non-agricultural non-point source abatement and control projects
(09NP13ER) (24833) ... 4,500,000 .................. (re. $1,618,000)
Agriculture and farmland protection activities (09FP13ER) (24825) ...
13,000,000 ........................................ (re. $4,548,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law, $800,000 of which shall be for the Mohawk
river action plan (09HE13ER) (24836) ... 3,800,000 ... (re. $27,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG13ER) (24824) ... 400,000 .............. (re. $75,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law; including $4,000,000 to be
distributed to municipalities pursuant to a competitive grants proc-
ess for natural infrastructure projects designed to mitigate the
impacts of floods, storm surge, and other effects of climate change
(09WQ13ER) (24837) ... 6,945,000 .................... (re. $715,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL13ER) (24830) ... 4,750,000 .................. (re. $1,116,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $100,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS13ER) (24704) ...........
4,600,000 ........................................... (re. $427,000)
By chapter 54, section 1, of the laws of 2012:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
222 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Long Island South Shore Estuary Reserve (09SE12ER) (24831) ...........
900,000 ............................................... (re. $3,000)
Agricultural non-point source abatement and control projects
(09AN12ER) (24832) ... 13,000,000 ................. (re. $1,235,000)
Non-agricultural non-point source abatement and control projects
(09NP12ER) (24833) ... 4,000,000 .................. (re. $1,377,000)
Agriculture and farmland protection activities (09FP12ER) (24825) ...
12,000,000 ........................................ (re. $5,616,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law and not less than $300,000 for a
total maximum daily load study for the Western Bays in the South
Shore Estuary Reserve (09WQ12ER) (24837) ...........................
2,932,000 ........................................... (re. $991,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL12ER) (24830) ... 4,728,000 .................... (re. $139,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $100,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS12ER) (24704) ...........
3,400,000 ........................................... (re. $335,000)
By chapter 54, section 1, of the laws of 2011:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
Special Groundwater Protection Areas, Inner City/Underserved Commu-
nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
223 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
kill Unfragmented Forest, Catskill River and Road Corridors, Long
Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
Albany Pine Bush, Five Rivers Environmental Education Center, Batten
Kill Watershed-Saratoga National Historic Park View shed, Washington
County Agricultural Lands-Saratoga National Historic Park View shed,
Lake George watershed, Lake Champlain watershed, Boeselager fores-
try, Catskill River and Road corridor, Rensselaer plateau, Hudson
River Gorge, Susquehanna River Valley Corridor, Lake Champlain
Shoreline and Wetlands, Saratoga County, State Forest and Wildlife
Management Area Protection, Follensby Park, Undeveloped Lake George
Shore, Whitney Park, Finch Woodlands, Washington County, Washington
County Grasslands, Recreational Trail Linkages and Networks, Rome
Sand Plains, Portaferry Lake, Tug Hill Core Forests and Headwater
Streams, Tioga County Park Opportunities, Nelson Swamp, Clark Reser-
vation State Park, State Parks Greenbelt/Tompkins County, Cattarau-
gus Creek and tributaries, Lake Erie Tributary Gorges, Two Rivers
State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
Complex, Genesee Greenway/Recreationway, Allegany State Park, Great
Lakes Shorelines and Niagara River, Long Distance Trail Corridors,
Statewide Small Projects, Working Forest Lands, State Park and State
Historic Site Protection, (a) notwithstanding any law to the contra-
ry, $500,000 from the land acquisition allocation for urban forestry
projects provided that no less than $250,000 shall be made available
for such programs in cities with populations of 65,000 or more; (b)
notwithstanding any law to the contrary, $1,575,000 from the land
acquisition allocation to the land trust alliance for the purpose of
awarding grants on a competitive basis to local land trusts,
provided that up to ten percent of such amount may be made available
for administrative costs and/or technical assistance (09LA11ER)
(24703) ... 17,500,000 ............................... (re. $46,000)
Agricultural non-point source abatement and control projects
(09AN11ER) (24832) ... 13,000,000 ................. (re. $2,115,000)
Non-agricultural non-point source abatement and control projects
(09NP11ER) (24833) ... 4,000,000 .................... (re. $222,000)
Agriculture and farmland protection activities (09FP11ER) (24825) ...
12,000,000 ........................................ (re. $5,881,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG11ER) (24824) ... 300,000 ............. (re. $300,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
224 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law (09WQ11ER) (24837) ..............
2,932,000 ......................................... (re. $1,117,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL11ER) (24830) ... 5,000,000 .................... (re. $281,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 including not less than $95,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS11ER) (24704) ...........
3,800,000 ........................................... (re. $136,000)
By chapter 99, section 1, of the laws of 2010:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Agricultural non-point source abatement and control projects
(09AN10ER) (24832) ... 13,297,000 .................... (re. $76,000)
Non-agricultural non-point source abatement and control projects
(09NP10ER) (24833) ... 3,703,000 .................... (re. $174,000)
Agriculture and farmland protection activities (09FP10ER) (24825) ...
10,750,000 ........................................ (re. $1,824,000)
Biodiversity stewardship and research, and notwithstanding any law to
the contrary, $75,000 for Cayuga Island (09BD10ER) (24827) .........
500,000 ............................................. (re. $194,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG10ER) (24824) ... 300,000 ............. (re. $300,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL10ER) (24830) ... 5,000,000 ..................... (re. $70,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
225 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
chapter 674 of the laws of 2007 including not less than $95,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS10ER) (24704) ...........
3,800,000 ............................................ (re. $12,000)
By chapter 55, section 1, of the laws of 2009:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-agricultural non-point source abatement and control projects
(09NP09ER) (24833) ... 5,600,000 .................... (re. $506,000)
Biodiversity stewardship and research, and notwithstanding any law to
the contrary, $100,000 for Cayuga Island (09BD09ER) (24827) ........
500,000 ............................................. (re. $100,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter
502, section 5, of the laws of 2009:
Agricultural non-point source abatement and control projects
(09AN09ER) (24832) ... 11,468,000 .................... (re. $66,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG09ER) (24824) ... 400,000 ............. (re. $118,000)
Agriculture and farmland protection activities (09FP09ER) (24825) ...
22,054,000 ........................................ (re. $2,697,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law (09WQ09ER) (24837) ..............
8,900,000 ........................................... (re. $221,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL09ER) (24830) ... 5,953,000 ..................... (re. $39,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
226 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
chapter 674 of the laws of 2007 including not less than $96,000 for
Lake George, provided that not less than $1,000,000 be made avail-
able for invasive species eradication, and including grants related
to the control and management of invasive species. Such funding for
grants shall be provided on a competitive basis in consultation with
the New York Invasive Species Council (09IS09ER) (24704) ...........
4,794,000 ............................................ (re. $28,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 1,
section 4, of the laws of 2009:
Costs related to the acquisition of the following properties: Atlan-
tic Coast, Long Island Sound Coastal Area, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
projects, Western Suffolk/Nassau Special Groundwater Protection
Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
lands, Mongaup Valley Wildlife Management Area, Northern Putnam
Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
Northeastern Westchester Watershed and Biodiversity Lands, Rockland
Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
Five Rivers Environmental Education Center, Helderberg Escarpment,
Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill Watershed-
Saratoga National Historic Park View shed, Washington County Agri-
cultural Lands-Saratoga National Historic Park View shed, Westmere
Woods, International Paper Fee Lands, Lake George watershed, Lake
Champlain watershed, Boeselager forestry, Domtar/Lyme Fee Lands,
working forests lands, Catskill River and Road corridor, Rensselaer
plateau, Hudson River Gorge, Franklinton Vlaie Wildlife Management
area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
Canal, Oomsdale farm and surrounding landscape, Susquehanna River
Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
and Wildlife Management Area Protection, Follensby Park, National
Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
Flow River Corridors, Recreational Trail Linkages and Networks, Bog
River/Beaver River Headwater Complex, Maumee Swamp, Moose River
Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
Core Forests and Headwater Streams, Tioga County Park Opportunities,
Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
Park, Salmon River Corridor, State Parks Greenbelt/Tompkins County,
Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp Creek
Corridor, Junius Ponds State Forest and Wildlife Management Area
Protection, Tonawanda Creek Watershed, Two Rivers State Park, Finger
Lakes Shoreline, Buffalo/Niagara River Corridors, Northern Montezuma
227 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine Valley
Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus, Hemlock,
Canadice and Honeoye, Genesee Greenway/Recreationway, Allegany State
Park, Alder Bottom Pond/French Creek, Great Lakes Shorelines and
Niagara River, Chautauqua Lake Access, Shore Lands and Vistas,
Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
Small Projects, Working Forest Lands, and State Park and State
Historic Site Protection, (a) notwithstanding any law to the contra-
ry, $500,000 from the land acquisition allocation for urban forestry
projects provided that no less than $250,000 shall be made available
for such programs in cities with populations of 65,000 or more; (b)
notwithstanding any law to the contrary, $1,575,000 from the land
acquisition allocation to the land trust alliance for the purpose of
awarding grants on a competitive basis to local land trusts,
provided that up to ten percent of such amount may be made available
for administrative costs and/or technical assistance (09LA08ER)
(24703) ... 58,725,000 ................................ (re. $2,000)
Agricultural non-point source abatement and control projects
(09AN08ER) (24832) ... 9,500,000 .................... (re. $334,000)
Non-agricultural non-point source abatement and control projects
(09NP08ER) (24833) ... 4,750,000 .................. (re. $1,084,000)
Agriculture and farmland protection activities (09FP08ER) (24825) ...
23,000,000 .......................................... (re. $649,000)
Notwithstanding any law to the contrary, for the Hudson River Estuary
Management Plan prepared pursuant to section 11-0306 of the environ-
mental conservation law provided however that no more than
$1,000,000 shall be used for Hudson-Fulton Champlain Quadricentenni-
al celebrations, projects and programs (09HE08ER) (24836) ..........
5,000,000 ............................................ (re. $11,000)
Notwithstanding any law to the contrary, for state assistance
payments, pursuant to a smart growth program, provided on a compet-
itive basis, to counties, cities, towns, or villages to establish,
update or implement comprehensive plans in a manner consistent with
smart growth; provided, however, that up to 25 percent of such
payments may be awarded to not-for-profit organizations for such
purposes (09SG08ER) (24824) ... 1,000,000 ............. (re. $4,000)
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law (09WQ08ER) (24837) ..............
9,000,000 ........................................... (re. $344,000)
Notwithstanding any law to the contrary, for the implementation of the
recommendations of the invasive species task force prepared pursuant
to chapter 324 of the laws of 2003 and for the purposes set forth in
chapter 674 of the laws of 2007 provided that not less than
$1,000,000 be made available for invasive species eradication, and
228 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including grants related to the control and management of invasive
species. Such funding for grants shall be provided on a competitive
basis in consultation with the New York Invasive Species Council
(09IS08ER) (24704) ... 4,000,000 ..................... (re. $49,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Costs related to the acquisition of the following properties: Long
Island Sound Coastal Area, Long Island South Shore Estuary Reserve,
Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
Adirondack Mountain Club Lands, Hudson River projects, Western
Suffolk/Nassau Special Groundwater Protection Area, Inner
City/Underserved Community Parks, Long Pond/Butler Wood, Staten
Island Greenbelt, Staten Island Wet Woods, Fahnestock State Park,
Great Swamp, Neversink Highlands, Plutarch/Black Creek Wetlands
Complex, Highlands Greenway Corridor, Mongaup Valley Wildlife
Management Area, Northern Putnam Greenway, Schunnemunk
Mountain/Moodna Creek/Woodcock Mountain, Sterling Forest, Shawangunk
Mountains, Westchester Marine Corridor, Rockland County Highlands,
Catskill Mountain/Delaware River Region, Beaverkill/Willowemoc,
Hudson River Corridor Estuary/Greenway Trail, Catskill Unfragmented
Forest, Long Path, New York City Watershed Lands-Croton, Taconic
Ridge/Harlem Valley, Albany Pine Bush, Five Rivers Environmental
Education Center, Helderberg Escarpment, Pine Bush-Hudson River
Link/Tivoli Preserve, Batten Kill Watershed-Saratoga National
Historic Park Viewshed, Washington County Agricultural LandsSaratoga
National Historic Park Viewshed, Westmere Woods, International Paper
Fee Lands, Lake George watershed, Lake Champlain watershed, Boese-
lager forestry, Domtar/Lyme Fee Lands, Catskill River and Road
corridor, Rensselaer plateau, Franklinton Vlaie Wildlife Management
area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
Canal, Oomsdale farm and surrounding landscape, Susquehanna River
Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
and Wildlife Management Area Protection, Follensby Park, National
Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
Flow River Corridors, Recreational Trail Linkages and Networks, Bog
River/Beaver River Headwater Complex, Maumee Swamp, Moose River
Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
Core Forests and Headwater Streams, Tioga County Park Opportunities,
Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
Park, Salmon River Corridor, Cattaraugus Creek and tributaries,
Carpenter Falls/Bear Swamp Creek Corridor, Junius Ponds State Forest
and Wildlife Management Area Protection, Tonawanda Creek Watershed,
Two Rivers State Park, Finger Lakes Shoreline, Buffalo/Niagara River
Corridors, Northern Montezuma Wetlands, HiTor/Bristol Hills, Brad-
229 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
dock Bay, Catharine Valley Complex, Sonnenberg Gardens, Western
Finger Lakes: Conesus, Hemlock, Canadice and Honeoye, Genesee
Greenway/Recreationway, Allegany State Park, Alder Bottom
Pond/French Creek, Great Lakes and Niagara River Access Shore Lands
and Vistas, Chautauqua Lake Access, Shore Lands and Vistas, Randolph
Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide Small
Projects, Working Forest Lands, and State Park and State Historic
Site Protection, (a) notwithstanding any law to the contrary,
$500,000 from the land acquisition allocation for urban forestry
projects provided that no less than $250,000 shall be made available
for such programs in cities with populations of 65,000 or more and
(b) notwithstanding any law to the contrary, $1,000,000 from the
land acquisition allocation to the land trust alliance for the
purpose of awarding grants on a competitive basis to local land
trusts, provided that up to ten percent of such amount shall be made
available for administrative costs (09LA07ER) (24703) ..............
55,000,000 ............................................ (re. $2,000)
Agriculture and farmland protection activities (09FP07ER) (24825) ...
28,000,000 ........................................ (re. $1,253,000)
Non-agricultural non-point source abatement and control projects
(09NP07ER) (24833) ... 6,417,000 .................... (re. $209,000)
Notwithstanding any law to the contrary for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law
(09GL07ER) (24830) ... 4,000,000 .................... (re. $442,000)
By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
section 1, of the laws of 2008:
Notwithstanding any law to the contrary, for the state share of costs
of wastewater treatment improvement projects undertaken by munici-
palities to upgrade municipal systems to meet stormwater, combined
sewer overflow, sanitary sewer overflow and wastewater treatment
discharge requirements with priority given to systems that are in
violation of title 8 of article 17 of the environmental conservation
law and aquatic habitat restoration projects undertaken by munici-
palities and not-for-profit corporations for aquatic habitat resto-
ration projects as defined in subdivision 1 of section 56-0101 of
the environmental conservation law (09WQ07ER) (24837) ..............
10,000,000 ........................................... (re. $39,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, including costs
related to the acquisition of the following properties: Long Island
Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
Growth Area and Critical Resource Area, Western Suffolk/Nassau
Special Groundwater Protection Area, Inner City/Underserved Communi-
230 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
Rockland County Highlands, Catskill Mountain/Delaware River Region,
Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
Catskill Unfragmented Forest, Long Path, New York City Watershed
Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
Rivers Environmental Education Center, Helderberg Escarpment, Pine
Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Interna-
tional Paper Fee Lands, Lake George watershed, Lake Champlain
watershed, Boeselager forestry, Domtar/Lyme Fee Lands, Catskill
River and Road corridor, Rensselaer plateau, Franklinton Vlaie Wild-
life Management area, Black Creek Marsh/Vly Swamp, Mohawk River
Valley Corridor/Erie Canal, Oomsdale farm and surrounding landscape,
Susquehanna River Valley Corridor, Pilot Knob, Floodwood Camp, Lake
Champlain Shoreline and Wetlands, Wilton Wildlife Preserve and Park,
Follensby Park, National Lead/Tahawus, Undeveloped Lake George
Shore, Whitney Park, Northern Flow River Corridors, Recreational
Trail Linkages and Networks, Bog River/Beaver River Headwater
Complex, Maumee Swamp, Moose River Corridor, Rome Sand Plains, Saint
Lawrence River Islands, Shorelines and Wetlands, Eastern Lake Ontar-
io Shoreline and Islands, Tug Hill Core Forests and Headwater
Streams, Tioga County Park Opportunities, Nelson Swamp, Genny-Green
Trail/Link Trail, Clark Reservation State Park, Salmon River Corri-
dor, Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp
Creek Corridor, Junius Ponds State Forest and Wildlife Management
Area Protection, Tonawanda Creek Watershed, Two Rivers State Park,
Finger Lakes Shoreline, Buffalo/Niagara River Corridors, Northern
Montezuma Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine
Valley Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus,
Hemlock, Canadice and Honeoye, Genesee Greenway/Recreationway, Alle-
gany State Park, Alder Bottom Pond/French Creek, Great Lakes and
Niagara River Access Shore Lands and Vistas, Chautauqua Lake Access,
Shore Lands and Vistas, Randolph Swamp, Eighteen Mile Creek/Hampton
Brook Woods, Statewide Small Projects, Working Forest Lands, and
State Park and State Historic Site Protection, including: (a)
notwithstanding any law to the contrary, $5,000,000 for the Hudson
River Estuary Management Plan prepared pursuant to section 11-0306
of the environmental conservation law; (b) notwithstanding any law
to the contrary, $2,000,000 for the Finger Lakes-Lake Ontario
Watershed Protection Alliance; (c) notwithstanding any law to the
contrary, $3,000,000 for Soil and Water Conservation District activ-
ities as authorized for reimbursement in section 11-a of the soil
and water conservation districts law; (d) notwithstanding any law to
the contrary, $500,000 from the land acquisition allocation for
urban forestry projects provided that no less than $250,000 shall be
made available for such programs in cities with populations of
65,000 or more; (e) notwithstanding any law to the contrary,
$500,000 from the land acquisition allocation to the land trust
231 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
alliance for the purpose of awarding grants on a competitive basis
to local land trusts, provided that up to ten percent of such amount
shall be made available for administrative costs; (f) notwithstand-
ing any law to the contrary, $3,000,000 for reimbursement of eligi-
ble costs related to the New York state quality communities program;
(g) notwithstanding any law to the contrary, $7,000,000 for the
state share costs of wastewater treatment improvement projects
undertaken by municipalities to upgrade municipal systems to meet
stormwater discharge requirements with priority given to systems
that are in violation of title 8 of article 17 of the environmental
conservation law and aquatic habitat restoration projects undertaken
by municipalities and not-for-profit corporations for aquatic habi-
tat restoration projects as defined in subdivision 1 of section
56-0101 of the environmental conservation law; (h) notwithstanding
any law to the contrary $3,000,000 for New York ocean and Great
Lakes ecosystem conservation projects, consistent with the policy
articulated in article 14 of the environmental conservation law; (i)
notwithstanding any law to the contrary, $3,250,000 for the imple-
mentation of the recommendations of the invasive species task force
prepared pursuant to chapter 324 of the laws of 2003 including not
less than $250,000 for Lake George, provided that not less than
$1,000,000 be made available for invasive species eradication.
Funding shall be limited to the preparation of a comprehensive inva-
sive species management plan, and grants for projects related to the
control and management of invasive species, education and outreach
efforts, and for projects aimed at the early detection and
prevention of invasive species. Such funding for grants shall be
provided on a competitive basis in consultation with the New York
State Invasive Species Task Force; and (j) notwithstanding any law
to the contrary, $16,505,000 for non-point source abatement and
control projects provided that no less than $11,003,000 shall be
made available for agricultural nonpoint source abatement and
control projects and no less than $5,502,000 shall be made available
for non-agricultural non-point source abatement and control projects
(09E606ER) (24753) ... 121,259,500 .................. (re. $798,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 50,000
Hudson River Estuary Manage-
ment Plan .......................... 5,000
Biodiversity stewardship and
research ........................... 1,500
County agriculture and farm-
land protection activities ........ 23,000
Agricultural non-point source
abatement and control
projects .......................... 11,003
Non-agricultural non-point
source abatement and
232 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
control projects ................... 5,502
Soil and water conservation
districts .......................... 3,000
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 2,000
Albany Pine Bush Preserve
Commission ......................... 1,500
Long Island Central Pine
Barrens Planning ................... 1,100
Long Island South Shore Estu-
ary Reserve .......................... 900
Quality Communities Projects ......... 3,000
Invasive Species Projects ............ 3,250
Water Quality Improvement
Projects ........................... 7,000
New York ocean and Great Lakes
Ecosystem conservation ............. 3,000
--------------
Total ............................ 120,755
==============
By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, including costs
related to the acquisition of the following properties: Long Island
Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
Growth Area and Critical Resource Area, Western Suffolk/Nassau
Special Groundwater Protection Area, Inner City/Underserved Communi-
ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
Rockland County Highlands, Catskill Mountain/Delaware River Region,
Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Train,
Catskill Unfragmented Forest, Long Path, New York City Watershed
Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
Rivers Environmental Education Center, Helderberg Escarpment, Pine
Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Black Creek
Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie Canal, Susquehan-
na River Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain
Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
Flow River Corridors, Recreational Trail Linkages and Networks, Bog
River/Beaver River Headwater Complex, Maumee Swamp, Moose River
233 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
Core Forests and Headwater Streams, Tioga County Park Opportunities,
Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
Park, Salmon River Corridor, Northern Montezuma Wetlands,
HiTor/Bristol Hills, Braddock Bay, Catharine Valley Complex, Sonnen-
berg Gardens, Western Finger Lakes: Conesus, Hemlock, Canadice and
Honeoye, Genesee Greenway/Recreationway, Allegany State Park, Alder
Bottom Pond/French Creek, Great Lakes and Niagara River Access Shore
Lands and Vistas, Chautauqua Lake Access, Shore Lands and Vistas,
Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
Small Projects, Working Forest Lands, and State Park and State
Historic Site Protection, including: (a) notwithstanding any law to
the contrary, $5,000,000 for the Hudson River Estuary Management
Plan prepared pursuant to section 11-0306 of the environmental
conservation law; (b) notwithstanding any law to the contrary,
$1,500,000 for the Finger Lakes-Lake Ontario Watershed Protection
Alliance; (c) notwithstanding any law to the contrary, $1,860,000
for Soil and Water Conservation District activities as authorized
for reimbursement in section 11-a of the soil and water conservation
districts law; (d) notwithstanding any law to the contrary, $500,000
from the land acquisition allocation for urban forestry projects
provided that no less than $250,000 shall be made available for such
programs in cities with populations of 65,000 or more; (e) notwith-
standing any law to the contrary, $500,000 from the land acquisition
allocation to the land trust alliance for the purpose of awarding
grants on a competitive basis to local land trusts, provided that up
to ten percent of such amount shall be made available for adminis-
trative costs; and (f) notwithstanding any law to the contrary,
$3,000,000 for reimbursement of eligible costs related to the New
York state quality communities program pursuant to chapter 62 of the
laws of 2005 (09E605ER) (24753) ... 84,435,000 ...... (re. $242,000)
PROJECT SCHEDULE
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 40,000
Hudson River Estuary Manage-
ment Plan .......................... 5,000
Biodiversity stewardship and
research ........................... 1,000
County agriculture and farm-
land protection activities ........ 16,000
Non-point source abatement and
control projects .................. 11,700
Soil and water conservation
districts .......................... 1,860
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,500
234 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Albany Pine Bush Preserve
Commission ........................... 800
Long Island Central Pine
Barrens Planning ..................... 950
Long Island South Shore Estu-
ary Reserve .......................... 600
Quality Communities Projects ......... 3,000
--------------
Total ............................. 82,410
==============
By chapter 55, section 1, of the laws of 2003, as added by chapter 684,
section 2, of the laws of 2003:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies including costs
related to the acquisition of the following properties: Long Island
Sound Coastal Area; Long Island South Shore Estuary Reserve; Peconic
Pinelands Maritime Reserve Projects; Pine Barrens Core, Compatible
Growth Area and Critical Resource Area; Western Suffolk/Nassau
Special Groundwater Protection Area; Inner City/Underserved Communi-
ty Parks; Staten Island Greenbelt; Staten Island Wet Woods; Fahnes-
tock State Park; Great Swamp; Neversink Highlands; Plutarch/Black
Creek Wetland Complex; Highlands Greenway Corridor; Mongaup Valley
Wildlife Management Area; Catskill Mountain/Delaware River Region;
Schunnemunk Mountain/Moodna Creek/Woodcock Mountain; Sterling
Forest; Sawangunk Mountains; Westchester Marine Corridor;
Beaverkill/Willowemoc; Hudson River Corridor Estuary/Greenway Trail;
Catskill Unfragmented Forest; Long Path; New York City Watershed
Lands-Croton; Taconic Ridge/Harlem Valley; Albany Pine Bush; Five
Rivers Environmental Education Center; Pine Bush-Hudson River/Tivoli
Preserve; Westmere Woods; Pilot Knob; Floodwood Camp; McLenitahn
Property; Lake Champlain Shoreline and Wetlands; Wilton Wildlife
Preserve and Park; National Lead/Hahawus; Undeveloped Lake George
Shore; Whitney Park; Roden Property; Northern Flow River Corridors;
Recreational Trail Linkages and Networks; Bog River/Beaver River
Headwater Complex; Eastern Lake Ontario Shoreline and Islands;
Maumee Swamp; Moose River Corridor; Tug Hill Core Forests and Head-
water Streams; Rome Sand Plains; Nelson Swamp; Genesee
Greenway/Recreationway; Genny-Green Trail/Link Trail; Northern
Montezuma Wetlands; HiTor/Bristol Hills; Western Finger Lakes:
Conesus, Hemlock, Canadice, and Honeoye; Allegany State Park; Alder
Bottom Pond/French Creek; Great Lakes and Niagara River Access,
Shore Lands and Vistas; Salmon River Corridor; Braddock Bay; Catha-
rine Valley Complex; Clark Reservation State Park; Chautauqua Lake
Access, Shore Lands and Vistas; Randolph Swamp; Eighteen Mile
Creek/Hampton Brook Woods; Statewide Small Projects; Working Forest
Lands; State Park and State Historic Site Protection; and Northern
Putnam Greenway (09E603ER) (24753) ... 62,410,000 .... (re. $32,000)
235 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 30,000
Hudson River Estuary Manage-
ment Plan .......................... 5,000
Biodiversity stewardship and
research ............................. 700
County agriculture and farm-
land protection activities ........ 12,000
Non-point source abatement and
control projects .................. 10,100
Soil and water conservation
districts .......................... 1,860
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,300
Albany Pine Bush Preserve
Commission ........................... 400
Long Island Central Pine
Barrens Planning ..................... 700
Long Island South Shore Estu-
ary Reserve .......................... 350
--------------
Total ............................. 62,410
==============
By chapter 54, section 1, of the laws of 2002:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies including costs
related to the acquisition of the following properties: Long Island
Sound Coastal Area including Held Property, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
Barrens Core Compatible Growth Area and Critical Resource Area,
Western Suffolk/Nassau Special Groundwater Protection Area Undhill,
Inner City/Underserved Community Parks - including Bushwick Inlet,
Mount Loretto, Staten Island Greenbelt, Staten Island Wet Woods,
Fahnestock State Park, Great Swamp, Lundy Estate, Neversink High-
lands, Highlands Greenway Corridor, Mongaup Valley Wildlife Manage-
ment Area, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain,
Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
Catskill Unfragmented Forest, Long Path, New York City Watershed
Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
Viewshed, Five Rivers Environmental Education Center, Tivoli
Preserve, Cedarlands, Pilot Knob, Floodwood Camp, Lake Champlain
Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
236 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Flow River Corridors, Recreational Trail Linkages and Networks, Bog
River/Beaver River Headwater Complex, Eastern Lake Ontario Shoreline
and Islands, Minnehaha Tract, Maumee Swamp, Moose River Corridor,
Tug Hill Core Forests and Headwater Streams, Rome Sand Plains,
Nelson Swamp, Genesee Greenway/Recreationway, Genny-Green Trail/Link
Trail, Northern Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes,
Allegany State Park, Alder Bottom/French Creek, Great Lakes &
Niagara River Access, Shore Lands & Vistas, Salmon River Corridor,
Braddock Bay, Clark Reservation State park, Chautauqua Lake Access,
Shore Lands and Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton
Brook Woods, Delaware River Tailwaters, Statewide Small Projects,
Working Forest Lands/Conservation Easements, Working Forest
Lands/Conservation Easements, Working Forest Lands/Conservation
Easements-Domtar Inc., Working Forest Lands/Conservation Easements-
Boeselager Forestry, and Working Forest Lands/Conservation Ease-
ments-Clerical Medical Forestry (09E402ER) (24753) .................
62,630,000 .......................................... (re. $318,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 38,000
Hudson River Estuary Manage-
ment Plan .......................... 5,800
Biodiversity stewardship and
research ............................. 750
County agriculture and farm-
land protection activities ......... 8,000
Non-point source abatement and
control projects ................... 5,500
Soil and water conservation
districts .......................... 1,860
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,300
Albany Pine Bush Preserve
Commission ........................... 370
Long Island Central Pine
Barrens Planning ..................... 700
Long Island South Shore Estu-
ary Reserve .......................... 350
--------------
Total ............................. 62,630
==============
By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
237 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
location to other state departments and agencies including costs
related to the acquisition of the following properties: Long Island
South Shore Estuary Reserve; Peconic Pinelands Maritime Reserve
Projects; Pine Barrens Core and Critical Resource Areas; Mt. Loret-
to; Inner City/Underserved Community Park-Eastern District Terminal;
Fahnestock State Park; Lundy Estate; Mongaup Valley Wildlife Manage-
ment Area Additions; Neversink Gorge; Schunemunk Mountain/Moodna
Creek; Shawangunk Ridge/Minnewaska State Park Preserve; New York
City Reservoirs-Croton; Sterling Forest; Hudson River
Estuary/Greenway Trail; Albany Pine Bush; Taconic Ridge/Harlem
Valley; Beaverkill/Willowemoc; Five Rivers Education Center; Long
Path; Bartlett Carry; Delaware River Tailwaters; Bear
Pen/Vly/Roundtop Mountains; Floodwood (Boy Scout Camp); Lake Cham-
plain Shoreline and Wetlands; National Lead/Tahawus; Underdeveloped
Lake George Shore; Wilton Wildlife Preserve and Park; Pilot Knob;
Northern Flow River Corridors; Minnehaha Tract; Rome Sand Plains;
Eastern Ontario Shoreline; Northern Montezuma Wetlands; Statewide
Small Projects; Hemlock/Canadice/Honeoye Lakes; Whitney Park;
Genny-Green Trail/Link Trail; Allegany State Park; Braddock Bay;
Chautauqua Lake Access; Nelson Swamp; Randolph Swamp; Alder Bottom
Pond/French Creek; Long Island Sound Coastal Area; Genesee
Greenway/Recreationway; Deveaux Woods; Watkins Glen State Park;
Taughannock Falls State Park; Onlana Viewshed; East Branch Fish
Creek; Staten Island Greenbelt - Decker Farm; Staten Island Green-
belt - Reeds Basket Willow Swamp/Chapin Avenue Woods; Westchester
Marine Corridor - Titus Mill Pond; Working Forest Lands/Conservation
Easements - Cedarlands; Working Forest Lands/Conservation Easements
- Champion International Inc and Working Forest Lands/Conservation
Easements - Domtar Inc; Lake Erie Niagara River Access/Spicer Creek;
Long Island Sound Coastal Access/Mt. Sinai Harbor - Chandler Estate;
Long Island Sound Coastal Area/Central Bays Complex - Conscience Bay
Watershed/Laurel Hill Cemetary; Innercity/Underserved Community Park
- Graniteville Quarry; Working Forest Lands/Conservation Easments
Boeselager Forestry; and Working Forest Lands/Conservation Easements
- Clerical Medical Forestry (09E400ER) (24753) .....................
56,425,000 ........................................... (re. $25,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 33,500
Hudson River Estuary Manage-
ment Plan .......................... 6,000
Biodiversity stewardship and
research ............................. 750
County agriculture and farm-
land protection activities ......... 5,500
Non-point source abatement and
control projects ................... 6,500
Soil and water conservation
238 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
districts .......................... 1,350
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,300
Albany Pine Bush Preserve
Commission ........................... 325
Long Island Central Pine
Barrens Planning ..................... 700
Long Island South Shore Estu-
ary Reserve .......................... 350
--------------
Total ............................. 56,275
==============
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies including costs
related to the acquisition of the following properties: Peconic
Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
Bush; Genny-Green Trail; Blue Mountain Lake; Taconic Ridge/Harlem
Valley; Inner City/Underserved Community Park-Graniteville Quarry;
Innercity/Underserved Community Park-Eastern District Terminal;
Shawangunk Ridge/Minnewaska State Park Preserve; Mount Loretto;
Floodwood (Boy Scout Camp); National Lead/Tahawus; Eastern Ontario
Shoreline; Wilton Wildlife Preserve and Park; Ess Kay Farm; Five
Rivers Education Center; statewide small projects; Barlett Carry;
Benton/Ludlow Creek; Gaisman; Long Path; Braddock Bay; Fair Haven
Beach State Park; Northern Montezuma Wetlands; Undeveloped Lake
George Shore; Hemlock/Canadice/Honeoye Lakes; Beaverkill/Willowemoc;
Deveaux Woods; Rockland County Highlands; Allegany State Park;
Neversink Gorge; Delaware River Tailwaters; Relay Forest; Minnehaha;
Whitney Park; Northern Flow River Corridor; Chautauqua Lake Access;
Bear Pen/Vly/Round Top Mountains; Nelson Swamp; Irondequoit Bay;
Rome Sand Plains; Olana Viewshed; Randolph Swamp; Pilot Knob;
Taughanock Falls State Park; Alder Bottom Pond French Creek; Watkins
Glen State Park; Mongaup Valley Wildlife Management Area; Long
Island Sound Coastal Area-Grandifolia Sand Hills; Working Forest
Lands/Conservation Easements - Champion International Inc.; Working
Forest Lands/Conservation Easements - Domtar Inc.; Great Swamp and
Millerton Meadows (09E499ER) (24753) ... 58,066,681 .. (re. $20,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
239 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Land acquisition .................... 34,250
Hudson River Estuary Manage-
ment Plan .......................... 8,325
Biodiversity stewardship and
research ............................. 300
County agriculture and farm-
land protection activities ......... 4,500
Non-point source abatement and
control projects ................... 6,500
Soil and water conservation
districts ............................ 900
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,300
Albany Pine Bush Preserve
Commission ........................... 240
Long Island Central Pine
Barrens Planning ..................... 650
Long Island South Shore Estu-
ary Reserve .......................... 285
--------------
Total ............................. 57,250
==============
By chapter 55, section 1, of the laws of 1998:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal
location to other state departments and agencies including costs
related to the acquisition of the following properties: Peconic
Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
Bush; Genny-Green Trail; Whitney Park; Northern Flow River Corri-
dors; Minnehaha Tract; Blue Mountain Lake; Taconic Ridge/Harlem
Valley; Inner City/Underserved Community Park-Graniteville Quarry;
Chautauqua Lake Access; Working Forest Lands; Bear Pen/Vly/Roundtop
Mountains; Shawangunk Ridge/Minnewaska State Park Preserve; Mount
Loretto; Floodwood (Boy Scout Camp); National Lead/Tahawus; Rome
Sand Plains; Eastern Ontario Shoreline; Nelson Swamp; Irondequoit
Bay; Alder Bottom Pond/French Creek; Wilton Wildlife Preserve and
Park; Taughannock Falls State Park; Ess Kay Farm; Watkins Glen State
Park; Mongaup Valley Wildlife Management Area; Five Rivers Education
Center; Pilot Knob; Randolph Swamp; Olana Viewshed and statewide
small projects (09E498ER) (24753) ... 44,725,000 .. (re. $1,015,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
240 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Land acquisition .................... 32,000
Biodiversity stewardship and
research ............................. 300
County agriculture and farm-
land protection activities ......... 5,000
Non-point source abatement and
control projects, including
$1,300,000 which shall be
made available to the Finger
Lakes-Lake Ontario Watershed
Protection Alliance ................ 6,300
Albany Pine Bush Preserve
Commission ........................... 220
Long Island Central Pine
Barrens Planning ..................... 630
Long Island South Shore Estu-
ary Reserve .......................... 275
--------------
Total ............................. 44,725
==============
By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies including costs
related to the acquisition of the following properties: Albany Pine
Bush, Northern Flow River Corridors, Alder Bottom Pond/French Creek,
Rome Sand Plains, Hudson River Greenway/Trail, Fahnestock State
Park-Hubbard Perkins Conservation Area, Taconic Ridge/Harlem Valley,
Eastern Ontario Shoreline, Sterling Forest, Staten Island Greenbelt
- St. Francis Seminary, Peconic Pinelands Maritime Reserve Projects,
Massawepie Mire, Plateau Mountain, Chautauqua Lake Access, New York
City reservoirs-Croton, Ganondagan Historic Site, Moreau Lake state
park, Olana Viewshed, Hudson Valley Winery, Staten Island Wet
Woods/Paw-Paw Hybrid Oak Woods, Nelson Swamp, Rockland County High-
lands, Whitney Park, Mt. Loretto, Green Lakes, Inner
City/Underserved Community Park-Graniteville Quarry, Irondequoit Bay
and Statewide small projects (09E497ER) (24753) ....................
47,090,000 ........................................... (re. $13,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 36,000
Biodiversity stewardship and
research ............................. 275
County agriculture and farm-
241 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
land protection activities ......... 4,000
Non-point source abatement and
control projects including
$653,000 which shall be made
available to county soil and
water conservation districts
and $1,300,000 which shall
be made available to the
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 5,400
Albany Pine Bush Preserve
Commission ........................... 200
Long Island Central Pine
Barrens Planning ..................... 615
Long Island South Shore Estu-
ary Reserve .......................... 225
--------------
Total ............................. 46,715
==============
Capital Projects Funds - Other
Environmental Protection Fund
Parks, Recreation and Historic Preservation Account - 30453
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $10,500,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and $200,000 for the Niagara
River greenway commission (09WR22ER) (24700) .......................
16,500,000 ....................................... (re. $16,500,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $13,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
242 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park; $500,000 for the Hudson River Valley Trail
Grants; $150,000 to the State University of New York college of
environmental science and forestry; $225,000 to Paul Smith's College
for the support of the Adirondack Park interpretive centers;
$150,000 to the Catskill Center for conservation and development for
the support of the Catskill Visitors Center; and $3,500,000 to
Scenic Hudson, Inc. for the Westchester RiverWalk; and $350,000 to
the Buffalo Museum of Science for the Tifft Nature Preserve accessi-
bilty trail (09MP22ER) (24701) .....................................
26,000,000 ....................................... (re. $25,500,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance: including but not limited to sustaina-
ble trail crews or other activities related to sustainable use of
the forest preserve and other state lands that are threatened by
overuse; Catskill and Adirondack camp ground improvements to public
access and sanitation facilities; environmental education; facility
improvements; archeological, historic, cultural and natural resource
surveys, forest health surveys, interpretation, and inventories, and
response to forest pests including southern pine beetle; Forest
Preserve and state forest unit management planning; invasive species
management; conservation easement public recreation planning; habi-
tat restoration and enhancement; state fish hatchery improvements;
state tree nursery improvements; safety equipment; water access
facilities and safety improvements; public beach facility develop-
ment and improvement; public access improvements at day use areas;
state historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; (iii)
$1,000,000 for Belleayre Mountain ski center projects; (iv)
$2,000,000 from the public access and stewardship allocation to
Parks & Trails New York for the purpose of awarding grants on a
competitive basis to local parks and department of environmental
conservation friends groups, provided that up to ten percent of such
amount may be made available for administrative costs and/or techni-
cal assistance; (v) public protection and emergency preparedness
purposes; and (vi) $18,000 to New York Natural Heritage to update
the New York Protected Areas Database, (vii) $8,000,000 for Adiron-
dack and Catskill visitor safety and wilderness protection activ-
ities to address issues relating to overuse; (viii) and up to
$600,000 to the Department of Environmental Conservation to initiate
a procurement for a Visitor Use Management Framework that will serve
243 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
as a tool to guide future management and stewarship decision-making
for the Adirondack and Catskill Parks; (ix) and $500,000 to the
Adirondack Architectural Heritage for the management of the Camp
Santanoni Historic Area (09ST22ER) (24702) .........................
48,689,800 ....................................... (re. $48,682,000)
Notwithstanding subdivision 7 of section 92-s of the state finance law
or any other law to the contrary, for services and expenses of the
Hudson River Park Trust for projects related to the development of
the Hudson River Park consistent with provisions of chapter 592 of
the laws of 1998, including but not limited to utility infrastruc-
ture improvements; provided, however, such funds shall not be avail-
able for suballocation to any public benefit corporation or public
authority with the exception of the Hudson River Park Trust and
shall be available solely for the liabilities incurred by the Hudson
River Park Trust or by other state departments or agencies on behalf
of the Hudson River Park Trust on or after April 1, 1999. Provided
further that, the comptroller is hereby authorized and directed to
release monies to the Hudson River Park Trust in amounts set forth
in a schedule approved by the director of the budget (09HR22ER)
(24820) ... 4,800,000 ............................. (re. $4,084,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB22ER) (24823) .............................
20,000,000 ....................................... (re. $20,000,000)
Notwithstanding any other provisions of law, for the administration of
the programs of section 79-b of the navigation law (09NV22ER)
(25719) ... 2,000,000 ............................. (re. $2,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $9,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and $200,000 for the Niagara
River greenway commission (09WR21ER) (24700) .......................
14,150,000 ....................................... (re. $13,977,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
244 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park; $500,000 for the Hudson River Valley Trail
Grants; $120,000 to the State University of New York college of
environmental science and forestry; $180,000 to Paul Smith's College
for the support of the Adirondack Park interpretive centers;
$150,000 to the Catskill Center for Conservation and Development for
the support of the Catskill Visitors Center; and $1,000,000 to the
city of New York for the East River Esplanade 107th Street Pier
(09MP21ER) (24701) ... 19,500,000 ................ (re. $18,902,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance: including but not limited to sustaina-
ble trail crews or other activities related to sustainable use of
the forest preserve and other state lands that are threatened by
overuse; Catskill and Adirondack camp ground improvements to public
access and sanitation facilities; environmental education; facility
improvements; archeological, historic, cultural and natural resource
surveys, forest health surveys, interpretation, and inventories, and
response to forest pests including southern pine beetle; Forest
Preserve and state forest unit management planning; invasive species
management; conservation easement public recreation planning; habi-
tat restoration and enhancement; state fish hatchery improvements;
state tree nursery improvements; safety equipment; water access
facilities and safety improvements; public beach facility develop-
ment and improvement; public access improvements at day use areas;
state historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; (iii)
$1,000,000 for Belleayre Mountain ski center projects; (iv)
$1,000,000 from the public access and stewardship allocation to
Parks & Trails New York for the purpose of awarding grants on a
competitive basis to local parks and department of environmental
conservation friends groups, provided that up to ten percent of such
amount may be made available for administrative costs and/or techni-
cal assistance; (v) public protection and emergency preparedness
purposes; (vi) $18,000 to New York Natural Heritage to update the
New York Protected Areas Database; (vii) $1,550,000 for Adirondack
and Catskill visitor safety and wilderness protection activities to
address issues relating to overuse including up to $800,000 to Essex
County to address issues of overuse in the Adirondack Park
(09ST21ER) (24702) ... 34,451,800 ................ (re. $28,894,000)
245 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding subdivision 7 of section 92-s of the state finance law
or any other law to the contrary, for services and expenses of the
Hudson River Park Trust for projects related to the development of
the Hudson River Park consistent with provisions of chapter 592 of
the laws of 1998, including but not limited to utility infrastruc-
ture improvements; provided, however, such funds shall not be avail-
able for suballocation to any public benefit corporation or public
authority with the exception of the Hudson River Park Trust and
shall be available solely for the liabilities incurred by the Hudson
River Park Trust or by other state departments or agencies on behalf
of the Hudson River Park Trust on or after April 1, 1999. Provided
further that, the comptroller is hereby authorized and directed to
release monies to the Hudson River Park Trust in amounts set forth
in a schedule approved by the director of the budget (09HR21ER)
(24820) ... 3,975,000 ............................. (re. $3,701,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB21ER) (24823) .............................
16,000,000 ....................................... (re. $15,962,000)
Notwithstanding any other provisions of law, for the administration of
the programs of section 79-b of the navigation law (09NV21ER)
(25719) ... 2,000,000 ............................. (re. $2,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $9,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and $200,000 for the Niagara
River greenway commission (09WR20ER) (24700) .......................
14,000,000 ....................................... (re. $13,800,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park; $500,000 for the Hudson River Valley Trail
246 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Grants; $120,000 to the State University of New York college of
environmental science and forestry; $180,000 to Paul Smith's College
for the support of the Adirondack Park interpretive centers; and
$150,000 to the Catskill Center for Conservation and Development for
the support of the Catskill Visitors Center; and $1,000,000 to the
city of New York for the East River Esplanade 107th Street Pier
(09MP20ER) (24701) ... 19,500,000 ................ (re. $18,802,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance: including but not limited to sustaina-
ble trail crews or other activities related to sustainable use of
the forest preserve and other state lands that are threatened by
overuse; Catskill and Adirondack camp ground improvements to public
access and sanitation facilities; environmental education; facility
improvements; archeological, historic, cultural and natural resource
surveys, forest health surveys, interpretation, and inventories, and
response to forest pests including southern pine beetle; Forest
Preserve and state forest unit management planning; invasive species
management; conservation easement public recreation planning; habi-
tat restoration and enhancement; state fish hatchery improvements;
state tree nursery improvements; safety equipment; water access
facilities and safety improvements; public beach facility develop-
ment and improvement; public access improvements at day use areas;
state historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; (iii)
$1,000,000 for Belleayre Mountain ski center projects; (iv)
$1,000,000 from the public access and stewardship allocation to
Parks & Trails New York for the purpose of awarding grants on a
competitive basis to local parks and department of environmental
conservation friends groups, provided that up to ten percent of such
amount may be made available for administrative costs and/or techni-
cal assistance; (v) public protection and emergency preparedness
purposes; (vi) $250,000 to Adirondack Architectural Heritage for
restoration projects at Camp Santanoni Historic Area; (vii) $55,000
to New York Natural Heritage to update the New York Protected Areas
Database; (viii) up to $1,200,000 to Essex County to address issues
of overuse in the Adirondack Park (09ST20ER) (24702) ...............
34,400,000 ....................................... (re. $24,883,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB20ER) (24823) .............................
16,000,000 ........................................ (re. $1,902,000)
By chapter 54, section 1, of the laws of 2019:
247 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $9,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and $200,000 for the Niagara
River greenway commission (09WR19ER) (24700) .......................
14,500,000 ....................................... (re. $14,300,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park; $500,000 for the Hudson River Valley Trail
Grants; $120,000 to the State University of New York college of
environmental science and forestry and $180,000 to Paul Smith's
College for the support of the Adirondack Park interpretive centers,
$1,000,000 to the city of New York for the East River Esplanade
107th Street Pier (09MP19ER) (24701) ...............................
19,500,000 ....................................... (re. $14,156,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack camp ground
improvements to public access and sanitation facilities; environ-
mental education; facility improvements; archeological, historic,
cultural and natural resource surveys, forest health surveys, inter-
pretation, and inventories, and response to forest pests including
southern pine beetle; Forest Preserve and state forest unit manage-
ment planning; invasive species management; conservation easement
248 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
public recreation planning; habitat restoration and enhancement;
state fish hatchery improvements; state tree nursery improvements;
safety equipment; water access facilities and safety improvements;
public beach facility development and improvement; public access
improvements at day use areas; state historic site exterior restora-
tion; and cabin area and camping facility development, restoration
and reconstruction; (iii) $1,000,000 for Belleayre Mountain ski
center projects; (iv) $1,000,000 from the public access and steward-
ship allocation to Parks & Trails New York for the purpose of award-
ing grants on a competitive basis to local parks and department of
environmental conservation friends groups, provided that up to ten
percent of such amount may be made available for administrative
costs and/or technical assistance; (v) public protection and emer-
gency preparedness purposes (09ST19ER) (24702) .....................
33,000,000 ........................................ (re. $9,465,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB19ER) (24823) .............................
16,000,000 ........................................... (re. $12,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $9,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and $200,000 for the Niagara
River greenway commission (09WR18ER) (24700) .......................
14,000,000 ....................................... (re. $13,800,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park; $500,000 for the Hudson River Valley Trail
Grants; $120,000 to the State University of New York college of
environmental science and forestry and $180,000 to Paul Smith's
College for the support of the Adirondack Park interpretive centers,
249 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
$500,000 to the city of New York for the East River Esplanade 107th
Street Pier, and $1,000,000 to the Wildlife Conservation Society for
the Bronx Zoo (09MP18ER) (24701) ... 19,500,000 .. (re. $11,312,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack camp ground
improvements to public access and sanitation facilities; environ-
mental education; facility improvements; archeological, historic,
cultural and natural resource surveys, forest health surveys, inter-
pretation, and inventories, and response to forest pests including
southern pine beetle; Forest Preserve and state forest unit manage-
ment planning; invasive species management; conservation easement
public recreation planning; habitat restoration and enhancement;
state fish hatchery improvements; state tree nursery improvements;
safety equipment; water access facilities and safety improvements;
public beach facility development and improvement; public access
improvements at day use areas; state historic site exterior restora-
tion; and cabin area and camping facility development, restoration
and reconstruction; (iii) $1,000,000 for Belleayre Mountain ski
center projects; (iv) $500,000 from the public access and steward-
ship allocation to Parks & Trails New York for the purpose of award-
ing grants on a competitive basis to local parks and department of
environmental conservation friends groups, provided that up to ten
percent of such amount may be made available for administrative
costs and/or technical assistance; (v) public protection and emer-
gency preparedness purposes; and (vi) up to $50,000 for Earl W.
Brydges Artpark State Park improvements; and (vii) up to $150,000
for Old Fort Niagara State Park Improvements (09ST18ER) (24702)
32,638,000 ........................................ (re. $8,128,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB18ER) (24823) .............................
15,000,000 .......................................... (re. $121,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $10,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
250 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and including $660,000 for
Adirondack infrastructure and environmental improvements for the
towns of Minerva, Indian Lake and Newcomb and $200,000 for the
Niagara River greenway commission (09WR17ER) (24700) ...............
16,000,000 ....................................... (re. $15,316,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park, $1,000,000 for the Ulster County rail
trail pursuant to initiation of a public planning process; and
$1,000,000 to the city of New York for the East River Esplanade
107th Street Pier (09MP17ER) (24701) ...............................
20,000,000 ....................................... (re. $10,312,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack camp ground
improvements to public access and sanitation facilities; environ-
mental education; facility improvements; archeological, historic,
cultural and natural resource surveys, forest health surveys, inter-
pretation, and inventories, and response to forest pests including
southern pine beetle; Forest Preserve and state forest unit manage-
ment planning; invasive species management; conservation easement
public recreation planning; habitat restoration and enhancement;
state fish hatchery improvements; state tree nursery improvements;
water access facilities and safety improvements; public beach facil-
ity development and improvement; public access improvements at day
use areas; state historic site exterior restoration; and cabin area
and camping facility development, restoration and reconstruction;
(iii) $1,000,000 for Belleayre Mountain ski center projects; (iv)
$500,000 from the public access and stewardship allocation to Parks
& Trails New York for the purpose of awarding grants on a compet-
itive basis to local parks and department of environmental conserva-
251 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tion friends groups, provided that up to ten percent of such amount
may be made available for administrative costs and/or technical
assistance; and $250,000 for the Hudson River Valley Trail Grants
(09ST17ER) (24702) ... 30,000,000 ................. (re. $2,876,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $10,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area including up to $2,000,000 for
updates to existing local waterfront revitalization program plans to
mitigate future physical climate risks; and including $660,000 for
Adirondack infrastructure and environmental improvements for the
towns of Minerva, Indian Lake and Newcomb and $200,000 for the
Niagara River greenway commission and including $150,000 for
Hammonds Cove dredging projects; and $1,000,000 to the city of New
York for the East River Esplanade 107th Street pier (09WR16ER)
(24700) ... 16,000,000 ........................... (re. $14,988,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $10,000,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and including
$250,000 for Tivoli Park, $300,000 for the Ulster County rail trail,
pursuant to initiation of a public planning process, and including
$100,000 for Old Westbury Gardens to rehabilitate property barns,
and including $150,000 for Udall's Cove land acquisition, and
including $100,000 to the Town of Middlesex Vine Valley Public Park
(09MP16ER) (24701) ... 20,000,000 ................. (re. $7,154,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state lands pursu-
ant to sections 54-0303 and 56-0307 of the environmental conserva-
tion law; (ii) on state parks or state owned lands and easements
under the jurisdiction of the department of environmental conserva-
tion or the office of parks, recreation and historic preservation
for access opportunities for people with disabilities; access to the
252 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State Forest Preserve, State reforestation, Wildlife Management
areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack camp ground
improvements to public access and sanitation facilities; environ-
mental education; facility improvements; archeological, historic,
cultural and natural resource surveys, forest health surveys, inter-
pretation, and inventories, and response to forest pests; Forest
Preserve and state forest unit management planning; invasive species
management; conservation easement public recreation planning; habi-
tat restoration and enhancement; state fish hatchery improvements;
state tree nursery improvements; water access facilities and safety
improvements; public beach facility development and improvement;
public access improvements at day use areas; state historic site
exterior restoration; and cabin area and camping facility develop-
ment, restoration and reconstruction; (iii) $500,000 for Belleayre
Mountain ski center projects; (iv) $500,000 from the public access
and stewardship allocation to Parks & Trails New York for the
purpose of awarding grants on a competitive basis to local parks'
friends groups, provided that up to ten percent of such amount may
be made available for administrative costs and/or technical assist-
ance; and $250,000 for the Hudson River Valley Trail Grants Program
and including $200,000 to SUNY ESF for an updated assessment of the
state's deer population (09ST16ER) (24702) .........................
28,000,000 .......................................... (re. $888,000)
By chapter 54, section 1, of the laws of 2015:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $6,250,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area; and provided further this appro-
priation shall not be construed to restrict the use of any addi-
tional monies for such projects including $250,000 for Flood Smart
communities, and $250,000 for Schuyler County Soil and Water Conser-
vation District (09WR15ER) (24700) .................................
12,500,000 ....................................... (re. $11,993,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $7,875,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
253 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; including $250,000
for Tivoli Park; $500,000 for Clute Park; and $150,000 for Yates
County SWCD Keuka Outlet Trail (09MP15ER) (24701) ..................
15,750,000 ........................................ (re. $3,938,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve, State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories, and response
to forest pests; Forest Preserve and state forest unit management
planning; conservation easement public recreation planning; habitat
restoration and enhancement; state fish hatchery improvements; state
tree nursery improvements; water access facilities and safety
improvements; public beach facility development and improvement;
public access improvements at day use areas; state historic site
exterior restoration; and cabin area and camping facility develop-
ment, restoration and reconstruction; (iii) $500,000 for Belleayre
Mountain ski center projects; (iv) $500,000 from the public access
and stewardship allocation to Parks & Trails New York for the
purpose of awarding grants on a competitive basis to local parks'
friends groups, provided that up to ten percent of such amount may
be made available for administrative costs and/or technical assist-
ance; and $100,000 for the Hudson River Valley Trail Grants Program
(09ST15ER) (24702) ... 18,500,000 ................... (re. $141,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB15ER) (24823) .............................
12,450,000 ........................................... (re. $97,000)
By chapter 54, section 1, of the laws of 2014:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $6,250,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
254 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area; and provided further this appro-
priation shall not be construed to restrict the use of any addi-
tional monies for such projects; including $200,000 for the Town of
Tonawanda; $75,000 for the Town of Evans; $125,000 for Hamburg Water
Rescue Unit; $50,000 for the village of Orchard Park; and $300,000
for the Beacon Institute (09WR14ER) (24700) ........................
12,500,000 ........................................ (re. $8,278,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $7,750,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; including $50,000
for Yaddo Artists' Community; including $50,000 for Green Lake Dam;
including $150,000 for Greek Lakes Center; including $180,000 for
Joseph Rodman Drake Park; including $20,000 for Udall's Cove; and
including $200,000 for Chestnut Ridge Conservancy (09MP14ER) (24701)
... 15,500,000 ................................... (re. $3,929,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; and (iii)
$500,000 for Belleayre Mountain ski center projects (09ST14ER)
(24702) ... 17,350,000 ............................... (re. $40,000)
By chapter 54, section 1, of the laws of 2013:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
255 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $7,750,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; including
$2,000,000 for the Ulster County Rail Trail, pursuant to the initi-
ation of a public planning process; $200,000 for the town of Orchard
Park; $150,000 for the Cazenovia community resource center; $100,000
for the town of Evans; and $275,000 for the Buffalo military and
naval park (09MP13ER) (24701) ... 15,500,000 ...... (re. $1,522,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; and (iii)
$500,000 for Belleayre Mountain ski center projects (09ST13ER)
(24702) ... 16,600,000 .............................. (re. $301,000)
Notwithstanding any law to the contrary, for zoos, botanical gardens
and aquaria program (09ZB13ER) (24823) .............................
10,250,000 ........................................... (re. $15,000)
By chapter 54, section 1, of the laws of 2012:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
256 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $6,500,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; including $425,000
for Buffalo - area parks; and $300,000 for Niagara and Erie Historic
Preservation (09MP12ER) (24701) ... 13,000,000 .... (re. $1,489,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; and (iii)
$500,000 for Belleayre Mountain ski center projects (09ST12ER)
(24702) ... 16,000,000 ............................... (re. $63,000)
By chapter 54, section 1, of the laws of 2011:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $6,500,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
257 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; $250,000 for Olmst-
ed Park; $125,000 for Hyde Park; $250,000 for Darwin Martin House;
and $50,000 for Graycliff Manor (09MP11ER) (24701) .................
13,000,000 ........................................ (re. $1,504,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction; and (iii)
$500,000 for Belleayre Mountain ski center projects (09ST11ER)
(24702) ... 16,228,000 ............................... (re. $13,000)
By chapter 99, section 1, of the laws of 2010:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $6,716,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area, and notwithstanding
any law to the contrary, $225,000 for Olmstead Park, $125,000 for
Hyde Park, $225,000 for Darwin Martin House and $125,000 for Gray-
cliff Manor (09MP10ER) (24701) ... 13,432,000 ..... (re. $2,037,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
258 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law and (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
facility development, restoration and reconstruction (09ST10ER)
(24702) ... 16,228,000 .............................. (re. $122,000)
By chapter 99, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2011:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $6,000,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area; and provided further this appro-
priation shall not be construed to restrict the use of any addi-
tional monies for such projects; $550,000 for Buffalo Waterfront;
$300,000 for Niagara River Greenway; $250,000 for Hudson and Cham-
plain Docks; and $400,000 for the Beacon Institute including costs
incurred prior to April 1, 2011 (09WR10ER) (24700) .................
12,000,000 ........................................ (re. $5,500,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter
502, section 5, of the laws of 2009:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $8,490,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area, and notwithstanding
any law to the contrary, $500,000 for Olmstead Park (09MP09ER)
(24701) ... 20,813,000 ............................ (re. $3,256,000)
259 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any law to the contrary, for the purposes of
Hudson-FultonChamplain Quadricentennial celebrations, projects and
programs (09QC09ER) (24821) ... 450,000 ............. (re. $125,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Notwithstanding any law to the contrary, for the purposes of
Hudson-FultonChamplain Quadricentennial celebrations, projects and
programs (09QC08ER) (24821) ... 3,000,000 ........... (re. $137,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 1,
section 4, of the laws of 2009:
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $6,400,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area, and notwithstanding
any law to the contrary, $50,000 from the heritage areas allocation
for the purpose of awarding grants on a competitive basis to herit-
age area organizations designated in statute (09MP08ER) (24701)
19,225,000 ........................................ (re. $2,428,000)
Notwithstanding any law to the contrary, for state parks and land and
easement infrastructure, access and stewardship projects which shall
include capital projects: (i) on state parks and state owned lands
acquired pursuant to sections 54-0303 and 56-0307 of the environ-
mental conservation law; (ii) on state parks or state owned lands
and easements under the jurisdiction of the department of environ-
mental conservation or the office of parks, recreation and historic
preservation for access opportunities for people with disabilities;
access to the State Forest Preserve; State reforestation, Wildlife
Management areas and conservation easement lands; recreational trail
construction and maintenance; Catskill and Adirondack campground
improvements to public access and sanitation facilities; environ-
mental education; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
forest health surveys, interpretation, and inventories; Forest
Preserve and state forest unit management planning; conservation
easement public recreation planning; habitat restoration and
enhancement; state fish hatchery improvements; water access facili-
ties and safety improvements; public beach facility development and
improvement; public access improvements at day use areas; state
historic site exterior restoration; and cabin area and camping
260 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
facility development, restoration and reconstruction; (iii) $750,000
from such amount for Belleayre Mountain ski center projects
(09ST08ER) (24702) ... 4,000,000 ..................... (re. $43,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, according to the following:
Local waterfront revitalization programs, notwithstanding any law to
the contrary, not less than, $6,656,000 for waterfront revitaliza-
tion projects which are in or primarily serve areas where demograph-
ic and other relevant data for such areas demonstrate that the areas
are densely populated and have sustained physical deterioration,
decay, neglect, or disinvestment, or where a substantial proportion
of the residential population is of low income or is otherwise
disadvantaged and is underserved with respect to the existing recre-
ational opportunities in the area; and provided further this section
shall not be construed to restrict the use of any additional monies
for such projects; $1,625,000 for services and expenses of the
Beacon Institute; $1,000,000 for services and expenses of riverfront
development properties in Rensselaer county; and $1,000,000 for
services and expenses for Long Island water projects (09WR07ER)
(24700) ... 26,625,000 .............................. (re. $125,000)
Parks, recreation and historic preservation projects, notwithstanding
any law to the contrary, not less than, $5,306,000 for municipal
parks projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect or disinvestment or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area (09MP07ER) (24701)
... 21,225,000 ................................... (re. $1,678,000)
By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
section 5, of the laws of 2006:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, including: (a) notwithstanding subdivision 7 of
section 92-s of the state finance law or any other law to the
contrary, $5,000,000 for services and expenses of the Hudson River
Park Trust for projects related to the development of the Hudson
River Park consistent with provisions of chapter 592 of the laws of
1998; provided, however, such funds shall not be available for
suballocation to any public benefit corporation or public authority
with the exception of the Hudson River Park Trust and shall be
261 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
available solely for the liabilities incurred by the Hudson River
Park Trust or by other state departments or agencies on behalf of
the Hudson River Park Trust and shall be available solely for the
liabilities incurred by the Hudson River Park Trust or by other
state departments or agencies on behalf of the Hudson River Park
Trust on or after April 1, 1999. Provided further that, the comp-
troller is hereby authorized and directed to release monies to the
Hudson River Park Trust in amounts set forth in a schedule approved
by the director of the budget; (b) notwithstanding any law to the
contrary, $15,000,000 for state parks and land infrastructure,
access and stewardship projects which shall include capital
projects: (i) on state parks and state owned lands acquired pursuant
to sections 54-0303 and 56-0307 of the environmental conservation
law or (ii) on state parks or state owned lands under the jurisdic-
tion of the department of environmental conservation or the office
of parks, recreation and historic preservation for access opportu-
nities for people with disabilities; access to the State Forest
Preserve; recreational trail construction and maintenance; Catskill
and Adirondack campground improvements to public access and sanita-
tion facilities; conservation education facility improvements;
archeological, historic, cultural and natural resource surveys,
interpretation, and inventories; Forest Preserve and state forest
unit management planning; habitat restoration and enhancement; state
fish hatchery improvements; water access facilities and safety
improvements; public beach facility development and improvement;
public access improvements at day use areas; state historic site
exterior restoration; and cabin area and camping facility develop-
ment, restoration and reconstruction; and (iii) $750,000 from such
amount for Belleayre Mountain ski center projects; (c) notwithstand-
ing any law to the contrary, $5,000,000 for historic barns program;
(d) notwithstanding any law to the contrary, $7,500,000 for zoos,
botanical gardens and aquaria program; (e) notwithstanding any law
to the contrary, not less than, $6,750,000 for waterfront revitali-
zation projects which are in or primarily serve areas where demo-
graphic and other relevant data for such areas demonstrate that the
areas are densely populated and have sustained physical deteri-
oration, decay, neglect, or disinvestment, or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and provided
further this section shall not be construed to restrict the use of
any additional monies for such projects; (f) notwithstanding any law
to the contrary, not less than, $5,118,000 for municipal parks
projects which are in or primarily serve areas where demographic and
other relevant data for such areas demonstrate that the areas are
densely populated and have sustained physical deterioration, decay,
neglect or disinvestment or where a substantial proportion of the
residential population is of low income or is otherwise disadvan-
taged and is underserved with respect to the existing recreational
opportunities in the area; and provided further this section shall
not be construed to restrict the use of any additional monies for
such projects and not less than $1,500,000 for the Albany Pine Bush
262 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Preserve Discovery Center; (g) notwithstanding any law to the
contrary, $7,250,000 from the waterfront revitalization allocation
for the Beacon Institute including $5,000,000 for the development of
the upper satellite center associated with the Beacon Institute
located on the Troy waterfront; and (h) notwithstanding any law to
the contrary, $1,000,000 for waterfront revitalization and river-
front development projects in the county of Rensselaer and $300,000
for Sea Cliff, $300,000 for the town of Huntington, $100,000 for
Laurel Hollow, $100,000 for Asharoken, $100,000 for Lloyd Harbor and
$100,000 for Bayville; provided that such state assistance payment
shall not be construed to restrict the use of any additional monies
for such project or be considered a state assistance payment or
other assistance for the purposes of title 11 of article 54 of the
environmental conservation law and title 3 of article 56 of the
environmental conservation law; and provided further, however that
such state assistance payment shall reduce the total cost of such
project for purposes of calculating eligibility for further state
assistance payments (09E306ER) (24752) .............................
79,970,000 ........................................ (re. $3,171,000)
PROJECT SCHEDULE
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ..................... 27,000
Parks, recreation and historic
preservation projects ............. 20,470
Stewardship projects ................ 15,000
Historic barn preservation ........... 5,000
Zoos, botanical gardens and
aquaria projects ................... 7,500
Hudson River Park .................... 5,000
--------------
Total ............................. 79,970
==============
By chapter 55, section 1, of the laws of 2005, as added by chapter 62,
section 4, of the laws of 2005:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies, including: (a) notwithstanding subdivision 7 of
section 92-s of the state finance law or any other law to the
contrary, $5,000,000 for services and expenses of the Hudson River
Park Trust for projects related to the development of the Hudson
River Park consistent with provisions of chapter 592 of the laws of
1998; provided, however, such funds shall not be available for
suballocation to any public benefit corporation or public authority
with the exception of the Hudson River Park Trust and shall be
263 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
available solely for the liabilities incurred by the Hudson River
Park Trust or by other state departments or agencies on behalf of
the Hudson River Park Trust and shall be available solely for the
liabilities incurred by the Hudson River Park Trust or by other
state departments or agencies on behalf of the Hudson River Park
Trust on or after April 1, 1999. Provided further that, the comp-
troller is hereby authorized and directed to release monies to the
Hudson River Park Trust in amounts set forth in a schedule approved
by the director of the budget; (b) notwithstanding any law to the
contrary, $6,500,000 for state parks and land infrastructure and
stewardship projects which shall include capital projects: (i) on
state parks and state owned lands acquired pursuant to sections
54-0303 and 56-0307 of the environmental conservation law or (ii) on
state parks or state owned lands under the jurisdiction of the
department of environmental conservation or the office of parks,
recreation and historic preservation for access opportunities for
people with disabilities; access to the State Forest Preserve;
recreational trail construction and maintenance; Catskill and
Adirondack campground improvements to public access and sanitation
facilities; conservation education facility improvements; archeolog-
ical, historic, cultural and natural resource surveys, interpreta-
tion, and inventories; Forest Preserve unit management planning;
habitat restoration and enhancement; water access facilities; public
beach facility development and improvement; public access improve-
ments at day use areas; state historic site exterior restoration;
and cabin area and camping facility development, restoration and
reconstruction; and include seven hundred fifty thousand dollars
from such amount for Belleayre Mountain ski center projects; (c)
notwithstanding any law to the contrary, $750,000 for historic barns
program; (d) notwithstanding any law to the contrary, $6,000,000 for
zoos, botanical gardens and aquaria program; (e) notwithstanding any
law to the contrary not less than, $3,563,000 for waterfront revi-
talization projects which are in or primarily serve areas where
demographic and other relevant data for such areas demonstrate that
the areas are densely populated and have sustained physical deteri-
oration, decay, neglect, or disinvestment, or where a substantial
proportion of the residential population is of low income or is
otherwise disadvantaged and is underserved with respect to the
existing recreational opportunities in the area; and provided
further this section shall not be construed to restrict the use of
any additional monies for such projects; (f) notwithstanding any law
to the contrary, not less than, $3,579,000 for municipal parks
projects which are in or primarily serve areas where demographic and
other relevant data for such areas demonstrate that the areas are
densely populated and have sustained physical deterioration, decay,
neglect or disinvestment or where a substantial proportion of the
residential population is of low income or is otherwise disadvan-
taged and is underserved with respect to the existing recreational
opportunities in the area; and provided further this section shall
not be construed to restrict the use of any additional monies for
such projects; (g) notwithstanding any law to the contrary,
$1,000,000 from the waterfront revitalization allocation for the
264 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
rivers and estuaries center on the Hudson; and (h) notwithstanding
any law to the contrary, $1,000,000 for waterfront revitalization
and riverfront development projects in the county of Rensselaer and
$500,000 for Oyster Bay and $500,000 for the town of Huntington;
provided that such state assistance payment shall not be construed
to restrict the use of any additional monies for such project or be
considered a state assistance payment or other assistance for the
purposes of title 11 of article 54 of the environmental conservation
law and title 3 of article 56 of the environmental conservation law;
and provided further, however that such state assistance payment
shall reduce the total cost of such project for purposes of calcu-
lating eligibility for further state assistance payments (09E305ER)
(24752) ... 46,815,000 ............................ (re. $1,345,000)
PROJECT SCHEDULE
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ..................... 14,250
Parks, recreation and historic
preservation projects ............. 14,315
Stewardship projects ................. 6,500
Historic barn preservation ............. 750
Zoos, botanical gardens and
aquaria projects ................... 6,000
Hudson River Park .................... 5,000
--------------
Total ............................. 46,815
==============
By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2011:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E304ER) (24752) ..............................
41,565,000 .......................................... (re. $965,000)
PROJECT SCHEDULE
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ..................... 12,500
Parks, recreation and historic
preservation projects ............. 12,565
265 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Hudson River Park ................... 10,000
Stewardship projects ................. 5,750
Historic barns projects ................ 750
--------------
Total ............................. 41,565
==============
By chapter 55, section 1, of the laws of 2003, as added by chapter 684,
section 2, of the laws of 2003:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E303ER) (24752) ..............................
45,665,000 .......................................... (re. $432,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion projects ..................... 12,000
Parks, recreation and historic
preservation projects ............. 12,165
Hudson River Park ................... 15,000
Stewardship projects ................. 5,750
Historic barns projects ................ 750
--------------
Total ............................. 45,665
==============
By chapter 54, section 1, of the laws of 2002:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies. Notwithstanding any other law to the contrary,
$11 million of this appropriation shall support capital projects,
excluding personal service costs, eligible and authorized for fund-
ing from any office of parks, recreation and historic preservation
state park infrastructure fund - 076 appropriation or reappropri-
ation, subject to the approval of the director of the budget.
Notwithstanding any other law to the contrary, such expenses shall be
paid in the first instance from the state park infrastructure fund -
076, then reimbursed from this appropriation, including the transfer
of expenses and the payment of liabilities incurred prior to April
1, 2002, up to the limit of $11 million (09E302ER) (24752) .........
47,935,000 .......................................... (re. $628,000)
266 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 6,685
Parks, recreation and historic
preservation projects .............. 7,250
Hudson River Park ................... 15,000
Stewardship projects ................. 7,000
State parks projects ................ 11,000
Historic barns projects .............. 1,000
--------------
Total ............................. 47,935
==============
By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E300ER) (24752) ..............................
46,550,000 .......................................... (re. $736,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 7,068
Park, recreation and historic
preservation projects .............. 7,482
Hudson River Park ................... 20,000
Stewardship projects ................ 12,000
--------------
Total ............................. 46,550
==============
By chapter 55, section 1, of the laws of 1999:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E399ER) (24752) ..............................
44,850,000 .......................................... (re. $396,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
267 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 4,975
Park, recreation and historic
preservation projects .............. 6,875
Hudson River Park ................... 21,000
Stewardship projects ................ 12,000
--------------
Total ............................. 44,850
==============
By chapter 55, section 1, of the laws of 1998:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments, agencies and public authorities (09E398ER) (24752) ..........
19,700,000 .......................................... (re. $622,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 5,600
Park, recreation and historic
preservation projects,
including $4,000,000 which
shall be made available for
services and expenses
related to development of
the Hudson River Park ............. 13,100
Coastal rehabilitation proj-
ects ............................... 1,000
--------------
Total.............................. 19,700
==============
By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E397ER) (24752) ..............................
31,800,000 .......................................... (re. $679,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
268 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 8,975
Park, recreation and historic
preservation projects ............. 14,525
Coastal rehabilitation proj-
ects .............................. 10,675
--------------
Total ............................. 34,175
==============
By chapter 55, section 1, of the laws of 1996, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments and agencies (09E396ER) (24752) ..............................
21,624,000 .......................................... (re. $764,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 3,000
Local waterfront revitaliza-
tion projects ...................... 1,500
Parks, recreation and historic
preservation projects .............. 8,000
Parks, recreation and historic
preservation projects .............. 8,500
Coastal rehabilitation proj-
ects ............................... 1,500
--------------
Total ............................. 22,500
==============
By chapter 54, section 1, of the laws of 1995, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
parks, recreation and historic preservation account (71E395ER)
(24752) ... 6,340,000 ................................ (re. $69,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
269 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tion plans ......................... 1,300
Parks, recreation and historic
preservation projects .............. 4,000
Coastal rehabilitation proj-
ects ............................... 1,200
--------------
Total .............................. 6,500
==============
Capital Projects Funds - Other
Environmental Protection Fund
Solid Waste Account - 30452
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-hazardous landfill closure projects, including $300,000 for Essex
county under an agreement with the department of environmental
conservation; and $150,000 for Hamilton county under an agreement
with the department of environmental conservation (09LC22ER) (24813)
... 750,000 ......................................... (re. $750,000)
Municipal waste reduction or recycling projects, including developing
secondary recycling markets in New York state, and $2,500,000 of
such amount shall be made available for municipalities and not-for-
profit food banks for projects for food donation and the recycling
of food scraps (09MR22ER) (24814) ..................................
19,000,000 ....................................... (re. $19,000,000)
Secondary materials regional marketing assistance (09SM22ER) (24816)
... 650,000 ......................................... (re. $650,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD22ER) (24818) ... 1,500,000 .................. (re. $1,500,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; $3,000,000 for the connect kids program facilitating
access in title 1 school districts, municipalities, and not-for-pro-
fit organizations to outdoor recreational activities, public lands
and parks and providing environmental education opportunities in
environmental justice, inner city and underserved communities; and
$4,000,000 of such amount shall be made available for community
impact and job training grants; including $500,000 of such amount
shall be made available to a not-for-profit organization for the
purpose of awarding grants on a competitive basis to community
groups to build the capacity of such groups, provided that up to ten
percent may be made available for administrative costs and/or tech-
nical assistance. Community impact and job training grants shall be
270 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
in or affecting environmental justice communities in an amount of up
to $100,000 for community groups for projects that address an envi-
ronmental justice community's exposure to multiple environmental
harms and risks, including lead exposure and shall include implemen-
tation, studies, including air monitoring, to investigate the envi-
ronment, or related public health issues of the community, research
that will be used to expand the knowledge or understanding of the
affected community and ways to improve the resiliency of the
affected community. The results of the investigation shall be
disseminated to members of the affected community. Community groups
eligible for funding must provide services within the same community
as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community; and $300,000 to the
Adirondack North Country Association for the purposes of the Adiron-
dack diversity initiative (09EJ22ER) (24713) .......................
13,000,000 ....................................... (re. $12,948,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD22ER) (24817) .................
1,775,000 ......................................... (re. $1,775,000)
Notwithstanding any law to the contrary, for the pollution prevention
institute, and including $250,000 for the department to contract
with the Northeast waste management officials' association for the
Interstate Chemicals Clearing house (09PP22ER) (24815) .............
4,250,000 ......................................... (re. $4,250,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water, including projects to combat harmful algal
blooms, including vector control for tick-borne illnesses such as
lyme disease; including up to $500,000 for the CleanSweepNY program;
and $4,000,000 for children's environmental health centers, includ-
ing school and community childhood lead exposure assessment
conducted by such centers; and not more than $2,350,000 for programs
to expand and improve access to local, fresh, nutritional food to
nutritionally underserved neighborhoods, including but not limited
to the New York State Fresh Connect Program, expanded Supplemental
Nutrition Assistance Program access, expanded community supported
agriculture program benefits, and the development of expanded tech-
nological access for these communities; and $1,000,000 to the State
University of New York at Stony Brook directly or through its
research foundation, to support research development and any associ-
ated testing or pilot projects towards wastewater and the treatment
of water to remove 1,4 dioxane (09EH22ER) (25703) ..................
10,000,000 ....................................... (re. $10,000,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO22ER) (25702) ..............
3,950,000 ......................................... (re. $3,950,000)
By chapter 54, section 1, of the laws of 2021:
271 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-hazardous landfill closure projects, including $300,000 for Essex
county under an agreement with the department of environmental
conservation; $150,000 for Hamilton county under an agreement with
the department of environmental conservation; and $250,000 for
regional municipal solid waste management and waste transportation
planning, including for impacted environmental justice communities,
associated with impending landfill closures (09LC21ER) (24813) .....
750,000 ............................................. (re. $750,000)
Municipal waste reduction or recycling projects, including developing
secondary recycling markets in New York state, and $2,000,000 of
such amount shall be made available for municipalities and not-for-
profit food banks for projects for food donation and the recycling
of food scraps (09MR21ER) (24814) ..................................
15,300,000 ....................................... (re. $15,300,000)
Secondary materials regional marketing assistance (09SM21ER) (24816)
... 200,000 ........................................ (re. $200,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD21ER) (24818) ... 1,500,000 .................. (re. $1,439,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; $2,000,000 for the connect kids program facilitating
access by title 1 schools to outdoor recreational activities, public
lands and parks; improvements to environmental quality; or environ-
mental job training, in environmental justice, inner city and under-
served communities, and which are undertaken by the state, or on
behalf of the state by municipalities, or not-for-profit corpo-
rations; and $3,000,000 of such amount shall be made available for
community impact and job training grants; including $500,000 of such
amount shall be made available to a not-for-profit organization for
the purpose of awarding grants on a competitive basis to community
groups to build the capacity of such groups, provided that up to ten
percent may be made available for administrative costs and/or tech-
nical assistance. Community impact and job training grants shall be
in or affecting environmental justice communities in an amount of up
to $100,000 for community groups for projects that address an envi-
ronmental justice community's exposure to multiple environmental
harms and risks, including lead exposure and shall include implemen-
tation, studies, including air monitoring, to investigate the envi-
ronment, or related public health issues of the community, research
that will be used to expand the knowledge or under- standing of the
affected community and ways to improve the resiliency of the
affected community. The results of the investigation shall be
disseminated to members of the affected community. Community groups
eligible for funding must provide services within the same community
272 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community; and $250,000 to the
Adirondack North Country Association for the purposes of the Adiron-
dack diversity initiative (09EJ21ER) (24713) .......................
8,000,000 ......................................... (re. $7,812,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD21ER) (24817) .................
1,775,000 ......................................... (re. $1,725,000)
Notwithstanding any law to the contrary, for the pollution prevention
institute, and including $100,000 for the department to contract
with the Northeast waste management officials' association for the
Interstate Chemicals Clearing house (09PP21ER) (24815) .............
4,000,000 ......................................... (re. $4,000,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water, including projects to combat harmful algal
blooms, including vector control for tick-borne illnesses such as
lyme disease; including up to $500,000 for the CleanSweepNY program;
and $1,000,000 to the State University of New York at Stony Brook,
directly or through its research foundation, to support research
development and any associated testing or pilot projects towards the
treatment of water to remove 1,4-dioxane; and $2,000,000 for chil-
dren's environmental health centers, including school and community
childhood lead exposure assessment conducted by such centers; not
more than $625,000 for programs to expand and improve access to
local, fresh, nutritional food to nutritionally underserved neigh-
borhoods in New York State through the Fresh Connect Program; and
$500,000 to study environmental health impacts, including asthma,
caused by new york city airports (09EH21ER) (25703) ................
6,500,000 ......................................... (re. $6,408,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO21ER) (25702) ..............
1,750,000 ......................................... (re. $1,750,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-hazardous landfill closure projects, including $300,000 for Essex
county under an agreement with the department of environmental
conservation and $150,000 for Hamilton county under an agreement
with the department of environmental conservation (09LC20ER) (24813)
... 764,000 ........................................ (re. $314,000)
Municipal waste reduction or recycling projects, and $2,000,000 of
such amount shall be made available for municipalities and not-for-
273 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
profit food banks for projects for food donation and the recycling
of food scraps (09MR20ER) (24814) ..................................
15,312,000 ........................................ (re. $3,122,000)
Secondary materials regional marketing assistance (09SM20ER) (24816)
... 200,000 ........................................ (re. $200,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD20ER) (24818) ... 1,800,000 .................. (re. $1,800,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; $2,000,000 for the connect kids program facilitating
access by title 1 schools to outdoor recreational activities, public
lands and parks; improvements to environmental quality; or environ-
mental job training, in environmental justice, inner city and under-
served communities, and which are undertaken by the state, or on
behalf of the state by municipalities, or not-for-profit corpo-
rations; and $3,000,000 of such amount shall be made available for
community impact and job training grants; including $500,000 of such
amount shall be made available to a not-for-profit organization for
the purpose of awarding grants on a competitive basis to community
groups to build the capacity of such groups, provided that up to ten
percent may be made available for administrative costs and/or tech-
nical assistance. Community impact and job training grants shall be
in or affecting to environmental justice communities in an amount of
up to $100,000 for community groups for projects that address an
environmental justice community's exposure to multiple environmental
harms and risks, including lead exposure and shall include implemen-
tation, studies, including air monitoring, to investigate the envi-
ronment, or related public health issues of the community, research
that will be used to expand the knowledge or understanding of the
affected community and ways to improve the resiliency of the
affected community. The results of the investigation shall be
disseminated to members of the affected community. Community groups
eligible for funding must provide services within the same community
as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community; and $250,000 to the
Adirondack North Country Association for the purposes of the Adiron-
dack diversity initiative (09EJ20ER) (24713) .......................
7,000,000 ......................................... (re. $7,000,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD20ER) (24817) .................
2,025,000 ......................................... (re. $2,004,000)
Notwithstanding any law to the contrary, for the pollution prevention
institute, and including $100,000 for the department to contract
with the Northeast waste management officials' association for the
Interstate Chemicals Clearing house (09PP20ER) (24815) .............
4,000,000 ......................................... (re. $2,843,000)
274 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water, including projects to combat harmful algal
blooms, including vector control for tick-borne illnesses such as
lyme disease; including up to $500,000 for the CleanSweepNY program;
and $1,000,000 to the State University of New York at Stony Brook,
directly or through its research foundation, to support research
development and any associated testing or pilot projects towards the
treatment of water to remove 1,4-dioxane; and $2,000,000 for chil-
dren's environmental health centers, including school and community
childhood lead exposure assessment conducted by such centers and not
more than $625,000 for programs to expand and improve access to
local, fresh, nutritional food to nutritionally underserved neigh-
borhoods in New York State through the Fresh Connect Program
(09EH20ER) (25703) ... 6,500,000 .................. (re. $5,831,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO20ER) (25702) ..............
1,500,000 ......................................... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-hazardous landfill closure projects, including $300,000 for Essex
county under an agreement with the department of environmental
conservation and $150,000 for Hamilton county under an agreement
with the department of environmental conservation (09LC19ER) (24813)
... 700,000 ........................................ (re. $250,000)
Municipal waste reduction or recycling projects, and $2,000,000 of
such amount shall be made available for municipalities and not-for-
profit food banks for projects for food donation and the recycling
of food scraps (09MR19ER) (24814) ..................................
14,000,000 ........................................ (re. $3,030,000)
Secondary materials regional marketing assistance (09SM19ER) (24816)
... 200,000 ........................................ (re. $200,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD19ER) (24818) ... 1,800,000 .................. (re. $1,460,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; $1,000,000 for the connect kids program facilitating
access by title 1 schools to outdoor recreational activities, public
lands and parks; improvements to environmental quality; or environ-
mental job training, in environmental justice, inner city and under-
served communities, and which are undertaken by the state, or on
behalf of the state by municipalities, or not-for-profit corpo-
rations; and $3,000,000 of such amount shall be made available for
275 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
community impact and job training grants; including $500,000 of such
amount shall be made available to a not-for-profit organization for
the purpose of awarding grants on a competitive basis to community
groups to build the capacity of such groups, provided that up to ten
percent may be made available for administrative costs and/or tech-
nical assistance. Community impact and job training grants shall be
in or affecting to environmental justice communities in an amount of
up to $100,000 for community groups for projects that address an
environmental justice community's exposure to multiple environmental
harms and risks, including lead exposure and shall include implemen-
tation, studies, including air monitoring, to investigate the envi-
ronment, or related public health issues of the community, research
that will be used to expand the knowledge or understanding of the
affected community and ways to improve the resiliency of the
affected community. The results of the investigation shall be
disseminated to members of the affected community. Community groups
eligible for funding must provide services within the same community
as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community; and $250,000 to the
Adirondack North Country Association for the purposes of the Adiron-
dack diversity initiative (09EJ19ER) (24713) .......................
7,000,000 ......................................... (re. $6,104,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD19ER) (24817) .................
2,025,000 ......................................... (re. $1,380,000)
Notwithstanding any law to the contrary, for the pollution prevention
institute, and including $100,000 for the department to contract
with the Northeast waste management officials' association for the
Interstate Chemicals Clearing house (09PP19ER) (24815) .............
4,000,000 ......................................... (re. $1,615,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water, including projects to combat harmful algal
blooms; including up to $500,000 for the CleanSweepNY program; and
$1,000,000 to the State University of New York at Stony Brook,
directly or through its research foundation, to support research
development and any associated testing or pilot projects towards the
treatment of water to remove 1,4-dioxane; and $2,000,000 for chil-
dren's environmental health centers, including school and community
childhood lead exposure assessment conducted by such centers and not
more than $625,000 for programs to expand and improve access to
local, fresh, nutritional food to nutritionally underserved neigh-
borhoods in New York State through the Fresh Connect Program
(09EH19ER) (25703) ... 6,500,000 .................. (re. $3,354,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO19ER) (25702) ..............
1,500,000 ......................................... (re. $1,500,000)
276 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Non-hazardous landfill closure projects, including $300,000 for Essex
county under an agreement with the department of environmental
conservation and $150,000 for Hamilton county under an agreement
with the department of environmental conservation (09LC18ER) (24813)
... 700,000 ........................................ (re. $174,000)
Municipal waste reduction or recycling projects, and $2,000,000 of
such amount shall be made available for municipalities and not-for-
profit food banks for projects for food donation and the recycling
of food scraps (09MR18ER) (24814) ... 14,000,000 .. (re. $1,052,000)
Secondary materials regional marketing assistance (09SM18ER) (24816)
... 149,000 ........................................ (re. $149,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD18ER) (24818) ... 1,800,000 .................... (re. $374,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; not more than $1,000,000 for the connect kids program
facilitating access by title 1 schools to outdoor recreational
activities, public lands and parks; improvements to environmental
quality; or environmental job training, in environmental justice,
inner city and underserved communities, and which are undertaken by
the state, or on behalf of the state by municipalities or not-for-
profit corporations; and $3,000,000 of such amount shall be made
available for community impact and job training grants; including
$500,000 of such amount shall be made available to a not-for-profit
organization for the purpose of awarding grants on a competitive
basis to community groups to build the capacity of such groups,
provided that up to ten percent may be made available for adminis-
trative costs and/or technical assistance. Community impact and job
training grants shall be in or affecting to environmental justice
communities in an amount of up to $100,000 for community groups for
projects that address an environmental justice community's exposure
to multiple environmental harms and risks, including lead exposure
and shall include implementation, studies, including air monitoring,
to investigate the environment, or related public health issues of
the community, research that will be used to expand the knowledge or
understanding of the affected community and ways to improve the
resiliency of the affected community. The results of the investi-
gation shall be disseminated to members of the affected community.
Community groups eligible for funding shall be located within the
same community as the environmental and/or related public health
issues to be addressed by the project. Such groups shall be primari-
ly focused on addressing the environmental and/or related public
health issues of the residents of the affected community and shall
277 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
be comprised primarily of members of the affected community
(09EJ18ER) (24713) ... 7,000,000 .................. (re. $3,898,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD18ER) (24817) .................
2,025,000 ......................................... (re. $1,732,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water, including projects to combat harmful algal
blooms; including up to $500,000 for the CleanSweepNY program; and
$1,000,000 to the State University of New York at Stony Brook,
directly or through its research foundation, to support research
development and any associated testing or pilot projects towards the
treatment of water to remove 1,4-dioxane; and $2,000,000 for chil-
dren's environmental health centers, including school and community
childhood lead exposure assessment conducted by such centers and not
more than $625,000 for programs to expand and improve access to
local, fresh, nutritional food to nutritionally underserved neigh-
borhoods in New York State through the Fresh Connect Program;
including up to $500,000 to the State University of New York at
Stony Brook to provide for a new laboratory testing facility for
PFOA and other chemicals (09EH18ER) (25703) ........................
6,500,000 ......................................... (re. $2,435,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO18ER) (25702) ..............
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Municipal waste reduction or recycling projects, and $2,000,000 of
such amount shall be made available for municipalities and not-for-
profit food banks for projects for food donation and the recycling
of food scraps (09MR17ER) (24814) ..................................
14,000,000 ............................................ (re. $7,000)
Secondary materials regional marketing assistance (09SM17ER) (24816)
... 500,000 ........................................ (re. $500,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD17ER) (24818) ... 1,500,000 .................... (re. $113,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; no more than $500,000 for the community garden grant
program; not more than $1,000,000 for the connect kids program
facilitating access by title 1 schools to outdoor recreational
activities, public lands and parks; improvements to environmental
quality; or environmental job training, in environmental justice,
278 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
inner city and underserved communities, and which are undertaken by
the state, or on behalf of the state by municipalities or not-for-
profit corporations; and $3,000,000 of such amount shall be made
available for community impact and job training grants; including
$500,000 of such amount shall be made available to a not-for-profit
organization for the purpose of awarding grants on a competitive
basis to community groups to build the capacity of such groups,
provided that up to ten percent may be made available for adminis-
trative costs and/or technical assistance. Community impact and job
training grants shall be in or affecting environmental justice
communities in an amount of up to $100,000 for community groups for
projects that address an environmental justice community's exposure
to multiple environmental harms and risks, including lead exposure
and shall include implementation, studies, including air monitoring,
to investigate the environment, or related public health issues of
the community, research that will be used to expand the knowledge or
understanding of the affected community and ways to improve the
resiliency of the affected community. The results of the investi-
gation shall be disseminated to members of the affected community.
Community groups eligible for funding shall be located in the same
area as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community (09EJ17ER) (24713)
... 8,000,000 .................................... (re. $2,760,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD17ER) (24817) .................
3,235,000 ......................................... (re. $1,153,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water; including up to $500,000 for the
Clean-SweepNY program; and $1,000,000 to the State University of New
York at Stony Brook, directly or through its research foundation, to
support research development and any associated testing or pilot
projects towards the treatment of water to remove 1,4-dioxane; and
$500,000 to land banks to assist with lead abatement; and $2,000,000
for children's environmental health centers, including school and
community childhood lead exposure assessment conducted by such
centers and not more than $625,000 for programs to expand and
improve access to local, fresh, nutritional food to nutritionally
underserved neighborhoods in New York State through the Fresh
Connect Program (09EH17ER) (25703) ... 6,500,000 .. (re. $1,444,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO17ER) (25702) ..............
2,000,000 ......................................... (re. $2,000,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
279 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance including productive
reuse of cathode ray tubes and energy conservation services projects
(09SM16ER) (24816) ... 1,000,000 .................. (re. $1,000,000)
Notwithstanding any law to the contrary, for the payment of the costs
associated with environmental justice projects and programs, includ-
ing but not limited to: monitoring of air quality; education and
outreach; not more than $500,000 for the connect kids program facil-
itating access by title 1 schools to outdoor recreational activ-
ities, public lands and parks; improvements to environmental quali-
ty; or environmental job training, in environmental justice, inner
city and underserved communities, and which are undertaken by the
state, or on behalf of the state by municipalities or not-for-profit
corporations; and $2,000,000 of such amount shall be made available
for community impact and job training grants. Community impact and
job training grants shall be in or affecting environmental justice
communities in an amount of up to $50,000 for community groups for
projects that address an environmental justice community's exposure
to multiple environmental harms and risks, including lead exposure
and shall include implementation, studies, including air monitoring,
to investigate the environment, or related public health issues of
the community, research that will be used to expand the knowledge or
understanding of the affected community and ways to improve the
resiliency of the affected community. The results of the investi-
gation shall be disseminated to members of the affected community.
Community groups eligible for funding shall be located in the same
area as the environmental and/or related public health issues to be
addressed by the project. Such groups shall be primarily focused on
addressing the environmental and/or related public health issues of
the residents of the affected community and shall be comprised
primarily of members of the affected community (09EJ16ER) (24713)
... 7,000,000 .................................... (re. $3,444,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD16ER) (24817) .................
1,950,000 ........................................... (re. $504,000)
Environmental health for assessments, testing and actions including
but not limited to abatement to address suspected human exposure to
chemical, physical and microbiological agents, including contam-
inants in drinking water; and $2,000,000 for children's environ-
mental health centers, including school and community childhood lead
exposure assessment conducted by such centers (09EH16ER) (25703) ...
3,000,000 ............................................ (re. $72,000)
Brownfield opportunity area grants as authorized pursuant to section
970-r of the general municipal law (09BO16ER) (25702) ..............
2,000,000 ......................................... (re. $1,929,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2017:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
280 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM15ER) (24816) ..........................
1,000,000 ........................................... (re. $979,000)
Notwithstanding any law to the contrary, for community impact research
grants. Such grants shall be in or affecting environmental justice
communities in an amount of up to $50,000 for community groups for
projects that address an environmental justice community's exposure
to multiple environmental harms and risks. Such projects shall
include studies, including air monitoring, to investigate the envi-
ronment, or related public health issues of the community, research
that will be used to expand the knowledge or understanding of the
affected community and ways to improve the resiliency of the
affected community. The results of the investigation shall be
disseminated to members of the affected community. Community groups
eligible for funding shall be located in the same area as the envi-
ronmental and/or related public health issues to be addressed by the
project. Such groups shall be primarily focused on addressing the
environmental and/or related public health issues of the residents
of the affected community and shall be comprised primarily of
members of the affected community, $100,000 of which shall be made
available to the city of Buffalo for lead inspection kits in zip
codes of northeast Buffalo previously designated by the Erie County
department of health as "communities of concern" where children are
at exceptionally high risk for lead poisoning (09EJ15ER) (24713) ...
1,100,000 ........................................... (re. $250,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD15ER) (24817) .................
1,000,000 ........................................... (re. $250,000)
By chapter 54, section 1, of the laws of 2014:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM14ER) (24816) ..........................
1,000,000 ......................................... (re. $1,000,000)
Pesticide program, not less than $200,000 of which shall be for activ-
ities related to Long Island pesticide pollution prevention
(09PD14ER) (24818) ... 1,200,000 ...................... (re. $1,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD14ER) (24817) .................
1,000,000 ........................................... (re. $183,000)
By chapter 54, section 1, of the laws of 2013:
281 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM13ER) (24816) ..........................
1,000,000 ......................................... (re. $1,000,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD13ER) (24817) .................
155,000 .............................................. (re. $15,000)
By chapter 54, section 1, of the laws of 2012:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM12ER) (24816) ..........................
1,000,000 ......................................... (re. $1,000,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD12ER) (24817) .................
175,000 .............................................. (re. $45,000)
By chapter 54, section 1, of the laws of 2011:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM11ER) (24816) ..........................
1,000,000 ......................................... (re. $1,000,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages (09RD11ER) (24817) .................
200,000 ............................................... (re. $3,000)
By chapter 99, section 1, of the laws of 2010:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM10ER) (24816) ..........................
1,000,000 ......................................... (re. $1,000,000)
282 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2009:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Notwithstanding any law to the contrary, for the breast cancer and
environmental risk factors program at Cornell University (09BC09ER)
(24819) ... 450,000 ................................. (re. $450,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter
502, section 5, of the laws of 2009:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM09ER) (24816) ..........................
1,381,000 ........................................... (re. $944,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 1,
section 4, of the laws of 2009:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM08ER) (24816) ..........................
2,500,000 ......................................... (re. $1,184,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, according to the
following:
Secondary materials regional marketing assistance and energy conserva-
tion services projects (09SM07ER) (24816) ..........................
8,750,000 ......................................... (re. $5,401,000)
Notwithstanding any law to the contrary, for assessment and recovery
of any natural resource damages to the Hudson River (09RD07ER)
(24817) ... 1,300,000 ................................. (re. $4,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, including: (a)
notwithstanding any law to the contrary, $1,300,000 for the assess-
ment and recovery of any natural resource damages to the Hudson
River; and (b) notwithstanding any law to the contrary, $450,000 for
a Cornell University program to assess breast cancer and environ-
mental risk factors in New York State (09E206ER) (24751) ...........
23,770,500 ........................................ (re. $5,418,000)
283 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects ........................... 3,000
Municipal waste reduction or
recycling projects ................. 8,750
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 8,750
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 2,475
--------------
Total ............................. 24,275
==============
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2011:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies, including: (a)
notwithstanding any law to the contrary, $1,300,000 for the assess-
ment and recovery of any natural resource damages to the Hudson
River; and (b) notwithstanding any law to the contrary, $450,000 for
a Cornell University program to assess breast cancer and environ-
mental risk factors in New York State (09E205ER) (24751) ...........
18,750,000 .......................................... (re. $597,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects ........................... 3,000
Municipal waste reduction or
recycling projects ................. 7,000
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 7,000
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 2,475
284 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
--------------
Total ............................. 20,775
==============
By chapter 55, section 1, of the laws of 2004:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E204ER) (24751)
... 16,775,000 ........................................ (re. $8,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Municipal waste reduction or
recycling projects ................. 6,500
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 6,500
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 2,475
--------------
Total ............................. 16,775
==============
By chapter 55, section 1, of the laws of 2003, as added by chapter 684,
section 2, of the laws of 2003:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E203ER) (24751)
... 16,925,000 ...................................... (re. $637,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Municipal waste reduction or
recycling projects ................. 6,500
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 6,500
Services and expenses of the
assessment and recovery of
285 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 2,625
--------------
Total ............................. 16,925
==============
By chapter 54, section 1, of the laws of 2002:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E202ER) (24751)
... 14,435,000 ...................................... (re. $134,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Municipal waste reduction or
recycling projects ................ 5,255
Secondary materials regional
marketing assistance and
energy conservation services
projects .......................... 5,255
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ............... 1,300
Pesticides program .................. 2,625
-------------
Total ............................ 14,435
==============
By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E200ER) (24751)
... 22,025,000 ....................................... (re. $19,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects ........................... 7,000
Municipal waste reduction or
recycling projects ................. 6,225
Secondary materials regional
286 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
marketing assistance and
energy conservation services
projects ........................... 5,000
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 2,650
--------------
Total ............................. 22,175
==============
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E299ER) (24751)
... 22,083,319 ....................................... (re. $32,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects ........................... 9,000
Municipal waste reduction or
recycling projects ................. 4,500
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 4,500
Services and expenses of the
assessment and recovery of
any natural resource damages
to the Hudson River ................ 1,300
Pesticides program ................... 3,600
--------------
Total ............................. 22,900
==============
By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses of projects and purposes authorized by
section 92-s of the state finance law to receive funding from the
solid waste account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subal-
location to other state departments and agencies (09E297ER) (24751)
... 31,110,000 ...................................... (re. $562,000)
287 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects .......................... 17,000
Municipal waste reduction or
recycling projects ................. 5,505
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 5,505
Pesticides program ................... 1,100
--------------
Total ............................. 29,110
==============
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses of projects authorized by the environmental
protection act of 1993 to receive funding from the solid and hazard-
ous materials account (71E294ER) (24751) ...........................
12,400,000 ............................................ (re. $4,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Non-hazardous landfill closure
projects ........................... 9,000
Municipal waste reduction or
recycling projects ................. 2,000
Secondary materials regional
marketing assistance
projects ........................... 2,000
--------------
Total ............................. 13,000
==============
ENVIRONMENTAL PROTECTION AND ENHANCEMENTS (CCP)
Capital Projects Funds - Other
Environmental Protection Fund
Open Space Account - 30454
Environmental Protection and Enhancements Purpose
By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
section 1, of the laws of 2003:
For supplemental services and expenses of projects and purposes,
including the payment of liabilities incurred during state fiscal
year 2001-02 for biodiversity stewardship and research, soil and
water conservation districts. Finger Lakes-Lake Ontario Watershed
288 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Protection Alliance, Albany Pinebush Preserve Commission, Long
Island South Shore Estuary Reserve and Peconic Bay; authorized by
section 92-s of the state finance law to receive funding from the
open space account in accordance with a programmatic and financial
plan to be approved by the director of the budget, including subalo-
cation to other state departments and agencies including costs
related to the acquisition of the following properties: Long Island
Sound Coastal Area including Held Property, Long Island South Shore
Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
Barrens Core Compatible Growth Area and Critical Resource Area,
Western Suffolk/Nassau Special Groundwater Protection Area Under-
hill, Inner City/Underserved Community Parks - including Bushwick
Inlet, Mount Loretto, Staten Island Greenbelt, Staten Island Wet
Woods, Fahnestock State Park, Great Swamp, Lundy Estate, Neversink
Highlands, Highlands Greenway Corridor, Mongaup Valley Wildlife
Management Area, Shunnemunk Mountain/Moodna Creek/Woodcock Mountain,
Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
Catskill Unfragmented Forest, Long Path, New York City Watershed
Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
Viewshed, Five Rivers Environmental Education Center, Tivoli
Preserve, Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and
Wetlands, Wilton Wildlife Preserve and Park, National Lead/Tahawus,
Undeveloped Lake George Shore, Whitney Park, Recreational Trail
Linkages and Networks, Bog River/Beaver River Headwater Complex,
Eastern Lake Ontario Shoreline and Islands, Minnehaha Tract, Maumee
Swamp, Moose River Corridor, Tug Hill Core Forests and Headwater
Streams, Rome Sand Plains, Nelson Swamp, Genesee
Greenway/Recreationway, Genny-Green Trail/Link Trail, Northern
Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes, Allegany State
Park, Alder Bottom/French Creek, Great Lakes & Niagara River Access,
Shore Lands & Vistas, Salmon River Corridor, Braddock Bay, Clark
Reservation State Park, Chautauqua Lake Access, Shore Lands and
Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton Brook Woods,
Delaware River Tailwaters, Statewide Small Projects, Working Forest
Lands/Conservation Easements - Cedarlands, Working Forest
Lands/Conservation Easements - Champion International Inc., Working
Forest Lands/Conservation Easements-Domtar Inc., Working Forest
Lands/Conservation Easements-Boeselager Forestry, and Working Forest
Lands/Conservation Easements-Clerical Medical Forestry (09E702EA)
(24716) ... 63,330,000 ............................... (re. $59,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Land acquisition .................... 38,000
Hudson River Estuary Manage-
ment Plan .......................... 5,800
Biodiversity stewardship and
research ............................. 750
County agriculture and farm-
289 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
land protection activities ......... 8,000
Non-point source abatement and
control projects ................... 6,000
Soil and water conservation
districts .......................... 1,860
Finger Lakes-Lake Ontario
Watershed Protection Alli-
ance ............................... 1,300
Albany Pine Bush Preserve
Commission ........................... 370
Long Island Central Pine
Barrens Planning ..................... 700
Long Island South Shore Estu-
ary Reserve .......................... 350
Peconic Bay ............................ 200
--------------
Total ............................. 63,330
==============
Capital Projects Funds - Other
Environmental Protection Fund
Parks, Recreation and Historic Preservation Account - 30453
Environmental Protection and Enhancements Purpose
By chapter 54, section 1, of the laws of 2002:
For supplemental services and expenses of projects and purposes
authorized by section 92-s of the state finance law to receive fund-
ing from the parks, recreation and historic preservation account in
accordance with a programmatic and financial plan to be approved by
the director of the budget, including suballocation to other state
departments and agencies. Notwithstanding any other law to the
contrary, $10 million of this appropriation shall support capital
projects, excluding personal service costs, eligible and authorized
for funding from any office of parks, recreation and historic pres-
ervation state parks infrastructure fund-076 appropriation or reap-
propriation, subject to the approval of the director of the budget.
Notwithstanding any other law to the contrary, such expenses shall be
paid in the first instance from the state parks infrastructure fund
- 076, then reimbursed from this appropriation, including the trans-
fer of expenses and the payment of liabilities incurred prior to
April 1, 2002, up to the limit of $10 million (09E602EA) (24715) ...
47,750,000 ........................................ (re. $1,547,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Local waterfront revitaliza-
tion programs ...................... 6,750
Parks, recreation and historic
preservation projects .............. 8,500
Hudson River Park ................... 15,000
290 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Stewardship projects ................. 6,500
State parks projects ................ 10,000
Historic barns projects .............. 1,000
--------------
Total ............................. 47,750
==============
By chapter 55, section 1, of the laws of 2000:
For services and expenses of projects to receive funding from the
parks, recreation, and historic preservation account, in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments, agencies, public benefit corporations and public authorities
(09E500EA) (24715) ... 10,000,000 ................. (re. $1,467,000)
By chapter 55, section 1, of the laws of 1999:
For services and expenses of projects to receive funding from the
parks, recreation and historic preservation account, in accordance
with a programmatic and financial plan to be approved by the direc-
tor of the budget, including suballocation to other state depart-
ments, agencies, public benefit corporations and public authorities
(09E699EA) (24715) ... 26,650,000 ................... (re. $858,000)
Capital Projects Funds - Other
Environmental Protection Fund
Solid Waste Account - 30452
Environmental Protection and Enhancements Purpose
By chapter 54, section 1, of the laws of 2002:
For supplemental services and expenses of projects and purposes,
including the payment of liabilities incurred during state fiscal
year 2001-02 for natural resource damages and pesticides program,
authorized by section 92-s of the state finance law to receive fund-
ing from the solid waste account in accordance with a programmatic
and financial plan to be approved by the director of the budget,
including suballocation to other state departments and agencies
(09E502EA) (24714) ... 13,920,000 ................... (re. $114,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Municipal waste reduction or
recycling projects ................. 5,000
Secondary materials regional
marketing assistance and
energy conservation services
projects ........................... 4,995
Services and expenses of the
assessment and recovery of
any natural resource damages
291 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to the Hudson River ................ 1,300
Pesticides program ................... 2,625
--------------
Total ............................. 13,920
==============
ENVIRONMENTAL QUALITY BOND ACT FUND (CCP)
Capital Projects Funds - Other
Environmental Quality Bond Act Fund
Environmental Quality Bond Act Fund Account - 30670
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $209,000,000 or so much thereof as may be necessary is
hereby appropriated from the "environmental quality bond act fund"
as established by section 97-d of the state finance law for payment
to the capital projects fund for disbursements from such fund as
certified by the state comptroller as: "Hazardous Waste Site Remedi-
ation Disbursements," "Municipal Landfill Closure Disbursements,"
"Land Acquisition, Preservation and Improvement Disbursements," and
"Historic Preservation, Municipal Park and Urban Cultural Parks
Disbursements." The director of the budget is hereby authorized to
designate to the state comptroller appropriations made from the
capital projects fund in accordance with the provisions of article
52 of the environmental conservation law for the purposes heretofore
specified. The state comptroller shall at the commencement of each
month certify to the director of the budget, the chairman of the
senate finance committee, and the chairman of the assembly ways and
means committee, the amounts disbursed from the appropriations
designated by the director of the budget for each of the purposes
herein enumerated for the month preceding such certification and
such certifications shall not exceed in the aggregate the moneys
appropriated therefor from the capital projects fund. A copy of each
such certification shall also be delivered to the public officers of
the respective state department or agency to which such capital
projects fund appropriations are made available (71109210) (80914)
... 209,000,000 .................................. (re. $39,005,000)
ENVIRONMENTAL QUALITY PROTECTION FUND (CCP)
Capital Projects Funds - Other
Environmental Quality Protection Fund
Environmental Quality Protection Account - 30640
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $84,369,000, or so much thereof as may be necessary is
hereby appropriated from the "environmental quality protection fund"
as established by section 97-a of the state finance law for payment
292 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to the capital projects fund for disbursements from such fund as
certified by the state comptroller as: "Water Quality Improvement
Disbursements," "State Air Quality Improvement Disbursements,"
"Municipal Air Quality Improvement Disbursements," "Land Preserva-
tion and Improvement Disbursements," "Municipal Solid Waste Manage-
ment Disbursements," and "Park Lands Disbursements."
The director of the budget is hereby authorized to designate to the
state comptroller appropriations made from the capital projects fund
in accordance with the provisions of article 51 of the environmental
conservation law for the purposes heretofore specified.
The state comptroller shall at the commencement of each month certify
to the director of the budget, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee, the amounts disbursed from the appropriations designated by the
director of the budget for each of the purposes herein enumerated
for the month preceding such certification and such certifications
shall not exceed in the aggregate the moneys appropriated therefor
from the capital projects fund. A copy of each such certification
shall also be delivered to the public officers of the respective
state department or agency to which such capital projects fund
appropriations are made available (71059210) (80906) ...............
84,369,000 ....................................... (re. $17,710,000)
By chapter 54, section 9, of the laws of 1981, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of seven hundred fifty-nine million nine hundred eighty-one
thousand two hundred eighty dollars ($759,981,280), or so much ther-
eof as may be necessary is hereby appropriated from the "environ-
mental quality protection fund" as established by section 97-a of
the state finance law for payment to the capital projects fund for
disbursements from such fund as certified by the state comptroller
as: "Water Quality Improvement Disbursements," "State Air Quality
Improvement Disbursements," "Municipal Air Quality Improvement
Disbursements," "Land Preservation and Improvement Disbursements,"
"Municipal Solid Waste Management Disbursements," and "Park Lands
Disbursements."
The director of the budget is hereby authorized to designate to the
state comptroller appropriations made from the capital projects fund
in accordance with the provisions of article fifty-one of the envi-
ronmental conservation law for the purposes heretofore specified.
The state comptroller shall at the commencement of each month certify
to the director of the budget, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee, the amounts disbursed from the appropriations designated by the
director of the budget for each of the purposes herein enumerated
for the month preceding such certification and such certifications
shall not exceed in the aggregate the moneys appropriated therefor
from the capital projects fund. A copy of each such certification
shall also be delivered to the public officers of the respective
state department or agency to which such capital projects fund
appropriations are made available (01371610) (80906) ...............
293 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
................................................... (re. $1,269,000)
ENVIRONMENTAL RESTORATION - CLEAN WATER/CLEAN AIR (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environmental Restoration Purpose
By chapter 54, section 1, of the laws of 2002:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA02W5) (24838) ... 75,000,000 ..... (re. $479,000)
By chapter 54, section 1, of the laws of 2001:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
294 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA01W5) (24838) ... 25,000,000 ..... (re. $288,000)
By chapter 55, section 1, of the laws of 2000:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA00W5) (24838) ... 10,000,000 ..... (re. $382,000)
By chapter 55, section 1, of the laws of 1999:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
295 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA99W5) (24838) ... 10,000,000 ..... (re. $138,000)
By chapter 55, section 1, of the laws of 1998:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA98W5) (24838) ... 10,000,000 ...... (re. $22,000)
By chapter 55, section 1, of the laws of 1997:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for environmental
restoration projects in accordance with title 5 of article 56 of the
environmental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
296 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Restoration Project Disbursements" for the month preceding such
certification (09BA97W5) (24838) ... 20,000,000 .. (re. $20,000,000)
By chapter 413, section 29, of the laws of 1996, as amended by chapter
55, section 1, of the laws of 1997:
For state assistance payments for the state share of the costs of
environmental restoration projects in accordance with the provisions
of title 5 of article 56 of the environmental conservation law for
project costs, including costs incidental and appurtenant thereto
and for payment of reimbursements to the clean water/clean air
implementation fund for services and expenses of state departments
and agencies, including fringe benefits, hereinafter referred to as
"Environmental Restoration Project Disbursements". The moneys appro-
priated herein may be suballocated to other state departments and
agencies.
Notwithstanding the provisions of any general or special law, moneys
hereby appropriated shall be available for environmental restoration
projects in accordance with title 5 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller at the commencement of each month shall certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Environmental
Restoration Project Disbursements" for the month preceding such
certification (09BA96W5) (24838) ... 50,000,000 ....... (re. $1,000)
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(09FM22MO) (81107) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(09FM21MO) (81107) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(09FM20MO) (81107) ... 6,000,000 .................. (re. $1,603,000)
FISH AND WILDLIFE (CCP)
297 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Fish and Wildlife Purpose
By chapter 54, section 1, of the laws of 2013:
For the purchase of capital equipment and for the renovation, rehabil-
itation and reconstruction of the department of environmental
conservation's fish hatcheries including personal service, fringe
benefits and indirect costs (09HE1354) (24839) .....................
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2012:
For the purchase of capital equipment and for the renovation, rehabil-
itation and reconstruction of the department of environmental
conservation's fish hatcheries including personal service, fringe
benefits and indirect costs (09HE1254) (24839) .....................
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2011:
For the purchase of capital equipment and for the renovation, rehabil-
itation and reconstruction of the department of environmental
conservation's fish hatcheries including personal services and
fringe benefits and indirect costs (09HE1154) (24839) ..............
1,000,000 ......................................... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2010:
For the purchase of capital equipment and for the renovation, rehabil-
itation and reconstruction of the department of environmental
conservation's fish hatcheries including personal services and
fringe benefits and indirect costs (09HE1054) (24839) ..............
1,000,000 ......................................... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2009:
For the purchase of capital equipment and for the renovation, rehabil-
itation and reconstruction of the department of environmental
conservation's fish hatcheries including personal services and
fringe benefits and indirect costs (09HE0954) (24839) ..............
1,000,000 ........................................... (re. $136,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
section 1, of the laws of 2004:
For rehabilitation and improvements of fishing access sites including
personal services, fringe benefits and indirect costs (09FA0354)
(24841) ... 500,000 ................................. (re. $409,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Habitat Conservation and Access Account - 32217
Fish and Wildlife Purpose
By chapter 54, section 1, of the laws of 2022:
298 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses, including personal service, nonpersonal
service, fringe benefits and indirect costs related to management,
protection and restoration fish and wildlife habitat, and improve-
ment and development of public access for fish and wildlife related
recreation (09HC2254) (24718) ......................................
1,500,000 ......................................... (re. $1,043,000)
LANDS AND FORESTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Lands and Forests Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses, including personal service, nonpersonal
service, indirect costs and fringe benefits related to the steward-
ship of newly acquired and existing state lands, for the implementa-
tion of Unit Management Plans, costs related to invasive species
management activities and for the development and implementation of
Green Certification for state forests, including suballocation to
other state departments and agencies (09LF2253) (25766) ............
4,000,000 ......................................... (re. $4,000,000)
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS2253) (24846) ....
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses, including personal service, nonpersonal
service, indirect costs and fringe benefits related to the steward-
ship of newly acquired and existing state lands, for the implementa-
tion of Unit Management Plans, costs related to invasive species
management activities and for the development and implementation of
Green Certification for state forests, including suballocation to
other state departments and agencies (09LF2153) (25766) ............
4,000,000 ......................................... (re. $4,000,000)
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS2153) (24846) ....
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses, including personal service, nonpersonal
service, indirect costs and fringe benefits related to the steward-
ship of newly acquired and existing state lands, for the implementa-
tion of Unit Management Plans, costs related to invasive species
management activities and for the development and implementation of
Green Certification for state forests, including suballocation to
other state departments and agencies (09LF2053) (25766) ............
4,000,000 ......................................... (re. $2,796,000)
299 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS2053) (24846) ....
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses, including personal service, non-personal
service, indirect costs and fringe benefits related to the steward-
ship of newly acquired and existing state lands, for the implementa-
tion of Unit Management Plans, costs related to invasive species
management activities and for the development and implementation of
Green Certification for state forests, including suballocation to
other state departments and agencies (09LF1953) (25766) ............
5,000,000 ......................................... (re. $3,770,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses, including personal service, non-personal
service, indirect costs and fringe benefits related to the steward-
ship of newly acquired and existing state lands, for the implementa-
tion of Unit Management Plans, costs related to invasive species
management activities and for the development and implementation of
Green Certification for state forests, including suballocation to
other state departments and agencies (09LF1853) (25766) ............
5,000,000 ........................................... (re. $540,000)
By chapter 54, section 1, of the laws of 2017:
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS1753) (24846) ....
1,000,000 ......................................... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2016:
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS1653) (24846) ....
500,000 ............................................. (re. $352,000)
By chapter 54, section 1, of the laws of 2015:
For the purchase and replacement of equipment and facility improve-
ments, including air monitoring, maintenance of facilities and emer-
gency response in support of public safety, including personal
services, fringe benefits and indirect costs (09PS1553) (24846) ....
2,500,000 ......................................... (re. $1,169,000)
By chapter 55, section 1, of the laws of 2010:
For the stewardship of newly acquired and existing state lands includ-
ing personal services, fringe benefits and indirect costs, including
suballocation to other state departments and agencies (09SW1053)
(24843) ... 500,000 ................................. (re. $101,000)
300 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2009:
For services and expenses, including necessary consultant costs, for
judgement or settlement payments related to land acquisition claims
or cases, pursuant to section 503 of the eminent domain procedure
law or article 78 of the civil practice law and rules (09AA0953)
(24848) ... 15,000,000 ........................... (re. $15,000,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses, including necessary consultant costs, for
judgement or settlement payments related to land acquisition claims
or cases, pursuant to section 503 of the eminent domain procedure
law or article 78 of the civil practice law and rules (09AA0753)
(24848) ... 4,300,000 ............................. (re. $4,300,000)
By chapter 54, section 1, of the laws of 2001, as amended by chapter 55,
section 1, of the laws of 2003:
For the state's share of Federal Transportation Efficiency Act of the
21st Century program grants including personal services and fringe
benefits (09IT0153) (24850) ... 2,532,000 ......... (re. $2,325,000)
By chapter 55, section 1, of the laws of 2000:
For services and expenses, including necessary consultant costs, for
judgement or settlement payments related to land acquisition claims
or cases brought before the court of claims or the supreme court,
pursuant to section 503 of the eminent domain procedure law or arti-
cle 78 of the civil practice law and rules (09AA0053) (24848) ......
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 2004:
For the state's share of Federal Intermodal Surface Transportation
Efficiency Act enhancement program grants including personal
services, fringe benefits and indirect costs. No portion of this
appropriation shall be allocated until the commissioner of the
department of environmental conservation and the director of the
budget have determined that no other sources of funding, including
but not limited to natural resource damage claim settlements and
environmental protection fund appropriations, are available for this
purpose (09IT9453) (24851) ... 500,000 .............. (re. $297,000)
By chapter 54, section 1, of the laws of 1993:
For services and expenses including necessary consultant costs, for
judgment or settlement payments related to land acquisition claims
or cases brought before the court of claims or the supreme court,
pursuant to section 503 of the eminent domain procedure law or arti-
cle 78 of the civil practice law and rules (09AA9353) (24848) ......
18,800,000 .......................................... (re. $596,000)
By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
section 3, of the laws of 1990:
For demolition of buildings at the former Edgewood Hospital site on
Long Island (09168953) (24852) ... 3,450,000 ........ (re. $891,000)
301 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1987, for:
Demolition of buildings at the former Edgewood Hospital site on Long
Island (09668753) (24852) ... 6,000,000 ........... (re. $2,246,000)
Capital Projects Funds - Other
Forest Preserve Expansion Fund
Forest Preserve Expansion Account - 31450
Lands and Forests Purpose
By chapter 55, section 1, of the laws of 1996:
For the acquisition of additional lands for the forest preserve within
either the Adirondack or Catskill parks, in accordance with the
provisions of section 97-e of the state finance law (09999653)
(24853) ... 20,000 ................................... (re. $20,000)
By chapter 54, section 1, of the laws of 1993:
For the acquisition of additional lands for the forest preserve within
either the Adirondack or Catskill parks, in accordance with the
provisions of section 97-e of the state finance law (09999353)
(24853) ... 175,000 .................................. (re. $90,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Lands and Forests Purpose
The appropriation made by Chapter 54, section 1, of the laws of 2022,
for the ENCON Federal Infrastructure and Jobs Act is hereby amended
by transferring $25,000,000 to the Lands and Forest purpose and is
reappropriated to read:
FOR THE FEDERAL SHARE OF CAPITAL PROJECTS PURSUANT TO LANDS AND
FORESTS RESOURCES PURPOSES INCLUDING THE COSTS ASSOCIATED WITH THE
ACQUISITION OF LANDS UNDER THE FOREST LEGACY PROGRAM, INCLUDING
SUBALLOCATION TO OTHER STATE DEPARTMENTS AND AGENCIES (09FL2253)
(24847) ... $50,000,000 .......................... (RE. $25,000,000)
By chapter 54, section 1, of the laws of 2018:
For the federal share of capital projects pursuant to lands and
forests resources purposes including the costs associated with the
acquisition of lands under the forest legacy program, including
suballocation to other state departments and agencies (09FL1853)
(24847) ... 10,000,000 ........................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2017:
For the federal share of capital projects pursuant to lands and
forests resources purposes including the costs associated with the
acquisition of lands under the forest legacy program, including
suballocation to other state departments and agencies (09FL1753)
(24847) ... 10,000,000 ........................... (re. $10,000,000)
By chapter 55, section 1, of the laws of 2016:
302 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the federal share of costs associated with the acquisition of
lands under the forest legacy program, including suballocation to
other state departments and agencies (09FL1653) (24847) ............
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2013:
For the federal share of costs associated with the acquisition of
lands under the forest legacy program, including suballocation to
other state departments and agencies (09FL1353) (24847) ............
1,900,000 ......................................... (re. $1,900,000)
By chapter 54, section 1, of the laws of 2011:
For the federal share of costs associated with the acquisition of
lands under the forest legacy program, including suballocation to
other state departments and agencies (09FL1153) (24847) ............
4,000,000 ......................................... (re. $3,200,000)
By chapter 55, section 1, of the laws of 2008:
For the federal share of costs associated with the acquisition of
lands under the forest legacy program, including suballocation to
other state departments and agencies (09FL0853) (24847) ............
2,000,000 ......................................... (re. $1,016,000)
By chapter 55, section 1, of the laws of 2007:
For the federal share of costs associated with the acquisition of
lands under the forest legacy program, including suballocation to
other state departments and agencies (09FL0753) (24847) ............
2,000,000 ........................................... (re. $505,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
DEC Land Transfer Account - 32226
Lands and Forests Purpose
By chapter 54, section 1, of the laws of 2021:
For services and capital expenses related to land acquisition through
the conveyances of real property in accordance with section 03-0301
of Environmental Conservation Law, section 49-0307 of Environmental
Conservation Law, sections 03-2 and 30-A of Public Lands Law, or any
other law authorizing the conveyance of state land (09LT2153)
(25740) ... 1,000,000 ............................. (re. $1,000,000)
MARINE RESOURCES (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364
Marine Projects Purpose
By chapter 54, section 1, of the laws of 2021:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
303 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of property including suballocation to other state departments and
agencies (09MR21A1) (24708) ... 10,000,000 ....... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2020:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR20A1) (24708) ... 10,000,000 ........ (re. $9,790,000)
By chapter 54, section 1, of the laws of 2019:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR19A1) (24708) ... 10,000,000 ........ (re. $6,757,000)
By chapter 54, section 1, of the laws of 2017:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR17A1) (24708) ... 5,000,000 ......... (re. $1,522,000)
By chapter 54, section 1, of the laws of 2015:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR15A1) (24708) ... 5,000,000 ......... (re. $1,150,000)
By chapter 54, section 1, of the laws of 2011:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR11A1) (24708) ... 5,000,000 ............ (re. $15,000)
By chapter 55, section 1, of the laws of 2010:
For the federal share of capital projects undertaken pursuant to fish
and wildlife and marine resources purposes including the acquisition
of property including suballocation to other state departments and
agencies (09MR10A1) (24708) ... 5,700,000 ............. (re. $1,000)
NEW YORK WORKS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Flood Control Purpose
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2015:
For New York Works Infrastructure projects to improve and enhance
water management infrastructure and public safety with respect to
flood management, including but not limited to various dam safety
projects and the demolition of unsafe structures on state-owned
land; various flood protection projects including the state share of
304 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
federal sponsored flood control projects, and the maintenance of
flood control projects, including Western NY, Ithaca and Syracuse
Channel; the state share of various shore protection projects,
including Long Island Coastal Erosion projects and Coney Island/Sea
Gate Beach, including an advance payment by the state for the local
costs of various shore protection projects, including personal
service, non-personal service, fringe benefits and indirect costs
and the payment of liabilities incurred prior to April 1, 2012,
including suballocation to other state departments and agencies
(09NY1263) (25769) ... 101,743,000 ................ (re. $7,875,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Operational Services Purpose
By chapter 54, section 1, of the laws of 2022:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; up to
$20,000,000 for the Conklingville Dam; including personal service,
nonpersonal service and fringe benefits, including suballocation to
other state departments and agencies (09NY2251) (25768) ............
90,000,000 ....................................... (re. $89,488,000)
By chapter 54, section 1, of the laws of 2021:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
305 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; up to
$20,000,000 for the Conklingville Dam; including personal service,
nonpersonal service and fringe benefits, including suballocation to
other state departments and agencies (09NY2151) (25768) ............
75,250,000 ....................................... (re. $69,649,000)
By chapter 54, section 1, of the laws of 2020:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; including
personal service, nonpersonal service and fringe benefits, including
suballocation to other state departments and agencies (09NY2051)
(25768) ... 55,250,000 ........................... (re. $40,434,000)
By chapter 54, section 1, of the laws of 2019:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; including
personal service, non-personal service and fringe benefits, includ-
ing suballocation to other state departments and agencies (09NY1951)
(25768) ... 55,250,000 ........................... (re. $27,838,000)
By chapter 54, section 1, of the laws of 2018:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
306 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; including
personal service, non-personal service and fringe benefits, includ-
ing suballocation to other state departments and agencies (09NY1851)
(25768) ... 40,000,000 ........................... (re. $13,502,000)
By chapter 54, section 1, of the laws of 2017:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects including, notwithstanding any law to the contra-
ry, projects on lands being sought pursuant to state land acquisi-
tion policy under article 49 of the environmental conservation law,
for which the state provided a letter of intent to the town of North
Hudson and Essex county to acquire a conservation easement or other
interest and for which the fee owner of any such property authorizes
such project; vehicles and equipment; water quality improvement
projects, fish hatcheries; rehabilitation and improvements of vari-
ous department facilities and systems; and well plugging; including
personal service, non-personal service and fringe benefits, includ-
ing suballocation to other state departments and agencies (09NY1751)
(25768) ... 70,000,000 ........................... (re. $21,126,000)
By chapter 55, section 1, of the laws of 2016:
For services, expenses, and indirect costs related to New York Works
projects including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; shore protection projects; state land
stewardship, public access and environmental and recreation infras-
tructure projects; vehicles and equipment; water quality improvement
projects, fish hatcheries; and well plugging; including personal
service, non-personal service and fringe benefits, including subal-
location to other state departments and agencies (09NY1651) (25768)
... 40,000,000 .................................... (re. $5,748,000)
307 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2015:
For services, expenses, and indirect costs related to New York Works
projects, including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; state land stewardship, public access and
environmental and recreation infrastructure projects; vehicles and
equipment related to stewardship and emergency preparedness; water
quality improvement projects; and fish hatcheries; including
personal service, nonpersonal service and fringe benefits, including
suballocation to other state departments and agencies (09NY1551)
(25768) ... 40,000,000 ........................... (re. $10,524,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2015:
For services, expenses, and indirect costs related to New York Works
projects, including but not limited to air monitoring infrastructure
investments; remediation of legacy environmental contamination;
investments in information technology; dam safety projects and the
demolition of unsafe structures on state-owned land; state-owned
flood protection projects; state land stewardship, public access and
environmental and recreation infrastructure projects; vehicles and
equipment related to stewardship and emergency preparedness; fish
hatcheries; and marine program infrastructure; including personal
service, nonpersonal service and fringe benefits, including suballo-
cation to other state departments and agencies (09NY1451) (25768)
... 40,000,000 .................................... (re. $3,273,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 55,
section 1, of the laws of 2016:
For services, expenses, and indirect costs related to New York Works
projects, including but not limited to environmental restoration
projects; remediation of legacy environmental contamination; invest-
ments in information technology; State land stewardship and environ-
mental and recreation infrastructure projects; and water quality
improvement projects, including suballocation to other state depart-
ments and agencies.
Notwithstanding any law to the contrary, the Department may enter into
agreements with municipalities to undertake environmental restora-
tion projects on behalf of a municipality upon request, provided
that the municipality shall provide ten percent of the total project
costs. Any and all moneys recovered or reimbursed through agreements
shall be deposited with the comptroller and credited to the account
of the fund from which the expenditures were made (09NY1351) (25768)
... 40,000,000 ................................... (re. $4,460,000)
OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Operational Services Purpose
308 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For rehabilitation and improvements of various department facilities
and systems including personal service and fringe benefits and indi-
rect costs in accordance with a programmatic and financial plan to
be approved by the director of the budget including suballocation to
other state departments and agencies (09RI2251) (24855) ............
26,000,000 ....................................... (re. $26,000,000)
For services and expenses, including personal service, fringe bene-
fits, and non-personal services necessary for remedial activities to
plug or replug abandoned oil and gas wells including the surface
restoration of the affected land pursuant to article 23 of the envi-
ronmental conservation law (09OG2251) (25767) ......................
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2021:
For rehabilitation and improvements of various department facilities
and systems including personal service and fringe benefits and indi-
rect costs in accordance with a programmatic and financial plan to
be approved by the director of the budget including suballocation to
other state departments and agencies (09RI2151) (24855) ............
24,000,000 ....................................... (re. $23,873,000)
For services and expenses, including personal service, fringe bene-
fits, and non-personal services necessary for remedial activities to
plug or replug abandoned oil and gas wells including the surface
restoration of the affected land pursuant to article 23 of the envi-
ronmental conservation law (09OG2151) (25767) ......................
500,000 ............................................. (re. $472,000)
By chapter 54, section 1, of the laws of 2020:
For rehabilitation and improvements of various department facilities
and systems including personal service and fringe benefits and indi-
rect costs in accordance with a programmatic and financial plan to
be approved by the director of the budget including suballocation to
other state departments and agencies (09RI2051) (24855) ............
24,000,000 ....................................... (re. $12,931,000)
For services and expenses, including personal service and fringe bene-
fits, necessary for projects and purposes required by Executive
Order 88, including design, construction, operation and maintenance
of all new buildings, and the development and purchase of energy
efficient equipment; for remedial activities at state-owned facili-
ties, including the compliance with state and federal laws and regu-
lations (09SF2051) (24859) ... 2,000,000 .......... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2017:
For rehabilitation and improvements of various department facilities
and systems including personal service and fringe benefits and indi-
rect costs in accordance with a programmatic and financial plan to
be approved by the director of the budget including suballocation to
other state departments and agencies (09RI1751) (24855) ............
15,000,000 .......................................... (re. $599,000)
For replacement of vehicles and heavy duty construction equipment
(09EQ1751) (24856) ... 1,000,000 .................. (re. $1,000,000)
309 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses, including personal service and fringe bene-
fits, necessary for projects and purposes required by Executive
Order 88, including design, construction, operation and maintenance
of all new buildings, and the development and purchase of energy
efficient equipment; for remedial activities at state-owned facili-
ties, including the compliance with state and federal laws and regu-
lations (09SF1751) (24859) ... 1,000,000 .......... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2016:
For replacement of vehicles and heavy duty construction equipment
(09EQ1651) (24856) ... 1,000,000 .................. (re. $1,000,000)
For services and expenses, including personal service and fringe bene-
fits, necessary for projects and purposes required by Executive
Order 88, including design, construction, operation and maintenance
of all new buildings, and the development and purchase of energy
efficient equipment; for remedial activities at state-owned facili-
ties, including the compliance with state and federal laws and regu-
lations (09SF1651) (24859) ... 900,000 .............. (re. $900,000)
By chapter 54, section 1, of the laws of 2015:
For replacement of vehicles and heavy duty construction equipment
(09EQ1551) (24856) ... 2,750,000 .................. (re. $1,093,000)
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF1551) (24858) ... 750,000 ...................... (re. $750,000)
For services and expenses, including personal service, fringe bene-
fits, and non-personal services necessary for remedial activities to
plug or replug abandoned oil and gas wells including the surface
restoration of the affected land pursuant to article 23 of the envi-
ronmental conservation law (09OG1551) (25767) ......................
500,000 ............................................. (re. $242,000)
For services and expenses, including personal service and fringe bene-
fits, necessary for projects and purposes required by Executive
Order 88, including design, construction, operation and maintenance
of all new buildings, and the development and purchase of energy
efficient equipment; for remedial activities at state-owned facili-
ties, including the compliance with state and federal laws and regu-
lations (09SF1551) (24859) ... 2,000,000 .......... (re. $1,472,000)
By chapter 54, section 1, of the laws of 2014:
For replacement of vehicles and heavy duty construction equipment
(09EQ1451) (24856) ... 2,000,000 .................... (re. $519,000)
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF1451) (24858) ... 750,000 ...................... (re. $750,000)
By chapter 54, section 1, of the laws of 2013:
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF1351) (24858) ... 750,000 ...................... (re. $443,000)
By chapter 54, section 1, of the laws of 2012:
310 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For dam safety and the demolition of unsafe structures on state-owned
land, and for various dam safety projects including personal service
and fringe benefits (09DS1251) (24857) .............................
1,500,000 ......................................... (re. $1,500,000)
For services and expenses, including personal service and fringe bene-
fits, necessary for projects and purposes required by Executive
Order 111, including design, construction, operation and maintenance
of all new buildings, and the development and purchase of energy
efficient equipment; for remedial activities at state-owned facili-
ties, including the compliance with state and federal laws and regu-
lations (09SF1251) (24859) ... 1,000,000 ............. (re. $70,000)
By chapter 55, section 1, of the laws of 2009:
For dam safety and the demolition of unsafe structures on state-owned
land, and for various dam safety projects including personal
services and fringe benefits (09DS0951) (24857) ....................
2,000,000 ......................................... (re. $1,753,000)
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF0951) (24858) ... 450,000 ....................... (re. $34,000)
By chapter 55, section 1, of the laws of 2008:
For dam safety and the demolition of unsafe structures on state-owned
land, and for various dam safety projects including personal
services and fringe benefits (09DS0851) (24857) ....................
2,000,000 ......................................... (re. $1,910,000)
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF0851) (24858) ... 450,000 ...................... (re. $277,000)
By chapter 55, section 1, of the laws of 2007:
For dam safety and the demolition of unsafe structures on state-owned
land including personal services and fringe benefits (09DS0751)
(24857) ... 2,000,000 ............................... (re. $209,000)
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF0751) (24858) ... 250,000 ........................ (re. $6,000)
By chapter 55, section 1, of the laws of 2006:
For services and expenses, including personal services and fringe
benefits, for design and construction of department facilities
(09DF0651) (24858) ... 750,000 ....................... (re. $58,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Financial Security Account - 32201
Operational Services Purpose
By chapter 54, section 1, of the laws of 2017:
For services and expenses of the department to complete or remediate a
department-regulated project using the proceeds specified in the
311 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
project's required financial security arrangement when the terms of
that arrangement must be implemented.
Notwithstanding any other provision of law or terms of any financial
security instrument, any residuals may be available for department
capital projects (09431751) (24895) ................................
5,000,000 ......................................... (re. $4,465,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses of the department to complete or remediate a
department-regulated project using the proceeds specified in the
project's required financial security arrangement when the terms of
that arrangement must be implemented. No portion of this appropri-
ation shall be available for projects for which financial security
proceeds have not been received (09431651) (24895) .................
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 1994:
For services and expenses of the department to complete or remediate a
department-regulated project using the proceeds specified in the
project's required financial security arrangement when the terms of
that arrangement must be implemented. No portion of this appropri-
ation shall be available for projects for which financial security
proceeds have not been received (09439451) (24895) .................
2,000,000 ........................................... (re. $552,000)
Capital Projects Funds - Other
Natural Resource Damages Fund
Natural Resource Damages Account - 31900(M)
Operational Services Purpose
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to restoration projects, replacement
acquisition projects or combinations thereof resulting from success-
ful natural resource damages claims against the northrop grumman
corporation associated with the northrop grumman facility in Nassau
County, including suballocation to other state departments and agen-
cies (09442151) (24860) ... 47,500,000 ... ....... (re. $47,500,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses related to restoration projects, replacement
acquisition projects or combinations thereof resulting from success-
ful natural resource damages claims including suballocation to other
state departments and agencies (09441651) (24860) ..................
26,000,000 ....................................... (re. $23,239,000)
By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2013:
For services and expenses related to restoration projects, replacement
acquisition projects or combinations thereof resulting from success-
ful natural resource damages claims, and suballocation to other
state departments and agencies (09440751) (24860) ..................
26,000,000 ........................................ (re. $5,595,000)
312 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
section 1, of the laws of 2005:
For services and expenses related to restoration projects, replacement
acquisition projects or combinations thereof resulting from success-
ful natural resource damages claims. No portion of this appropri-
ation shall be available for projects for which recovered funds have
not been received including suballocation to the department of
health and the office of parks, recreation and historic preservation
(09449451) (24860) ... 23,503,000 ................... (re. $330,000)
PURE WATERS BOND FUND (CCP)
Capital Projects Funds - Other
Pure Waters Bond Fund
Pure Waters Bond Fund Account - 30620
Bond Proceeds Purpose
By chapter 54, section 8, of the laws of 1978, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of two hundred sixty-three million thirty-five thousand nine
hundred sixty-one dollars ($263,035,961) or so much thereof as may
be necessary, is hereby appropriated from the proceeds of the sale
of bonds authorized pursuant to the provisions of chapter one
hundred and seventy-six of the laws of nineteen hundred sixty-five
known as the "Pure Waters Bond Act" for payment to the capital
projects fund as created by section ninety-three of the state
finance law for disbursements from such fund pursuant to appropri-
ations for the payment of the non-municipal share of the cost of
construction of sewage treatment works in the manner and to the
extent specified in section 17-1903 of the environmental conserva-
tion law. Such disbursements are hereinafter referred to as "Pure
Waters disbursements."
The director of the budget is hereby authorized to designate to the
state comptroller appropriations made from the capital projects fund
for purposes for which pure waters expenditures are authorized. The
state comptroller shall at the commencement of each month certify to
the director of the budget, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee, the amounts disbursed from the appropriations designated by the
director of the budget from the capital construction fund for pure
waters disbursements for the month preceding such certification.
Such certifications shall not exceed in aggregate the moneys appro-
priated thereof from the capital projects fund. A copy of each such
certification shall also be delivered to the public officer of the
respective state department to which such capital projects fund
appropriations are made available (01354910) (80917) ...............
.................................................. (re. $20,568,000)
RECREATION (CCP)
Capital Projects Funds - Other
313 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Fund - 30000
Recreation Purpose
By chapter 54, section 1, of the laws of 2017:
For campground modernization and reconstruction including personal
services, fringe benefits and indirect costs (09CM1752) (24861)
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2013:
For campground modernization and reconstruction including personal
services, fringe benefits and indirect costs (09CM1352) (24861)
1,000,000 ........................................... (re. $317,000)
By chapter 55, section 1, of the laws of 2009:
For campground modernization and reconstruction including personal
services, fringe benefits and indirect costs (09CM0952) (24861)
500,000 .............................................. (re. $27,000)
SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Hazardous Waste Purpose
By chapter 54, section 1, of the laws of 2022:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD22F7)
(24868) ... 20,000,000 ........................... (re. $20,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
314 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD21F7)
(24868) ... 20,000,000 ........................... (re. $20,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste. The director of the budget shall certify to the
comptroller the specific portions of this appropriation for which
monies have been received pursuant to such consent orders and agree-
ments (09AD20F7) (24868) ... 20,000,000 .......... (re. $15,851,000)
By chapter 54, section 1, of the laws of 2019:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
315 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD19F7)
(24868) ... 20,000,000 ............................ (re. $3,003,000)
By chapter 54, section 1, of the laws of 2018:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD18F7)
(24868) ... 16,000,000 .............................. (re. $573,000)
By chapter 54, section 1, of the laws of 2017:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
316 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD17F7)
(24868) ... 16,000,000 ........................... (re. $10,135,000)
By chapter 55, section 1, of the laws of 2016:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste. The director of the budget shall certify to the
comptroller the specific portions of this appropriation for which
monies have been received pursuant to such consent orders and agree-
ments (09AD16F7) (24868) ... 8,000,000 ............ (re. $2,877,000)
By chapter 54, section 1, of the laws of 2015:
For payment by the state, as reimbursement or as an advance from
responsible parties or volunteers for remedial and monitoring work
at sites contaminated with hazardous waste. No portion of this
appropriation shall be available for expenditure until a party or
parties either responsible for a site or volunteering to cleanup a
site have entered into an agreement with the commissioner of the
department of environmental conservation or the commissioner's
designee, and which agreement is approved by the director of the
budget, providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation. A copy of such agree-
317 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
remedial and monitoring projects from this fund with monies of the
hazardous waste remedial fund received for such projects pursuant to
consent orders and agreements to address sites contaminated with
hazardous waste.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and agreements (09AD15F7)
(24868) ... 8,000,000 ............................. (re. $1,567,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2010:
For payment by the state, as reimbursement or as an advance from
responsible parties for remedial and monitoring work at inactive
hazardous waste disposal sites or from volunteers for the voluntary
cleanup of contaminated brownfield sites. No portion of this appro-
priation shall be available for expenditure until a party or parties
either responsible for a site or volunteering to cleanup a site have
entered into an agreement with the commissioner of the department of
environmental conservation or the commissioner's designee, and which
agreement is approved by the director of the budget, providing for
repayment to the state of an amount equal to the amount disbursed
from this appropriation. A copy of such agreement shall be filed
with the state comptroller, the chairman of the senate finance
committee and chairman of the assembly ways and means committee.
Nothwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
inactive hazardous waste remedial projects and voluntary cleanup
projects from this fund with monies of the hazardous waste remedial
fund received for such projects pursuant to inactive hazardous waste
site remediation consent orders and voluntary cleanup agreements.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and voluntary cleanup
agreements (09AD08F7) (24868) ... 10,000,000 ........ (re. $102,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2007:
For services and expenses for the Town of Smithtown/Kings Park Psychi-
atric Center Rehabilitation including suballocation to other state
departments and agencies (09KP06F7) (24865) ........................
25,000,000 .......................................... (re. $360,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2006:
For payment by the state, as reimbursement or as an advance from
responsible parties for remedial and monitoring work at inactive
hazardous waste disposal sites or from volunteers for the voluntary
318 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cleanup of contaminated brownfield sites. No portion of this appro-
priation shall be available for expenditure until a party or parties
either responsible for a site or volunteering to cleanup a site have
entered into an agreement with the commissioner of the department of
environmental conservation or the commission's designee, and which
agreement is approved by the director of the budget, providing for
repayment to the state of an amount equal to the amount disbursed
from this appropriation. A copy of such agreement shall be filed
with the state comptroller, the chairman of the senate finance
committee and chairman of the assembly ways and means committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay settlements or advances for specified
inactive hazardous waste remedial projects and voluntary cleanup
projects from this fund with monies of the hazardous waste remedial
fund received for such projects pursuant to inactive hazardous waste
site remediation consent orders and voluntary cleanup agreements.
The director of the budget shall certify to the comptroller the
specific portions of this appropriation for which monies have been
received pursuant to such consent orders and voluntary cleanup
agreements (09AD04F7) (24868) ... 30,000,000 ........ (re. $196,000)
By chapter 55, section 1, of the laws of 1999:
For payment by the state, as an advance for remedial and monitoring
work at inactive hazardous waste disposal sites. No portion of this
appropriation shall be available for expenditure until a party or
parties responsible for a site have entered into an agreement with
the commissioner of the department of environmental conservation,
and which agreement is approved by the director of the budget,
providing for repayment to the state of an amount equal to the
amount disbursed from this appropriation. A copy of such agreement
shall be filed with the state comptroller, the chairman of the
senate finance committee and chairman of the assembly ways and means
committee.
Notwithstanding any other provision of law to the contrary, the comp-
troller is authorized to repay advances for specified inactive
hazardous waste remedial projects from this fund with moneys of the
hazardous waste remedial fund received for such projects pursuant to
inactive hazardous waste site remediation consent orders. The direc-
tor of the budget shall certify to the comptroller the specific
portions of this appropriation for which moneys have been received
pursuant to such consent orders (09AD99F7) (24868) .................
60,000,000 ........................................ (re. $1,096,000)
By chapter 55, section 1, of the laws of 1998:
For payment by the state, as an advance for remedial and monitoring
work at inactive hazardous waste disposal sites (09AD98F7) (24868)
... 30,000,000 ..................................... (re. $164,000)
Capital Projects Fund - Other
Hazardous Waste Remedial Fund
Environmental Restoration Projects Account - 31504
Hazardous Waste Purpose
319 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to environmental restoration
projects in accordance with title 5 of article 56 of the environ-
mental conservation law (09ER19F7) (25738) .........................
3,100,000 ......................................... (re. $2,698,000)
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Cleanup Account - 31506
Hazardous Waste Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB22F7) (24863) ..............
100,000,000 ...................................... (re. $84,889,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB21F7) (24863) ..............
100,000,000 ...................................... (re. $80,506,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
320 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB20F7) (24863) ..............
100,000,000 ...................................... (re. $52,401,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB19F7) (24863) ..............
100,000,000 ...................................... (re. $24,847,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB18F7) (24863) ..............
100,000,000 ...................................... (re. $24,498,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
321 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law. None of this appropriation may be
expended for any purposes authorized in title 12 of article 27 of
the environmental conservation law (09HB17F7) (24863) ..............
100,000,000 ...................................... (re. $15,429,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law (09HB16F7) (24863) ......................
100,000,000 ....................................... (re. $2,609,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto, provided that a
portion of such amount may be available for environmental restora-
tion projects in accordance with title 5 of article 56 of the envi-
ronmental conservation law (09HB15F7) (24863) ......................
100,000,000 ...................................... (re. $10,201,000)
By chapter 54, section 1, of the laws of 2012:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
322 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal service and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB12F7)
(24863) ... 120,000,000 ........................... (re. $8,173,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB11F7)
(24863) ... 120,000,000 ........................... (re. $8,741,000)
By chapter 55, section 1, of the laws of 2010:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB10F7)
(24863) ... 120,000,000 ............................. (re. $725,000)
By chapter 55, section 1, of the laws of 2009:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB09F7)
(24863) ... 120,000,000 ............................. (re. $241,000)
By chapter 55, section 1, of the laws of 2008:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
323 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB08F7)
(24863) ... 120,000,000 ........................... (re. $5,354,000)
By chapter 55, section 1, of the laws of 2007:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB07F7)
(24863) ... 120,000,000 ............................. (re. $563,000)
By chapter 55, section 1, of the laws of 2006:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and fringe benefits of
the departments of environmental conservation, health and law and
including suballocations to the departments of health and law and
including costs incidental and appurtenant thereto (09HB06F7)
(24863) ... 120,000,000 ........................... (re. $2,938,000)
By chapter 55, section 1, of the laws of 2005:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and related fringe
benefits of the departments of environmental conservation, health
and law and including suballocations to the departments of health
and law and including costs incidental and appurtenant thereto
(09HB05F7) (24863) ... 120,000,000 ................ (re. $1,372,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2005:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with title 13 of article 27 of
the environmental conservation law and section 97-b of the state
324 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
finance law, for projects, and for payment of state costs associated
with the remediation of offsite contamination at significant threat
sites as provided for in section 27-1411 of the environmental
conservation law, including personal services and related fringe
benefits of the departments of environmental conservation, health
and law and including suballocations to the departments of health
and law and including costs incidental and appurtenant thereto
(09HB04F7) (24863) ... 120,222,000 ................ (re. $5,465,000)
SCHEDULE
Personal service .............................. 15,855,844
Nonpersonal service .............................. 975,871
Fringe benefits ................................ 5,746,290
Maintenance undistributed
For services and expenses related to the
hazardous waste remedial program at the
department of health and for suballocation
to the department of health .................. 5,880,163
For services and expenses related to the
hazardous waste remedial program at the
department of law and for suballocation to
the department of law .......................... 763,832
For payment of the state share of the costs
of hazardous waste site remediation
projects in accordance with title 13 of
article 27 of the environmental conserva-
tion law and section 97-b of the state
finance law and for payment of state costs
associated with the remediation of offsite
contamination at significant threat sites
as provided for in section 27-1411 of the
environmental conservation law, including
costs incidental and appurtenant thereto .... 91,000,000
--------------
Available for maintenance undistributed ..... 97,643,995
--------------
Total of schedule ........................ 120,222,000
==============
By chapter 55, section 1, of the laws of 2003, as amended by chapter 1,
part I, section 5, of the laws of 2003:
For payment of the state share of costs of hazardous waste site reme-
diation projects, in accordance with title 13 of article 27 of the
environmental conservation law and section 97-b of the state finance
law, for projects, and for payment of state costs associated with
the remediation of offsite contamination at significant threat sites
as provided for in section 27-1411 of the environmental conservation
law, including personal services and related fringe benefits of the
departments of environmental conservation, health and law and
325 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including costs incidental and appurtenant thereto (09HB03F7)
(24863) ... 120,000,000 ........................... (re. $3,743,000)
SCHEDULE
Personal service .............................. 15,700,000
Nonpersonal service .............................. 966,325
Fringe benefits ................................ 5,689,680
Maintenance undistributed
For services and expenses related to the
hazardous waste remedial program at the
department of health and for suballocation
to the department of health .................. 5,880,163
For services and expenses related to the
hazardous waste remedial program at the
department of law and for suballocation to
the department of law .......................... 763,832
For payment of the state share of the costs
of hazardous waste site remediation
projects in accordance with title 13 of
article 27 of the environmental conserva-
tion law and section 97-b of the state
finance law and for payment of state costs
associated with the remediation of offsite
contamination at significant threat sites
as provided for in section 27-1411 of the
environmental conservation law, including
costs incidental and appurtenant thereto .... 91,000,000
--------------
Available for maintenance undistributed ..... 97,643,995
--------------
Total of schedule ........................ 120,000,000
==============
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Remediation Oversight and Assistance Account - 31505
Hazardous Waste Purpose
By chapter 54, section 1, of the laws of 2022:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2022 (09BC22F7) (24867) ... 10,000,000 ............ (re. $9,151,000)
By chapter 54, section 1, of the laws of 2021:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
326 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2021 (09BC21F7) (24867) ... 6,000,000 ............. (re. $1,236,000)
By chapter 54, section 1, of the laws of 2020:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2020 (09BC20F7) (24867) ... 6,000,000 ............... (re. $937,000)
By chapter 54, section 1, of the laws of 2019:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2019 (09BC19F7) (24867) ... 6,000,000 ............. (re. $1,033,000)
By chapter 54, section 1, of the laws of 2018:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2018 (09BC18F7) (24867) ... 6,000,000 ............. (re. $1,004,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2017 (09BC17F7) (24867) ... 6,000,000 ............... (re. $928,000)
By chapter 55, section 1, of the laws of 2016:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2016 (09BC16F7) (24867) ... 6,000,000 ............... (re. $562,000)
By chapter 54, section 1, of the laws of 2015:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2015 (09BC15F7) (24867) ... 6,000,000 ............... (re. $630,000)
327 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2014:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2014 (09BC14F7) (24867) ... 6,000,000 ............... (re. $439,000)
By chapter 54, section 1, of the laws of 2013:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2013 (09BC13F7) (24867) ... 6,000,000 ............... (re. $629,000)
By chapter 54, section 1, of the laws of 2012:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2012 (09BC12F7) (24867) ... 10,000,000 ............ (re. $4,405,000)
By chapter 54, section 1, of the laws of 2011:
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2011 (09BC11F7) (24867) ... 10,000,000 ............ (re. $5,564,000)
By chapter 55, section 1, of the laws of 2010:
For the following purposes: non-bondable services and expenses associ-
ated with the brownfield cleanup and hazardous waste remediation
projects; and, suballocation to other state departments and agen-
cies; and for other brownfield site cleanup hazardous waste purposes
(09TG10F7) (24866) ... 2,250,000 .................. (re. $2,250,000)
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2010 (09BC10F7) (24867) ... 10,000,000 ............ (re. $5,414,000)
By chapter 55, section 1, of the laws of 2009:
For the following purposes: non-bondable services and expenses associ-
ated with the brownfield cleanup and hazardous waste remediation
projects; and, suballocation to other state departments and agen-
cies; and for other brownfield site cleanup hazardous waste purposes
(09TG09F7) (24866) ... 2,250,000 .................. (re. $2,250,000)
328 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2009 (09BC09F7) (24867) ... 10,000,000 ............ (re. $3,462,000)
By chapter 55, section 1, of the laws of 2008:
For the following purposes: non-bondable services and expenses associ-
ated with the brownfield cleanup and hazardous waste remediation
projects; and, suballocation to other state departments and agen-
cies; and for other brownfield site cleanup hazardous waste purposes
(09TG08F7) (24866) ... 2,250,000 .................. (re. $2,250,000)
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2008 (09BC08F7) (24867) ... 10,275,000 ............ (re. $2,022,000)
By chapter 55, section 1, of the laws of 2007:
For the following purposes: non-bondable services and expenses associ-
ated with the brownfield cleanup and hazardous waste remediation
projects; and, suballocation to other state departments and agen-
cies; and for other brownfield site cleanup hazardous waste purposes
(09TG07F7) (24866) ... 2,250,000 .................... (re. $638,000)
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2007 (09BC07F7) (24867) ... 9,375,000 ............. (re. $3,417,000)
By chapter 55, section 1, of the laws of 2006:
For the following purposes pursuant to a memorandum of understanding
to be executed by the governor, the temporary president of the
senate and the speaker of the assembly: non-bondable services and
expenses associated with the brownfield cleanup and hazardous waste
remediation projects; grants authorized pursuant to section 970-r of
the general municipal law; technical assistance grants pursuant to
titles 13 and 14 of article 27 of the environmental conservation
law; services and expenses associated with negotiating and oversee-
ing implementation of brownfield site cleanup agreements in accord-
ance with title 14 of article 27 of the environmental conservation
law; including personal services and fringe benefits of the depart-
ment of environmental conservation including costs incidental and
appurtenant thereto including suballocation to other state depart-
ments and agencies; and for other brownfield site cleanup hazardous
waste purposes (09HT06F7) (81096) ..................................
15,000,000 ....................................... (re. $15,000,000)
For the personal services and fringe benefits of the department of
environmental conservation including suballocation to the department
329 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of health related to the brownfield cleanup program pursuant to
title 14 of article 27 of the environmental conservation law and the
voluntary cleanup program including costs incurred prior to April 1,
2006 (09BC06F7) (24867) ... 7,375,000 ............... (re. $702,000)
By chapter 55, section 1, of the laws of 2005:
For the following purposes pursuant to a memorandum of understanding
to be executed by the governor, the temporary president of the
senate and the speaker of the assembly: non-bondable services and
expenses associated with the brownfield cleanup and hazardous waste
remediation projects; grants authorized pursuant to section 970-r of
the general municipal law; technical assistance grants pursuant to
titles 13 and 14 of article 27 of the environmental conservation
law; services and expenses associated with negotiating and oversee-
ing implementation of brownfield site cleanup agreements in accord-
ance with title 14 of article 27 of the environmental conservation
law; including personal services and related fringe benefits of the
department of environmental conservation including costs incidental
and appurtenant thereto including suballocation to other state
departments and agencies; and for other brownfield site cleanup
hazardous waste purposes (09HT05F7) (81096) ........................
15,000,000 ....................................... (re. $15,000,000)
For the personal services and related fringe benefits of the depart-
ment of environmental conservation including suballocation to the
department of health related to the brownfield cleanup program
pursuant to title 14 of article 27 of the environmental conservation
law and the voluntary cleanup program including costs incurred prior
to April 1, 2005 (09BC05F7) (24867) ................................
14,217,000 ........................................ (re. $1,762,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2009:
For the following purposes pursuant to a memorandum of understanding
to be executed by the governor, the temporary president of the
senate and the speaker of the assembly: non-bondable services and
expenses associated with the brownfield cleanup and hazardous waste
remediation projects; grants authorized pursuant to section 970-r of
the general municipal law; technical assistance grants pursuant to
titles 13 and 14 of article 27 of the environmental conservation
law; services and expenses associated with negotiating and oversee-
ing implementation of brownfield site cleanup agreements in accord-
ance with title 14 of article 27 of the environmental conservation
law; including personal services and related fringe benefits of the
department of environmental conservation including costs incidental
and appurtenant thereto including suballocation to other state
departments and agencies; and for other brownfield site cleanup
hazardous waste purposes (09HT04F7) (81096) ........................
15,000,000 ........................................ (re. $6,340,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
section 1, of the laws of 2009:
330 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the following purposes pursuant to a Memorandum of Understanding
to be executed by the Governor, the temporary president of the
Senate and the speaker of the Assembly: non-bondable services and
expenses associated with brownfield clean up and hazardous waste
remediation projects; grants authorized pursuant to section 970-r of
the general municipal law; technical assistance grants pursuant to
titles 13 and 14 of article 27 of the environmental conservation
law; services and expenses associated with negotiating and oversee-
ing implementation of brownfield site cleanup agreements in accord-
ance with title 14 of article 27 of the environmental conservation
law; including personal services and related fringe benefits of the
department of environmental conservation including costs incidental
and appurtenant thereto including suballocation to other state
departments and agencies; and for other brownfield site cleanup
hazardous waste purposes (09HT03F7) (81096) ........................
15,000,000 ........................................ (re. $8,371,000)
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Remediation Site Investigation and Construction
Account - 31501
Hazardous Waste Purpose
By chapter 55, section 1, of the laws of 2016:
For services and expenses related to Hazardous Waste Program, includ-
ing personal service, fringe benefits and non-bondable services and
expenses related to hazardous waste remediation projects (09IN16F7)
(25709) ... 2,000,000 ............................. (re. $2,000,000)
SOLID AND HAZARDOUS WASTE MANAGEMENT - EQBA 86 (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Hazardous Waste Purpose
By chapter 55, section 1, of the laws of 1999:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto, and for payment
of reimbursements to the hazardous waste remedial fund for services
and expenses of the departments of environmental conservation, law
and health, including fringe benefits (09HW99F7) (24870) ...........
37,625,000 .......................................... (re. $579,000)
By chapter 55, section 1, of the laws of 1997:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW97F7)
(24870) ... ..... 30,000,000 ...................... (re. $501,000)
331 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 1996:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW96F7)
(24870) ... ..... 32,800,000 ...................... (re. $228,000)
By chapter 54, section 1, of the laws of 1995:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW95F7)
(24870) ... ..... 66,000,000 .................... (re. $1,065,000)
By chapter 54, section 1, of the laws of 1994:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW94F7)
(24870) ... ..... 150,000,000 .................. (re. $11,785,000)
By chapter 54, section 1, of the laws of 1993:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW93F7)
(24870) ... ..... 140,000,000 ................... (re. $1,182,000)
By chapter 54, section 1, of the laws of 1992:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (09HW92F7)
(24870) ... ..... 204,000,000 ................... (re. $2,761,000)
By chapter 54, section 1, of the laws of 1991, as amended by chapter 54,
section 3, of the laws of 1992:
For payment of the state's share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (091691F7)
(24870) ... ..... 110,000,000 ..................... (re. $601,000)
By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
section 3, of the laws of 1991:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (095390F7)
(24870) ... ..... 173,575,000 .................. (re. $10,170,000)
332 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
section 3, of the laws of 1990:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title 3
of article 52 of the environmental conservation law, for projects,
including costs incidental and appurtenant thereto (095489F7)
(24870) ... ..... 26,000,000 .................... (re. $1,570,000)
By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
section 3, of the laws of 1990:
For payment of the state share of the costs of hazardous waste site
remediation projects, in accordance with the provisions of title
three of article fifty-two of the environmental conservation law,
for projects, including the transfer of obligations from capital
projects appropriations funded from the hazardous waste remedial
fund - 312 and including costs incidental and appurtenant thereto,
(095887F7) (24870) ... ..... 100,000,000 ........ (re. $1,499,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Solid Waste Management Purpose
By chapter 55, section 1, of the laws of 2010:
For payment of the state share of the costs of municipal landfill
closure projects, in accordance with the provisions of article 52
and title 5 of article 54 of the environmental conservation law, for
projects, including costs incidental and appurtenant thereto and the
payment of liabilities incurred prior to April 1, 2010 (09571056)
(24869) ... 342,000 ................................. (re. $342,000)
SOLID WASTE MANAGEMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Solid Waste Management Purpose
By chapter 54, section 1, of the laws of 2022:
For services and capital expenses related to the waste management and
cleanup program as put forth in section 27-1915 of environmental
conservation law, including suballocation to other state departments
and agencies (09WT2256) (25730) ... 4,000,000 ..... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and capital expenses related to the waste management and
cleanup program as put forth in section 27-1915 of environmental
conservation law, including suballocation to other state departments
and agencies (09WT2156) (25730) ... 4,000,000 ..... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and capital expenses related to the waste management and
cleanup program as put forth in article 27-1915 of environmental
333 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
conservation law, including suballocation to other state departments
and agencies (09WT2056) (25730) ... 4,000,000 ..... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2019:
For services and capital expenses related to the waste management and
cleanup program as put forth in article 27-1915 of environmental
conservation law, including suballocation to other state departments
and agencies (09WT1956) (25730) ... 4,000,000 ..... (re. $3,807,000)
By chapter 54, section 1, of the laws of 2018:
For pre-closure and post-closure costs associated with Adirondack
landfills pursuant to agreements with Essex county (09EX1856)
(24872) ... 500,000 ................................. (re. $500,000)
For services and capital expenses related to the waste management and
cleanup program as put forth in article 27-1915 of environmental
conservation law, including suballocation to other state departments
and agencies (09WT1856) (25730) ... 4,000,000 ....... (re. $419,000)
By chapter 54, section 1, of the laws of 2017:
For pre-closure and post-closure costs associated with Adirondack
landfills pursuant to agreements with Essex county (09EX1756)
(24872) ... 500,000 ................................. (re. $478,000)
By chapter 55, section 1, of the laws of 2016:
For pre-closure and post-closure costs associated with Adirondack
landfills pursuant to agreements with Essex county (09EX1656)
(24872) ... 500,000 .................................. (re. $79,000)
By chapter 55, section 1, of the laws of 2009:
For post-closure costs associated with the state-owned Rush Landfill
including suballocation to other state departments and agencies
(09RL0956) (24871) ... 50,000 ......................... (re. $7,000)
By chapter 55, section 1, of the laws of 2008:
For post-closure costs associated with the state-owned Rush Landfill
including suballocation to other state departments and agencies
(09RL0856) (24871) ... 50,000 ......................... (re. $2,000)
By chapter 55, section 1, of the laws of 2007:
For post-closure costs associated with the state-owned Rush Landfill
including suballocation to other state departments and agencies
(09RL0756) (24871) ... 350,000 ....................... (re. $38,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
New York Environmental Protection and Spill Remediation Account -
32219
Solid Waste Management Purposes
By chapter 54, section 1, of the laws of 2022:
For services and capital expenses associated with costs incurred under
Article 12 of the Navigation Law, and for cleanup, investigation,
334 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and removal of petroleum spills, including prior year liabilities
(09OS2256) (25720) ... 21,200,000 ................ (re. $21,200,000)
By chapter 54, section 1, of the laws of 2021:
For services and capital expenses associated with costs incurred under
Article 12 of the Navigation Law, and for cleanup, investigation,
and removal of petroleum spills, including prior year liabilities
(09OS2156) (25720) ... 21,200,000 ................ (re. $10,742,000)
By chapter 54, section 1, of the laws of 2020:
For services and capital expenses associated with costs incurred under
Article 12 of the Navigation Law, and for cleanup, investigation,
and removal of petroleum spills, including prior year liabilities
(09OS2056) (25720) ... 21,200,000 ................. (re. $7,453,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
ENCON Federal Capital Account - 31364(M)
Hazardous Waste Purpose
By chapter 54, section 1, of the laws of 2018:
For the federal share of the cleanup of hazardous waste sites pursuant
to the provision of the federal comprehensive environmental
response, compensation and liability act of 1980 reauthorization or
amendments thereto including suballocation to other state depart-
ments and agencies (09FS18F7) (24873) ..............................
30,000,000 ....................................... (re. $28,807,000)
By chapter 55, section 1, of the laws of 2016:
For the federal share of the cleanup of hazardous waste sites pursuant
to the provision of the federal comprehensive environmental
response, compensation and liability act of 1980 reauthorization or
amendments thereto including suballocation to other state depart-
ments and agencies (09FS16F7) (24873) ..............................
30,000,000 ....................................... (re. $28,011,000)
WATER RESOURCES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Flood Control Purpose
By chapter 54, section 1, of the laws of 2022:
For the state's share including personal service, nonpersonal service,
fringe benefits and indirect costs of various shore protection
projects including suballocation to other state departments and
agencies (09W12263) (24880) ... 1,700,000 ......... (re. $1,700,000)
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects; for coastal erosion
hazard area mapping of the state's Atlantic Ocean and Great Lakes
coastlines and the state share of costs associated with matching
335 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
federal funds for a statewide flood plain map modernization program;
for the state share of costs associated with the installation and/or
reinstallation, upgrade, monitoring and maintenance of a statewide
network of stream flow gauges, including personal service, nonper-
sonal service, fringe benefits and indirect costs, including subal-
location to other state departments and agencies (09FL2263) (24881)
... 5,000,000 ..................................... (re. $5,000,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD2263) (24887) ... 5,000,000 ........... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2021:
For the state's share including personal service, nonpersonal service,
fringe benefits and indirect costs of various shore protection
projects including suballocation to other state departments and
agencies (09W12163) (24880) ... 1,000,000 ......... (re. $1,000,000)
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects; for coastal erosion
hazard area mapping of the state's Atlantic Ocean and Great Lakes
coastlines and the state share of costs associated with matching
federal funds for a statewide flood plain map modernization program;
for the state share of costs associated with the installation and/or
reinstallation, upgrade, monitoring and maintenance of a statewide
network of stream flow gauges, including personal service, nonper-
sonal service, fringe benefits and indirect costs, including subal-
location to other state departments and agencies (09FL2163) (24881)
... 3,000,000 ..................................... (re. $3,000,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD2163) (24887) ... 5,000,000 ........... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2020:
For the state's share including personal service, nonpersonal service,
fringe benefits and indirect costs of various shore protection
projects including suballocation to other state departments and
agencies (09W12063) (24880) ... 1,000,000 ......... (re. $1,000,000)
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects; for coastal erosion
hazard area mapping of the state's Atlantic Ocean and Great Lakes
coastlines and the state share of costs associated with matching
federal funds for a statewide flood plain map modernization program;
for the state share of costs associated with the installation and/or
reinstallation, upgrade, monitoring and maintenance of a statewide
network of stream flow gauges, including personal service, nonper-
336 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sonal service, fringe benefits and indirect costs, including subal-
location to other state departments and agencies (09FL2063) (24881)
... 1,500,000 ....................................... (re. $461,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD2063) (24887) ... 5,000,000 ........... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2019:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD1963) (24887) ... 5,000,000 ........... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2018:
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects; for coastal erosion
hazard area mapping of the state's Atlantic Ocean and Great Lakes
coastlines and the state share of costs associated with matching
federal funds for a statewide flood plain map modernization program;
for the state share of costs associated with the installation and/or
reinstallation, upgrade, monitoring and maintenance of a statewide
network of stream flow gauges, including personal service, non-per-
sonal service, fringe benefits and indirect costs, including subal-
location to other state departments and agencies (09FL1863) (24881)
... 2,000,000 ....................................... (re. $778,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD1863) (24887) ... 3,000,000 ........... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2017:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD1763) (24887) ... 3,000,000 ........... (re. $3,000,000)
By chapter 55, section 1, of the laws of 2016:
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects; for coastal erosion
hazard area mapping of the state's Atlantic Ocean and Great Lakes
coastlines and the state share of costs associated with matching
337 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
federal funds for a statewide flood plain map modernization program;
for the state share of costs associated with the installation and/or
reinstallation, upgrade, monitoring and maintenance of a statewide
network of stream flow gauges, including personal service, non-per-
sonal service, fringe benefits and indirect costs, including subal-
location to other state departments and agencies (09FL1663) (24881)
... 2,250,000 ....................................... (re. $657,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD1663) (24887) ... 3,000,000 ........... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2015:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective municipality has entered into an
agreement with the commissioner of the department of environmental
conservation, and such agreement is approved by the director of the
budget (09AD1563) (24887) ... 3,000,000 ........... (re. $3,000,000)
By chapter 54, section 1, of the laws of 2012:
For the state's share including personal service, nonpersonal service,
fringe benefits and indirect costs of various shore protection
projects including suballocation to other state departments and
agencies (09W11263) (24880) ... 1,000,000 ......... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2011:
For the state's share including personal services, fringe benefits and
indirect costs of various shore protection projects including subal-
location to other state departments and agencies (09W11163) (24880)
... 1,000,000 ..................................... (re. $1,000,000)
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects including personal
services and fringe benefits, including suballocation to other state
departments and agencies (09FL1163) (24881) ........................
1,000,000 ............................................. (re. $2,000)
For services and expenses for the state share of costs associated with
matching federal funds for a statewide flood plain map modernization
program, including suballocation to other state departments and
agencies (09FP1163) (24883) ... 834,000 ............. (re. $834,000)
By chapter 55, section 1, of the laws of 2010:
For various new and existing flood protection projects including the
state share of federal sponsored flood control projects, and the
maintenance of existing flood control projects including personal
services and fringe benefits, including suballocation to other state
departments and agencies (09FL1063) (24881) ........................
1,000,000 ........................................... (re. $373,000)
338 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses for the state share of costs associated with
matching federal funds for a statewide flood plain map modernization
program, including suballocation to other state departments and
agencies (09FP1063) (24883) ... 834,000 ............. (re. $834,000)
By chapter 55, section 1, of the laws of 2009:
For the state's share including personal services, fringe benefits and
indirect costs of various shore protection projects including subal-
location to other state departments and agencies (09W10963) (24880)
... 1,000,000 ..................................... (re. $1,000,000)
For services and expenses for the state share of costs associated with
matching federal funds for a statewide flood plain map modernization
program, including suballocation to other state departments and
agencies (09FP0963) (24883) ... 834,000 ............. (re. $834,000)
By chapter 55, section 1, of the laws of 2008:
For services and expenses for the state share of costs associated with
matching federal funds for a statewide flood plain map modernization
program, including suballocation to other state departments and
agencies (09FP0863) (24883) ... 834,000 .............. (re. $95,000)
By chapter 55, section 1, of the laws of 2007:
For various dam safety projects (09FD0763) (24884) ...................
300,000 ............................................. (re. $261,000)
By chapter 55, section 1, of the laws of 2006:
For services and expenses for the state share of costs associated with
matching federal funds for a statewide flood plain map modernization
program, including suballocation to other state departments and
agencies (09FP0663) (24883) ... 834,000 ............. (re. $145,000)
By chapter 55, section 1, of the laws of 2005:
For the state's share including personal services, fringe benefits and
indirect costs of various shore protection projects including subal-
location to other state departments and agencies (09W10563) (24880)
... 800,000 ......................................... (re. $367,000)
By chapter 55, section 1, of the laws of 2004:
For the state's share including personal services, fringe benefits and
indirect costs of various shore protection projects including subal-
location to other state departments and agencies (09W10463) (24880)
... 1,000,000 ..................................... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2003:
For the state's share of federally funded flood control projects
including personal services, fringe benefits and indirect costs. No
portion of this appropriation shall be available until the federal
share of such projects is appropriated (09FC0363) (24723) ..........
2,359,000 ......................................... (re. $1,563,000)
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective county has entered into an agreement
339 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with the commissioner of the department of environmental conserva-
tion, and such agreement is approved by the director of the budget
(09AD0363) (24887) ... 895,000 ...................... (re. $150,000)
By chapter 54, section 1, of the laws of 2002:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective county has entered into an agreement
with the commissioner of the department of environmental conserva-
tion, and such agreement is approved by the director of the budget
(09AD0263) (24887) ... 1,955,000 .................... (re. $102,000)
By chapter 54, section 1, of the laws of 2001:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective county has entered into an agreement
with the commissioner of the department of environmental conserva-
tion, and such agreement is approved by the director of the budget
(09070163) (24887) ... 1,275,000 ...................... (re. $3,000)
By chapter 55, section 1, of the laws of 2000:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective county has entered into an agreement
with the commissioner of the department of environmental conserva-
tion, and such agreement is approved by the director of the budget
(09A10063) (24887) ... 1,275,000 ..................... (re. $38,000)
By chapter 55, section 1, of the laws of 1999:
For an advance payment by the state for the local costs of various
shore protection projects. No portion of this appropriation shall be
available until the respective county has entered into an agreement
with the commissioner of the department of environmental conserva-
tion, and such agreement is approved by the director of the budget
(09A29963) (24887) ... 880,000 ...................... (re. $374,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2009:
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and the Rockaway
Beach Nourishment Project (09W29963) (25892) .......................
3,750,000 ........................................... (re. $147,000)
By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2009:
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
Beach Nourishment Project (09W39863) (25889) .......................
490,000 ............................................. (re. $490,000)
340 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2010:
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and the Shinnecock
Inlet project including suballocation to the department of state
(09W49863) (25886) ... 2,183,000 .................... (re. $130,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter
108, section 5, of the laws of 2006:
For various dam safety projects (09009763) (24884) ...................
500,000 .............................................. (re. $72,000)
For costs associated with storm damage reduction and beach nourishment
projects on Long Beach Barrier Island in the communities of Point
Lookout and Lido Beach (09099763) (25893) ..........................
7,600,000 ......................................... (re. $7,600,000)
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 2009:
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
Beach nourishment project (09539463) (25889) .......................
840,000 ............................................. (re. $611,000)
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
shore monitoring systems (09A69463) (25895) ........................
1,400,000 ........................................... (re. $900,000)
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
sand bypassing projects at Asharoken Beach and the LILCO Jetties
(09A79463) (25894) ... 1,000,000 ..................... (re. $65,000)
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and sand bypassing
projects at the Long Island South Shore Inlets (09A19463) (25897)
... 1,450,000 ....................................... (re. $55,000)
For the state's share of shore protection projects including Shinne-
cock Inlet, coastal erosion of Coney Island, coastal erosion of
Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
evacuation route projects at Bayville, Rockaway and Long Beach
(09A49463) (25896) ... 2,000,000 .................. (re. $1,072,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
By chapter 54, section 1, of the laws of 2022:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
341 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
accordance with section 15-0507 of the environmental conservation
law (09DA2257) (24878) ... 500,000 .................. (re. $500,000)
For the expansion of the Huntington Station Sewer Treatment Center
Network, in the hamlet of Huntington Station in Suffolk County
(09HU2257) (62029) ... 22,000,000 ................ (re. $22,000,000)
For upgrades and improvements at North Tonawanda Wastewater Treatment
Plant in Niagara County (09TO2257) (62030) .........................
5,000,000 ......................................... (re. $5,000,000)
For the Great Neck Water Pollution Control District for the Manhasset
Sewer Installation Project (09MH2257) (62031) ......................
5,000,000 ......................................... (re. $5,000,000)
For payment of a portion of the state's match for federal capitaliza-
tion grants for the water pollution control revolving fund
(09RF2257) (24874) ... 55,000,000 ................ (re. $55,000,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the water pollution control revolving
fund and related water quality activities including suballocation to
other state departments and agencies (09SR2257) (25707) ............
5,500,000 ......................................... (re. $5,082,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the Excelsior Conservation Corps program
including suballocation to other state departments and agencies
(09CC2257) (25708) ... 200,000 ...................... (re. $200,000)
The sum of $500,000,000 is hereby appropriated for the costs of clean
water infrastructure projects, including services, expenses, and
indirect costs, including but not limited to the following: projects
as authorized by the New York state water infrastructure improvement
act of 2017; for New York state intermunicipal water infrastructure
projects pursuant to section 1285-s of the public authorities law;
for water quality improvement projects, including nonagricultural
nonpoint source abatement and control projects, municipal wastewater
treatment projects, and municipal separate storm sewer system
projects, and for the proper management of road salt; for green
infrastructure projects; for land acquisition projects, including
projects for source water protection pursuant to title 33 of article
15 of the environmental conservation law; for state assistance
payments, services, and expenses to soil and water conservation
districts for the cost of water quality protection projects awarded
on a competitive basis prioritizing financial need and hardship,
intended to assist concentrated animal feeding operations; for the
remediation of sites, including for investigation, mitigation and
remediation of solid waste sites, pursuant to titles 12 and 13 of
article 27 of the environmental conservation law and consistent with
the provisions of section 97-b of the state finance law, provided
however that no more than $5,000,000 of such appropriation may be
expended for investigation, mitigation and remediation of solid
waste sites; for replacement of lead drinking water service lines
pursuant to section 1114 of the public health law; for New York City
for water quality projects located within the New York City
watershed; for a program to upgrade or replace septic systems and
cesspools pursuant to section 1285-u of the public authorities law;
for water infrastructure emergency assistance pursuant to section
342 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
1285-t of the public authorities law; to support municipal water
quality infrastructure programs which may otherwise not qualify for
state support, or may require additional state support; for the
development of information technology systems related to water qual-
ity pursuant to section 3-0315 of the environmental conservation
law. All or a portion of the appropriation may be provided to the
environmental facilities corporation or suballocated to any other
department or state agency (09CW2257) (25722) ......................
500,000,000 ..................................... (re. $500,000,000)
By chapter 54, section 1, of the laws of 2021:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA2157) (24878) ... 500,000 .................. (re. $500,000)
For payment of a portion of the state's match for federal capitaliza-
tion grants for the water pollution control revolving fund
(09RF2157) (24874) ... 35,000,000 ................ (re. $35,000,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the water pollution control revolving
fund and related water quality activities including suballocation to
other state departments and agencies (09SR2157) (25707) ............
5,500,000 ......................................... (re. $2,985,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the Excelsior Conservation Corps program
including suballocation to other state departments and agencies
(09CC2157) (25708) ... 200,000 ...................... (re. $200,000)
The sum of $500,000,000 is hereby appropriated for the costs of clean
water infrastructure projects, including services, expenses, and
indirect costs, including but not limited to the following: projects
as authorized by the New York state water infrastructure improvement
act of 2017; for New York state intermunicipal water infrastructure
projects pursuant to section 1285-s of the public authorities law;
for water quality improvement projects, including nonagricultural
nonpoint source abatement and control projects, municipal wastewater
treatment projects, and municipal separate storm sewer system
projects, and for the proper management of road salt; for green
infrastructure projects; for land acquisition projects, including
projects for source water protection pursuant to title 33 of article
15 of the environmental conservation law; for state assistance
payments, services, and expenses to soil and water conservation
districts for the cost of water quality protection projects awarded
on a competitive basis prioritizing financial need and hardship,
intended to assist concentrated animal feeding operations; for the
remediation of sites pursuant to titles 12 and 13 of article 27 of
the environmental conservation law and consistent with the
provisions of section 97-b of the state finance law, provided howev-
er that no more than $5,000,000 of such appropriation may be
expended for investigation, mitigation and remediation of solid
waste sites; for replacement of lead drinking water service lines
pursuant to section 1114 of the public health law; for New York City
for water quality projects located within the New York City
343 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
watershed; for a program to upgrade or replace septic systems and
cesspools pursuant to section 1285-u of the public authorities law;
for water infrastructure emergency assistance pursuant to section
1285-t of the public authorities law; to support municipal water
quality infrastructure programs which may otherwise not qualify for
state support, or may require additional state support; for the
development of information technology systems related to water qual-
ity pursuant to section 3-0315 of the environmental conservation
law. All or a portion of the appropriation may be provided to the
environmental facilities corporation or suballocated to any other
department or state agency (09CW2157) (25722) ......................
500,000,000 ..................................... (re. $500,000,000)
By chapter 54, section 1, of the laws of 2020:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA2057) (24878) ... 500,000 .................. (re. $500,000)
For payment of a portion of the state's match for federal capitaliza-
tion grants for the water pollution control revolving fund
(09RF2057) (24874) ... 35,000,000 ................ (re. $35,000,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the water pollution control revolving
fund and related water quality activities including suballocation to
other state departments and agencies (09SR2057) (25707) ............
5,500,000 ......................................... (re. $2,958,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the Excelsior Conservation Corps program
including suballocation to other state departments and agencies
(09CC2057) (25708) ... 200,000 ...................... (re. $136,000)
The sum of $500,000,000 is hereby appropriated for the costs of clean
water infrastructure projects, including services, expenses, and
indirect costs, including but not limited to the following: projects
as authorized by the New York state water infrastructure improvement
act of 2017; for New York state intermunicipal water infrastructure
projects pursuant to section 1285-s of the public authorities law;
for water quality improvement projects, including nonagricultural
nonpoint source abatement and control projects, municipal wastewater
treatment projects, and municipal separate storm sewer system
projects, and for the proper management of road salt; for green
infrastructure projects; for land acquisition projects, including
projects for source water protection pursuant to title 33 of article
15 of the environmental conservation law; for state assistance
payments, services, and expenses to soil and water conservation
districts for the cost of water quality protection projects awarded
on a competitive basis prioritizing financial need and hardship,
intended to assist concentrated animal feeding operations; for the
remediation of sites pursuant to titles 12 and 13 of article 27 of
the environmental conservation law and consistent with the
provisions of section 97-b of the state finance law, provided howev-
er that no more than 5,000,000 of such appropriation may be expended
for investigation, mitigation and remediation of solid waste sites;
344 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
for replacement of lead drinking water service lines pursuant to
section 1114 of the public health law; for New York City for water
quality projects located within the New York City watershed; for a
program to upgrade or replace septic systems and cesspools pursuant
to section 1285-u of the public authorities law; for water infras-
tructure emergency assistance pursuant to section 1285-t of the
public authorities law; to support municipal water quality infras-
tructure programs which may otherwise not qualify for state support,
or may require additional state support; for the development of
information technology systems related to water quality pursuant to
section 3-0315 of the environmental conservation law. All or a
portion of the appropriation may be provided to the environmental
facilities corporation or suballocated to any other department or
state agency (09CW2057) (25722) ....................................
500,000,000 ..................................... (re. $497,539,000)
By chapter 54, section 1, of the laws of 2019:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1957) (24878) ... 500,000 .................. (re. $500,000)
For payment of a portion of the state's match for federal capitaliza-
tion grants for the water pollution control revolving fund
(09RF1957) (24874) ... 35,000,000 ................ (re. $35,000,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the water pollution control revolving
fund and related water quality activities including suballocation to
other state departments and agencies (09SR1957) (25707) ............
5,500,000 ......................................... (re. $2,742,000)
The sum of $500,000,000 is hereby appropriated for the costs of clean
water infrastructure projects, including services, expenses, and
indirect costs, including but not limited to the following: projects
as authorized by the New York state water infrastructure improvement
act of 2017; for New York state intermunicipal water infrastructure
projects pursuant to section 1285-s of the public authorities law;
for water quality improvement projects, including nonagricultural
nonpoint source abatement and control projects, municipal wastewater
treatment projects, and municipal separate storm sewer system
projects, and for the proper management of road salt; for green
infrastructure projects; for land acquisition projects, including
projects for source water protection pursuant to title 33 of article
15 of the environmental conservation law; for state assistance
payments, services, and expenses to soil and water conservation
districts for the cost of water quality protection projects awarded
on a competitive basis prioritizing financial need and hardship,
intended to assist concentrated animal feeding operations; for the
remediation of sites pursuant to titles 12 and 13 of article 27 of
the environmental conservation law and consistent with the
provisions of section 97-b of the state finance law, provided howev-
er that no more than 5,000,000 of such appropriation may be expended
for investigation, mitigation and remediation of solid waste sites;
for replacement of lead drinking water service lines pursuant to
345 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
section 1114 of the public health law; for New York City for water
quality projects located within the New York City watershed; for a
program to upgrade or replace septic systems and cesspools pursuant
to section 1285-u of the public authorities law; for water infras-
tructure emergency assistance pursuant to section 1285-t of the
public authorities law; to support municipal water quality infras-
tructure programs which may otherwise not qualify for state support,
or may require additional state support; for the development of
information technology systems related to water quality pursuant to
section 3-0315 of the environmental conservation law. All or a
portion of the appropriation may be provided to the environmental
facilities corporation or suballocated to any other department or
state agency (09CW1957) (25722) ....................................
500,000,000 ..................................... (re. $472,109,000)
By chapter 54, section 1, of the laws of 2018:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1857) (24878) ... 500,000 .................. (re. $500,000)
For payment of a portion of the state's match for federal capitaliza-
tion grants for the water pollution control revolving fund
(09RF1857) (24874) ... 35,000,000 ................. (re. $2,572,000)
For services and expenses including personal service, fringe benefits,
and nonpersonal service for the water pollution control revolving
fund and related water quality activities including suballocation to
other state departments and agencies (09SR1857) (25707) ............
5,500,000 ........................................... (re. $775,000)
By chapter 54, section 1, of the laws of 2017:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1757) (24878) ... 500,000 .................. (re. $500,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For the state's share of shore protection or coastal erosion projects,
including the Army Corp of Engineers South Shore of Staten Island
Project (09SI1757) (25721) ... 151,000,000 ...... (re. $125,986,000)
The sum of $2,500,000,000 is hereby appropriated for the capital costs
of clean water infrastructure projects, including services,
expenses, and indirect costs, as follows: not less than
$1,000,000,000 to the environmental facilities corporation for
projects authorized by the New York state water infrastructure
improvement act of 2017; not less than $150,000,000 to the environ-
mental facilities corporation for New York state intermunicipal
water infrastructure projects pursuant to section 1285-s of the
public authorities law; not less than $245,000,000 for water quality
improvement projects, including nonagricultural nonpoint source
abatement and control projects, municipal wastewater treatment
projects, and municipal separate storm sewer system projects, and
346 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including up to $25,000,000 of such amount for projects for the
proper management of road salt; up to $50,000,000 for green infras-
tructure projects; $110,000,000 for land acquisition projects for
source water protection pursuant to title 33 of article 15 of the
environmental conservation law, including suballocation to the
department of agriculture and markets; up to $50,000,000 for subal-
location to the department of agriculture and markets for state
assistance payments, services, and expenses to soil and water
conservation districts for the cost of water quality protection
projects awarded on a competitive basis prioritizing financial need
and hardship, intended to assist concentrated animal feeding oper-
ations; up to $130,000,000 for the remediation of sites pursuant to
titles 12 and 13 of article 27 of the environmental conservation law
and consistent with the provisions of section 97-b of the state
finance law, provided however that no more than $25,000,000 of such
appropriation may be expended for investigation, mitigation and
remediation of solid waste sites; not less than $20,000,000 for
suballocation to the department of health for replacement of lead
drinking water service lines pursuant to section 1114 of the public
health law; $200,000,000 for New York City for water quality
projects located within the New York City watershed; not less than
$75,000,000 to the environmental facilities corporation for a
program to upgrade or replace septic systems and cesspools pursuant
to section 1285-u of the public authorities law; up to $10,000,000
to the environmental facilities corporation for water infrastructure
emergency assistance pursuant to section 1285-t of the public
authorities law; $100,000,000 to the environmental facilities corpo-
ration to support municipal water quality infrastructure programs
which may otherwise not qualify for state support, or may require
additional state support; and up to $10,000,000 for the development
of information technology systems related to water quality pursuant
to section 3-0315 of the environmental conservation law including
suballocation to the department of health (09CW1757) (25722) .......
2,500,000,000 ................................. (re. $1,840,230,000)
By chapter 55, section 1, of the laws of 2016:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1657) (24878) ... 500,000 .................. (re. $500,000)
The sum of $200,000,000 is hereby appropriated over a multi-year peri-
od for the capital costs of water quality infrastructure projects as
authorized by the New York state water infrastructure improvement
act of 2015. Up to $100,000,000 shall be available from this appro-
priation in state fiscal year 2016-17, with no less than $10,000,000
available for water quality infrastructure projects for compliance
with environmental and public health laws and regulations related to
water quality; and up to an additional $100,000,000 shall be avail-
able in state fiscal year 2017-18, with no less than $10,000,000
available for water quality infrastructure projects for compliance
with environmental and public health laws and regulations related to
water quality. All or a portion of the funds may be suballocated or
347 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transferred to any department, agency, or public authority
(09WW1657) (25765) ... 200,000,000 ............... (re. $95,000,000)
By chapter 54, section 1, of the laws of 2015:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1557) (24878) ... 500,000 .................. (re. $500,000)
By chapter 54, section 1, of the laws of 2014:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1457) (24878) ... 500,000 .................. (re. $500,000)
By chapter 54, section 1, of the laws of 2013:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1357) (24878) ... 500,000 .................. (re. $500,000)
By chapter 54, section 1, of the laws of 2012:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA1257) (24878) ... 500,000 .................. (re. $500,000)
By chapter 55, section 1, of the laws of 2007:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA0757) (24878) ... 350,000 .................. (re. $349,000)
By chapter 55, section 1, of the laws of 2006:
An advance for costs incurred relating to work required for the safety
of dams and other structures impounding water, to be reimbursed in
accordance with section 15-0507 of the environmental conservation
law (09DA0657) (24878) ... 300,000 .................. (re. $300,000)
By chapter 54, section 1, of the laws of 1985, as amended by chapter 55,
section 1, of the laws of 2009:
For the state share of shore protection projects including Shinnecock
Inlet, coastal erosion of Coney Island, coastal erosion of Westhamp-
ton, West of Shinnecock, Orchard Beach and for removal of derelict
structures and other hazards along the New York harbor shoreline
under provisions of PL930251 water resources development act of 1974
(09168557) (24705) .................................. (re. $180,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
SRF Capitalization Grants Account - 31359
Water Resources Purpose
348 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For federal capitalization grants for the water pollution control
revolving fund (09SF2257) (24876) ..................................
383,500,000 ..................................... (re. $383,500,000)
By chapter 54, section 1, of the laws of 2021:
For federal capitalization grants for the water pollution control
revolving fund (09SF2157) (24876) ..................................
175,000,000 ..................................... (re. $175,000,000)
By chapter 54, section 1, of the laws of 2020:
For federal capitalization grants for the water pollution control
revolving fund (09SF2057) (24876) ..................................
175,000,000 ..................................... (re. $175,000,000)
By chapter 54, section 1, of the laws of 2019:
For federal capitalization grants for the water pollution control
revolving fund (09SF1957) (24876) ..................................
175,000,000 ..................................... (re. $175,000,000)
By chapter 54, section 1, of the laws of 2018:
For federal capitalization grants for the water pollution control
revolving fund (09SF1857) (24876) ..................................
175,000,000 ...................................... (re. $12,855,000)
WATER RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
Water Quality Improvement Projects
By chapter 54, section 1, of the laws of 2002:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project cost,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision 1 of
section 56-0303 of the environmental conservation law to enter into
contracts for state assistance payments for the state share of costs
for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision 1 of section
56-0303 of the environmental conservation law for state facility
349 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget. The state comptroller shall at the commencement of each
month certify to the director of the division of the budget, the
commissioner of environmental conservation, the chairman of the
senate finance committee, and the chairman of the assembly ways and
means committee the amounts disbursed from this appropriation for
"Clean Water Project Disbursements" for the month preceding such
certification (09BA0257) (24712) ... 46,918,000 ... (re. $3,899,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 1,334
Long Island Sound water quali-
ty improvement projects ........... 21,000
New York Harbor water quality
improvement projects ............... 1,142
Finger Lakes water quality
improvement projects ............... 3,372
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 7,500
State facility projects .............. 1,881
Municipal wastewater treatment
improvement projects and
municipal flood control
projects ........................... 2,575
Dam safety projects .................. 4,000
State parks projects ................. 1,814
Municipal parks projects and
historic preservation and
heritage area projects ............. 2,300
--------------
Total ............................. 46,918
==============
By chapter 54, section 1, of the laws of 2001:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project cost,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
350 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision 1 of
section 56-0303 of the environmental conservation law to enter into
contracts for state assistance payments for the state share of costs
for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision 1 of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09BA0157) (24712) ... 87,582,000 ................. (re. $8,299,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 2,800
Long Island Sound water quali-
ty improvement projects ........... 50,000
Lake Champlain water quality
improvement projects ............... 1,000
Onondaga Lake water quality
improvement projects ............... 9,912
New York Harbor water quality
improvement projects ............... 1,500
Finger Lakes water quality
improvement projects ............... 3,500
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 2,000
State facility projects .............. 1,400
Open space land conservation
projects ........................... 3,470
State parks projects ................. 4,000
Municipal parks projects and
historic preservation and
351 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
heritage area projects ............. 8,000
--------------
Total ............................. 87,582
==============
By chapter 55, section 1, of the laws of 2000:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project cost,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision 1 of
section 56-0303 of the environmental conservation law to enter into
contracts for state assistance payments for the state share of costs
for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision 1 of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09BA0057) (24712) ... 104,500,000 ................ (re. $8,879,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 2,000
Long Island Sound water quali-
ty improvement projects ........... 30,000
Lake Champlain water quality
improvement projects ............... 1,000
Onondaga Lake water quality
improvement projects .............. 15,000
New York Harbor water quality
352 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
improvement projects ............... 2,000
Finger Lakes water quality
improvement projects ............... 3,500
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 2,000
State facility projects .............. 2,500
Municipal wastewater treatment
improvement projects and
municipal flood control
projects ........................... 2,000
Dam safety projects .................. 2,000
Open space land conservation
projects .......................... 30,000
State parks projects ................. 4,500
Municipal parks projects and
historic preservation and
heritage area projects ............. 8,000
--------------
Total ............................ 104,500
==============
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision 1 of
section 56-0303 of the environmental conservation law to enter into
contracts for state assistance payments for the state share of costs
for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision 1 of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget. The state comptroller shall at the commencement of each
month certify to the director of the division of the budget, the
commissioner of environmental conservation, the chairman of the
senate finance committee, and the chairman of the assembly ways and
means committee the amounts disbursed from this appropriation for
353 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
"Clean Water Project Disbursements" for the month preceding such
certification (09B20057) (25888) ... 5,000,000 ...... (re. $176,000)
By chapter 55, section 1, of the laws of 1999:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project cost,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision one
of section 56-0303 of the environmental conservation law to enter
into contracts for state assistance payments for the state share of
costs for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision 1 of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09BA9957) (24712) ... 188,000,000 ................ (re. $4,550,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 4,000
Long Island Sound water quali-
ty improvement projects ........... 50,000
Lake Champlain water quality
improvement projects ............... 2,000
Onondaga Lake water quality
improvement projects .............. 20,000
New York Harbor water quality
improvement projects ............... 2,000
Great Lakes water quality
354 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
improvement projects ............... 1,000
Finger Lakes water quality
improvement projects ............... 7,000
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 7,000
State facility projects .............. 5,000
Municipal wastewater treatment
improvement projects and
municipal flood control
projects ........................... 2,000
Environmental compliance
assistance projects-water
quality ........................... 26,000
Dam safety projects .................. 2,000
Open space land conservation
projects .......................... 40,000
State parks projects ................ 10,000
Municipal parks projects and
historic preservation and
heritage area projects ............ 10,000
--------------
Total ............................ 188,000
==============
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements". The moneys appropriated herein may be suballocated
to all state departments and agencies. Further, moneys herein appro-
priated may be suballocated only to public authorities and public
benefit corporations specifically authorized by paragraph (1) of
subdivision 1 of section 56-0303 of the environmental conservation
law to enter into contracts for state assistance payments for the
state share of costs for clean water projects, provided however,
that moneys herein appropriated pursuant to paragraph (i) of subdi-
vision 1 of section 56-0303 of the environmental conservation law
for state facility projects may be suballocated to any public
authority or public benefit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability of the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
355 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09B29957) (25888) ... 8,000,000 .................. (re. $2,254,000)
By chapter 55, section 1, of the laws of 1998:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision one
of section 56-0303 of the environmental conservation law to enter
into contracts for state assistance payments for the state share of
costs for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision one of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09BA9857) (24712) ... 149,000,000 ................ (re. $2,313,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 5,000
Long Island Sound water quali-
ty improvement projects ........... 15,000
Lake Champlain water quality
improvement projects ............... 5,000
Onondaga Lake water quality
improvement projects .............. 20,000
New York Harbor water quality
356 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
improvement projects ............... 2,000
Great Lakes water quality
improvement projects ............... 2,000
Finger Lakes water quality
improvement projects ............... 5,000
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 5,000
State facility projects .............. 5,000
Municipal wastewater treatment
improvement projects and
municipal flood control
projects ........................... 6,000
Municipal wastewater treatment
improvement projects and
municipal flood control
projects .......................... 15,000
Environmental compliance
assistance projects-water
quality ............................ 2,000
Dam safety projects .................. 2,000
Open space land conservation
projects .......................... 40,000
State parks projects ................ 10,000
Municipal parks projects and
historic preservation and
heritage area projects ............ 10,000
--------------
Total ............................ 149,000
==============
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements". The moneys appropriated herein may be suballocated
to all state departments and agencies. Further, moneys herein appro-
priated may be suballocated only to public authorities and public
benefit corporations specifically authorized by paragraph (1) of
subdivision one of section 56-0303 of the environmental conservation
law to enter into contracts for state assistance payments for the
state share of costs for clean water projects, provided however,
that moneys herein appropriated pursuant to paragraph (i) of subdi-
vision one of section 56-0303 of the environmental conservation law
for state facility projects may be suballocated to any public
authority or public benefit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
357 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental conservation law upon the issuance of a certificate of
approval of availability of the director of the division of budget.
The state comptroller shall at the commencement of each month certi-
fy to the director of the division of the budget, the commissioner
of environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09B29857) (25888) ... 15,000,000 .................... (re. $77,000)
By chapter 55, section 1, of the laws of 1997:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements".
The moneys appropriated herein may be suballocated to all state
departments and agencies. Further, moneys herein appropriated may be
suballocated only to public authorities and public benefit corpo-
rations specifically authorized by paragraph (1) of subdivision one
of section 56-0303 of the environmental conservation law to enter
into contracts for state assistance payments for the state share of
costs for clean water projects, provided however, that moneys herein
appropriated pursuant to paragraph (i) of subdivision one of section
56-0303 of the environmental conservation law for state facility
projects may be suballocated to any public authority or public bene-
fit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09BA9757) (24712) ... 101,000,000 ................ (re. $3,695,000)
project schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Hudson River water quality
improvement projects ............... 2,000
Long Island Sound water quali-
358 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ty improvement projects ........... 14,000
Lake Champlain water quality
improvement projects ............... 2,000
Onondaga Lake water quality
improvement projects .............. 10,000
New York Harbor water quality
improvement projects ............... 3,000
Great Lakes water quality
improvement projects ............... 2,000
Finger Lakes water quality
improvement projects ............... 2,000
Peconic and South Shore Estu-
ary water quality improve-
ment projects ...................... 2,000
Other water bodies water qual-
ity improvement projects ........... 2,000
State facility projects .............. 5,000
Municipal wastewater treatment
improvement projects and
municipal flood control
projects .......................... 15,000
Environmental compliance
assistance projects-water
quality ............................ 2,000
Dam safety projects .................. 5,000
Open space land conservation
projects .......................... 20,000
State parks projects ................ 10,000
Municipal parks projects and
historic preservation and
heritage area projects ............. 5,000
--------------
Total ............................ 101,000
==============
By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
section 1, of the laws of 1998:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements". The moneys appropriated herein may be suballocated
to all state departments and agencies. Further, moneys herein appro-
priated may be suballocated only to public authorities and public
benefit corporations specifically authorized by paragraph (1) of
subdivision one of section 56-0303 of the environmental conservation
law to enter into contracts for state assistance payments for the
state share of costs for clean water projects, provided however,
that moneys herein appropriated pursuant to paragraph (i) of subdi-
359 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
vision one of section 56-0303 of the environmental conservation law
for state facility projects may be suballocated to any public
authority or public benefit corporation.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for clean water quali-
ty projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability of the director of the division of budget.
The state comptroller shall at the commencement of each month certi-
fy to the director of the division of the budget, the commissioner
of environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for "Clean Water
Project Disbursements" for the month preceding such certification
(09B29757) (25888) ... 10,000,000 ................... (re. $504,000)
By chapter 413, section 27, of the laws of 1996, as amended by chapter
55, section 1, of the laws of 1997:
For state assistance payments for the state share of the costs of
clean water projects in accordance with the provisions of title 3 of
article 56 of the environmental conservation law for project costs,
including costs incidental and appurtenant thereto and for payment
of reimbursements to the clean water/clean air implementation fund
for services and expenses of state departments and agencies, includ-
ing fringe benefits, hereinafter referred to as "Clean Water Project
Disbursements". The moneys appropriated herein may be suballocated
to the environmental facilities corporation, other state depart-
ments, agencies, and public authorities.
Notwithstanding the provisions of any general or special law, moneys
hereby appropriated shall be available for clean water quality
projects in accordance with title 3 of article 56 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget. The state comptroller at the commencement of each month
shall certify to the director of the division of the budget, the
commissioner of environmental conservation, the chairman of the
senate finance committee, and the chairman of the assembly ways and
means committee the amounts disbursed from this appropriation for
"Clean Water Project Disbursements" for the month preceding such
certification (09BA9657) (25888) ... 75,000,000 ... (re. $2,681,000)
WATER RESOURCES - EQBA (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
By chapter 54, section 1, of the laws of 1981, as amended by chapter 54,
section 1, of the laws of 2002:
For the state share of the costs of construction of water quality
improvement projects, including the payment of liabilities incurred
prior to April 1, 1981, in accordance with the provisions of title
360 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
three of article fifty-one of the environmental conservation law as
amended for projects included in the following schedule, including
costs incidental and appurtenant thereto, hereinafter referred to as
"Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
ability by the director of the division of the budget. The state
comptroller shall at the commencement of each month certify to the
director of the division of the budget, the commissioner of environ-
mental conservation, the chairman of the senate finance committee,
and the chairman of the assembly ways and means committee the
amounts disbursed from this appropriation for Water Quality Improve-
ment Disbursements for the month preceding such certification
(01387057) (24889) ... 27,190,300 ................... (re. $604,000)
project schedule
ESTIMATED ESTIMATED
ELIGIBLE STATE
COUNTY PROJECT PROJECT COST SHARE
-----------------------------------------------------------------------
(thousands)
Supplements to previous appro-
priations:
Allegany County
Village of Cuba .............................. $6,200 $775
Broome County
Village of Endicott .......................... 608 76
Town of Sanford .............................. 952 119
Chautauqua County
Village of Brocton ........................... 1,272 159
Ripley Sewer District ........................ 2,384 298
Chautauqua County ............................ 560 70
Columbia County
Village of Chatham ........................... 880 110
Erie County
Southtown's Sewage Treatment
Agency ..................................... 440 55
Village of Alden ............................. 1,808 195
City of Lackawanna ........................... 984 123
Village of Blasdell .......................... 4,600 548
Genesee
Village of Attica ............................ 3,480 435
Monroe County
Rochester Pure Waters District ............... 47,736 5,967
Nassau County
Nassau County Sewer District 3 ............... 11,920 1,490
New York City
City of New York: Newtown
361 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Creek Plant Upgrading ...................... 2,040 255
Niagara County
Village of Middleport ........................ 96 12
Oneida County
City of Sherrill ............................. 1,384 173
Onondaga County
Baldwinsville-Seneca Knolls
Sewer District ............................. 2,224 278
Nine Mile Creek .............................. 2,936 367
Orange County
Town of New Windsor .......................... 1,336 167
St. Lawrence County
City of Ogdensburg ........................... 696 87
Saratoga County
Village of South Glens Falls ................. 1,200 150
Seneca County
Seneca County Sewer District 1 .............. 4,200 525
Sullivan County
Town of Rockland ............................. 296 37
Town of Delaware ............................. 412 89
Tioga County
Village of Waverly ........................... 1,104 138
Village of Owego ............................. 1,408 176
Tompkins County
City of Ithaca ............................... 440 55
Yates County
Village of Penn Yan .......................... 1,720 215
--------- --------
Subtotal-Supplements ......................... $13,144
New Projects (In Planning and
Construction):
Albany County
City of Albany ............................... $360 $45
Cattaraugus County
Town of Olean ................................ 8 1
Clinton County
Clinton County Sludge Study .................. 1,040 130
Town of Black Brook .......................... 1,384 173
Cortland County
Village of McGraw ............................ 912 114
Delaware County
Village of Hancock ........................... 968 121
Village of Hobart ............................ 72 9
Fulton County
City of Gloversville ......................... 2,192 274
Genesee County
Batavia Sewer District 2 ..................... 72 9
Greene County
Town and Village of Catskill ................. 96 12
Town of Catskill ............................. 192 24
Herkimer County
362 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Village of Herkimer .......................... 304 38
Livingston County
Village of Avon .............................. 160 20
Madison County
Village of Hamilton .......................... 504 63
Monroe County
Town of Perinton ............................. 88 11
Rochester Pure Waters District ............... 1,528 191
Village of Spencerport ....................... 1,400 175
Town of Henrietta ............................ 56 7
Ontario County
City of Geneva ............................... 1,720 215
Onondaga County
Onondaga County/Syracuse
Metro ...................................... 10,776 1,347
Onondaga County (Ley Creek) .................. 56 7
Orange County
Town of Montgomery ........................... 728 91
Village of Montgomery ........................ 1,632 204
Orleans County
Town of Shelby ............................... 8 1
Town of Ridgeway ............................. 264 33
Putnam County
Putnam County ................................ 152 19
Rockland County
Village of Suffern ........................... 4,160 520
Seneca County
Village of Lodi .............................. 360 45
Town of Waterloo ............................. 144 18
St. Lawrence County
Town of Lawrence ............................. 200 25
Steuben County
Village of South Corning ..................... 808 101
Sullivan County
Town of Tusten ............................... 816 102
Town of Fallsburg ............................ 504 63
Tompkins County
Town of Newfield ............................. 384 48
Village of Dryden ............................ 1,000 125
Ulster County
Village of Ellenville ........................ 448 56
Town of Wawarsing ............................ 1,224 153
Town of Crawford ............................. 1,240 155
Town of Saugerties ........................... 5,912 702
Westchester County
Town of North Castle ......................... 1,408 176
Wyoming County
Village of Castile ........................... 40 5
--------
Subtotal-New Projects ........................ $5,628
Statewide
Supplement to various previously
363 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
scheduled projects ......................... $62,152 $7,684
Engineering studies, reports
and designs, various projects .............. 6,088 736
--------
Supplements .................................. $8,420
Grand Total Appropriation .................. $27,190
========
By chapter 54, section 3, of the laws of 1978, as amended by chapter 55,
section 1, of the laws of 2003, for:
The state share of the cost of construction of water quality improve
ment projects, including the payment of liabilities incurred prior
to April 1, 1978, in accordance with the provisions of title three
of article fifty-one of the environmental conservation law as
amended for projects included in the following schedule, including
costs incidental and appurtenant thereto, hereinafter referred to as
"Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
ability by the director of the division of the budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for Water Quality
Improvement Disbursements for the month preceding such certification
(01385957) (24889) ... 21,229,100 ................... (re. $525,000)
project schedule
ESTIMATED
ELIGIBLE ESTIMATED
PROJECT STATE
COUNTY OR CITY PROJECT COST SHARE
-----------------------------------------------------------------------
(thousands)
Supplements to previous appropriations:
Albany
Town of Guilderland .............................. $2,088 $261
Chautauqua
City of Jamestown ................................. 3,720 465
Chautauqua Lake Sewer District .................... 4,864 164
Delaware
Village of Hancock ................................ 4,984 623
Erie
Buffalo Sewer Authority ........................... 33,104 4,001
Towns of Aurora and Holland; Village of East
Aurora .......................................... 3,448 431
Southtown's Sewage Treatment Agency ............... 22,944 2,757
Niagara
364 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Village of Wilson ................................. 2,600 311
Ontario
Honeoye Lake Sewer District ....................... 1,664 208
Orange
Towns of Blooming Grove, Cornwall and New Wind-
sor ............................................. 1,104 138
Oswego
City of Fulton .................................... 4,680 585
Rensselaer
Town of Sand Lake ................................. 2,208 97
Rockland
Rockland County Sewer District No. 1 .............. 8,136 1,017
Suffolk
Suffolk County Sewer District No. 3 ............... 1,296 162
Sullivan
Town of Bethel .................................... 7,208 901
Westchester
Mamaroneck Sewer District ......................... 5,128 641
--------
Subtotal-Supplements .............................. $12,761
New Construction Projects:
Albany
Town of Coeymans .................................. $440 $55
Chautauqua
Village of Falconer ............................... 424 53
Clinton
Town of Peru ...................................... 1,072 134
Columbia
Town of Stockport ................................. 544 68
Erie
Buffalo Sewer Authority (Project C-36-915) ........ 768 96
City of Lackawanna ................................ 7,080 885
Genesee
Village of Elba ................................... 256 32
Greene
Town of Hunter and Village of Tannersville ........ 120 15
Jefferson
Village of Brownville ............................. 104 13
Town of Watertown ................................. 176 22
Madison
Town of Sullivan .................................. 72 9
Oneida
Town of Marcy ..................................... 144 18
Onondaga
Meadowbrook-Limestone Sewage Treatment Plant Ex-
pansion ......................................... 1,352 169
Morgan Road Sewer Agency .......................... 3,056 382
Ontario
Town of Farmington ................................ 408 51
Village of Holcomb ................................ 392 49
Orange
Village of Montgomery ............................. 1,576 197
365 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Town of Warwick and Village of Greenwood Lake ..... 48 6
Town of Woodbury .................................. 12,472 1,559
Otsego
City and Town of Oneonta .......................... 320 40
Village of Richfield Springs ...................... 15 2
Rensselaer
Town of Brunswick ................................. 128 16
Town of North Greenbush ........................... 152 19
Schoharie
Village of Richmondville .......................... 16 2
Schuyler
Town of Reading ................................... 384 48
Seneca
Towns of Romulus and Varick ....................... 304 38
Seneca County Sewer District No. 1 ................ 2,352 294
Village of Waterloo ............................... 1,368 171
Ulster
City of Kingston .................................. 2,744 343
New York City
City of New York: Area Sludge Study (C-36-1082) ... 9,608 1,118
--------
Subtotal-New Projects ............................. $5,904
New Projects (In Planning):
Albany
City of Cohoes .................................... $72 $9
Broome
Village of Endicott ............................... 144 18
Town of Sanford ................................... 16 2
Cattaraugus
City of Olean ..................................... 144 18
Village of Portville .............................. 64 8
Chautauqua
Town of Ellicott .................................. 32 4
Ripley Sewer District ............................. 152 19
Village of Sinclairville .......................... 16 2
Clinton
Town of Champlain ................................. 104 13
Town of Plattsburgh ............................... 788 99
Dutchess
Village of Pawling ................................ 192 24
Erie
Village of Akron .................................. 80 10
Town of Brant ..................................... 110 14
Buffalo Sewer Authority (Project C-36-1044) ....... 3,416 427
Buffalo Sewer Authority (Project C-36-1070) ....... 112 14
Buffalo Sewer Authority (Project C-36-1130) ....... 800 100
Village of Springville ............................ 104 13
Essex
Town of Port Henry ................................ 40 5
Town of Willsboro ................................. 80 10
Franklin
366 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Village of Tupper Lake ............................ 104 13
Fulton
City of Gloversville and Village of Johnstown ..... 360 45
Genesee
City of Batavia ................................... 560 70
Greene
Village of Coxsackie .............................. 160 20
Jefferson
Village of Deferiet ............................... 32 4
Lewis
Village of Castorland ............................. 8 1
Madison
Village of Chittenango ............................ 88 11
Monroe
Town of Brighton .................................. 32 4
Towns of Hamlin and Kendall ....................... 48 6
Montgomery
City of Amsterdam and Town of Amsterdam ........... 336 42
Nassau
Nassau County Sewer District No. 3 ................ 1,021 128
Oyster Bay Sewer District ......................... 256 32
West Long Beach Sewer District (Project C-36-
1043) ........................................... 1,984 248
Niagara
Town of Lewiston .................................. 88 11
Village of Middleport ............................. 136 17
Oneida
Town of Marcy ..................................... 552 69
County of Oneida, Pump Station, Sequoit Creek ..... 520 65
Onondaga
Village of Marcellus .............................. 224 28
Orange
Town of Warwick ................................... 264 33
Orleans
Village of Medina ................................. 376 47
Rensselaer
Village of Hoosick Falls .......................... 56 7
City of Rensselaer ................................ 56 7
Rockland
Village of Suffern ................................ 200 25
St. Lawrence
Village of Heuvelton .............................. 56 7
Village of Norwood ................................ 64 8
Saratoga
Village of South Glens Falls ...................... 104 13
Seneca
Town of Seneca Falls .............................. 528 66
Steuben
City of Corning ................................... 200 22
Suffolk
Village of Greenport and Town of Southold ......... 1,064 133
Town of Huntington ................................ 312 39
367 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Town of Southold .................................. 24 3
Sullivan
Towns of Callicoon and Delaware, and Village of
Jeffersonville (C-D-J) Joint Sewer Board ........ 40 5
Town of Delaware .................................. 72 9
Tompkins
Village of Lansing ................................ 104 13
Ulster
Town of Wawarsing ................................. 16 2
Town of Woodstock ................................. 120 15
Washington
Village of Fort Ann ............................... 32 4
Wayne
Village of Clyde .................................. 64 8
Village of Newark ................................. 128 16
Village of Lyons .................................. 40 5
Westchester
Town of Mount Pleasant ............................ 128 16
Yonkers Sewer District ............................ 728 91
Town of Yorktown .................................. 168 21
Wyoming
Village of Attica ................................. 280 35
Town of Bennington and Hamlet of Cowlesville ...... 24 3
Towns of Castile and Perry ........................ 288 36
New York City
City of New York: Newtown Creek Plant Upgrading
(C-36-713) ...................................... 2,008 251
--------
Subtotal-Projects In Planning ..................... $2,563
Grand Total of Appropriations ................. $21,229
========
By chapter 54, section 3, of the laws of 1977, as amended by chapter 54,
section 1, of the laws of 2002:
The state share of the cost of construction of water quality improve-
ment projects, including the payment of liabilities incurred prior
to April 1, 1977, in accordance with the provisions of title three
of article fifty-one of the environmental conservation law as
amended for projects included in the following schedule, including
costs incidental and appurtenant thereto, hereinafter referred to as
"Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
ability by the director of the division of the budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts expended from this appropriation for Water Quality
368 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Improvement Disbursements for the month preceding such certification
(01385757) (24889) ... 20,829,700 ................... (re. $415,000)
project schedule
ADDITIONAL
ESTIMATED ADDITIONAL
ELIGIBLE ESTIMATED
PROJECT STATE
COUNTY OR CITY PROJECT COST SHARE
-----------------------------------------------------------------------
(thousands)
Supplements to previous appropriations:
Chautauqua
City of Jamestown .............................. $3,824 $478
Erie
Southtown's sewage treatment agency ............ 8,128 880
Monroe
Town of Webster ................................ 5,560 695
Rochester pure waters district (project C-36-
745) ......................................... 80,736 10,092
Irondequoit Bay pure waters district ........... 352 44
South Central pure waters district ............. 1,112 139
Ontario
City of Canandaigua ............................ 4,640 580
Rockland
Rockland County sewer district No. 1 ........... 4,304 538
Saratoga
Saratoga County sewer district No. 1 ........... 1,864 ...
Sullivan
Town of Thompson, Village of Monticello ........ 4,344 543
Wayne
Town of Ontario ................................ 8 1
New York City
Oakwood Beach .................................. 23,424 2,928
---------
Subtotal-Supplements ........................... $16,909
---------
New Projects
Chautauqua
North Chautauqua Lake sewer district
(project C-36-913) ........................... $2,701 $338
Chenango
Village of Greene .............................. 43 6
Madison
Town of Lenox .................................. 1,700 213
Town of Sullivan, East Sullivan ................ 400 50
Oneida
Town of Verona, East Oneida Lake ............... 2,500 313
Otsego
Town of Oneonta ................................ 302 38
Suffolk
Suffolk County sewer district (project C-36-
369 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
1036) ........................................ 20,064 2,508
---------
Subtotal-New Projects .......................... $3,466
Step I Planning
Albany
Town of Bethlehem (C-36-1096) .................. $6
Chautauqua
Portland, Pomfret, Dunkirk Sewer District
(C-36-1097) .................................. 4
Chenango
Village of Sherburne (C-36-1051) ............... 8
Columbia
Village of Chatham (C-36-1101) ................. 4
Town of Kinderhook (C-36-1118) ................. 5
Cortland
Cortland County SA (C-36-1001) ................. 5
Delaware
Village of Hancock (C-36-874) .................. 5
Village of Stamford (C-36-1114) ................ 1
Erie
Town of Aurora (C-36-836) ...................... 26
Village of Blasdell (C-36-1012) ................ 25
Buffalo Sewer Authority (C-36-830) ............. 32
Essex
Village of Elizabethtown (C-36-1105) ........... 3
Franklin
St. Regis Mohawk Indian Reservation
(C-36-1111) .................................. 10
Genesee
Town of Pavilion (C-36-1078) ................... 2
Greene
Town of Catskill (C-36-1024) ................... 1
Herkimer
Town of West Winfield (C-36-1084) .............. 1
Jefferson
Village of Dexter (C-36-1005) .................. 1
LaFargeville, Town of Orleans (C-36-1119) ...... 4
Livingston
Village of Caledonia (C-36-1010) ............... 5
Town of Livonia (C-36-1088) .................... 3
Town of York (C-36-1011) ....................... 5
Madison
Town of Cazenovia (C-36-1092) .................. 3
Onondaga
Village of Skaneateles (C-36-1000) ............. 13
Ontario
Village of Rushville (C-36-1094) ............... 9
Oswego
City of Fulton (C-36-1009) ..................... 24
Rensselaer
Town of Schodack (C-36-1117) ................... 10
Rockland
370 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Town of Stony Point (C-36-993) ................. 10
St. Lawrence
Village of Waddington (C-36-1076) .............. 4
Saratoga
Town of Stillwater (C-36-1113) ................. 5
Schoharie
Village of Middleburgh (C-36-929) .............. 3
Village of Sharon Springs (C-36-1098) .......... 1
Seneca
Village of Seneca Falls (C-36-1102) ............ 7
Sullivan
Town of Bethel (C-36-1115) ..................... 10
Tioga
Town of Owego (C-36-1004) ...................... 3
Tompkins
City of Ithaca (C-36-1095) ..................... 42
Ulster
Town of Gardiner (C-36-1086) ................... 6
Town of Marlborough (C-36-1098) ................ 101
Town & Village of New Paltz (C-36-1087) ........ 12
Washington
Washington County SA (C-36-1021) ............... 28
Wayne
Village of Sodus (C-36-1091) ................... 3
Yates
Village of Penn Yan (C-36-1022) ................ 5
---------
Subtotal-Step I Planning ....................... $455
---------
Grand Total Appropriation .................... $20,830
=========
By chapter 54, section 5, of the laws of 1976, as amended by chapter 55,
section 1, of the laws of 2003, for:
The state share of the cost of construction of water quality improve
ment projects, including the payment of liabilities incurred prior
to April 1, 1976, in accordance with the provisions of title three
of article fifty-one of the environmental conservation law as
amended for projects included in the following schedule, including
costs incidental and appurtenant thereto, hereinafter referred to as
"Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
ability by the director of the division of the budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for Water Quality
371 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Improvement Disbursements for the month preceding such certification
(01385557) (24889) ... 45,543,700 ................... (re. $346,000)
project schedule
ADDITIONAL
ESTIMATED ADDITIONAL
ELIGIBLE ESTIMATED
PROJECT STATE
COUNTY OR CITY PROJECT COST SHARE
-----------------------------------------------------------------------
(thousands)
Supplements to previous appropriations:
Albany
Village of Green Island ....................... $424 $53
Chautauqua
So. Central Chautauqua Lake sewer district .... 3,592 449
Erie
Town of Grand Island .......................... 3,824 478
Southtown's Sewage Treatment Agency ........... 13,664 1,708
Herkimer
Herkimer County sewer district ................ 2,136 267
Madison
City of Oneida ................................ 2,208 276
Monroe
Rochester pure waters district (project C-36-
745) ........................................ 16,560 1,935
Town of Webster ............................... 288 36
Nassau
Recharge facility, Nassau Co. sewer district
No. 3 ....................................... 6,224 778
Niagara
Town of Niagara ............................... 2,432 304
Oneida
Village of Sylvan Beach ....................... 1,416 177
City of Utica ................................. 496 62
Onondaga
Baldwinsville--
Seneca Knolls sewer district .................. 4,032 504
Oak Orchard service area ...................... 3,744 468
Ontario
City of Canandaigua ........................... 904 113
Putnam
Town of Carmel, Lake Secor sewer district
No. 4 ....................................... 704 88
Rockland
Rockland County sewer district No. 1 .......... 9,600 1,200
Sullivan
Town of Thompson, Village of Monticello ....... 1,208 151
Wayne
Town of Williamson ............................ 2,424 303
Westchester
Blind Brook sewer district .................... 1,368 171
372 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Port Chester sewer district ................... 1,488 186
New York City
Coney Island .................................. 53,776 6,722
Oakwood Beach ................................. 20,864 2,608
Red Hook ...................................... 19,608 2,451
Statewide
Supplements to various previously scheduled
projects ................................... 157,864 19,171
---------
Subtotal--Supplements ........................... $40,659
---------
New Projects
Genesee
Town of Batavia, Sewer district No. 1 ......... $51 $7
Onondaga
Meadowbrook Trunk sewer ....................... 1,000 125
Statewide Engineering studies, reports and
designs, various projects ................... 38,584 4,764
---------
Subtotal--New Projects ........................ $4,896
---------
Grand Total Appropriation ................... $45,544
=========
By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
section 1, of the laws of 2002, for:
The state share of the cost of construction of water quality improve-
ment projects, including the payment of liabilities incurred prior
to April 1, 1975, in accordance with the provisions of title three
of article fifty-one of the environmental conservation law as
amended for projects included in the following schedule, including
costs incidental and appurtenant thereto, hereinafter referred to as
"Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
ability by the director of the division of the budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for Water Quality
Improvement Disbursements for the month preceding such certification
(00320557) (24889) ... 92,201,700 ................... (re. $460,000)
project schedule
ESTIMATED
ELIGIBLE ESTIMATED
373 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PROJECT STATE
COUNTY PROJECT COST SHARE
-----------------------------------------------------------------------
(thousands)
Supplements to previous appropriations
Albany
Village of Altamont ........................... $315 $39
Town of Guilderland ........................... 1,182 148
Village of Green Island ....................... 130 16
Cattaraugus
Village of Franklinville ...................... 205 26
Village of Limestone .......................... 50 7
Village of Little Valley ...................... 1,594 200
Chautauqua
So. Chautauqua Lake Sewer District ............ 422 53
Chautauqua Utility District ................... 2,080 260
Village of Fredonia ........................... 2,400 300
Town of Hanover ............................... 770 96
Village of Sherman ............................ 211 26
Chemung
Chemung County ................................ 27,770 3,471
Columbia
Town of Greenport ............................. 420 52
City of Hudson ................................ 24 3
Village of Philmont ........................... 449 57
Village of Valatie ............................ 161 20
Cortland
City of Cortland .............................. 64 8
Erie
Erie County Sewer District No. 4 .............. 6,352 794
Town of Amherst ............................... 65,184 8,148
Essex
Village of Ticonderoga ........................ 512 64
Franklin
Village of Chateaugay ......................... 28 4
Herkimer
Herkimer County Sewer District ................ 1,304 163
Jefferson
Village of Adams .............................. 490 62
City of Watertown ............................. 904 113
Lewis
Village of Croghan ............................ 26 3
Livingston
Village of Dansville .......................... 80 10
Madison
Cazenovia ..................................... 112 14
Monroe
City of Rochester ............................. 44,850 5,607
Montgomery
Montgomery County Sewer District No. 1 ........ 1,400 175
Niagara
Town of Newfane ............................... 670 84
374 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Niagara County Sewer District No. 1 ........... 1,880 235
City of North Tonawanda ....................... 126 16
Village of Youngstown, Town of Porter ......... 376 47
Town of Somerset, Village of Barker ........... 184 23
Oneida
Village of Clinton, Town of Kirkland .......... 1,497 187
City of Sherrill .............................. 450 57
Village of Sylvan Beach ....................... 4,877 610
Onondaga
Clay Sewer District ........................... 3,537 442
Village of Jordan ............................. 94 12
Limestone Sewer District ...................... 10 2
Baldwinsville Seneca Knolls Sewer District .... 1,992 249
Ontario
City of Canandaigua ........................... 845 106
Orange
Town of Goshen ................................ 48 6
Orleans
Village of Albion ............................. 2,428 304
Oswego
Village of Mexico ............................. 56 7
Town of Minetto ............................... 98 12
City of Oswego ................................ 1,656 207
Village of Phoenix ............................ 416 52
Otsego
Village of Milford ............................ 128 16
Putnam
Town of Carmel, Lake Secor Sewer District No.
4 ........................................... 625 79
Rensselaer
Village of Castleton-on-Hudson ................ 177 23
Town of East Greenbush ........................ 390 48
Town of North Greenbush ....................... 240 30
Rockland
Rockland County Sewer District No. 1 .......... 6,273 784
St. Lawrence
Village of Massena ............................ 455 57
City of Ogdensburg ............................ 144 18
Saratoga
Saratoga County Sewer District No. 1 .......... 1,820 184
Village of Schuylerville ...................... 447 55
Town and Village of Waterford ................. 1,722 216
Schuyler
Village of Watkins Glen ....................... 520 65
Steuben
Village of Wayland ............................ 217 28
Suffolk
Village of Ocean Beach ........................ 210 26
Sullivan
Village of Monticello, Town of Thompson ....... 1,471 184
Town of Fallsburg ............................. 15,336 1,917
375 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Village of Woodbridge ......................... 1,944 243
Tioga
Village of Owego .............................. 97 12
Village of Waverly ............................ 74 10
Tompkins
Village of Groton ............................. 39 5
Ulster
Town of Shawangunk ............................ 2,135 267
Wayne
Town of Marion ................................ 165 21
Town of Williamson ............................ 4,960 620
Westchester
Blind Brook Sewer District .................... 7,215 902
Ossining Sewer District ....................... 10,221 1,278
Port Chester Sewer District ................... 1,800 225
Wyoming
Village of Warsaw ............................. 110 14
New York City
Coney Island .................................. 1,584 198
Oakwood Beach ................................. 7,229 904
--------
Subtotal Supplements .......................... $31,026
New Projects
Albany
City of Albany ................................ $280 $35
Allegany
Village of Bolivar ............................ 904 113
Broome
City of Binghamton ............................ 10,952 1,330
Cattaraugus
Village of Allegany ........................... 1,560 191
Cayuga
City of Auburn ................................ 70 9
Village and Town of Union Springs ............. 2,118 265
Chautauqua
City of Jamestown ............................. 6,136 665
City of Jamestown ............................. 4,000 500
Village of Brocton ............................ 1,200 150
Chenango
City of Norwich ............................... 3,000 375
Dutchess
Tri-Municipal Sewer District .................. 16,840 2,105
Erie
Village of Alden .............................. 1,870 234
Village of Gowanda ............................ 3,017 377
City of Lackawanna ............................ 4,000 500
Southtowns .................................... 40,335 5,042
Greene
Town of New Baltimore ......................... 830 104
Herkimer
Town of Webb .................................. 400 50
Livingston
376 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Village of Geneseo ............................ 900 113
Madison
Village of Canastota .......................... 2,577 322
Monroe
City of Rochester, West Side .................. 152,560 19,070
Village of Honeoye Falls ...................... 296 37
Town of Victor, Town of Mendon ................ 1,240 155
Nassau
Sewer District No. 2, Bay Park ................ 150,000 18,750
Wantaugh Recharge Sewer District No. 3 ........ 14,803 1,850
Niagara
City of Lockport .............................. 600 75
Village of Wilson ............................. 1,360 170
Oneida
Starch Factory Creek .......................... 2,356 295
Town of Kirkland .............................. 40 5
Onondaga
Nine Mile Creek ............................... 6,700 837
Ontario
Canandaigua Lake Sewer District ............... 2,695 337
Otsego
Village of Cooperstown ........................ 24 3
Oswego
Village of Parish ............................. 470 59
Orange
Sewer District No. 2 .......................... 800 100
Town of Newburgh .............................. 784 98
Putnam
Town of Putnam Valley ......................... 112 14
Rensselaer
Town of Sand Lake ............................. 2,823 353
Schenectady
Town of Niskayuna ............................. 480 60
Town of Rotterdam ............................. 3,968 496
Seneca
Village of Interlaken ......................... 88 11
Suffolk
Port Jefferson Sewer District ................. 9,184 1,148
Town of Riverhead ............................. 3,664 458
Sullivan
Village of Liberty ............................ 4,700 547
Town of Liberty ............................... 1,528 191
Ulster
Town of Esopus ................................ 3,000 375
Village of Rosendale .......................... 778 97
Warren
Village of Lake George ........................ 955 119
Warren County Sewer District .................. 1,760 182
Washington
Village of Cambridge .......................... 48 6
Westchester
Irvington Extension ........................... 1,552 194
377 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Mamaroneck Sewer District ..................... 20,000 2,500
Town of North Castle, Armonk Sewer District ... 1,500 188
Town of Greenburgh ............................ 208 26
--------
Subtotal New Projects ........................... $61,176
--------
Grand Total Appropriations .................... $92,202
========
WATER RESOURCES - PWBA (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
Water Quality Improvements
By chapter 55, section 1, of the laws of 2003:
For water resources purposes, shall be available for the state share
of the costs of water quality improvement projects, as defined in
section 56-0101 of the environmental conservation law, to implement
the Long Island Sound Comprehensive Conservation Management Plan
consistent with paragraph (b) of subdivision 1 of section 56-0303 of
the environmental conservation law, and to implement wastewater
treatment improvement projects in small upstate communities
(09650357) (24890) ... 8,168,000 .................... (re. $543,000)
By chapter 54, section 1, of the laws of 2002:
For water resources purposes, shall be available for the state share
of the costs of water quality improvement projects, as defined in
section 56-0101 of the environmental conservation law, to implement
the Long Island Sound Comprehensive Conservation Management Plan
consistent with paragraph (b) of subdivision 1 of section 56-0303 of
the environmental conservation law, and to implement wastewater
treatment improvement projects in small upstate communities
(09650257) (24890) ... 4,900,000 .................... (re. $668,000)
By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
section 1, of the laws of 2002:
For the state share of the costs of construction of water quality
improvement projects, including the payment of liabilities incurred
prior to April 1, 1990, in accordance with the provisions of title 3
of article 51 of the environmental conservation law as amended, to
provide state matching funds for projects scheduled to receive
construction grants from federal fiscal years 1989 and 1990 funds,
including costs incidental and appurtenant thereto, hereinafter
referred to as "Water Quality Improvement Disbursements."
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for eligible water quality improvement
projects as defined by section 51-0303 of the environmental conser-
vation law upon the issuance of a certificate of approval of avail-
378 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ability by the director of the division of the budget. No such
certificates of approval of availability shall be issued for or
include funds for projects which have not received a federal grant
for the construction of sewage treatment related facilities.
Notwithstanding the provisions of any general or special law, the
amounts hereby appropriated shall have all disbursements reimbursed
from the Pure Waters Bond Act proceeds authorizations and are
contingent upon the partial repeal of existing capital projects fund
authorizations elsewhere in this chapter. The state comptroller
shall at the commencement of each month certify to the director of
the division of the budget, the commissioner of environmental
conservation, the chairman of the senate finance committee, and the
chairman of the assembly ways and means committee the amounts
disbursed from this appropriation for Water Quality Improvement
Disbursements for the month preceding such certification (09019057)
(24891) ... 4,609,600 ............................. (re. $1,466,000)
By chapter 54, section 1, of the laws of 1988, as amended by chapter 55,
section 1, of the laws of 2003:
For the state share of the costs of construction of water quality
improvement projects, including the payment of liabilities incurred
prior to April 1, 1988, in accordance with the provisions of title 3
of article 51 of the environmental conservation law as amended, to
provide a reserve to supplement or fund additional phases of
projects previously appropriated and scheduled on or after May 12,
1965.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for any project scheduled in appropriation
bills on or after May 12, 1965.
Notwithstanding the provisions of any general or special law, the
amounts hereby appropriated shall be made available from the Pure
Waters Bond Act authorizations and are contingent upon the repeal of
existing authorizations elsewhere in this chapter.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall not be made available until the
director of the division of the budget issues a certificate of
approval of availability with a schedule of approved and previously
authorized projects for which such funds shall be used. No such
certificates of approval of availability shall be issued for or
include funds for projects which have not received a federal grant
for the construction of sewage treatment related facilities. The
state comptroller shall at the commencement of each month certify to
the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for Water Quality
Improvement Disbursements for the month preceding such certification
(09P28857) (24891) ... 11,690,000 ................... (re. $718,000)
By chapter 54, section 1, of the laws of 1984, as amended by chapter 55,
section 1, of the laws of 2006:
379 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the state share of the costs of construction of water quality
improvement projects, including the payment of liabilities incurred
prior to April one, nineteen hundred eighty-four, in accordance with
the provisions of title three of article fifty-one of the environ-
mental conservation law as amended, for projects previously appro-
priated and scheduled on or after April one, nineteen hundred seven-
ty-two.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for water quality
improvement expenditures for any project scheduled in appropriation
bills on or after April one, nineteen hundred seventy-two.
Notwithstanding the provisions of any general or special law, the
amounts hereby appropriated shall be made available from the Pure
Water Bond Act authorizations and are contingent upon the repeal of
existing authorizations elsewhere in this chapter.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall not be made available until the
director of the division of the budget issues a certificate of
approval of availability with a schedule of approved and previously
authorized projects for which such funds shall be used. No such
certificates of approval of availability shall be issued for or
include funds for projects which have not received a federal grant
for the construction of sewage treatment related facilities
(09178457) (24891) ... 56,869,200 ................... (re. $913,000)
By chapter 79, section 14, of the laws of 1970, as amended by chapter
55, section 1, of the laws of 2006:
Notwithstanding the provisions of chapter 657 of the laws of 1982 to
the contrary, the sum of two hundred eighty million nine hundred
thirty-four thousand dollars ($280,934,000), or so much thereof as
may be necessary, is hereby appropriated from the Capital Projects
Fund to the department of environmental conservation for the payment
of the nonmunicipal share of the cost of construction of sewage
treatment works in the manner and to the extent specified in section
17-1903 of the Environmental Conservation Law.
Notwithstanding the provisions of any general or special law, no part
of this appropriation made hereby shall be available until a certif-
icate of approval of availability shall have been issued by the
director of the budget and a copy of such certificate filed with the
state comptroller, the chairman of the senate finance committee and
the chairman of the assembly ways and means committee.
Such certificate may be amended from time to time by the director of
the budget and a copy of each such amendment shall be filed with the
state comptroller, the chairman of the senate finance committee and
the chairman of the assembly ways and means committee (01385357)
(24892) ... 272,873,100 ........................... (re. $1,101,000)
By chapter 177, section 5, of the laws of 1965, as amended by chapter
55, section 1, of the laws of 2003:
The sum of two hundred eighty-six million three hundred thirty-four
thousand dollars ($286,334,000), or so much thereof as may be neces-
sary, is hereby appropriated from the Capital Projects Fund to the
380 12554-05-3
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
department of environmental conservation for the payment of the
nonmunicipal share of the cost of construction of sewage treatment
works in the manner and to the extent specified in section 17-1903
of the Environmental Conservation Law.
Notwithstanding the provisions of any general or special law, no part
of the appropriation made hereby shall be available until a certif-
icate of approval of availability shall have been issued by the
director of the budget and a copy of such certificate filed with the
state comptroller, the chairman of the senate finance committee and
the chairman of the assembly ways and means committee. Such certif-
icate may be amended from time to time by the director of the budget
and a copy of each such amendment shall be filed with the state
comptroller, the chairman of the senate finance committee and the
chairman of the assembly ways and means committee (01385057) (24892)
... 278,484,000 .................................... (re. $630,000)
381 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 110,114,000 488,765,000
---------------- ----------------
All Funds ........................ 110,114,000 488,765,000
================ ================
CHILD CARE CAPITAL PROGRAM .................................. 50,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For the comprehensive construction programs,
purposes and projects as herein specified
in accordance with the following: For
payment to the dormitory authority of the
state of New York for services and
expenses relating to the design,
construction, reconstruction, rehabili-
tation, improvement, furnishing, or equip-
ping of new facilities and alterations and
improvements to existing facilities for
capital maintenance, including but not
limited to capital design, construction,
reconstruction, rehabilitation, and equip-
ment for facilities for eligible child
care providers, as defined in the applica-
tion. The dormitory authority shall have
power to enter into a design and
construction management agreement with the
office of children and family services,
pursuant to which one or more facilities
are to be designed, constructed, recon-
structed, rehabilitated, improved,
furnished or equipped for such office. Any
such design and construction management
agreement entered into pursuant to this
appropriation shall provide for the
following: the scope of design and
construction management services to be
provided by the dormitory authority, the
manner in which those services will be
provided, the fees to be charged by the
authority and the sources of funds for the
382 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2023-24
projects. Notwithstanding any other law to
the contrary, all or a portion of the
amounts hereby appropriated may be subal-
located or transferred to the dormitory
authority of the state of New York for
such purpose (25CC23CC) ..................... 50,000,000
DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................... 7,000,000
--------------
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Preparation of Plans Purpose
For payment of design and construction
management account of the centralized
services fund of the New York state office
of general services or to the dormitory
authority of the state of New York for the
purpose of preparation and review of
plans, specifications, estimates,
services, construction management and
supervision, inspection studies,
appraisals, surveys, testing and environ-
mental impact statements and for the cost
of consultant design service (25GS2330)
(81088) ...................................... 7,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 6,392,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (25FM23MO)
(81107) ...................................... 6,392,000
MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP) ....... 28,722,000
--------------
Capital Projects Funds - Other
383 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2023-24
Capital Projects Fund - 30000
Administration Purpose
For the preparation and review of plans,
specifications, estimates, studies,
inspections, appraisals and surveys, and
payment of personal service and nonper-
sonal service, including fringe benefits
and indirect costs related to the adminis-
tration and security of capital projects
provided by the office of children and
family services for new and reappropriated
projects (25AD2350) (14041) .................... 897,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For alterations and improvements to youth
facilities, including the preparation of
designs, plans, specifications, and esti-
mates for the preservation of existing
facilities and programs, including liabil-
ities incurred prior to April 1, 2023
(25GM2303) (14021) ........................... 1,725,000
For the cost of maintaining the Tonawanda
Indian Community House pursuant to chapter
549 of the laws of 1936 (25T32303) (14022) ..... 100,000
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Environmental Protection or Improvements Purpose
For payment of the cost of construction,
reconstruction and improvements, including
the preparation of designs, plans, spec-
ifications and estimates for environmental
protection or improvements at various
youth facilities, including liabilities
incurred prior to April 1, 2023 (25EN2306)
(14043) ...................................... 5,000,000
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Health and Safety Purpose
For payment of the cost of construction,
reconstruction and improvements, including
384 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2023-24
the preparation of designs, plans, spec-
ifications and estimates, for health and
safety improvements to existing youth
facilities and programs, including liabil-
ities incurred prior to April 1, 2023
(25012301) (14042) ........................... 6,000,000
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Preservation of Facilities Purpose
For payment of the cost of construction,
reconstruction and improvements, including
the preparation of designs, plans, spec-
ifications, and estimates for the preser-
vation of existing facilities and
programs, including liabilities incurred
prior to April 1, 2023 (25032303) (14023) ... 15,000,000
PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP) ................. 18,000,000
--------------
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Program Improvement or Program Change Purpose
For payment of the cost of construction,
reconstruction, security and other
improvements, including the preparation of
designs, plans, specifications and esti-
mates related to improvements or changes
to existing facilities or programs,
including liabilities incurred prior to
April 1, 2023 (25082308) (14051) ............ 18,000,000
385 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
CHILD CARE CAPITAL PROGRAM
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the comprehensive construction programs, purposes and projects as
herein specified in accordance with the following: For payment to
the dormitory authority of the state of New York for services and
expenses relating to the design, construction, reconstruction, reha-
bilitation, improvement, furnishing, or equipping of new facilities
and alterations and improvements to existing facilities for capital
maintenance, including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment for
facilities for eligible child care providers, as defined in the
application. The dormitory authority shall have power to enter into
a design and construction management agreement with the office of
children and family services, pursuant to which one or more facili-
ties are to be designed, constructed, reconstructed, rehabilitated,
improved, furnished or equipped for such office. Any such design and
construction management agreement entered into pursuant to this
appropriation shall provide for the following: the scope of design
and construction management services to be provided by the dormitory
authority, the manner in which those services will be provided, the
fees to be charged by the authority and the sources of funds for the
projects. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the dormitory authority of the state of New York for
such purpose (25CC22CC)(60581) .....................................
50,000,000 ....................................... (re. $50,000,000)
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection studies, appraisals, surveys, testing and environmental
impact statements and for the cost of consultant design service
(25GS2230) (81088) ... 7,000,000 .................. (re. $7,000,000)
By chapter 54, section 1, of the laws of 2021:
386 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection studies, appraisals, surveys, testing and environmental
impact statements and for the cost of consultant design service
(25GS2130) (81088) ... 7,000,000 .................. (re. $5,501,000)
By chapter 54, section 1, of the laws of 2020:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection studies, appraisals, surveys, testing and environmental
impact statements and for the cost of consultant design service
(25GS2030) (81088) ... 7,000,000 .................. (re. $7,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1930) (81088) ... 7,000,000 .......... (re. $1,586,000)
By chapter 54, section 1, of the laws of 2018:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1830) (81088) ... 7,000,000 .......... (re. $3,949,000)
By chapter 54, section 1, of the laws of 2017:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1730) (81088) ... 7,000,000 .......... (re. $7,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
387 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1630) (81088) ... 7,000,000 .......... (re. $2,067,000)
By chapter 54, section 1, of the laws of 2015:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1530) (81088) ... 7,000,000 ............ (re. $648,000)
By chapter 54, section 1, of the laws of 2014:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1430) (81088) ... 7,000,000 .......... (re. $3,699,000)
By chapter 54, section 1, of the laws of 2013:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1330) (81088) ... 7,000,000 ............ (re. $187,000)
By chapter 54, section 1, of the laws of 2012:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1230) (81088) ... 7,000,000 .......... (re. $3,573,000)
By chapter 54, section 1, of the laws of 2011:
For payment of design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection studies, appraisals, surveys, testing and envi-
ronmental impact statements and for the cost of consultant design
service (25GS1130) (81088) ... 7,000,000 .......... (re. $3,559,000)
388 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (25FM22MO) (81107) .....
5,871,000 ......................................... (re. $4,085,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (25FM21MO) (81107) .....
5,754,000 ......................................... (re. $1,263,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (25FM20MO) (81107) .........
5,754,000 ........................................... (re. $863,000)
By chapter 54, section 1, of the laws of 2019:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (25FM19MO) (81107) .........
5,754,000 ............................................ (re. $68,000)
MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 54, section 1, of the laws of 2022:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
389 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
services for new and reappropriated projects (25AD2250) (14041) ....
894,000 ............................................. (re. $659,000)
By chapter 54, section 1, of the laws of 2021:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25AD2150) (14041) ....
874,000 ............................................. (re. $112,000)
By chapter 54, section 1, of the laws of 2020:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25AD2050) (14041) ....
874,000 .............................................. (re. $49,000)
By chapter 54, section 1, of the laws of 2019:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25AD1950) (14041) ....
874,000 ............................................... (re. $3,000)
By chapter 54, section 1, of the laws of 2018:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25AD1850) (14041) ....
874,000 .............................................. (re. $58,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2022 (25GM2203) (14021) ...........
1,725,000 ......................................... (re. $1,649,000)
390 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T32203) (14022) .....
100,000 .............................................. (re. $91,000)
By chapter 54, section 1, of the laws of 2021:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2021 (25GM2103) (14021) ...........
1,725,000 ......................................... (re. $1,256,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T32103) (14022) .....
100,000 ............................................. (re. $100,000)
By chapter 54, section 1, of the laws of 2020:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2020 (25GM2003) (14021) ...........
1,725,000 ......................................... (re. $1,254,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T32003) (14022) .....
100,000 ............................................. (re. $100,000)
By chapter 54, section 1, of the laws of 2019:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2019 (25GM1903) (14021) ...........
1,725,000 ........................................... (re. $458,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31903) (14022) .....
100,000 .............................................. (re. $64,000)
By chapter 54, section 1, of the laws of 2018:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2018 (25GM1803) (14021) ...........
1,725,000 ........................................... (re. $643,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31803) (14022) .....
100,000 ............................................... (re. $5,000)
By chapter 54, section 1, of the laws of 2017:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2017 (25GM1703) (14021) ...........
1,725,000 ........................................... (re. $682,000)
391 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31703) (14022) .....
100,000 .............................................. (re. $63,000)
By chapter 55, section 1, of the laws of 2016:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2016 (25GM1603) (14021) ...........
1,725,000 ........................................... (re. $372,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31603) (14022) .....
100,000 .............................................. (re. $58,000)
By chapter 54, section 1, of the laws of 2015:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2015 (25GM1503) (14021) ...........
1,725,000 ........................................... (re. $437,000)
By chapter 54, section 1, of the laws of 2014:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2014 (25GM1403) (14021) ...........
1,725,000 ......................................... (re. $1,237,000)
By chapter 54, section 1, of the laws of 2013:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2013 (25GM1303) (14021) ...........
1,725,000 ........................................... (re. $901,000)
By chapter 54, section 1, of the laws of 2012:
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31203) (14022) .....
100,000 ............................................. (re. $100,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2012 (25GM1203) (14021) ...........
1,725,000 ........................................... (re. $423,000)
By chapter 54, section 1, of the laws of 2011:
392 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2011 (25GM1103) (14021) ...........
1,725,000 ........................................... (re. $414,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T31103) (14022) .....
100,000 .............................................. (re. $51,000)
By chapter 53, section 1, of the laws of 2010:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2010 (25GM1003) (14021) ...........
1,725,000 ......................................... (re. $1,725,000)
By chapter 53, section 1, of the laws of 2009:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2009 (25GM0903) (14021) ...........
1,500,000 ......................................... (re. $1,500,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T30903) (14022) .....
325,000 ............................................. (re. $325,000)
By chapter 53, section 1, of the laws of 2008:
For alterations and improvements to youth facilities, including the
preparation of designs, plans, specifications, and estimates for the
preservation of existing facilities and programs, including liabil-
ities incurred prior to April 1, 2008 (25GM0803) (14021) ...........
1,500,000 ......................................... (re. $1,500,000)
For the cost of maintaining the Tonawanda Indian Community House
pursuant to chapter 549 of the laws of 1936 (25T30803) (14022) .....
325,000 ............................................. (re. $325,000)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Administration Purpose
By chapter 54, section 1, of the laws of 2017:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25ST1750) (14041) ....
874,000 ............................................. (re. $385,000)
393 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2015:
For the preparation and review of plans, specifications, estimates,
studies, inspections, appraisals and surveys, and payment of
personal service and nonpersonal service, including fringe benefits
and indirect costs related to the administration and security of
capital projects provided by the office of children and family
services for new and reappropriated projects (25ST1550) (14041) ....
850,000 ............................................. (re. $309,000)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Environmental Protection or Improvements Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2022 (25EN2206) (14043) .........................................
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2021 (25EN2106) (14043) ... 5,000,000 .......... (re. $4,705,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2020 (25EN2006) (14043) ... 5,000,000 .......... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2019 (25EN1906) (14043) ... 5,000,000 .......... (re. $2,381,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2018 (25EN1806) (14043) ... 5,000,000 .......... (re. $2,859,000)
394 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2017 (25EN1706) (14043) ... 5,000,000 .......... (re. $5,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2016 (25EN1606) (14043) ... 5,000,000 .......... (re. $1,940,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2015 (25EN1506) (14043) ... 5,000,000 .......... (re. $4,930,000)
By chapter 54, section 1, of the laws of 2014:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2014 (25EN1406) (14043) ... 5,000,000 .......... (re. $4,477,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2013 (25EN1306) (14043) ... 5,000,000 .......... (re. $2,864,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2012 (25EN1206) (14043) ... 5,000,000 .......... (re. $2,874,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2011 (25EN1106) (14043) ... 5,000,000 .......... (re. $5,000,000)
395 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2010:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection or improvements at vari-
ous youth facilities, including liabilities incurred prior to April
1, 2010 (25EN1006) (14043) ... 5,000,000 .......... (re. $5,000,000)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2022 (25012201) (14042) ...................................
6,000,000 ......................................... (re. $5,180,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2021 (25012101) (14042) ... 6,000,000 .... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2020 (25012001) (14042) ... 6,000,000 .... (re. $5,300,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2019 (25011901) (14042) ... 6,000,000 .... (re. $1,958,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2018 (25011801) (14042) ... 6,000,000 .... (re. $5,052,000)
By chapter 54, section 1, of the laws of 2017:
396 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2017 (25011701) (14042) ... 6,000,000 .... (re. $6,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2016 (25011601) (14042) ... 6,000,000 .... (re. $1,892,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2015 (25011501) (14042) ... 6,000,000 ...... (re. $831,000)
By chapter 54, section 1, of the laws of 2014:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2014 (25011401) (14042) ... 6,000,000 .... (re. $4,858,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2013 (25011301) (14042) ... 6,000,000 .... (re. $3,158,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2012 (25011201) (14042) ... 6,000,000 ...... (re. $383,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2011 (25011101) (14042) ... 6,000,000 .... (re. $3,341,000)
By chapter 53, section 1, of the laws of 2010:
397 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing youth
facilities and programs, including liabilities incurred prior to
April 1, 2010 (25011001) (14042) ... 6,000,000 .... (re. $6,000,000)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2022
(25032203) (14023) ... 7,000,000 .................. (re. $7,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2021
(25032103) (14023) ... 7,000,000 .................. (re. $6,089,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2020
(25032003) (14023) ... 7,000,000 .................. (re. $7,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2019
(25031903) (14023) ... 7,000,000 .................. (re. $5,117,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2018
(25031803) (14023) ... 7,000,000 .................... (re. $723,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
398 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
programs, including liabilities incurred prior to April 1, 2017
(25031703) (14023) ... 7,000,000 .................. (re. $7,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2016
(25031603) (14023) ... 7,000,000 .................. (re. $1,382,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2015
(25031503) (14023) ... 7,000,000 .................... (re. $295,000)
By chapter 54, section 1, of the laws of 2014:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2014
(25031403) (14023) ... 7,000,000 .................. (re. $4,916,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2013
(25031303) (14023) ... 7,000,000 .................. (re. $3,620,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2012
(25031203) (14023) ... 7,000,000 .................... (re. $481,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
programs, including liabilities incurred prior to April 1, 2011
(25031103) (14023) ... 7,000,000 .................. (re. $5,594,000)
By chapter 53, section 1, of the laws of 2010:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications,
and estimates for the preservation of existing facilities and
399 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
programs, including liabilities incurred prior to April 1, 2010
(25031003) (14023) ... 7,000,000 .................. (re. $7,000,000)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new and
existing capital projects and programs including, but not limited
to, preparation of plans, administration, maintenance and improve-
ment of existing facilities of any state agency, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes associated with the raising the age
of juvenile jurisdiction, including to the extent feasible, the
reuse of a facility of any state agency or a new facility, provided,
however, that expenditures from this appropriation are pursuant to
part WWW of chapter 59 of the laws of 2017 and no expenditures may
be made from this appropriation until a plan of projects has been
approved by the director of the budget. Notwithstanding any other
provision of law to the contrary, money hereby appropriated may be
suballocated or transferred to the department of corrections and
community supervision or any other agency for expenses related to
this program (25RA1808) (13913) ... 50,000,000 ... (re. $49,995,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new and
existing capital projects and programs including, but not limited
to, preparation of plans, administration, maintenance and improve-
ment of existing facilities of any state agency, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes associated with the raising the age
of juvenile jurisdiction, including to the extent feasible, the
reuse of a facility of any state agency or a new facility, provided,
however, that expenditures from this appropriation are pursuant to
part WWW of chapter 59 of the laws of 2017 and no expenditures may
be made from this appropriation until a plan of projects has been
approved by the director of the budget. Notwithstanding any other
provision of law to the contrary, money hereby appropriated may be
suballocated or transferred to the department of corrections and
community supervision or any other agency for expenses related to
this program (25RA1708) (13913) ... 110,000,000 .. (re. $61,922,000)
400 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP)
Capital Projects Funds - Other
Division for Youth Facilities Improvement Fund
OCF Improvement Projects Account - 31701
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2022 (25082208) (14051) ..........................
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2021 (25082108) (14051) ..........................
10,000,000 ........................................ (re. $9,997,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2020 (25082008) (14051) ..........................
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2019 (25081908) (14051) ..........................
10,000,000 ........................................ (re. $9,001,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2018 (25081808) (14051) ..........................
10,000,000 ........................................ (re. $6,027,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
401 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2017 (25081708) (14051) ..........................
10,000,000 ....................................... (re. $10,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2016 (25081608) (14051) ..........................
10,000,000 ........................................ (re. $6,812,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2015 (25081508) (14051) ..........................
10,000,000 .......................................... (re. $108,000)
By chapter 54, section 1, of the laws of 2014:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2014 (25081408) (14051) ..........................
10,000,000 ........................................ (re. $6,454,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2013 (25081308) (14051) ..........................
10,000,000 ........................................ (re. $5,189,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2012 (25081208) (14051) ..........................
10,000,000 .......................................... (re. $131,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
402 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
existing facilities or programs, including liabilities incurred
prior to April 1, 2011 (25081108) (14051) ..........................
10,000,000 ........................................ (re. $9,482,000)
By chapter 53, section 1, of the laws of 2010:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2010 (25081008) (14051) ..........................
10,000,000 ....................................... (re. $10,000,000)
By chapter 53, section 1, of the laws of 2008:
For payment of the cost of construction, reconstruction, security and
other improvements, including the preparation of designs, plans,
specifications and estimates related to improvements or changes to
existing facilities or programs, including liabilities incurred
prior to April 1, 2008 (25A80808) (14051) ..........................
13,840,000 ........................................ (re. $6,091,000)
403 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 128,000,000 389,173,000
---------------- ----------------
All Funds ........................ 128,000,000 389,173,000
================ ================
SUPPORTED HOUSING PROGRAM (CCP) ............................ 128,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Homeless Housing Grants Purpose
Notwithstanding any inconsistent provision
of law, funds appropriated herein shall be
used for the preparation and review of
proposals, specifications, estimates,
studies, inspections, appraisals and
surveys, and payment of personal service
and nonpersonal service, including fringe
benefits and indirect costs related to
implementing the provisions of the home-
less housing and assistance program in
accordance with title 1 of article 2-A of
the social services law provided by the
office of temporary and disability assist-
ance for new and reappropriated projects
(27OP23G5) (52334) ........................... 2,000,000
Capital Projects Funds - Other
Housing Program Fund
Department of Social Services Account - 31853
Homeless Housing Grants Purpose
For services and expenses, including the
payments on contracts executed prior to
April 1, 2023, related to implementing the
provisions of the homeless housing and
assistance program in accordance with
title 1 of article 2-A of the social
services law, including costs incurred
through individual or joint contracts with
any entity where such contract will result
in expedited homeless project development,
and including, without deposit to the
homeless housing and assistance account,
404 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2023-24
payments to any entity for technical
assistance required to approve contracts.
Up to $1,000,000 of the amount appropriated
herein may be used for purposes of neces-
sary health and safety improvements to
existing emergency shelters located in
local social services districts with a
population of less than five million.
Notwithstanding any inconsistent
provisions of law, such funds shall be
disbursed pursuant to contracts made in
accordance with the terms and conditions
established by the homeless housing and
assistance corporation.
Notwithstanding any inconsistent provision
of law, up to two percent of the appropri-
ation for any fiscal year may be used to
pay for technical assistance in support of
project development and operation, support
services development, architecture and
engineering, legal services and financial
services and may be provided by individ-
uals and not-for-profit or business corpo-
rations. No funds shall be expended from
this appropriation until the director of
the budget has approved a financial plan
submitted by the office of temporary and
disability assistance on behalf of the
homeless housing and assistance program in
such detail as required by the budget
director (270323G5) (52220) ................ 116,000,000
For the development of permanent, emergency
and transitional housing for persons
living with HIV or AIDS in accordance with
article 2-A of the social services law
including the payment of liabilities prior
to April 1, 2023; provided, however, that
if an insufficient number of viable
proposals for persons living with HIV or
AIDS are received, the balance of funding
can be used for the development of perma-
nent, emergency and transitional housing
for other priority need populations as
determined by the commissioner of the
office of temporary and disability assist-
ance and approved by the director of the
budget. Notwithstanding any inconsistent
provision of law, up to two percent of the
appropriation for any fiscal year may be
used to pay for technical assistance in
support of project development and opera-
405 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2023-24
tion, support services development, archi-
tecture and engineering, legal services
and financial services and may be provided
by individuals and not-for-profit or busi-
ness corporations (270823G5) (52309) ......... 5,000,000
For the development of permanent, emergency
and transitional housing for veterans in
accordance with article 2-A of the social
services law including the payment of
liabilities prior to April 1, 2023;
provided, however, that if an insufficient
number of viable proposals for veterans
are received, the balance of funding can
be used for the development of permanent,
emergency and transitional housing for
other priority need populations as deter-
mined by the commissioner of the office of
temporary and disability assistance and
approved by the director of the budget.
Notwithstanding any inconsistent provision
of law, up to two percent of the appropri-
ation for any fiscal year may be used to
pay for technical assistance in support of
project development and operation, support
services development, architecture and
engineering, legal services and financial
services and may be provided by individ-
uals and not-for-profit or business corpo-
rations (27VT23G5) (52357) ................... 5,000,000
406 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
SUPPORTED HOUSING PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Homeless Housing Grants Purpose
By chapter 54, section 1, of the laws of 2022:
Notwithstanding any inconsistent provision of law, funds appropriated
herein shall be used for the preparation and review of proposals,
specifications, estimates, studies, inspections, appraisals and
surveys, and payment of personal service and nonpersonal service,
including fringe benefits and indirect costs related to implementing
the provisions of the homeless housing and assistance program in
accordance with title 1 of article 2-A of the social services law
provided by the office of temporary and disability assistance for
new and reappropriated projects (27OP22G5) (52334) .................
2,000,000 ......................................... (re. $2,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
Notwithstanding any inconsistent provision of law, funds appropriated
herein shall be used for the preparation and review of proposals,
specifications, estimates, studies, inspections, appraisals and
surveys, and payment of personal service and nonpersonal service,
including fringe benefits and indirect costs related to implementing
the provisions of the homeless housing and assistance program in
accordance with title 1 of article 2-A of the social services law
provided by the office of temporary and disability assistance for
new and reappropriated projects (27OP21G5) (52334) .................
[2,000,000] 2,093,000 ............................. (re. $1,771,000)
Capital Projects Funds - Other
Housing Program Fund
Department of Social Services Account - 31853
Homeless Housing Grants Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses, including the payments on contracts
executed prior to April 1, 2022, related to implementing the
provisions of the homeless housing and assistance program in accord-
ance with title 1 of article 2-A of the social services law, includ-
ing costs incurred through individual or joint contracts with any
entity where such contract will result in expedited homeless project
development, and including, without deposit to the homeless housing
and assistance account, payments to any entity for technical assist-
ance required to approve contracts.
Up to $1,000,000 of the amount appropriated herein may be used for
purposes of necessary health and safety improvements to existing
emergency shelters located in local social services districts with a
population of less than five million. Notwithstanding any inconsist-
407 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ent provisions of law, such funds shall be disbursed pursuant to
contracts made in accordance with the terms and conditions estab-
lished by the homeless housing and assistance corporation.
Notwithstanding any inconsistent provision of law, up to two percent
of the appropriation for any fiscal year may be used to pay for
technical assistance in support of project development and opera-
tion, support services development, architecture and engineering,
legal services and financial services and may be provided by indi-
viduals and not-for-profit or business corporations. No funds shall
be expended from this appropriation until the director of the budget
has approved a financial plan submitted by the office of temporary
and disability assistance on behalf of the homeless housing and
assistance program in such detail as required by the budget director
(270322G5) (52220) .................................................
116,000,000 ..................................... (re. $116,000,000)
For the development of permanent, emergency and transitional housing
for persons living with HIV or AIDS in accordance with article 2-A
of the social services law including the payment of liabilities
prior to April 1, 2022; provided, however, that if an insufficient
number of viable proposals for persons living with HIV or AIDS are
received, the balance of funding can be used for the development of
permanent, emergency and transitional housing for other priority
need populations as determined by the commissioner of the office of
temporary and disability assistance and approved by the director of
the budget. Notwithstanding any inconsistent provision of law, up to
two percent of the appropriation for any fiscal year may be used to
pay for technical assistance in support of project development and
operation, support services development, architecture and engineer-
ing, legal services and financial services and may be provided by
individuals and not-for-profit or business corporations (270822G5)
(52309) ... 5,000,000 ............................. (re. $5,000,000)
For the development of permanent, emergency and transitional housing
for veterans in accordance with article 2-A of the social services
law including the payment of liabilities prior to April 1, 2022;
provided, however, that if an insufficient number of viable
proposals for veterans are received, the balance of funding can be
used for the development of permanent, emergency and transitional
housing for other priority need populations as determined by the
commissioner of the office of temporary and disability assistance
and approved by the director of the budget. Notwithstanding any
inconsistent provision of law, up to two percent of the appropri-
ation for any fiscal year may be used to pay for technical assist-
ance in support of project development and operation, support
services development, architecture and engineering, legal services
and financial services and may be provided by individuals and not-
for-profit or business corporations (27VT22G5) (52357) .............
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses, including the payments on contracts
executed prior to April 1, 2021, related to implementing the
408 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
provisions of the homeless housing and assistance program in accord-
ance with title 1 of article 2-A of the social services law, includ-
ing costs incurred through individual or joint contracts with any
entity where such contract will result in expedited homeless project
development, and including, without deposit to the homeless housing
and assistance account, payments to any entity for technical assist-
ance required to approve contracts.
Up to $1,000,000 of the amount appropriated herein may be used for
purposes of necessary health and safety improvements to existing
emergency shelters located in local social services districts with a
population of less than five million. Notwithstanding any inconsist-
ent provisions of law, such funds shall be disbursed pursuant to
contracts made in accordance with the terms and conditions estab-
lished by the homeless housing and assistance corporation.
Notwithstanding any inconsistent provision of law, up to two percent
of the appropriation for any fiscal year may be used to pay for
technical assistance in support of project development and opera-
tion, support services development, architecture and engineering,
legal services and financial services and may be provided by indi-
viduals and not-for-profit or business corporations. No funds shall
be expended from this appropriation until the director of the budget
has approved a financial plan submitted by the office of temporary
and disability assistance on behalf of the homeless housing and
assistance program in such detail as required by the budget director
(270321G5) (52220) ... 116,000,000 .............. (re. $116,000,000)
For the development of permanent, emergency and transitional housing
for persons living with HIV or AIDS in accordance with article 2-A
of the social services law including the payment of liabilities
prior to April 1, 2021; provided, however, that if an insufficient
number of viable proposals for persons living with HIV or AIDS are
received, the balance of funding can be used for the development of
permanent, emergency and transitional housing for other priority
need populations as determined by the commissioner of the office of
temporary and disability assistance and approved by the director of
the budget. Notwithstanding any inconsistent provision of law, up to
two percent of the appropriation for any fiscal year may be used to
pay for technical assistance in support of project development and
operation, support services development, architecture and engineer-
ing, legal services and financial services and may be provided by
individuals and not-for-profit or business corporations (270821G5)
(52309) ... 5,000,000 ............................. (re. $5,000,000)
For the development of permanent, emergency and transitional housing
for veterans in accordance with article 2-A of the social services
law including the payment of liabilities prior to April 1, 2021;
provided, however, that if an insufficient number of viable
proposals for veterans are received, the balance of funding can be
used for the development of permanent, emergency and transitional
housing for other priority need populations as determined by the
commissioner of the office of temporary and disability assistance
and approved by the director of the budget. Notwithstanding any
inconsistent provision of law, up to two percent of the appropri-
409 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ation for any fiscal year may be used to pay for technical assist-
ance in support of project development and operation, support
services development, architecture and engineering, legal services
and financial services and may be provided by individuals and not-
for-profit or business corporations (27VT21G5) (52357) .............
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses, including the payments on contracts
executed prior to April 1, 2020, related to implementing the
provisions of the homeless housing and assistance program in accord-
ance with title 1 of article 2-A of the social services law, includ-
ing costs incurred through individual or joint contracts with any
entity where such contract will result in expedited homeless project
development, and including, without deposit to the homeless housing
and assistance account, payments to any entity for technical assist-
ance required to approve contracts.
Up to $1,000,000 of the amount appropriated herein may be used for
purposes of necessary health and safety improvements to existing
emergency shelters located in local social services districts with a
population of less than five million. Notwithstanding any inconsist-
ent provisions of law, such funds shall be disbursed pursuant to
contracts made in accordance with the terms and conditions estab-
lished by the homeless housing and assistance corporation.
Notwithstanding any inconsistent provision of law, up to two percent
of the appropriation for any fiscal year may be used to pay for
technical assistance in support of project development and opera-
tion, support services development, architecture and engineering,
legal services and financial services and may be provided by indi-
viduals and not-for-profit or business corporations. No funds shall
be expended from this appropriation until the director of the budget
has approved a financial plan submitted by the office of temporary
and disability assistance on behalf of the homeless housing and
assistance program in such detail as required by the budget director
(270320G5) (52220) ... 116,000,000 .............. (re. $116,000,000)
For the development of permanent, emergency and transitional housing
for persons living with HIV or AIDS in accordance with article 2-A
of the social services law including the payment of liabilities
prior to April 1, 2020; provided, however, that if an insufficient
number of viable proposals for persons living with HIV or AIDS are
received, the balance of funding can be used for the development of
permanent, emergency and transitional housing for other priority
need populations as determined by the commissioner of the office of
temporary and disability assistance and approved by the director of
the budget. Notwithstanding any inconsistent provision of law, up to
two percent of the appropriation for any fiscal year may be used to
pay for technical assistance in support of project development and
operation, support services development, architecture and engineer-
ing, legal services and financial services and may be provided by
individuals and not-for-profit or business corporations (270820G5)
(52309) ... 5,000,000 ............................. (re. $5,000,000)
410 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the development of permanent, emergency and transitional housing
for veterans in accordance with article 2-A of the social services
law including the payment of liabilities prior to April 1, 2020;
provided, however, that if an insufficient number of viable
proposals for veterans are received, the balance of funding can be
used for the development of permanent, emergency and transitional
housing for other priority need populations as determined by the
commissioner of the office of temporary and disability assistance
and approved by the director of the budget. Notwithstanding any
inconsistent provision of law, up to two percent of the appropri-
ation for any fiscal year may be used to pay for technical assist-
ance in support of project development and operation, support
services development, architecture and engineering, legal services
and financial services and may be provided by individuals and not-
for-profit or business corporations (27VT20G5) (52357) .............
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses, including the payments on contracts
executed prior to April 1, 2019, related to implementing the
provisions of the homeless housing and assistance program in accord-
ance with title 1 of article 2-A of the social services law, includ-
ing costs incurred through individual or joint contracts with any
entity where such contract will result in expedited homeless project
development, and including, without deposit to the homeless housing
and assistance account, payments to any entity for technical assist-
ance required to approve contracts.
Up to $1,000,000 of the amount appropriated herein may be used for
purposes of necessary health and safety improvements to existing
emergency shelters located in local social services districts with a
population of less than five million. Notwithstanding any inconsist-
ent provisions of law, such funds shall be disbursed pursuant to
contracts made in accordance with the terms and conditions estab-
lished by the homeless housing and assistance corporation.
Notwithstanding any inconsistent provision of law, up to two percent
of the appropriation for any fiscal year may be used to pay for
technical assistance in support of project development and opera-
tion, support services development, architecture and engineering,
legal services and financial services and may be provided by indi-
viduals and not-for-profit or business corporations. No funds shall
be expended from this appropriation until the director of the budget
has approved a financial plan submitted by the office of temporary
and disability assistance on behalf of the homeless housing and
assistance program in such detail as required by the budget director
(270319G5) (52220) ... 58,000,000 ................. (re. $2,402,000)
For the development of permanent, emergency and transitional housing
for persons with AIDS in accordance with article 2-A of the social
services law including the payment of liabilities prior to April 1,
2019; provided, however, that if an insufficient number of viable
proposals for persons with AIDS are received, the balance of funding
can be used for the development of permanent, emergency and transi-
411 12554-05-3
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tional housing for other priority need populations as determined by
the commissioner of the office of temporary and disability assist-
ance and approved by the director of the budget. Notwithstanding any
inconsistent provision of law, up to two percent of the appropri-
ation for any fiscal year may be used to pay for technical assist-
ance in support of project development and operation, support
services development, architecture and engineering, legal services
and financial services and may be provided by individuals and not-
for-profit or business corporations (270819G5) (52309) .............
5,000,000 ......................................... (re. $5,000,000)
412 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 259,239,000 1,018,793,950
---------------- ----------------
All Funds ........................ 259,239,000 1,018,793,950
================ ================
DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 15,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services for the purpose of
preparation and review of plans, specifi-
cations, estimates, services, construction
management and supervision, inspection,
studies, appraisals, surveys, testing and
environmental impact statements, value
engineering, life cycle costing, or, for
the costs of consultant services to
perform said purposes to be used for the
rehabilitation, erection, construction,
reconstruction, alteration, or improvement
of new or existing facilities or programs,
including the payment of liabilities
incurred prior to April 1, 2023, providing
that moneys hereby appropriated shall be
available to the office net of disallow-
ances, refunds, rebates, reimbursements,
and credits (05062330) (81088) .............. 15,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 83,739,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, nonpersonal services, fringe
benefits and indirect costs. Notwith-
standing any other law to the contrary,
413 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2023-24
all or a portion of the funds appropriated
herein may be suballocated or transferred
to any department, agency, or public
authority (05FM23MO) (81107) ................ 83,739,000
FLOOD RECOVERY (CCP) ........................................ 15,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Flood Recovery Purpose
For services and expenses associated with
repairing, restoring, or replacing stat-
eowned structures and their contents in
accordance with section 203-a of the exec-
utive law. Notwithstanding any other
provision of the law to the contrary, the
office of general services in consultation
with the division of homeland security and
emergency services shall, upon approval of
the budget director, suballocate or trans-
fer the funding appropriated herein to any
other state department or agency maintain-
ing or in control of such state-owned
structures and their contents in an amount
not less than the limits of coverage that
would be applicable if such state-owned
structures and their contents had been
covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR23FR)
(26245) ..................................... 15,000,000
MAINTENANCE AND IMPROVEMENT OF REAL PROPERTY FACILITIES
(CCP) .................................................... 128,500,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Energy Conservation Purpose
For the payment of the costs of energy
conservation projects for existing facili-
ties including the payment of liabilities
incurred prior to April 1, 2023 (05132305)
(81036) ...................................... 7,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
414 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2023-24
For payment of the cost of demolition,
alterations and improvements for health
and safety to existing facilities, includ-
ing the payment of liabilities incurred
prior to April 1, 2023 (05072301) (81028) ... 11,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For payment of the cost of alterations and
improvements and minor rehabilitation and
improvements for the preservation of
existing facilities, including the payment
of liabilities incurred prior to April 1,
2023 (05012303) (81010) ..................... 24,300,000
For payment of the costs of alterations,
improvements and rehabilitation for the
preservation of various facilities
throughout the state, including the
payment of liabilities incurred prior to
April 1, 2023 (05NR2303) (26217) ............ 25,600,000
For payment of the cost of alterations,
improvements and rehabilitation, including
design, consultants, furniture, moving,
and technology, for the preservation of
various facilities throughout the state,
including the payment of liabilities
incurred prior to April 1, 2023.
Notwithstanding any provision of law, rule
or regulation to the contrary, of the
amounts appropriated herein, $25,000,000
may be made available for expenses that
will result in the reduction of vacant and
underutilized space within buildings owned
and leased by the office of general
services. The office of general services
shall submit a utilization plan to the
division of the budget and no expenditures
may be made from this appropriation until
the plan has been approved by the division
of the budget (05OS2303) (26247) ............ 25,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preventive Maintenance Purpose
For preventive maintenance on state facili-
ties including personal services, nonper-
sonal services, fringe benefits and the
contractual services provided by private
firms, including the payment of liabil-
415 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2023-24
ities incurred prior to April 1, 2023
(050923PM) (26224) .......................... 35,600,000
SUSTAINABILITY (CCP) ........................................ 17,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Energy Conservation Purpose
For services and expenses related to the
conversion of light duty vehicles in the
New York state fleet to electric vehicles
(05602305) (26248) .......................... 17,000,000
416 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2022, providing that moneys hereby appropriated shall be
available to the office net of disallowances, refunds, rebates,
reimbursements, and credits (05062230) (81088) .....................
15,000,000 ....................................... (re. $14,420,000)
By chapter 54, section 1, of the laws of 2021:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2021, providing that moneys hereby appropriated shall be
available to the office net of disallowances, refunds, rebates,
reimbursements, and credits (05062130) (81088) .....................
15,000,000 ....................................... (re. $11,682,000)
By chapter 54, section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2020, providing that moneys hereby appropriated shall be
available to the office net of disallowances, refunds, rebates,
417 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
reimbursements, and credits (05062030) (81088) .....................
15,000,000 ........................................ (re. $2,691,000)
By chapter 54, section 1, of the laws of 2019:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2019, providing that moneys hereby appropriated shall be
available to the office net of disallowances, refunds, rebates,
reimbursements and credits (05061930) (81088) ......................
15,000,000 ........................................ (re. $2,712,000)
By chapter 54, section 1, of the laws of 2018:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2018, providing that moneys hereby appropriated shall be
available to the office net of disallowances, refunds, rebates,
reimbursements and credits (05061830) (81088) ......................
11,000,000 ........................................ (re. $2,549,000)
By chapter 54, section 1, of the laws of 2017:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, value engineering, life cycle costing,
or, for the costs of consultant services to perform said purposes to
be used for the rehabilitation, erection, construction, recon-
struction, alteration, or improvement of new or existing facilities
or programs, including the payment of liabilities incurred prior to
April 1, 2017 (05061730) (81088) ... 10,000,000 ... (re. $1,458,000)
By chapter 55, section 1, of the laws of 2016:
For payment of a marketing and redevelopment study concerning the most
appropriate uses of the J N Adam developmental center (the center),
located in the town of Perrysburg, county of Cattaraugus, and an
418 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
analysis of the historic significance of the buildings comprising
the center, in consultation with the commissioner of the office for
people with developmental disabilities, the empire state development
corporation, the office of parks, recreation and historic preserva-
tion, and the department of environmental conservation. Copies of
such study and analysis shall be provided to the governor, temporary
president of the senate, the speaker of the assembly, and state and
local officials representing the county of Cattaraugus, town of
Perrysburg, and city of Buffalo (05JN1630) (26206) .................
235,000 ............................................. (re. $220,000)
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, nonpersonal services, fringe benefits
and indirect costs. Notwithstanding any other law to the contrary,
all or a portion of the funds appropriated herein may be suballo-
cated or transferred to any department, agency, or public authority
(05FM22MO) (81107) ... 71,000,000 ................ (re. $64,077,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, nonpersonal services, fringe benefits
and indirect costs. Notwithstanding any other law to the contrary,
all or a portion of the funds appropriated herein may be suballo-
cated or transferred to any department, agency, or public authority
(05FM21MO) (81107) ... 71,000,000 ................. (re. $9,682,167)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, nonpersonal services, fringe benefits
and indirect costs. Notwithstanding any other law to the contrary,
all or a portion of the funds appropriated herein may be suballo-
cated or transferred to any department, agency, or public authority
(05FM20MO) (81107) ... 71,000,000 ................ (re. $13,317,000)
FLOOD RECOVERY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Flood Recovery Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-a of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
419 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such state-owned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR22FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-a of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such state-owned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR21FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-A of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such state-owned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR20FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-A of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such state-owned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
420 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cies, as defined in 44 CFR 59.1 (05FR19FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-A of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such state-owned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR18FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses associated with repairing, restoring, or
replacing state-owned structures and their contents in accordance
with section 203-A of the executive law. Notwithstanding any other
provision of the law to the contrary, the office of general services
in consultation with the division of homeland security and emergency
services shall, upon approval of the budget director, suballocate or
transfer the funding appropriated herein to any other state depart-
ment or agency maintaining or in control of such stateowned struc-
tures and their contents in an amount not less than the limits of
coverage that would be applicable if such state-owned structures and
their contents had been covered by standard flood insurance poli-
cies, as defined in 44 CFR 59.1 (05FR17FR) (26245) .................
15,000,000 ....................................... (re. $15,000,000)
MAINTENANCE AND IMPROVEMENT OF REAL PROPERTY FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 50, section 1, of the laws of 2006:
For services and expenses related to the redevelopment of the Governor
Averell Harriman State Office Building Campus, including the costs
of demolition and site preparation, and for services provided by the
design and construction account of the centralized services fund of
the New York state office of general services (05060609) (26225) ...
10,000,000 ........................................ (re. $2,491,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Energy Conservation Purpose
By chapter 54, section 1, of the laws of 2022:
421 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of the costs of energy conservation projects for
existing facilities including the payment of liabilities incurred
prior to April 1, 2022 (05132205) (81036) ..........................
5,000,000 ......................................... (re. $3,835,000)
By chapter 54, section 1, of the laws of 2020:
For the payment of the costs of energy conservation projects for
existing facilities including the payment of liabilities incurred
prior to April 1, 2020 (05132005) (81036) ..........................
2,500,000 ............................................ (re. $36,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2019:
For services and expenses related to the design and construction of a
microgrid and/or an efficient energy system, to operate to the
extent possible on renewable energy to provide heating, cooling,
and/or electricity for the Empire State Plaza Complex and the design
and construction of other energy-efficient initiatives for the
Empire State Plaza Complex, including the payment of liabilities
incurred prior to April 1, 2017 (05CG1705) (26246) .................
87,600,000 ....................................... (re. $47,063,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2022 (05072201) (81028)
... 7,040,000 ..................................... (re. $6,040,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2021 (05072101) (81028)
... 7,600,000 ..................................... (re. $5,289,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2020 (05072001) (81028)
... 4,000,000 ..................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2019 (05071901) (81028)
... 7,800,000 ..................................... (re. $4,020,000)
By chapter 54, section 1, of the laws of 2018:
422 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2018 (05071801) (81028)
... 12,400,000 ................................... (re. $10,928,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2017 (05071701) (81028)
... 3,000,000 ....................................... (re. $730,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2016 (05071601) (81028)
... 16,000,000 .................................... (re. $2,876,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2013 (05071301) (81028)
... 6,320,000 ..................................... (re. $2,143,000)
By chapter 54, section 1, of the laws of 2012:
For payment of the cost of demolition, alterations and improvements
for health and safety to existing facilities, including the payment
of liabilities incurred prior to April 1, 2012 (05061201) (81028)
... 17,279,000 ...................................... (re. $964,000)
For additional funds for the construction of a security portal on the
State Street entrance of the third floor of the Legislative Office
Building (05071201) (26236) ... 65,000 ............... (re. $65,000)
By chapter 50, section 1, of the laws of 2010:
For payment of the cost of alterations and improvements for health and
safety to existing facilities, including the payment of liabilities
incurred prior to April 1, 2010 (05061001) (81028) .................
22,000,000 ........................................ (re. $1,525,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 50, section 1, of the laws of 2009:
For services and expenses related to the design and construction of
state facilities, including payment of liabilities incurred prior to
April 1, 2009. Amounts appropriated herein may be transferred from
this appropriation to any other capital projects appropriation made
to any other state department or agency, for the purpose of
constructing a facility that will benefit multiple state agencies
(05AA0907) (26223) ... 10,000,000 ................ (re. $10,000,000)
423 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 50, section 1, of the laws of 2008:
For services and expenses related to the design and construction of
state facilities, including payment of liabilities incurred prior to
April 1, 2008. Amounts appropriated herein may be transferred from
this appropriation to any other capital projects appropriation made
to any other state department or agency, for the purpose of
constructing a facility that will benefit multiple state agencies
(05AA0807) (26223) ... 10,000,000 ................ (re. $10,000,000)
By chapter 50, section 1, of the laws of 2007:
For services and expenses related to the design and construction of
state facilities, including payment of liabilities incurred prior to
April 1, 2007. Notwithstanding section 51 of the state finance law,
funds may be transferred from this appropriation to any other capi-
tal projects appropriation made to a state department or agency, for
the purpose of constructing a facility that will benefit multiple
state agencies (05AA0707) (26223) ..................................
10,000,000 ........................................ (re. $9,000,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2022 (05012203) (81010) ...................................
20,320,000 ....................................... (re. $19,792,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2022 (05NR2203) (26217) ... 63,660,000 ........ (re. $63,660,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2022.
Notwithstanding any provision of law, rule or regulation to the
contrary, of the amounts appropriated herein, $25,000,000 may be
made available for expenses that will result in the reduction of
vacant and underutilized space within buildings owned and leased by
the office of general services. The office of general services shall
submit a utilization plan to the division of the budget and no
expenditures may be made from this appropriation until the plan has
been approved by the division of the budget (05OS2203) (26247) .....
25,000,000 ....................................... (re. $23,228,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities in the Empire
State plaza, including the payment of liabilities incurred prior to
424 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
April 1, 2022 (05SR2203) (26243) ...................................
175,500,000 ..................................... (re. $175,500,000)
For payment of the cost of alterations and improvements and mainte-
nance rehabilitation for the Legislative Library (05142203) (26249)
... 3,000,000 ..................................... (re. $2,994,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2021 (05012103) (81010) ...................................
28,600,000 ....................................... (re. $25,737,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2021 (05NR2103) (26217) ... 17,400,000 ........ (re. $17,400,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2021.
Notwithstanding any provision of law, rule or regulation to the
contrary, of the amounts appropriated herein, $25,000,000 may be
made available for expenses that will result in the reduction of
vacant and underutilized space within buildings owned and leased by
the office of general services. The office of general services shall
submit a utilization plan to the division of the budget and no
expenditures may be made from this appropriation until the plan has
been approved by the division of the budget (05OS2103) (26247) .....
50,000,000 ....................................... (re. $27,888,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2020 (05012003) (81010) ...................................
29,400,000 ....................................... (re. $22,621,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2020 (05NR2003) (26217) ... 30,400,000 ........ (re. $18,329,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2020.
Notwithstanding any provision of law, rule or regulation to the
contrary, of the amounts appropriated herein, $25,000,000 may be
made available for expenses that will result in the reduction of
vacant and underutilized space within buildings owned and leased by
the office of general services. The office of general services shall
submit a utilization plan to the division of the budget and no
425 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
expenditures may be made from this appropriation until the plan has
been approved by the division of the budget (05OS2003) (26247) .....
50,000,000 ....................................... (re. $14,427,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2019 (05011903) (81010) ...................................
31,500,000 ....................................... (re. $20,544,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2019 (05NR1903) (26217) ... 20,000,000 ........ (re. $10,447,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2019.
Notwithstanding any provision of law, rule or regulation to the
contrary, of the amounts appropriated herein, $25,000,000 may be
made available for expenses that will result in the reduction of
vacant and underutilized space within buildings owned and leased by
the office of general services. The office of general services shall
submit a utilization plan to the division of the budget and no
expenditures may be made from this appropriation until the plan has
been approved by the division of the budget (05OS1903) (26247) .....
50,000,000 ........................................ (re. $9,554,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2018 (05011803) (81010) ...................................
25,500,000 ... .................................... (re. $9,794,000)
For payment of the cost of alterations and improvements and mainte-
nance rehabilitation for the state capitol and the legislative
office building (05AR1803) (26207) .................................
2,000,000 ......................................... (re. $2,000,000)
For payment of the cost of alterations and improvements and mainte-
nance rehabilitation for the state capitol and the legislative
office building (05SR1803) (26210) .................................
2,000,000 ......................................... (re. $1,488,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2018 (05NR1803) (26217) ... 26,100,000 ........ (re. $14,956,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2018, that will result in the reduction of vacant and underuti-
426 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
lized space within buildings owned and leased by the office of
general services. The office of general services shall submit a
utilization plan to the division of the budget and no expenditures
may be made from this appropriation until the plan has been approved
by the division of the budget (05OS1803) (26247) ...................
25,000,000 ........................................ (re. $2,541,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2017 (05011703) (81010) ...................................
22,400,000 ....................................... (re. $10,020,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2017 (05NR1703) (26217) ... 32,600,000 ........ (re. $11,116,000)
For payment of the cost of alterations, improvements and rehabili-
tation, including design, consultants, furniture, moving, and tech-
nology, for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2017, that will result in the reduction of vacant and underuti-
lized space within buildings owned and leased by the office of
general services. The office of general services shall submit a
utilization plan to the division of the budget and no expenditures
may be made from this appropriation until the plan has been approved
by the division of the budget (05OS1703) (26247) ...................
25,000,000 .......................................... (re. $464,000)
By chapter 55, section 1, of the laws of 2016:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2016 (05011603) (81010) ...................................
25,800,000 ....................................... (re. $13,203,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state capitol building, including
the payment of liabilities incurred prior to April 1, 2016
(05CR1603) (26216) ... 200,000 ...................... (re. $200,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of various facilities throughout the
state, including the payment of liabilities incurred prior to April
1, 2016 (05NR1603) (26217) ... 14,000,000 ......... (re. $5,364,000)
By chapter 54, section 1, of the laws of 2015:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2015 (05031503) (81010) ... 42,720,000 ... (re. $9,882,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state capitol building, including
427 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the payment of liabilities incurred prior to April 1, 2015
(05CR1503) (26216) ... 200,000 ...................... (re. $200,000)
For payment of the cost of design and related services, demolition,
alterations, improvements, and rehabilitation at the Harriman state
office campus, including the payment of liabilities incurred prior
to April 1,2015 (05HC1503) (26203) .................................
152,000,000 ...................................... (re. $40,757,000)
By chapter 54, section 1, of the laws of 2014:
For payment of the cost of alterations and improvements and minor
rehabilitation and improvements for the preservation of existing
facilities, including the payment of liabilities incurred prior to
April 1, 2014 (05131403) (81010) ...................................
32,720,000 ........................................ (re. $1,717,783)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state capitol building, including
the payment of liabilities incurred prior to April 1, 2014
(05CR1403) (26216) ... 200,000 ...................... (re. $200,000)
By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
section 1, of the laws of 2016:
For services and expenses of the correctional officers' memorial fund
established pursuant to chapter 55 of the laws of 2014. Funds herein
shall be for the construction of such correctional officers' memori-
al on the New York state empire state plaza (05CM1403) (39706) .....
300,000 .............................................. (re. $30,000)
By chapter 54, section 1, of the laws of 2013:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state capitol building, including
the payment of liabilities incurred prior to April 1, 2013
(05CR1303) (26216) ... 10,000,000 ................ (re. $10,000,000)
By chapter 54, section 1, of the laws of 2012:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR1203)
(26216) ... 250,000 ................................. (re. $250,000)
By chapter 54, section 1, of the laws of 2011:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR1103)
(26216) ... 650,000 ................................. (re. $650,000)
By chapter 50, section 1, of the laws of 2010:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR1003)
(26216) ... 3,650,000 ............................. (re. $3,650,000)
By chapter 50, section 1, of the laws of 2009:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR0903)
(26216) ... 15,000,000 ........................... (re. $14,923,000)
428 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 50, section 1, of the laws of 2008:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR0803)
(26216) ... 5,000,000 ............................. (re. $3,604,000)
For the payment of the costs of alterations, improvement and rehabili-
tation for the preservation of Hearing Room C located in the Legis-
lative Office Building (05LC0803) (26219) ..........................
1,075,000 ........................................... (re. $137,000)
By chapter 50, section 1, of the laws of 2007:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05CR0703)
(26216) ... 5,000,000 ............................... (re. $430,000)
By chapter 50, section 1, of the laws of 2006:
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of the state Capitol Building (05030603)
(26216) ... 26,000,000 ............................ (re. $1,694,000)
For payment of the costs of alterations, improvements and rehabili-
tation for the preservation of Hearing Rooms B and C located in the
Legislative Office Building (05LL0603) (26221) .....................
1,645,000 ........................................... (re. $104,000)
For payment of the state's share of costs of alterations and improve-
ments for preservation of facilities at the Binghamton Governmental
Complex, including but not limited to repair and rehabilitation of
parking garage facilities. The state's share of such costs shall be
determined pursuant to a written tripartite agreement between the
state of New York, Broome County, and the city of Binghamton. All or
part of this amount may be used for payment to the design and
construction management account of the centralized services fund of
the New York state office of general services for services rendered
(05BP0603) (26222) ... 6,200,000 .................. (re. $1,160,000)
Advance for costs of alterations and improvements for preservation of
facilities at the Binghamton Governmental Complex, including but not
limited to repair and rehabilitation of parking garage facilities.
All or part of this amount may be used for payment to the design and
construction management account of the centralized services fund of
the New York state office of general services for services rendered.
No portion of this appropriation shall be available until the divi-
sion of the budget has reviewed and approved a repayment agreement
with the city of Binghamton and Broome county. Such agreement, at
the minimum, shall provide for reimbursement to the state by the
city of Binghamton and Broome county for their respective shares of
all design and construction disbursements (05BL0603) (26230) .......
5,800,000 ............................................ (re. $59,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preventive Maintenance Purpose
By chapter 54, section 1, of the laws of 2022:
429 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For preventive maintenance on state facilities including personal
services, nonpersonal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2022 (050922PM) (26224) ...........
26,280,000 ....................................... (re. $24,066,000)
By chapter 54, section 1, of the laws of 2021:
For preventive maintenance on state facilities including personal
services, nonpersonal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2021 (050921PM) (26224) ...........
25,400,000 ....................................... (re. $13,133,000)
By chapter 54, section 1, of the laws of 2020:
For preventive maintenance on state facilities including personal
services, nonpersonal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2020 (050920PM) (26224) ...........
16,700,000 ........................................ (re. $3,330,000)
By chapter 54, section 1, of the laws of 2019:
For preventive maintenance on state facilities including personal
services, non-personal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2019 (050919PM) (26224) ...........
16,700,000 ........................................ (re. $3,606,000)
By chapter 54, section 1, of the laws of 2018:
For preventive maintenance on state facilities including personal
services, non-personal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2018 (050918PM) (26224) ...........
16,000,000 .......................................... (re. $470,000)
By chapter 55, section 1, of the laws of 2016:
For preventive maintenance on state facilities including personal
services, non-personal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2016 (050916PM) (26224) ...........
23,000,000 .......................................... (re. $303,000)
By chapter 54, section 1, of the laws of 2015:
For preventive maintenance on state facilities including personal
services, non-personal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2015 (050515PM) (26224) ...........
15,000,000 ........................................... (re. $15,000)
SUSTAINABILITY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
430 12554-05-3
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Energy Conservation Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to the conversion of light duty
vehicles in the New York state fleet to electric vehicles (05602205)
(26248) ... 17,000,000 ........................... (re. $17,000,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Sustainability Purpose
By chapter 50, section 1, of the laws of 2009:
For payments on sustainability projects at various facilities through-
out the State, including the payment of liabilities incurred prior
to April 1, 2009 (050109SU) (26226) ................................
13,300,000 ....................................... (re. $10,343,000)
431 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 2,364,670,000 4,064,319,000
Capital Projects Funds - Federal ... 330,000,000 644,277,000
---------------- ----------------
All Funds ........................ 2,694,670,000 4,708,596,000
================ ================
ALL PAYERS CLAIMS DATABASE (CCP) ............................ 10,000,000
--------------
Capital Project Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For grants, services and expenses related to
the establishment, support, and adminis-
tration of an all payers claim database,
including but not limited to technology,
equipment, software, personal service,
fringe benefits, and indirect costs. For
purposes of the program, all such activ-
ities are deemed to constitute a capital
expenditure. No expenditures related to
this appropriation shall be made without a
plan, prepared by the commissioner of
health and approved by the director of the
budget, detailing sufficient resources are
available to support such expenditures
(12AP2308) (26624) .......................... 10,000,000
ECONOMIC DEVELOPMENT (CCP) ................................. 967,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
The sum of $967,000,000 is hereby appropri-
ated for services and expenses of a life
sciences laboratory public health initi-
ative in the Capital District pursuant to
a plan developed by the commissioner of
the New York State department of health,
and subject to the approval of the direc-
tor of the division of the budget, for the
acquisition of real property, preparation
of plans, design, construction, reno-
432 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
vation, administration, and other costs
incidental thereto, including the payment
of liabilities incurred prior to April 1,
2023. All or a portion of the funds appro-
priated hereby may be suballocated or
transferred to any department, agency, or
public authority (12262309) (85501) ........ 967,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 12,266,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For services and expenses of a quality
program for adult care facilities. Such
program shall be targeted at facilities
with a high population of residents who
receive supplemental security income, as
defined in subchapter XVI of chapter 7 of
title 42 of the United States Code, state
supplemental payments, Medicaid (with
respect to residents in an assisted living
program), or safety net assistance, as
defined in section 159 of the social
services law, and used to support capital
improvement projects that will enhance the
physical environment of the facility and
promote a higher quality of life for resi-
dents, in accordance with a plan approved
by the residents' council, the department,
and the director of the budget, provided
however that such expenditures shall not
be used to supplant the obligations of
facility operator to provide a safe
comfortable living environment for resi-
dents in a good state of repair and sani-
tation. The department, subject to the
approval of the director of the division
of budget, shall develop an allocation
methodology taking into account financial
status of the facility, resident needs,
and the population of residents who
receive supplemental security income,
state supplemental payments, Medicaid
(with respect to residents in an assisted
living program), or safety net assistance.
Such allocation shall serve as the basis
of distribution to eligible facilities
(12EQ23MO) ................................... 3,266,000
433 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits, and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (12FM23MO)
(81107) ...................................... 9,000,000
HEALTH CARE FACILITY TRANSFORMATION PROGRAM (CCP) ........ 1,200,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health Care System Improvement Purpose
For payments and grants to support health
care facility transformation statewide,
made available pursuant to section 2825-h
of the public health law. A portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (12SW23HE)
(26668) .................................. 1,000,000,000
For additional payments and grants to
support health care facility transforma-
tion statewide, made available pursuant to
section 2825-h of the public health law. A
portion of the funds appropriated herein
may be suballocated or transferred to any
department, agency, or public authority .... 200,000,000
IT INITIATIVES PROGRAM (CCP) ................................ 10,000,000
--------------
Capital Projects Fund - Other
Miscellaneous Capital Projects Fund
Health Care IT Capital Account - 32216
Program Improvement/Change Purpose
For services and expenses related to infor-
mation technology projects undertaken by
the department of health, including the
payment of liabilities incurred prior to
April 1, 2023 pursuant to a plan that
addresses information technology security
and data management, prepared by the
department of health, developed in consul-
tation with the office of information
technology services, and approved by the
director of the budget. Upon the request
434 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
of the commissioner of the department of
health and approval of the director of the
division of the budget, all or a portion
of the funds appropriated hereby may be
suballocated or transferred to the office
of information technology services
(12IT2308) (51919) .......................... 10,000,000
HEALTH CARE DATA MODERNIZATION (CCP) ........................ 30,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expense related to the
development and implementation of an elec-
tronic health record connectivity incen-
tive program. Use of such funds shall not
be subject to the requirements of section
163 of the state finance law (12EH2308) ..... 30,000,000
LABORATORIES AND RESEARCH (CCP) ............................. 12,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
To maintain and improve existing facilities
including preparation of plans and for
payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services. Upon the request of
the commissioner of the department of
health and approval of the director of the
division of the budget, funds of this
appropriation may be transferred to the
dormitory authority of the state of New
York for capital projects (12592303)
(29780) ..................................... 12,000,000
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP) ... 58,904,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For minor alterations, improvements and
preventive maintenance of St. Albans Nurs-
435 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
ing Home, Helen Hayes Hospital, Oxford
Nursing Home, Batavia Nursing Home, and
Montrose Nursing Home including prepara-
tion of plans and for payment to the
design and construction management account
of the centralized services fund of the
New York state office of general services.
Upon the request of the commissioner of
the department of health and approval of
the director of the division of the budg-
et, funds of this appropriation may be
transferred to the dormitory authority of
the state of New York for capital projects
(12602303) (81010) ........................... 7,600,000
The sum of $51,304,000 is hereby appropri-
ated to support capital expenses of the
Roswell Park cancer institute corporation.
Notwithstanding any law to the contrary, all
or a portion of funds appropriated herein
may be transferred to the Roswell Park
cancer institute corporation, subject to a
plan developed by Roswell Park cancer
institute corporation, submitted to the
department of health, and approved by the
director of the budget (12RP2303) (26665) ... 51,304,000
STATEWIDE HEALTH INFORMATION NETWORK FOR NEW YORK (CCP) ..... 32,500,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For grants, services and expenses including
contracts for the New York eHealth Colla-
borative for the purpose of supporting and
administering the statewide health infor-
mation network for New York, including but
not limited to qualified entities certi-
fied by the department, technology, equip-
ment, software, personal service, fringe
benefits, and indirect costs. For purposes
of the program, all such activities are
deemed to constitute a capital expendi-
ture. Provided, however, that two million
five hundred thousand dollars shall be
used for modernizing health reporting
systems. No expenditures related to this
appropriation shall be made without a
plan, prepared by the commissioner of
health and approved by the director of the
budget, detailing sufficient resources are
436 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2023-24
available to support such expenditures.
Use of such funds shall not be subject to
the requirements of section 163 of the
state finance law. (12SH2308) (26628) ....... 32,500,000
WATER RESOURCES (CCP) ...................................... 362,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
For payment of a portion of the state's
match for the safe drinking water revolv-
ing fund (12SM2357) (26888) ................. 30,000,000
For services and expenses including
contracts related to the laboratory test-
ing of public drinking water for chemical
compounds and emerging contaminants
defined pursuant to section 1112 of the
public health law (12EC2357) ................. 2,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
Safe Drinking Water Revolving Account - 31360
Water Resources Purpose
For federal grants for the safe drinking
water revolving fund (12022357) (26888) .... 300,000,000
For services and expenses of the state
revolving funds program (12DW2357) (26666)
............................................. 30,000,000
437 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
All or a portion of the disbursements made pursuant to the reappropri-
ations made hereinafter from the capital projects fund may be eligi-
ble for reimbursement from proceeds of bonds issued by the dormitory
authority. The dormitory authority and the department of health
shall report quarterly to the director of the budget the amounts
expended from appropriations which are eligible for reimbursement
from the proceeds of the bonds. The director of the budget shall
review these reports and then certify to the comptroller amounts
expended from these appropriations which are reimbursable from bond
proceeds. Until such time as the dormitory authority determines that
amounts expended from these appropriations are not reimbursable from
bond proceeds, all such expenditures shall be considered to be reim-
bursable from bond proceeds.
CAPITAL RESTRUCTURING FINANCING PROGRAM FOR HEALTH CARE AND RELATED
FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health Care System Improvement Purpose
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for payments and grants establishing the capital restruc-
turing financing program for health care and related facilities
licensed pursuant to public health law or mental hygiene law,
including general hospitals, nursing homes, clinics, residential
health care facilities, diagnostic and treatment centers, and clin-
ics licensed pursuant to the public health law or the mental hygiene
law, assisted living programs, primary care providers, and home care
providers certified or licensed pursuant to article thirty-six of
this chapter and other primary care providers, to support capital
projects that will improve the quality, financial viability, and
efficiency of the health care delivery system in New York state,
including necessary support to facilitate restructuring, closures,
conversions and consolidations within the health care delivery
system including funding intended to maintain facility viability,
provided, however, that no expenditures may be made from this appro-
priation to a facility until a facility specific plan has been
submitted to the department of health and has been approved by the
director of the budget. Up to $75,000,000 of this appropriation may
be suballocated to the state university of New York, provided howev-
er that these funds shall be used for eligible project costs of the
ambulatory care integration project awarded to upstate university
hospital pursuant to request for applications number 1504100252 and
in accordance with an agreement between the department of health and
the state university construction fund and approved by the director
of the budget (12CR14HE) (26626) ...................................
1,200,000,000 ................................... (re. $472,469,000)
ECONOMIC DEVELOPMENT (CCP)
438 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
The appropriation made by chapter 54, section 1, of the laws of 2018, to
the New York state urban development corporation, is hereby trans-
ferred and reappropriated to the Department of Health:
The sum of $600,000,000 is hereby appropriated for services and
expenses of a life sciences laboratory and public health initiative
in the Capital District to develop life science research, inno-
vation, and infrastructure, including but not limited to the acqui-
sition of real property, preparation of plans, design, construction,
renovation, administration, and other costs incidental thereto,
including the payment of liabilities incurred prior to April 1,
2018. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority [(91251809)] (12251809) (85501) ..........................
600,000,000 ..................................... (re. $600,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2017, to
the New York state urban development corporation, is hereby trans-
ferred and reappropriated to the department of health:
The sum of $150,000,000 is hereby appropriated for services and
expenses of a life sciences laboratory public health initiative in
the Capital District pursuant to a plan developed by the chief exec-
utive officer of the New York state urban development corporation
jointly with the commissioner of health to develop life science
research, innovation, and infrastructure including, but not limited
to the preparation of plans, design, construction, renovation, and
other costs incidental thereto, including the payment of liabilities
incurred prior to April 1, 2017. Notwithstanding section 51 of the
public authorities law, such plan shall be reviewed and approved by
New York State public authorities control board. Prior to any award,
the New York state public authorities control board shall review and
approve any construction project in excess of five million dollars
funded from this appropriation. All or a portion of the funds appro-
priated hereby may be suballocated or transferred to any department,
agency, or public authority [(91241709)] (12251709) (85501) ........
150,000,000 ..................................... (re. $145,105,000)
HEALTH CARE FACILITY TRANSFORMATION PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health Care System Improvement Purpose
By chapter 54, section 1, of the laws of 2022:
For payments and grants to support health care facility transformation
statewide, made available pursuant to section 2825-g of the public
health law. A portion of the funds appropriated herein may be subal-
located or transferred to any department, agency, or public authori-
439 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ty (12SW22HE) (26668) ..............................................
1,600,000,000 ................................. (re. $1,600,000,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter
314, section 1, of the laws of 2019:
For payments and grants to support health care facility transformation
statewide. Notwithstanding section 163 of the state finance law or
any other provision of law to the contrary, this appropriation may
be used to fund payments and or grants, including up to $5,000,000
to regional perinatal care centers or other health providers to
establish telehealth applications, made by the commissioner of
health in his or her sole discretion, without a competitive bid or
request for proposal process, to eligible applicants as determined
by the commissioner of health for the purposes that strengthen and
protect continued access to health care services in communities
including but not limited to children's residential treatment facil-
ities. Such purposes may include debt retirement and capital
projects or non-capital projects that facilitate health care trans-
formation activities including, merger, consolidation, acquisition
or other activities intended to: create financially sustainable
systems of care; preserve or expand essential health care services;
modernize obsolete facility physical plants and infrastructure;
foster participation in alternative payment arrangements, including
but not limited to contracts with managed care plans and accountable
care organizations; increase the quality of resident care or experi-
ence in residential health care facilities; or improve health infor-
mation technology infrastructure, including telehealth, to strength-
en the acute, post-acute care, primary care, and longterm care
continuum. Grants shall not be available to support general operat-
ing expenses.
The commissioner and the president of the dormitory authority of the
state of New York shall enter into an agreement, subject to the
approval of the director of the budget, and subject to section
1680-r of the public authorities law, for the purposes of awarding,
distributing, and administering the funds made available pursuant to
this appropriation.
In determining awards for eligible applicants under this appropri-
ation, the commissioner of health shall consider criteria including,
but not limited to:
(a) The extent to which the proposed project will contribute to the
integration of health care services or the long term sustainability
of the applicant or preservation of essential health services in the
community or communities served by the applicant;
(b) The extent to which the proposed project or purpose is aligned
with delivery system reform incentive payment ("DSRIP") program
goals and objectives;
(c) The geographic distribution of funds;
(d) The relationship between the proposed project and identified
community need;
(e) The extent to which the applicant has access to alternative
financing;
440 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(f) The extent to which the proposed project furthers the development
of primary care and other outpatient services;
(g) The extent to which the proposed project benefits medicaid enrol-
lees and uninsured individuals;
(h) The extent to which the applicant has engaged the community
affected by the proposed project and the manner in which community
engagement has shaped such project; and
(i) The extent to which the proposed project addresses potential risk
to patient safety and welfare.
Notwithstanding any inconsistent provision of law to the contrary, and
upon approval of the director of the budget, the commissioner may
award up to $300,000,000 of the funds made available pursuant to
this appropriation for unfunded project applications submitted in
response to the request for applications number 17648 issued by the
department on January 8, 2018 pursuant to section 2825-e of the
public health law.
Authorized amounts to be awarded pursuant to applications submitted in
response to the request for application number 17648 shall be
awarded no later than September 1, 2019.
The department shall provide a report on a quarterly basis to the
chairs of the senate finance, assembly ways and means, and senate
health and assembly health committees, until such time as the
department determines that the projects that receive funding pursu-
ant to this appropriation are substantially complete. Such reports
shall be submitted no later than sixty days after the close of the
quarter, and shall include, for each award, the name of the appli-
cant, a description of the project or purpose, the amount of the
award, disbursement date, and status of achievement of process and
performance metrics and milestones pursuant to subdivision 6 of
section 2825-f of the public health law.
Within amounts appropriated herein, a minimum of $45,000,000 shall be
made available for grant awards to residential health care facili-
ties, up to $20,000,000 may be made available for grant awards made
pursuant to paragraphs (l) and (m) of subdivision 3 of section 461-l
of the social services law, pursuant to criteria to be determined by
the commissioner and a minimum of $60,000,000 shall be made avail-
able for grant awards to community-based health care providers which
shall be defined as a diagnostic and treatment center licensed or
granted an operating certificate under article 28 of the public
health law, a mental health clinic licensed or granted an operating
certificate under article 31 of the mental hygiene law, a substance
use disorder treatment clinic licensed or granted an operating
certificate under article 32 of the mental hygiene law, a primary
care provider, a home care provider certified or licensed pursuant
to article 36 of the public health law, a facility granted an oper-
ating certificate under article 16 of the mental hygiene law or
hospices licensed or granted an operating certificate pursuant to
article 40 of the public health law.
The dormitory authority may issue bonds for such purposes up to the
amount appropriated herein. No expenditures may be made from this
appropriation to a facility until a facility specific plan has been
submitted to the department of health and has been approved by the
441 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
director of the budget (12SW18HE) (26668) ..........................
525,000,000 ..................................... (re. $387,801,000)
By chapter 54, section 1, of the laws of 2017, as transferred by chapter
54, section 1, of the laws of 2018:
For payments and grants to support health care facility transformation
statewide for capital, non-operational works. Notwithstanding
section 163 of the state finance law or any other provision of law
to the contrary, this appropriation may be used to fund payments and
or grants made by the commissioner of health in his or her sole
discretion, without a competitive bid or request for proposal proc-
ess, to eligible applicants as determined by the commissioner of
health for purposes in support of essential health care services.
Such purposes may include debt retirement and capital projects or
non-capital projects that facilitate health care transformation,
including mergers, consolidation, acquisition or other corporate
restructuring activities intended to create a financially sustaina-
ble system of care that promotes a patient-centered model of health
care delivery or preserves or expands essential health care
services. Grants shall not be available to support general operating
expenses.
The commissioner and the president of the dormitory authority of the
state of New York shall enter into an agreement, subject to the
approval of the director of the budget, and subject to section
1680-r of the public authorities law, for the purposes of awarding,
distributing, and administering the funds made available pursuant to
this appropriation.
In determining awards for eligible applicants under this appropri-
ation, the commissioner of health shall consider stakeholder, commu-
nity, and legislative input pursuant to subdivision 4-a of section
2825-e of the public health law criteria including, but not limited
to:
(a) the extent to which the proposed project will contribute to the
integration of health care services or the long term sustainability
of the applicant or preservation of essential health services in the
community or communities served by the applicant;
(b) The extent to which the proposed project or purpose is aligned
with delivery system reform incentive payment ("DSRIP") program
goals and objectives;
(c) Consideration of geographic distribution of funds;
(d) The relationship between the proposed project and identified
community need;
(e) The extent to which the applicant has access to alternative
financing;
(f) The extent that the proposed project furthers the development of
primary care and other outpatient services;
(g) The extent to which the proposed project benefits medicaid enrol-
lees and uninsured individuals;
(h) The extent to which the applicant has engaged the community
affected by the proposed capital project and the manner in which
community engagement has shaped such capital project; and
442 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(i) The extent to which the proposed project addresses potential risk
to patient safety and welfare.
Notwithstanding any inconsistent provision of law to the contrary, and
upon approval of the director of the budget, the commissioner of
health may award up to $300,000,000 of the funds made available
pursuant to this appropriation for unfunded project applications
submitted in response to the request for applications number
1607010255 issued by the department on July 20, 2016 pursuant to
section 2825-d of the public health law.
The department shall provide a report on a quarterly basis to the
chairs of the senate finance, assembly ways and means, and senate
health and assembly health committees. Such reports shall be submit-
ted no later than 60 days after the close of the quarter, and shall
include, for each award, the name of the applicant, a description of
the project or purpose, the amount of the award, disbursement date,
and status of achievement of process and performance metrics and
milestones pursuant to subdivision 5 of section 2825-e of the public
health law.
Within amounts appropriated herein, the director of the budget is
authorized to make a determination to fund up to $200,000,000 for
grant awards which are not eligible to be funded with the proceeds
of bonds issued pursuant to section 1680-r of the public authorities
law.
Within amounts appropriated herein, $50,000,000 shall be made avail-
able for grant awards to Montefiore medical center, and a minimum of
$75,000,000 shall be made available for grant awards to community-
based health care providers which shall be defined as a diagnostic
and treatment center licensed or granted an operating certificate
under article 28 of the public health law, a mental health clinic
licensed or granted an operating certificate under article 31 of the
mental hygiene law, an alcohol and substance abuse treatment clinic
licensed or granted an operating certificate under article 32 of the
mental hygiene law, a primary care provider, or a home care provider
certified or licensed pursuant to article 36 of public health law.
The dormitory authority may issue bonds for such purposes up to the
amount appropriated herein. No expenditures may be made from this
appropriation to a facility until a facility specific plan has been
submitted to the department of health and has been approved by the
director of the budget (12SW17HE) (26668) ..........................
500,000,000 ..................................... (re. $206,896,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2017:
For payments and grants to support health care facility transformation
statewide for capital, non-operational works. Notwithstanding
section 163 of the state finance law or any other provision of law
to the contrary, this appropriation may be used to fund payments and
or grants made by the commissioner of health in his or her sole
discretion, without a competitive bid or request for proposal proc-
ess, to eligible applicants as determined by the commissioner of
health for purposes in support of essential health care services.
Such purposes may include renovating or replacing inefficient or
443 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
outdated facilities as part of a merger, consolidation, acquisition
or other significant corporate restructuring activity that is part
of an overall transformation plan intended to create a financially
sustainable system of care that promotes a patient-centered model of
health care delivery aimed at improving the overall health and
wellbeing of a community. Eligible applicants shall be those deemed
by the commissioner to be a provider that fulfills or will fulfill a
health care need for acute inpatient, outpatient, primary, home care
or residential health care services in a community. The commissioner
and the president of the dormitory authority of the state of New
York shall enter into an agreement, subject to the approval of the
director of the budget, and subject to section 1680-r of the public
authorities law, for the purposes of awarding, distributing, and
administering the funds made available pursuant to this appropri-
ation. In determining awards for eligible applicants under this
appropriation, the commissioner of health and the president of the
authority shall consider criteria including, but not limited to:
(a) the extent to which the proposed capital project will contribute
to the integration of health care services and long term sustaina-
bility of the applicant or preservation of essential health services
in the community or communities served by the applicant;
(b) the extent to which the proposed project or purpose is aligned
with delivery system reform incentive payment ("DSRIP") program
goals and objectives;
(c) consideration of geographic distribution of funds;
(d) the relationship between the proposed capital project and identi-
fied community need;
(e) the extent to which the applicant has access to alternative
financing;
(f) the extent that the proposed capital project furthers the develop-
ment of primary care and other outpatient services;
(g) the extent to which the proposed capital project benefits medicaid
enrollees and uninsured individuals;
(h) the extent to which the applicant has engaged the community
affected by the proposed capital project and the manner in which
community engagement has shaped such capital project; and
(i) the extent to which the proposed capital project addresses poten-
tial risk to patient safety and welfare.
Disbursement of awards made pursuant to this appropriation shall be
conditioned on the awardee achieving certain process and performance
metrics and milestones as determined in the sole discretion of the
commissioner. Such metrics and milestones shall be structured to
ensure that the health care transformation and provider sustainabil-
ity goals of the project are achieved, and such metrics and mile-
stones shall be included in grant disbursement agreements or other
contractual documents as required by the commissioner.
The department shall provide a report on a quarterly basis to the
chairs of the senate finance, assembly ways and means, senate health
and assembly health committees. Such reports shall be submitted no
later than sixty days after the close of the quarter, and shall
include, for each award, the name of the applicant, a description of
the project or purpose, the amount of the award, disbursement date,
444 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and status of achievement of process and performance metrics and
milestones pursuant to subdivision 5 of section 2825-b of the public
health law. Within amounts appropriated herein, up to $5,000,000 may
be made available for the purchase of mammography equipped vehicles,
and a minimum of $30,000,000 shall be made available for community-
based health care providers which shall be defined as a diagnostic
and treatment center licensed or granted an operating certificate
under article twenty-eight of the public health law, a mental health
clinic licensed or granted an operating certificate under article
thirty-one of the mental hygiene law, an alcohol and substance abuse
treatment clinic licensed or granted an operating certificate under
article thirty-two of the mental hygiene law, primary care provid-
ers, or a home care provider certified or licensed pursuant to arti-
cle 36 of the Public Health Law. The dormitory authority may issue
bonds for such purposes in an amount appropriated herein. No expend-
itures may be made from this appropriation to a facility until a
facility specific plan has been submitted to the department of
health and has been approved by the director of the budget
(12SW16HE) (26668) ... 200,000,000 ............... (re. $52,035,000)
By chapter 54, section 1, of the laws of 2015:
For payments and grants to support health care facility transformation
within the county of Kings, for capital, non-operational works serv-
ing communities whose residents are experiencing significant levels
of health care disparities, health care needs and other risk
factors. Funding will be awarded in the discretion of the commis-
sioner of health, without a competitive bid or request for proposal
process, for purposes in support of essential health care services.
Such purposes may include renovating or replacing inefficient or
outdated facilities as part of a merger, consolidation, acquisition
or other significant corporate restructuring activity intended to
create a financially sustainable system of care that promotes a
patient-centered model of health care delivery aimed at improving
the overall health and well-being of a community. The dormitory
authority may issue bonds for such purposes in an amount appropri-
ated herein. No expenditures may be made from this appropriation to
a facility until a facility specific plan has been submitted to the
department of health and has been approved by the director of the
budget (12BK15HE) (26928) ... 700,000,000 ....... (re. $486,635,000)
IT INITIATIVES PROGRAM (CCP)
Capital Projects Fund - Other
Miscellaneous Capital Projects Fund
Health Care IT Capital Account - 32216
Program Improvement/Change Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
For services and expenses related to information technology projects
undertaken by the department of health, including the payment of
liabilities incurred prior to April 1, 2022 PURSUANT TO A PLAN THAT
445 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ADDRESSES INFORMATION TECHNOLOGY SECURITY AND DATA MANAGEMENT,
PREPARED BY THE DEPARTMENT OF HEALTH, DEVELOPED IN CONSULTATION WITH
THE OFFICE OF INFORMATION TECHNOLOGY SERVICES, AND APPROVED BY THE
DIRECTOR OF THE BUDGET. Upon the request of the commissioner of the
department of health and approval of the director of the division of
the budget, all or a portion of the funds appropriated hereby may be
suballocated or transferred to the office of information technology
services (12IT2208) (51919) ... 10,000,000 ........ (re. $8,677,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, is
hereby amended and reappropriated to read:
For services and expenses related to information technology projects
undertaken by the department of health, including the payment of
liabilities incurred prior to April 1, 2021 PURSUANT TO A PLAN THAT
ADDRESSES INFORMATION TECHNOLOGY SECURITY AND DATA MANAGEMENT,
PREPARED BY THE DEPARTMENT OF HEALTH, DEVELOPED IN CONSULTATION WITH
THE OFFICE OF INFORMATION TECHNOLOGY SERVICES, AND APPROVED BY THE
DIRECTOR OF THE BUDGET. Upon the request of the commissioner of the
department of health and approval of the director of the division of
the budget, all or a portion of the funds appropriated hereby may be
suballocated or transferred to the office of information technology
services (12IT2108) (51919) ... 10,000,000 ........ (re. $3,417,000)
LABORATORIES AND RESEARCH (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12592203) (29780) ........................................
12,000,000 ....................................... (re. $10,526,000)
By chapter 54, section 1, of the laws of 2021:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12592103) (29780) ... 8,000,000 ......... (re. $4,773,000)
By chapter 54, section 1, of the laws of 2020:
446 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12592003) (29780) ... 8,000,000 ......... (re. $4,170,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2021:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591903) (29780) ... 9,940,000 ........... (re. $771,000)
By chapter 54, section 1, of the laws of 2018:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591803) (29780) ... 8,000,000 ........... (re. $746,000)
By chapter 54, section 1, of the laws of 2017:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591703) (29780) ... 8,000,000 ........... (re. $783,000)
By chapter 55, section 1, of the laws of 2016:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591603) (29780) ... 8,000,000 ......... (re. $3,868,000)
By chapter 54, section 1, of the laws of 2015:
447 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591503) (29780) ... 8,000,000 ......... (re. $3,192,000)
By chapter 54, section 1, of the laws of 2014:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591403) (29780) ... 8,000,000 ........... (re. $122,000)
By chapter 54, section 1, of the laws of 2013:
To maintain and improve existing facilities including preparation of
plans and for payment to the design and construction management
account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12591303) (29780) ... 8,000,000 ......... (re. $3,027,000)
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12602203) (81010) ........................................
7,600,000 ......................................... (re. $7,494,000)
By chapter 54, section 1, of the laws of 2021:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
448 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12602103) (81010) ... 7,600,000 ......... (re. $4,911,000)
By chapter 54, section 1, of the laws of 2020:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12602003) (81010) ... 7,600,000 ......... (re. $2,005,000)
By chapter 54, section 1, of the laws of 2019:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601903) (81010) ... 7,600,000 ......... (re. $2,621,000)
By chapter 54, section 1, of the laws of 2018:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601803) (81010) ... 7,600,000 ......... (re. $2,349,000)
By chapter 54, section 1, of the laws of 2017:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
449 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601703) (81010) ... 7,600,000 ......... (re. $5,153,000)
By chapter 55, section 1, of the laws of 2016:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601603) (81010) ... 7,600,000 ......... (re. $4,769,000)
By chapter 54, section 1, of the laws of 2015:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601503) (81010) ... 7,600,000 ......... (re. $2,502,000)
By chapter 54, section 1, of the laws of 2014:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601403) (81010) ... 7,600,000 ......... (re. $7,600,000)
By chapter 54, section 1, of the laws of 2013:
For minor alterations, improvements and preventive maintenance of St.
Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
Batavia Nursing Home, and Montrose Nursing Home including prepara-
tion of plans and for payment to the design and construction manage-
ment account of the centralized services fund of the New York state
office of general services. Upon the request of the commissioner of
the department of health and approval of the director of the divi-
sion of the budget, funds of this appropriation may be transferred
to the dormitory authority of the state of New York for capital
projects (12601303) (81010) ... 7,600,000 ......... (re. $3,902,000)
450 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
VETERANS AFFAIRS (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Department of Veterans Affairs Grants Account - 31360
Veterans Affairs Purpose
By chapter 54, section 1, of the laws of 2022:
For federal grant support to department of health facilities including
minor alterations, improvements, and preventive maintenance. For
services and expenses for payment of liabilities accrued heretofore
and hereafter to accrue (120122VA) (29601) .........................
5,569,000 ......................................... (re. $5,569,000)
By chapter 54, section 1, of the laws of 2020:
For federal grant support to department of health facilities including
minor alterations, improvements, and preventive maintenance. For
services and expenses for payment of liabilities accrued heretofore
and hereafter to accrue (120120VA) (29601) .........................
6,000,000 ......................................... (re. $2,356,000)
WATER RESOURCES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Water Resources Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of a portion of the state's match for the safe drinking
water revolving fund (12SM2257) (26888) ............................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of a portion of the state's match for the safe drinking
water revolving fund (12SM2157) (26888) ............................
15,000,000 ....................................... (re. $11,000,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Safe Drinking Water Revolving Account - 31360
Water Resources Purpose
By chapter 54, section 1, of the laws of 2022:
For federal grants for the safe drinking water revolving fund
(12022257) (26888) ... 300,000,000 .............. (re. $300,000,000)
For services and expenses of the state revolving funds program
(12DW2257) (26666) ... 30,000,000 ................ (re. $29,998,000)
By chapter 54, section 1, of the laws of 2021:
For federal grants for the safe drinking water revolving fund
(12022157) (26888) ... 70,000,000 ................ (re. $31,909,000)
451 12554-05-3
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of the state revolving funds program
(12DW2157) (26666) ... 7,000,000 .................. (re. $3,285,000)
By chapter 54, section 1, of the laws of 2020:
For federal grants for the safe drinking water revolving fund
(12022057) (26888) ... 70,000,000 ................ (re. $32,228,000)
For services and expenses of the state revolving funds program
(12DW2057) (26666) ... 7,000,000 .................... (re. $842,000)
By chapter 54, section 1, of the laws of 2019:
For federal grants for the safe drinking water revolving fund
(12021957) (26888) ... 70,000,000 ................ (re. $32,252,000)
For services and expenses of the state revolving funds program
(12DW1957) (26666) ... 7,000,000 ..................... (re. $66,000)
By chapter 54, section 1, of the laws of 2018:
For federal grants for the safe drinking water revolving fund
(12021857) (26888) ... 70,000,000 ................ (re. $31,895,000)
For services and expenses of the state revolving funds program
(12DW1857) (26666) ... 7,000,000 .................... (re. $168,000)
By chapter 54, section 1, of the laws of 2017:
For federal grants for the safe drinking water revolving fund
(12021757) (26888) ... 70,000,000 ................ (re. $36,770,000)
For services and expenses of the state revolving funds program
(12DW1757) (26666) ... 7,000,000 .................. (re. $1,013,000)
By chapter 55, section 1, of the laws of 2016:
For federal grants for the safe drinking water revolving fund
(12021657) (26888) ... 70,000,000 ................ (re. $34,087,000)
For services and expenses of the state revolving funds program
(12DW1657) (26666) ... 7,000,000 .................... (re. $236,000)
By chapter 54, section 1, of the laws of 2015:
For federal grants for the safe drinking water revolving fund
(12021557) (26888) ... 70,000,000 ................ (re. $26,134,000)
By chapter 54, section 1, of the laws of 2014:
For federal grants for the safe drinking water revolving fund
(12021457) (26888) ... 70,000,000 ................ (re. $30,761,000)
By chapter 54, section 1, of the laws of 2013:
For federal grants for the safe drinking water revolving fund
(12021357) (26888) ... 70,000,000 ................ (re. $14,641,000)
By chapter 54, section 1, of the laws of 2010:
For federal grants for the safe drinking water revolving fund
(12021057) (26888) ... 157,183,000 ............... (re. $30,067,000)
452 12554-05-3
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 143,000,000 479,154,000
---------------- ----------------
All Funds ........................ 143,000,000 479,154,000
================ ================
DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................. 140,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
For the cost of studies, planning, design,
construction, reconstruction, renovation,
and equipment related to the development
of a centralized state emergency oper-
ations center facility including related
departmental administrative cost
(EROC2307)(30349) ........................... 80,000,000
For the cost of studies, planning, design,
construction, reconstruction, renovation,
and equipment related to the development
of the state academy of fire science
including related departmental administra-
tive cost(ERBM2307) ......................... 10,000,000
For services and expenses of volunteer fire
departments, including but not limited to,
planning, design, construction, recon-
struction, renovation and/or purchase of
equipment and/or facilities ................. 50,000,000
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) ..... 3,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
Alterations and improvements for the preser-
vation of facilities including liabilities
incurred prior to April 1, 2023 (ERPF2303)
(81108) ...................................... 3,000,000
453 12554-05-3
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the cost of studies, site acquisition, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of centralized state public safety training facili-
ties including related departmental administrative costs incurred
prior to April 1, 2022 (ERNF2207) (81007) ..........................
3,000,000 ......................................... (re. $3,000,000)
For the cost of studies, planning, design, construction, recon-
struction, renovation, and equipment related to the development of
centralized state emergency operations center facility including
related departmental administrative cost (EROC2207) (30349) ........
25,000,000 ....................................... (re. $24,974,000)
By chapter 54, section 1, of the laws of 2019:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of centralized state public safety training facili-
ties including related departmental administrative costs incurred
prior to April 1, 2019 (ERNF1907) (81007) ..........................
5,000,000 ......................................... (re. $4,921,000)
By chapter 50, section 1, of the laws of 2010:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of centralized state public safety training facili-
ties including related departmental administrative costs incurred
prior to April 1, 2010 (ERNF1007) (81007) ..........................
42,000,000 ........................................ (re. $1,483,000)
DISASTER ASSISTANCE (CCP)
Capital Projects Funds - Other
New York State Storm Recovery Capital Fund
Storm Recovery Account - 33001
Disaster Assistance Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2014:
For the cost of repair, rehabilitation, or replacement of capital
works or purposes damaged by hurricane Sandy which are expected to
be eligible for reimbursement by the federal emergency management
agency (FEMA), the federal transit administration (FTA), the federal
highway administration (FHWA) and/or any other federal reimbursement
source, including liabilities incurred prior to April 1, 2013. This
appropriation may be available to provide advances in anticipation
of reimbursement for the repair, rehabilitation, or replacement of
454 12554-05-3
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital works or purposes damaged by hurricane Sandy which are
expected to be eligible for reimbursement by FEMA, FTA, FHWA and/or
any other federal reimbursement source. No such advances for a
project shall be made unless the division of budget has first deter-
mined that there is a substantial likelihood that the project is
eligible for reimbursement by FEMA, FTA, FHWA and/or any other
federal reimbursement source. Notwithstanding any provision of law
to the contrary, the state comptroller shall credit these appropri-
ations with federal grants received pursuant to the federal communi-
ty development block grant program or any other federal program
providing disaster aid, in recognition that the state was required
to make payments for eligible projects in advance of the availabili-
ty of federal reimbursement. Funds appropriated herein may be subal-
located or transferred to any other state department, agency, or
public benefit corporation, to achieve this purpose. Five business
days after the close of each month, the division of the budget shall
report to the chair of the senate finance committee and the chair of
the assembly ways and means committee total disbursements from this
appropriation (73FA13DA) (30328) ...................................
450,000,000 ..................................... (re. $384,167,000)
INTEROPERABLE COMMUNICATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement Purpose
By chapter 54, section 1, of the laws of 2021:
For the provision of grants or reimbursement to counties for the
development, consolidation or operation of public safety communi-
cations systems or networks designed to support statewide interoper-
able communications for first responders. Expenditures from this
appropriation shall reduce appropriations for grants from the state-
wide public safety communications account for the same purpose by an
equivalent amount, and such appropriation authority in such account
shall then be deemed to have lapsed to the extent of such reduction
(ERIC2108) (30336) ... 30,500,000 ................ (re. $30,500,000)
By chapter 54, section 1, of the laws of 2015:
For projects designed to advance completion of a fully interoperable
statewide public safety communications network. Expenditures from
this appropriation shall reduce appropriations for grants from the
statewide public safety communications account for the same purpose
by an equivalent amount, and such appropriation authority in such
account shall then be deemed to have lapsed to the extent of such
reduction (ERCN1508) (30337) ... 15,000,000 ...... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2014:
For projects designed to advance completion of a fully interoperable
statewide public safety communications network. Expenditures from
this appropriation shall reduce appropriations for grants from the
statewide public safety communications account for the same purpose
455 12554-05-3
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
by an equivalent amount, and such appropriation authority in such
account shall then be deemed to have lapsed to the extent of such
reduction (ERCN1408) (30337) ... 15,000,000 ....... (re. $1,026,000)
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2017 (ERHS1701) (81028) ...........
2,000,000 ........................................... (re. $632,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2022 (ERPF2203)
(81108) ... 3,000,000 ............................. (re. $3,000,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2021 (ERPF2103)
(81108) ... 3,000,000 ............................. (re. $3,000,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2020 (ERPF2003)
(81108) ... 3,000,000 ............................. (re. $3,000,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2019 (ERPF1903)
(81108) ... 3,000,000 ............................. (re. $3,000,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2018 (ERPF1803)
(81108) ... 3,000,000 ............................... (re. $994,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2017 (ERPF1703)
(81108) ... 1,000,000 ............................... (re. $457,000)
456 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,257,300,000 7,513,979,000
Capital Projects Funds - Federal ... 0 10,100,000
---------------- ----------------
All Funds ........................ 1,257,300,000 7,524,079,000
================ ================
ACCESS TO HOME (CCP) ......................................... 4,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For allocation as follows: For contract with
eligible applicants to provide financial
assistance for the actual costs of an
access to home program pursuant to article
XXV of the private housing finance law
(08052307) (31409) ........................... 1,000,000
For additional expenses for the Access to
Home Program ................................. 3,000,000
AFFORDABLE HOUSING CORPORATION (CCP) ........................ 40,500,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Affordable Housing Corporation Account - 31852
New Facilities Purpose
For allocation as follows: For deposit in
the affordable housing development account
created pursuant to section 59-b of the
private housing finance law for the
purposes of carrying out the provisions of
article XIX of the private housing finance
law. No funds shall be expended from this
appropriation until the director of the
budget has approved a financial plan
submitted by the affordable housing corpo-
ration in such detail as required by the
director of the budget.
Up to 5 percent of the funds appropriated
herein may be used for administrative
purposes (08012307) (31424) ................. 26,000,000
457 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
For additional funding for the affordable
housing corporation program. For allo-
cation as follows: For deposit in the
affordable housing development account
created pursuant to section 59-b of the
private housing finance law for the
purposes of carrying out the provisions of
article XIX of the private housing finance
law. No funds shall be expended from this
appropriation until the director of the
budget has approved a financial plan
submitted by the affordable housing corpo-
ration in such detail as required by the
director of the budget. The amounts appro-
priated herein may be suballocated or
transferred to any state department, agen-
cy, or public authority for the purposes
stated herein (08312307)(31399) ............. 14,500,000
GOVERNOR'S OFFICE OF STORM RECOVERY (CCP) ................... 28,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For allocation as follows: For the purpose
of capital projects and other improvements
in support of recovery and rebuilding
efforts in areas of New York state
impacted by natural disasters to be admin-
istered by the housing trust fund corpo-
ration by means of the governor's office
of storm recovery. No funds shall be
expended from this appropriation until the
director of the budget has approved a
financial plan submitted by the housing
trust fund corporation on behalf of the
governor's office of storm recovery in
such detail as required by the director of
the budget. The amounts appropriated here-
in may be suballocated or transferred to
any state department, agency, or public
authority for the purposes stated herein
(08202307) (30915) .......................... 28,000,000
HOMES FOR WORKING FAMILIES PROGRAM (CCP) .................... 14,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
458 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For allocation as follows: For the purpose
of maximizing the state's utilization of
federal low income housing tax credits in
conjunction with the issuance of tax
exempt bonds used to finance affordable
housing construction. The amounts appro-
priated herein may be suballocated or
transferred to any state department, agen-
cy, or public authority for the purposes
stated herein. Up to 5 percent of the
funds appropriated herein may be used for
administrative purposes (08032307) (31423)
............................................. 14,000,000
HOMEOWNER STABILIZATION FUND (CCP) .......................... 50,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For services and expenses of a homeowner
stabilization fund. Funds appropriated
herein may be suballocated or transferred
to any state department, agency, or public
authority for the purposes stated herein
(08282303) .................................. 50,000,000
HOUSING OPPORTUNITIES PROGRAM FOR THE ELDERLY (CCP) .......... 6,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For allocation as follows: For contracts
with not-for-profit corporations or muni-
cipalities to provide state financial
assistance to administer emergency home
repairs programs which provide grants and
loans in an amount not to exceed $10,000
per unit for the cost of correcting any
condition which poses a threat to the
life, health or safety of a low income
elderly homeowner pursuant to article XXIX
of the private housing finance law. No
funds shall be expended from this appro-
459 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
priation until the director of the budget
has approved a financial plan submitted by
the housing trust fund corporation on
behalf of the housing opportunities for
the elderly program in such detail as
required by the director of the budget.
Up to 5 percent of the funds appropriated
herein may be used for administrative
purposes (08082303) (31422) .................. 1,400,000
For additional expenses for the Housing
Program for the Elderly ...................... 4,600,000
INFRASTRUCTURE SUPPORT FUND (CCP) .......................... 500,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For services and expenses of a program to
support infrastructure development and
improvement in localities that undertake
zoning changes to increase housing
production. The amounts appropriated here-
in may be suballocated or transferred to
any state department, agency, or public
authority for the purposes stated herein
(08272303) ................................. 250,000,000
For additional expenses of the Infrastruc-
ture Support Fund .......................... 250,000,000
LEAD ABATEMENT PROGRAM (CCP) ................................ 20,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For services and expenses of a lead abate-
ment program to be administered through
the housing trust fund corporation. Funds
may be used to support lead abatement
outside the city of New York. The amounts
appropriated herein may be suballocated or
transferred to any state department, agen-
cy, or public authority for the purposes
stated herein (08302303) .................... 20,000,000
LOW INCOME HOUSING TRUST FUND (CCP) ......................... 44,200,000
--------------
460 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For allocation as follows: For deposit in
the housing trust fund account created
pursuant to section 59-a of the private
housing finance law for the purposes of
carrying out the provisions of article
XVIII of the private housing finance law
including up to $300,000 to offset housing
trust fund corporation costs of adminis-
tering the low income housing trust fund
program established by such article. No
funds shall be expended from this appro-
priation until the director of the budget
has approved a financial plan submitted by
the housing trust fund corporation on
behalf of the housing trust fund program
in such detail as required by the director
of the budget.
Up to 5 percent of the funds appropriated
herein may be used for administrative
purposes (08042307) (31421) ................. 44,200,000
MAIN STREET PROGRAM (CCP) .................................... 4,200,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For allocation as follows: For contract with
not-for-profit corporations and munici-
palities to provide state fiscal assist-
ance to administer main street or downtown
revitalization projects for communities
pursuant to article XXVI of the private
housing finance law (08062307) (31413) ....... 4,200,000
MANUFACTURED HOME ADVANTAGE PROGRAM (CCP) .................... 5,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For allocation as follows: For the purposes
of a mobile and manufactured home advan-
461 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
tage program to fund loans and grants for
the acquisition, demolition, or replace-
ment and/or repair of mobile or manufac-
tured homes and/or mobile or manufactured
home parks. No funds shall be expended
from this appropriation until the director
of the budget has approved a financial
plan submitted by the administering agency
in such detail as required by the director
of the budget. Notwithstanding any other
law to the contrary, the amounts appropri-
ated herein may be suballocated or trans-
ferred to any state department, agency, or
public authority for the purposes stated
herein (08212303) (30917) .................... 5,000,000
MITCHELL-LAMA PRESERVATION AND HOMEOWNERSHIP PROGRAM (CCP) . 100,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For services and expenses of a Mitchell-Lama
preservation and homeownership program to
preserve and improve Mitchell-Lama proper-
ties and create permanently affordable
homeownership in the state. Amounts appro-
priated herein shall be distributed based
on a plan submitted by the division of
housing and community renewal and approved
by the director of the budget. Up to 5
percent of the funds appropriated herein
may be used for administrative purposes.
The amounts appropriated herein may be
suballocated or transferred to any state
department, agency, or public authority
for the purposes stated herein ............. 100,000,000
PUBLIC HOUSING MODERNIZATION PROGRAM (CCP) ................... 6,400,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
For allocation as follows: For services and
expenses of a public housing modernization
program. Of the amount appropriated here-
in, the sum of $400,000 may be allocated
462 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
for capital project activities associated
with article XII of the public housing
law. No funds shall be expended from this
appropriation until the director of the
budget has approved a financial plan
submitted by the housing trust fund corpo-
ration on behalf of the public housing
modernization program in such detail as
required by the director of the budget.
Up to 5 percent of the funds appropriated
herein may be used for administrative
purposes (08052303) (31420) .................. 6,400,000
PUBLIC HOUSING ASSISTANCE PROGRAM (CCP) .................... 400,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For services and expenses of a public hous-
ing assistance program for public housing
across the state. Of the amounts appropri-
ated herein $350,000,000 shall be suballo-
cated to the New York city housing author-
ity. Provided further that $50,000,000
shall be distributed to public housing
throughout the state based on a plan
submitted by the division of housing and
community renewal and approved by the
director of the budget. The amounts
appropriated herein may be suballocated or
transferred to any state department, agen-
cy, or public authority for the purposes
stated herein .............................. 400,000,000
SMALL RENTAL HOUSING DEVELOPMENT INITIATIVE (CCP) ........... 20,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For services and expenses of a small rental
housing development initiative for capital
developments under 20 units. The amounts
appropriated herein may be suballocated or
transferred to any state department, agen-
cy, or public authority for the purposes
stated herein ................................ 7,000,000
463 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2023-24
For additional services and expenses of the
small rental housing development initi-
ative ....................................... 13,000,000
--------------
STATEWIDE DATA COLLECTION PROGRAM (CCP) ..................... 15,000,000
--------------
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
For services and expenses of the development
and implementation of a statewide data
collection system program in consultation
with the office of information technology
services. The amounts appropriated herein
may be suballocated or transferred to any
state department, agency, or public
authority for the purposes stated herein
(08292307) .................................. 15,000,000
464 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ACCESS TO HOME (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For contract with eligible applicants to
provide financial assistance for the actual costs of an access to
home program pursuant to article XXV of the private housing finance
law (08052207)(31409) ... 1,000,000 ................. (re. $457,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For contract with eligible applicants to
provide financial assistance for the actual costs of an access to
home program pursuant to article XXV of the private housing finance
law (08052107) (31409) ... 1,000,000 .............. (re. $1,000,000)
ADAPTIVE REUSE AFFORDABLE HOUSING PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2021, as amended by chapter
151, section 2, of the laws of 2021:
To support the creation of the adaptive reuse affordable housing
program to finance conversion of commercial properties and hotel
properties in the city of New York for the purposes of creating
permanent affordable residential housing. The amounts appropriated
herein may be suballocated or transferred to any state department,
agency, or public authority for purposes stated herein (08232107)
(31491) ... 100,000,000 ......................... (re. $100,000,000)
AFFORDABLE HOUSING CORPORATION (CCP)
Capital Projects Funds - Other
Housing Program Fund
Affordable Housing Corporation Account - 31852
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
465 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08012207) (31424) .........................
26,000,000 ....................................... (re. $26,000,000)
For additional funding for the affordable housing corporation program.
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et. The amounts appropriated herein may be suballocated or trans-
ferred to any state department, agency, or public authority for the
purposes stated herein [(08012207) (31424)] (08LA2207) (31399)
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08012107) (31424) .........................
26,000,000 ....................................... (re. $26,000,000)
Notwithstanding section 59-b of the private housing finance law, funds
appropriated herein may be used to fund the vacant property program
for renovation projects of vacant and blighted homes for the
purposes of creating affordable housing for first-time homebuyers.
The amounts appropriated herein may be suballocated or transferred
to any state department, agency, or public authority for the
purposes stated herein (08242107) (31492) ..........................
25,000,000 ....................................... (re. $21,793,000)
By chapter 54, section 1, of the laws of 2020:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08012007) (31424) .........................
26,000,000 ....................................... (re. $26,000,000)
By chapter 54, section 1, of the laws of 2019:
466 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011907) (31424) .........................
26,000,000 ....................................... (re. $26,000,000)
By chapter 54, section 1, of the laws of 2018:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011807) (31424) .........................
26,000,000 ....................................... (re. $20,538,000)
By chapter 54, section 1, of the laws of 2017:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011707) (31424) .........................
26,000,000 ........................................ (re. $1,300,000)
By chapter 55, section 1, of the laws of 2016:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011607) (31424) .........................
26,000,000 ........................................ (re. $1,025,000)
By chapter 54, section 1, of the laws of 2015:
467 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011507) (31424) .........................
29,000,000 .......................................... (re. $700,000)
By chapter 54, section 1, of the laws of 2014:
For allocation as follows: For deposit in the affordable housing
development account created pursuant to section 59-b of the private
housing finance law for the purposes of carrying out the provisions
of article XIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the affordable housing
corporation in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08011407) (31424) .........................
25,000,000 .......................................... (re. $950,000)
GOVERNOR'S OFFICE OF STORM RECOVERY (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For the purpose of capital projects and
other improvements in support of recovery and rebuilding efforts in
areas of New York state impacted by natural disasters to be adminis-
tered by the housing trust fund corporation by means of the gover-
nor's office of storm recovery. No funds shall be expended from this
appropriation until the director of the budget has approved a finan-
cial plan submitted by the housing trust fund corporation on behalf
of the governor's office of storm recovery in such detail as
required by the director of the budget. The amounts appropriated
herein may be suballocated or transferred to any state department,
agency, or public authority for the purposes stated herein
(08202207) (30915) ... 77,000,000 ................ (re. $77,000,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For the purpose of capital projects and
other improvements in support of recovery and rebuilding efforts in
areas of New York state impacted by natural disasters to be adminis-
tered by the housing trust fund corporation by means of the gover-
nor's office of storm recovery. No funds shall be expended from this
468 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriation until the director of the budget has approved a finan-
cial plan submitted by the housing trust fund corporation on behalf
of the governor's office of storm recovery in such detail as
required by the director of the budget. The amounts appropriated
herein may be suballocated or transferred to any state department,
agency, or public authority for the purposes stated herein
(08202107) (30915) ... 130,000,000 ............... (re. $16,960,000)
HOMES FOR WORKING FAMILIES PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
For allocation as follows: For [deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law and subject to the provisions of article XVIII of the
private housing finance law for] the purpose of maximizing the
state's utilization of federal low income housing tax credits in
conjunction with the issuance of tax exempt bonds used to finance
affordable housing construction. THE AMOUNTS APPROPRIATED HEREIN
MAY BE SUBALLOCATED OR TRANSFERRED TO ANY STATE DEPARTMENT, AGENCY,
OR PUBLIC AUTHORITY FOR THE PURPOSES STATED HEREIN.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08032207) (31423) .........................
14,000,000 ....................................... (re. $14,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, is
hereby amended and reappropriated to read:
For allocation as follows: For [deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law and subject to the provisions of article XVIII of the
private housing finance law for] the purpose of maximizing the
state's utilization of federal low income housing tax credits in
conjunction with the issuance of tax exempt bonds used to finance
affordable housing construction. THE AMOUNTS APPROPRIATED HEREIN
MAY BE SUBALLOCATED OR TRANSFERRED TO ANY STATE DEPARTMENT, AGENCY,
OR PUBLIC AUTHORITY FOR THE PURPOSES STATED HEREIN.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08032107) (31423) .........................
14,000,000 ....................................... (re. $13,300,000)
The appropriation made by chapter 54, section 1, of the laws of 2020, is
hereby amended and reappropriated to read:
For allocation as follows: For [deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law and subject to the provisions of article XVIII of the
private housing finance law for] the purpose of maximizing the
state's utilization of federal low income housing tax credits in
469 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
conjunction with the issuance of tax exempt bonds used to finance
affordable housing construction. THE AMOUNTS APPROPRIATED HEREIN
MAY BE SUBALLOCATED OR TRANSFERRED TO ANY STATE DEPARTMENT, AGENCY,
OR PUBLIC AUTHORITY FOR THE PURPOSES STATED HEREIN.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08032007) (31423) .........................
14,000,000 ....................................... (re. $13,300,000)
The appropriation made by chapter 54, section 1, of the laws of 2019, is
hereby amended and reappropriated to read:
For allocation as follows: For [deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law and subject to the provisions of article XVIII of the
private housing finance law for] the purpose of maximizing the
state's utilization of federal low income housing tax credits in
conjunction with the issuance of tax exempt bonds used to finance
affordable housing construction. THE AMOUNTS APPROPRIATED HEREIN
MAY BE SUBALLOCATED OR TRANSFERRED TO ANY STATE DEPARTMENT, AGENCY,
OR PUBLIC AUTHORITY FOR THE PURPOSES STATED HEREIN.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08031907) (31423) .........................
14,000,000 ....................................... (re. $13,300,000)
The appropriation made by chapter 54, section 1, of the laws of 2018, is
hereby amended and reappropriated to read:
For allocation as follows: For [deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law and subject to the provisions of article XVIII of the
private housing finance law for] the purpose of maximizing the
state's utilization of federal low income housing tax credits in
conjunction with the issuance of tax exempt bonds used to finance
affordable housing construction. THE AMOUNTS APPROPRIATED HEREIN
MAY BE SUBALLOCATED OR TRANSFERRED TO ANY STATE DEPARTMENT, AGENCY,
OR PUBLIC AUTHORITY FOR THE PURPOSES STATED HEREIN.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08031807) (31423) .........................
14,000,000 ........................................ (re. $4,948,000)
HOUSING PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
In support of a comprehensive, statewide multi-year housing program.
The commissioner shall provide, in electronic excel format or as
requested by the Legislature, an annual report to the director of
the budget, the speaker of the Assembly, and the temporary president
of the Senate, on or before July 1 of each year, that summarizes the
activities undertaken pursuant to the funding made available in the
470 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
2022-23 state fiscal year housing program (ccp). Such annual report
shall be cumulative and shall include an itemized list of each
project utilizing funds appropriated by the 2022-23 fiscal year
housing program (ccp), including a brief description of the project,
project address, county, awardee, total budget, amount of capital
subsidy appropriated by the housing program (ccp), relevant section
of the housing program (ccp), number of units, area median income
requirements if applicable, month and year construction will
commence, projected date of occupancy, and project phase
(construction, complete, defunded). In addition to the annual
report, the commissioner shall provide, in electronic excel format
or as requested by the Legislature, a summary update to the director
of the budget, the speaker of the Assembly, and the temporary presi-
dent of the Senate, on or before January 1 of each year. Such summa-
ry update shall include total commitments against each subprogram
within the 2022-23 fiscal year housing program (ccp), total number
of projects supported with those commitments, and total number of
affordable units within those projects. Such report and summary
update shall continue to be provided until such time as the final
disbursement of funds appropriated in the 2022-23 state fiscal year
housing program (ccp) has occurred. Notwithstanding any other law to
the contrary, the amounts appropriated herein may be suballocated or
transferred to any state department, agency, or public authority for
the purposes stated herein.
1. A total of $1,500,000,000 shall be made available for the purpose
of providing capital and operating subsidies for the development or
preservation of supportive housing units throughout the state over
the next five years.
2. A total of $1,000,000,000 shall be made available for the purpose
of providing capital subsidies for the new construction or adaptive
reuse of rental housing that advance one or more of the specific
housing priorities of the state. Up to 5 percent of the funds allo-
cated herein may be used for administrative purposes.
3. A total of $300,000,000 shall be made available for the purpose of
developing or rehabilitating senior rental affordable housing
targeted to low-income seniors, aged 60 and above.
4. A total of $80,000,000 for purposes of the rural and urban communi-
ty investment fund program created pursuant to article XXVII of the
private housing finance law.
5. A total of $90,000,000 shall be made available for the purpose of
providing capital subsidies for the new construction, adaptive
reuse, or reconstruction of rental housing affordable to households
that earn between 60 percent and 130 percent of AMI and that advance
one or more of the specific housing priorities of the state.
6. A total of $450,000,000 shall be made available for the purpose of
substantial or moderate rehabilitation of site-specific multi-family
rental housing.
7. A total of $120,000,000 shall be made available for the purpose of
providing capital subsidies to preserve and improve Mitchell-Lama
properties in the state.
8. A total of $150,000,000 shall be made available for the purpose of
substantial or moderate rehabilitation and/or the demolition and
471 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
replacement through new construction of site-specific multi-family
rental housing currently owned by federally-supervised or state-su-
pervised public housing authorities outside of New York city.
9. A total of $60,000,000 shall be made available for the purpose of
substantial or moderate rehabilitation and new construction of
buildings of 5 to 50 units.
10. A total of $400,000,000 shall be made available for the purpose of
promoting home ownership among families of low and moderate income
for whom there are few affordable home ownership alternatives in the
private market, and to stimulate the development, stabilization, and
preservation of New York communities.
11. A total of $20,000,000 shall be made available for the purposes of
mobile and manufactured home replacement program pursuant to chapter
54 of the laws of 2016.
12. A total of $85,000,000 shall be made available for the purposes of
creating and upgrading accessory dwelling units across the state.
13. A total of $250,000,000 shall be made available for the purposes
of capital projects including all-electric, high-performance equip-
ment for heating and for capital projects to utilize high-perfor-
mance building envelope design, and alternative energy sources
(08112207) (30904) ... 4,505,000,000 .......... (re. $4,505,000,000)
By chapter 54, section 1, of the laws of 2021:
In support of a comprehensive, statewide multi-year housing program.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein.
Funds appropriated shall support the development of supportive housing
units throughout the state (08112107) (30904) ......................
186,000,000 ..................................... (re. $186,000,000)
By chapter 54, section 1, of the laws of 2018:
In support of a comprehensive, statewide multi-year housing program.
Spending authorized by this appropriation shall be subject to the
same reporting requirements as the 2016-17 and 2017-18 state fiscal
year housing program (CCP).
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein.
When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (CCP), funds appropriated
herein shall be made available for the purpose of providing capital
subsidies for the development of 6,000 or more supportive housing
units throughout the state over the next five years, as determined
by a competitive selection process (08111807) (30904) ..............
132,000,000 ..................................... (re. $132,000,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
In support of a comprehensive, statewide multi-year housing program.
The commissioner shall provide, in electronic excel format or as
requested by the Legislature, an annual report to the director of
472 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the budget, the speaker of the Assembly, and the temporary president
of the Senate, on or before July 1 of each year, that summarizes the
activities undertaken pursuant to the funding made available in the
2016-17 and 2017-18 state fiscal year housing program (ccp). Such
annual report shall be cumulative and shall include an itemized list
of each project utilizing funds appropriated by the 2016-17 and
2017-18 state fiscal year housing program (ccp), including a brief
description of the project, street address, county, awardee, total
budget, amount of capital subsidy appropriated by the housing
program (ccp), relevant section of the housing program (ccp), bonded
or cash, amount of each additional public funding source, funding
program, number of units, area median income requirements if appli-
cable, month and year construction will commence, projected date of
occupancy, and project phase (in development, engineering,
construction, complete, defunded). Such annual report shall continue
to be provided until such time as the final disbursement of funds
appropriated in the 2016-17 and 2017-18 state fiscal year housing
program (ccp) has occurred.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated to any state department, agency, or
public authority for the purposes stated herein. Notwithstanding
section 40 of the state finance law or any other law to the contra-
ry, all assistance appropriations made from this account shall
remain in full force and effect in accordance, in the aggregate,
with the following schedule: not more than an additional
$500,000,000 for the period April 1, 2019 through and past March 31,
2020, and not more than an additional $41,525,000 for the period
April 1, 2020 through and past March 31, 2021 as indicated below:
1. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$950,000,000 shall be made available for the purpose of providing
capital and operating subsidies for the development of 6,000 or more
supportive housing units throughout the state over the next five
years, as determined by a competitive selection process.
2. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$472,025,000 shall be made available for the purpose of providing
capital subsidies for the new construction or adaptive reuse of
rental housing affordable to households that earn up to 60 percent
of area median income (AMI) and that advance one or more of the
specific housing priorities of the state. Up to 5 percent of the
funds allocated herein may be used for administrative purposes.
3. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$125,000,000 shall be made available for the purpose of developing
or rehabilitating one hundred percent senior rental affordable hous-
ing targeted to low-income seniors, aged 60 and above.
4. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$45,000,000 for purposes of the rural and urban community investment
fund program created pursuant to article XXVII of the private hous-
ing finance law.
473 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
5. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$150,000,000 shall be made available for the purpose of providing
capital subsidies for the new construction, adaptive reuse, or
reconstruction of rental housing affordable to households that earn
between 60 percent and 130 percent of AMI and that advance one or
more of the specific housing priorities of the state.
6. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$146,000,000 shall be made available for the purpose of substantial
or moderate rehabilitation of site-specific multi-family rental
housing currently under a regulatory agreement or extended use
agreement with the division of housing and community renewal or
another state, federal or local housing agency.
7. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$75,000,000 shall be made available for the purpose of providing
capital subsidies to preserve and improve Mitchell-Lama properties
in the state.
8. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$125,000,000 shall be made available for the purpose of substantial
or moderate rehabilitation and/or the demolition and replacement
through new construction of site-specific multi-family rental hous-
ing currently owned by public housing authorities outside of New
York city. The distribution of any funds which the division of hous-
ing and community renewal or other appropriate state agencies or
authorities authorizes to be used as part of a federal housing
program, shall require the division of housing and community renewal
to monitor and ensure that any affected public housing tenants are
properly informed regarding participation in the federal housing
program and that appropriate documents related to participation in
such federal housing program are made publicly available and are
posted on each applicable housing authority's website in a timely
manner to properly inform such public housing authority tenants.
The residents of public housing that receives and uses such funds to
participate in such federal program shall be provided a uniform
lease agreement that provides, at a minimum, terms and conditions
consistent with those found in the public housing lease they had
prior to the public housing having received any such funds. Public
housing authorities that receive and use such funds shall be
required to: provide resident education, which shall include compre-
hensive information about any anticipated changes to the public
housing; provide language assistance to residents with limited
English proficiency; recognize the right of residents to form a
resident organization; require resident participation funding
commensurate to the funding that was being allocated to residents
already; develop a set of procedures for resident grievances and
lease termination proceedings that apply to residents following the
use of such funds, which shall be consistent with any existing
procedures, can provide stronger resident protections, and conform
with any other applicable federal rules and/or regulations. In cases
474 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
when there is a property manager other than the public housing
authority that receives these funds, then such property manager
shall be required to take actions including, but not limited to,
providing clear and accessible information to residents before,
during, and after becoming the property manager; provide language
assistance to residents with limited English proficiency; and recog-
nize a legitimate resident organization as the residents' represen-
tative, invite such resident organization to all resident engage-
ments, and meet regularly with the resident organization to discuss
emerging property-wide issues.
9. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$62,500,000 shall be made available for the purpose of substantial
or moderate rehabilitation and/or the demolition and replacement
through new construction of buildings of 5 to 40 units.
10. When combined with other funds made available in the 2016-17 amd
2017-18 state fiscal year housing program (ccp), up to a total of
$41,475,000 shall be made available for the purpose of promoting
home ownership among families of low and moderate income for whom
there are few affordable home ownership alternatives in the private
market, and to stimulate the development, stabilization, and preser-
vation of New York communities.
11. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$13,000,000 shall be made available for the purposes of mobile and
manufactured home replacement program pursuant to chapter 54 of the
laws of 2016.
12. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$10,000,000 shall be made available for the purpose of stimulating
reinvestment in properties located within mixed-used commercial
districts located in urban, small town, and rural areas of the state
pursuant to article XXVI of the private housing finance law.
13. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$200,000,000 shall be made available, pursuant to a plan approved by
the director of the budget, in consultation with the New York city
housing authority chair and the dormitory authority of the state of
New York, for the purpose of capital projects and other improvements
related to housing developments owned or operated by the New York
city housing authority; provided further to the extent practicable,
the New York city housing authority in its administration of such
funds shall include employment opportunities for NYCHA tenants
consistent with section 3 of the housing and urban development act
of 1968.
14. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$100,000,000 shall be made available for the preservation, restora-
tion or creation of affordable housing units in a city having a
population of one million or more, one hundred percent of which
shall be affordable to households that earn up to sixty percent of
the area median income adjusted for family size. Priority shall be
475 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
given to applicants incorporated pursuant to the not-for-profit
corporation law, with prior experience in community development
projects with at least a fifty-one percent controlling interest in
such project. Not-for-profits shall strive to develop projects
utilizing state or city-owned land and such utilization shall be
prioritized in the agency review of such project (08111707) (30904)
... 541,525,000 ................................. (re. $541,525,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
In support of a comprehensive, statewide multi-year housing program.
The commissioner shall provide, in electronic excel format or as
requested by the Legislature, an annual report to the director of
the budget, the speaker of the Assembly, and the temporary president
of the Senate, on or before July 1 of each year, that summarizes the
activities undertaken pursuant to the funding made available in the
2016-17 and 2017-18 state fiscal year housing program (ccp). Such
annual report shall be cumulative and shall include an itemized list
of each project utilizing funds appropriated by the 2016-17 and
2017-18 state fiscal year housing program (ccp), including a brief
description of the project, street address, county, awardee, total
budget, amount of capital subsidy appropriated by the housing
program (ccp), relevant section of the housing program (ccp), bonded
or cash, amount of each additional public funding source, funding
program, number of units, area median income requirements if appli-
cable, month and year construction will commence, projected date of
occupancy, and project phase (in development, engineering,
construction, complete, defunded). Such annual report shall continue
to be provided until such time as the final disbursement of funds
appropriated in the 2016-17 and 2017-18 state fiscal year housing
program (ccp) has occurred.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated to any state department, agency, or
public authority for the purposes stated herein. Notwithstanding
section 40 of the state finance law or any other law to the contra-
ry, all assistance appropriations made from this account shall
remain in full force and effect in accordance, in the aggregate,
with the following schedule: not more than $303,384,000 for the
period April 1, 2017 through and past March 31, 2018, not more than
an additional $354,715,000 for the period April 1, 2018 through and
past March 31, 2019, not more than an additional $359,565,000 for
the period April 1, 2019 through and past March 31, 2020, and not
more than an additional $365,811,000 for the period April 1, 2020
through and past March 31, 2021 as indicated below:
1. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$950,000,000 shall be made available for the purpose of providing
capital and operating subsidies for the development of 6,000 or more
supportive housing units throughout the state over the next five
years, as determined by a competitive selection process.
2. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
476 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
$472,025,000 shall be made available for the purpose of providing
capital subsidies for the new construction or adaptive reuse of
rental housing affordable to households that earn up to 60 percent
of area median income (AMI) and that advance one or more of the
specific housing priorities of the state. Up to 5 percent of the
funds allocated herein may be used for administrative purposes.
3. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$125,000,000 shall be made available for the purpose of developing
or rehabilitating one hundred percent senior rental affordable hous-
ing targeted to low-income seniors, aged 60 and above.
4. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$45,000,000 for purposes of the rural and urban community investment
fund program created pursuant to article XXVII of the private hous-
ing finance law.
5. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$150,000,000 shall be made available for the purpose of providing
capital subsidies for the new construction, adaptive reuse, or
reconstruction of rental housing affordable to households that earn
between 60 percent and 130 percent of AMI and that advance one or
more of the specific housing priorities of the state.
6. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$146,000,000 shall be made available for the purpose of substantial
or moderate rehabilitation of site-specific multi-family rental
housing currently under a regulatory agreement or extended use
agreement with the division of housing and community renewal or
another state, federal or local housing agency.
7. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$75,000,000 shall be made available for the purpose of providing
capital subsidies to preserve and improve Mitchell-Lama properties
in the state.
8. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$125,000,000 shall be made available for the purpose of substantial
or moderate rehabilitation and/or the demolition and replacement
through new construction of site-specific multi-family rental hous-
ing currently owned by public housing authorities outside of New
York city. The distribution of any funds which the division of hous-
ing and community renewal or other appropriate state agencies or
authorities authorizes to be used as part of a federal housing
program, shall require the division of housing and community renewal
to monitor and ensure that any affected public housing tenants are
properly informed regarding participation in the federal housing
program and that appropriate documents related to participation in
such federal housing program are made publicly available and are
posted on each applicable housing authority's website in a timely
manner to properly inform such public housing authority tenants. The
residents of public housing that receives and uses such funds to
477 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
participate in such federal program shall be provided a uniform
lease agreement that provides, at a minimum, terms and conditions
consistent with those found in the public housing lease they had
prior to the public housing having received any such funds. Public
housing authorities that receive and use such funds shall be
required to: provide resident education, which shall include compre-
hensive information about any anticipated changes to the public
housing; provide language assistance to residents with limited
English proficiency; recognize the right of residents to form a
resident organization; require resident participation funding
commensurate to the funding that was being allocated to residents
already; develop a set of procedures for resident grievances and
lease termination proceedings that apply to residents following the
use of such funds, which shall be consistent with any existing
procedures, can provide stronger resident protections, and conform
with any other applicable federal rules and/or regulations. In cases
when there is a property manager other than the public housing
authority that receives these funds, then such property manager
shall be required to take actions including, but not limited to,
providing clear and accessible information to residents before,
during, and after becoming the property manager; provide language
assistance to residents with limited English proficiency; and recog-
nize a legitimate resident organization as the residents' represen-
tative, invite such resident organization to all resident engage-
ments, and meet regularly with the resident organization to discuss
emerging property-wide issues.
9. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$62,500,000 shall be made available for the purpose of substantial
or moderate rehabilitation and/or the demolition and replacement
through new construction of buildings of 5 to 40 units.
10. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$41,475,000 shall be made available for the purpose of promoting
home ownership among families of low and moderate income for whom
there are few affordable home ownership alternatives in the private
market, and to stimulate the development, stabilization, and preser-
vation of New York communities.
11. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$13,000,000 shall be made available for the purposes of mobile and
manufactured home replacement program pursuant to chapter 54 of the
laws of 2016.
12. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$10,000,000 shall be made available for the purpose of stimulating
reinvestment in properties located within mixed-used commercial
districts located in urban, small town, and rural areas of the state
pursuant to article XXVI of the private housing finance law.
13. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$200,000,000 shall be made available, pursuant to a plan approved by
478 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the director of the budget, in consultation with the New York city
housing authority chair and the dormitory authority of the state of
New York, for the purpose of capital projects and other improvements
related to housing developments owned or operated by the New York
city housing authority; provided further to the extent practicable,
the New York city housing authority in its administration of such
funds shall include employment opportunities for NYCHA tenants
consistent with section 3 of the housing and urban development act
of 1968.
14. When combined with other funds made available in the 2016-17 and
2017-18 state fiscal year housing program (ccp), up to a total of
$100,000,000 shall be made available for the preservation, restora-
tion or creation of affordable housing units in a city having a
population of one million or more, one hundred percent of which
shall be affordable to households that earn up to sixty percent of
the area median income adjusted for family size. Priority shall be
given to applicants incorporated pursuant to the not-for-profit
corporation law, with prior experience in community development
projects with at least a fifty-one percent controlling interest in
such project. Not-for-profits shall strive to develop projects
utilizing state or city-owned land and such utilization shall be
prioritized in the agency review of such project (08111607) (30904)
... 1,383,475,000 ............................... (re. $108,191,000)
HOUSING OPPORTUNITIES PROGRAM FOR THE ELDERLY (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For contracts with not-for-profit corpo-
rations or municipalities to provide state financial assistance to
administer emergency home repairs programs which provide grants and
loans in an amount not to exceed $10,000 per unit for the cost of
correcting any condition which poses a threat to the life, health or
safety of a low income elderly homeowner pursuant to article XXIX of
the private housing finance law. No funds shall be expended from
this appropriation until the director of the budget has approved a
financial plan submitted by the housing trust fund corporation on
behalf of the housing opportunities for the elderly program in such
detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08082203) (31422) ........................
1,400,000 ......................................... (re. $1,400,000)
For additional funding for the housing opportunities program for the
elderly. For allocation as follows: For contracts with not-for-pro-
fit corporations or municipalities to provide state financial
assistance to administer emergency home repairs programs which
provide grants and loans in an amount not to exceed $10,000 per unit
for the cost of correcting any condition which poses a threat to the
479 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
life, health or safety of a low income elderly homeowner pursuant to
article XXIX of the private housing finance law. No funds shall be
expended from this appropriation until the director of the budget
has approved a financial plan submitted by the housing trust fund
corporation on behalf of the housing opportunities for the elderly
program in such detail as required by the director of the budget.
The amounts appropriated herein may be suballocated or transferred
to any state department, agency, or public authority for the
purposes stated herein [(08082203) (31422)] (08HO2203) (31518) .....
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For contracts with not-for-profit corpo-
rations or municipalities to provide state financial assistance to
administer emergency home repairs programs which provide grants and
loans in an amount not to exceed $10,000 per unit for the cost of
correcting any condition which poses a threat to the life, health or
safety of a low income elderly homeowner pursuant to article XXIX of
the private housing finance law. No funds shall be expended from
this appropriation until the director of the budget has approved a
financial plan submitted by the housing trust fund corporation on
behalf of the housing opportunities for the elderly program in such
detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08082103) (31422) .........................
1,400,000 ........................................... (re. $836,000)
HOUSING OUR NEIGHBORS WITH DIGNITY PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of the housing our neighbors with dignity
program to acquire vacant commercial properties and distressed hotel
properties throughout the State of New York for the purpose of
conversion to permanent affordable rental housing. Up to 5 percent
of the funds allocated herein may be used for administrative
purposes. The amounts appropriated herein may be suballocated or
transferred to any state department, agency, or public authority for
the purposes stated herein (08232207) (31520) ......................
100,000,000 ..................................... (re. $100,000,000)
HOUSING PROGRAM CAPITAL IMPROVEMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
480 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1990, as added by chapter 215,
section 10, of the laws of 1990, and as amended by chapter 55,
section 1, of the laws of 1996:
For transfer to the Housing Program Fund for the non-bondable costs of
projects authorized by appropriations in the Housing Program Fund.
Upon certification of such non-bondable costs by the director of the
budget, the comptroller is hereby authorized and directed to trans-
fer moneys to the Housing Program Fund to repay such costs
(71259050) (31416) ... 120,000,000 ............... (re. $56,897,000)
LOW INCOME HOUSING TRUST FUND (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law for the purposes of carrying out the provisions of arti-
cle XVIII of the private housing finance law including up to
$300,000 to offset housing trust fund corporation costs of adminis-
tering the low income housing trust fund program established by such
article. No funds shall be expended from this appropriation until
the director of the budget has approved a financial plan submitted
by the housing trust fund corporation on behalf of the housing trust
fund program in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08042207) (31421) .........................
44,200,000 ....................................... (re. $44,200,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law for the purposes of carrying out the provisions of arti-
cle XVIII of the private housing finance law including up to
$300,000 to offset housing trust fund corporation costs of adminis-
tering the low income housing trust fund program established by such
article. No funds shall be expended from this appropriation until
the director of the budget has approved a financial plan submitted
by the housing trust fund corporation on behalf of the housing trust
fund program in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08042107) (31421) .........................
44,200,000 ....................................... (re. $42,245,000)
By chapter 54, section 1, of the laws of 2020:
For allocation as follows: For deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
481 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
finance law for the purposes of carrying out the provisions of arti-
cle XVIII of the private housing finance law including up to
$300,000 to offset housing trust fund corporation costs of adminis-
tering the low income housing trust fund program established by such
article. No funds shall be expended from this appropriation until
the director of the budget has approved a financial plan submitted
by the housing trust fund corporation on behalf of the housing trust
fund program in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08042007) (31421) .........................
44,200,000 ....................................... (re. $41,990,000)
By chapter 54, section 1, of the laws of 2019:
For allocation as follows: For deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law for the purposes of carrying out the provisions of arti-
cle XVIII of the private housing finance law including up to
$300,000 to offset housing trust fund corporation costs of adminis-
tering the low income housing trust fund program established by such
article. No funds shall be expended from this appropriation until
the director of the budget has approved a financial plan submitted
by the housing trust fund corporation on behalf of the housing trust
fund program in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08141907) (31421) .........................
44,200,000 ....................................... (re. $41,990,000)
By chapter 54, section 1, of the laws of 2018:
For allocation as follows: For deposit in the housing trust fund
account created pursuant to section 59-a of the private housing
finance law for the purposes of carrying out the provisions of arti-
cle XVIII of the private housing finance law including up to
$300,000 to offset housing trust fund corporation costs of adminis-
tering the low income housing trust fund program established by such
article. No funds shall be expended from this appropriation until
the director of the budget has approved a financial plan submitted
by the housing trust fund corporation on behalf of the housing trust
fund program in such detail as required by the director of the budg-
et.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08141807) (31421) .........................
44,200,000 ....................................... (re. $13,204,000)
MAIN STREET PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
482 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For contract with not-for-profit corpo-
rations and municipalities to provide state fiscal assistance to
administer main street or downtown revitalization projects for
communities pursuant to article XXVI of the private housing finance
law (08062207) (31413) ... 4,200,000 .............. (re. $4,200,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For contract with not-for-profit corpo-
rations and municipalities to provide state fiscal assistance to
administer main street or downtown revitalization projects for
communities pursuant to article XXVI of the private housing finance
law (08062107) (31413) ... 4,200,000 .............. (re. $4,200,000)
By chapter 54, section 1, of the laws of 2020:
For allocation as follows: For contract with not-for-profit corpo-
rations and municipalities to provide state fiscal assistance to
administer main street or downtown revitalization projects for
communities pursuant to article XXVI of the private housing finance
law (08062007) (31413) ... 4,200,000 .............. (re. $1,614,000)
By chapter 54, section 1, of the laws of 2019:
For allocation as follows: For contract with not-for-profit corpo-
rations and municipalities to provide state fiscal assistance to
administer main street or downtown revitalization projects for
communities pursuant to article XXVI of the private housing finance
law (08061907) (31413) ... 4,200,000 ................ (re. $334,000)
MANUFACTURED HOME ADVANTAGE PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For the purposes of a mobile and manufac-
tured home advantage program to fund loans and grants for the acqui-
sition, demolition, or replacement and/or repair of mobile or manu-
factured homes and/or mobile or manufactured home parks. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the administering
agency in such detail as required by the director of the budget.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein
(08212203) (30917) ... 5,000,000 .................. (re. $5,000,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For the purposes of a mobile and manufac-
tured home advantage program to fund loans and grants for the acqui-
sition, demolition, or replacement and/or repair of mobile or manu-
483 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
factured homes and/or mobile or manufactured home parks. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the administering
agency in such detail as required by the director of the budget.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein
(08212103) (30917) ... 5,000,000 .................. (re. $5,000,000)
By chapter 54, section 1, of the laws of 2020:
For allocation as follows: For the purposes of a mobile and manufac-
tured home advantage program to fund loans and grants for the acqui-
sition, demolition, or replacement and/or repair of mobile or manu-
factured homes and/or mobile or manufactured home parks. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the administering
agency in such detail as required by the director of the budget.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein
(08212003) (30917) ... 5,000,000 .................. (re. $3,743,000)
By chapter 54, section 1, of the laws of 2019:
For allocation as follows: For the purposes of a mobile and manufac-
tured home advantage program to fund loans and grants for the acqui-
sition, demolition, or replacement and/or repair of mobile or manu-
factured homes and/or mobile or manufactured home parks. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the administering
agency in such detail as required by the director of the budget.
Notwithstanding any other law to the contrary, the amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein
(08211903) (30917) ... 5,000,000 .................. (re. $3,748,000)
MITCHELL-LAMA PRESERVATION AND HOMEOWNERSHIP PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of a Mitchell-Lama preservation and homeown-
ership program to preserve and improve Mitchell-Lama properties and
create permanently affordable homeownership in the state. Amounts
appropriated herein shall be distributed based on a plan submitted
by the division of housing and community renewal and approved by the
director of the budget. Up to 5 percent of the funds appropriated
herein may be used for administrative purposes. The amounts appro-
priated herein may be suballocated or transferred to any state
department, agency, or public authority for the purposes stated
484 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
herein (08252203) (31522) ..........................................
100,000,000 ..................................... (re. $100,000,000)
MITCHELL LAMA REHABILITATION AND PRESERVATION PROGRAM AND ALL AFFORDABLE
PROGRAM (CCP)
Capital Projects Funds - Other
Housing Assistance Fund
Housing Assistance Account - 31801
Preservation of Facilities Purpose
By chapter 55, section 1, of the laws of 2008, as added by chapter 1,
section 4, of the laws of 2009:
For allocation as follows: For services and expenses related to the
New York state housing finance agency's Mitchell Lama Rehabilitation
and Preservation Program and the All Affordable Program (08ML0803)
(31419) ... 10,000,000 ............................ (re. $5,911,000)
NEW FACILITIES (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Federal Capital Projects Account - 31350
New Facilities Purpose
The appropriation made by chapter 54, section 1, of the laws of 1991, as
amended by chapter 54, section 1, of the laws of 2021, is hereby
amended and reappropriated to read:
For expenditure of funds made available pursuant to the CranstonGon-
zales National Affordable Housing Act (, being P.L. 101-625) for
activities authorized pursuant to article XXIV of the Private Hous-
ing Finance Law. Notwithstanding any other provision of law,
[$76,800,000] $82,800,000 of the amount appropriated herein shall be
used for payment of administrative costs incurred in the implementa-
tion of article XXIV of the private housing finance law for Federal
aid made available under the HOME Investment Partnership Program to
pay State personal service and fringe benefit costs related to
administration of the HOME program. Such funds allocated for admin-
istration shall be set aside prior to the distribution of funds to
projects as required by article XXIV of the private housing finance
law (08019107) (31414) ... 125,132,000 .......... (re. $10,100,000)
NEW YORK CITY HOUSING AUTHORITY PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
485 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the purposes of capital projects and other improvements to address
issues including, but not limited to lead at housing developments
owned or operated by the New York city housing authority, pursuant
to a plan approved by the director of the budget, in consultation
with the New York city housing authority chair and the dormitory
authority of the state of New York; provided further to the extent
practicable, the New York city housing authority in its adminis-
tration of such funds shall include employment opportunities for
NYCHA tenants consistent with section 3 of the housing and urban
development act of 1968. The amounts appropriated herein may be
suballocated or transferred to any state department, agency, or
public authority for the purposes stated herein (08191907) (30913)
... 100,000,000 ................................. (re. $100,000,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For the purpose of capital projects and other improvements to address
issues relating to conditions of governance and habitability,
including but not limited to, heating, mold, or lead, and other such
conditions affecting the health and safety of tenants at housing
developments owned or operated by the New York city housing authori-
ty. Notwithstanding any other law to the contrary, funds appropri-
ated herein shall be made available pursuant to a plan established
under section 402-d of the public housing law. All work conducted
utilizing the funds appropriated herein must be conducted exclusive-
ly in accordance with the terms and conditions of the plan described
therein; provided further to the extent practicable, the New York
city housing authority in its administration of such funds shall
include employment opportunities for NYCHA tenants consistent with
section 3 of the housing and urban development act of 1968.
Notwithstanding any law to the contrary, no funds made available
pursuant to chapter 54 of the laws of 2017 for capital projects and
other improvements related to housing developments owned or operated
by the New York city housing authority shall be allocated until the
establishment of a plan pursuant to section 402-d of the public
housing law. The amounts appropriated herein may be suballocated or
transferred to any state department, agency, or public authority for
the purposes stated herein (08191807) (30913) ......................
250,000,000 ..................................... (re. $250,000,000)
PUBLIC HOUSING PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2021:
For services and expenses of a public housing program. Funds appropri-
ated herein should be used for weatherization, heating needs, eleva-
tors, lead remediation, and other critical maintenance projects for
public housing across the state. Of the amounts appropriated herein
486 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
$200,000,000 shall be suballocated to the New York city housing
authority. Provided further that $125,000,000 shall be distributed
to public housing throughout the state based on a plan submitted by
the division of housing and community renewal and approved by the
director of the budget (08252107) (31494) ..........................
325,000,000 ..................................... (re. $325,000,000)
PUBLIC HOUSING ASSISTANCE PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of a public housing assistance program for
public housing across the state. Of the amounts appropriated herein
$350,000,000 shall be suballocated to the New York city housing
authority. Provided further that $50,000,000 shall be distributed to
public housing throughout the state based on a plan submitted by the
division of housing and community renewal and approved by the direc-
tor of the budget. The amounts appropriated herein may be suballo-
cated or transferred to any state department, agency, or public
authority for the purposes stated herein (08262207) (31524) ........
400,000,000 ..................................... (re. $400,000,000)
PUBLIC HOUSING MODERNIZATION PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated here- in, the
sum of $400,000 may be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08052203) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2021:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 may be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
487 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08062103) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2020:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 may be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08052003) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2019:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 may be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051903) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2018:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051803) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2017:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
488 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051703) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 55, section 1, of the laws of 2016:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08061603) (31420) .........................
6,400,000 ......................................... (re. $6,400,000)
By chapter 54, section 1, of the laws of 2015:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051503) (31420) .........................
6,400,000 ......................................... (re. $1,882,000)
By chapter 54, section 1, of the laws of 2014:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051403) (31420) .........................
6,400,000 ........................................... (re. $320,000)
By chapter 54, section 1, of the laws of 2013:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
489 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08051303) (31420) .........................
6,400,000 ........................................... (re. $320,000)
By chapter 54, section 1, of the laws of 2012:
For allocation as follows: For services and expenses of a public hous-
ing modernization program. Of the amount appropriated herein, the
sum of $400,000 shall be allocated for capital project activities
associated with article XII of the public housing law. No funds
shall be expended from this appropriation until the director of the
budget has approved a financial plan submitted by the housing trust
fund corporation on behalf of the public housing modernization
program in such detail as required by the director of the budget.
Up to 5 percent of the funds appropriated herein may be used for
administrative purposes (08041203) (31420) .........................
6,400,000 ........................................... (re. $320,000)
PUBLIC HOUSING PRESERVATION PROGRAM (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
For the purpose of substantial or moderate rehabilitation and/or the
demolition and replacement through new construction of site-specific
multi-family rental housing currently owned by public housing
authorities outside of New York city, or any affordable, low-income
or senior housing related purpose, including disaster recovery,
outside of New York city. The amounts appropriated herein may be
suballocated or transferred to any state department, agency, or
public authority for the purposes stated herein (08221903) (31378)
... 20,000,000 ................................... (re. $16,276,000)
SMALL RENTAL HOUSING DEVELOPMENT INITIATIVE (CCP)
Capital Projects Funds - Other
Housing Program Fund
Housing Trust Fund Corporation Account - 31851
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of a small rental housing development initi-
ative for capital developments under 20 units. The amounts appropri-
ated herein may be suballocated or transferred to any state depart-
ment, agency, or public authority for the purposes stated herein
(08242207) (31526) ... 7,000,000 ................. (re. $7,000,000)
490 12554-05-3
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
STATE HOUSING BOND FUND (CCP)
Capital Projects Funds - Other
State Housing Bond Fund
State Housing Bond Account - 30700
New Facilities Purpose
By chapter 955, section 4, of the laws of 1958, as amended by chapter
55, section 1, of the laws of 1996, for:
Loan contracts for low rent public housing. No funds shall be made
available until a plan which includes a draft request for proposals
has been submitted to the chairs of the senate and assembly housing
committees and approved by the director of the budget. In any event,
no expenditure shall be made pursuant to this appropriation prior to
October 1, 1994 (01347607) (80920) ................ (re. $7,294,000)
By chapter 27, section 4, of the laws of 1949, as amended by chapter 55,
section 1, of the laws of 1996, for:
Loan contracts for public housing (01347407) (80920) ... (re. $50,000)
491 12554-05-3
HUDSON RIVER PARK TRUST
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 55,332,000
---------------- ----------------
All Funds ........................ 0 55,332,000
================ ================
IMPROVEMENT AND REHABILITATION OF HUDSON RIVER PARK (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environmental Protection or Improvements Purpose
By chapter 54, section 1, of the laws of 2019:
For services and expenses of the Hudson River park trust for projects
related to the development of the Hudson River park in coordination
with a matching payment by New York city in the amount of
$23,000,000 (29HR1906) (42903) ... 23,000,000 .... (re. $23,000,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses of the Hudson River park trust for projects
related to the development of the Hudson River park in coordination
with a matching payment by New York city in the amount of
$50,000,000 (29HR1806) (42903) ... 50,000,000 .... (re. $32,332,000)
492 12554-05-3
OFFICE OF INFORMATION TECHNOLOGY SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 130,700,000 248,505,000
Capital Projects Funds - Federal ... 0 124,892,000
---------------- ----------------
All Funds ........................ 130,700,000 373,397,000
================ ================
IT INITIATIVE PROGRAM (CCP) ................................ 130,700,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expenses related to tech-
nology equipment, software and services
with a demonstrated return on investment
or service improvement, as well as the
exploration and study of lower-cost alter-
natives. Funds appropriated herein may be
suballocated to any other state depart-
ment, agency, or public benefit corpo-
ration, to achieve this purpose (00IT2308)
(51919) .................................... 130,700,000
493 12554-05-3
OFFICE OF INFORMATION TECHNOLOGY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
IT INITIATIVE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT2208) (51919) ............................
115,700,000 ..................................... (re. $115,700,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT2108) (51919) ............................
[95,700,000] 96,311,000 .......................... (re. $80,772,000)
The appropriation made by chapter 54, section 1, of the laws of 2020, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT2008) (51919) ............................
[95,700,000] 101,023,000 ......................... (re. $17,990,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose. Provided further that $10,000,000 of the funds
appropriated herein shall be suballocated to the statewide financial
system for enterprise technology and financial application invest-
ments, pursuant to a plan approved by the division of budget
(00IT1908) (51919) ... 95,700,000 ................. (re. $5,809,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
494 12554-05-3
OFFICE OF INFORMATION TECHNOLOGY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT1808) (51919) ............................
85,700,000 ........................................ (re. $7,778,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT1708) (51919) ............................
85,700,000 ........................................ (re. $5,869,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses related to technology equipment, software
and services with a demonstrated return on investment or service
improvement, as well as the exploration and study of lower-cost
alternatives. Funds appropriated herein may be suballocated to any
other state department, agency, or public benefit corporation, to
achieve this purpose (00IT1808) (51919) 85,700,000 .. (re. $206,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Information Technology Capital Financing Account - 32215
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2014:
Amounts appropriated herein may be made available, subject to the
identification and transferability of appropriate revenue, for the
expenses of information technology projects and services (00BS1408)
(51919) ... 30,000,000 ........................... (re. $14,381,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund Federal Capital Projects Account - 31350
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020:
For the federal share, from any federal agency under any federal
program, of development costs related to the integrated eligibility
system program, including technology equipment, software and
services (00IE2008) (51919) ... 150,000,000 ..... (re. $124,892,000)
495 12554-05-3
DEPARTMENT OF LAW
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 2,750,000 9,373,000
---------------- ----------------
All Funds .......................... 2,750,000 9,373,000
================ ================
IT INITIATIVE PROGRAM (CCP) .................................. 2,750,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expenses related to the
acquisition and development of technology,
including but not limited to equipment,
software and services (36012308) (51919) ..... 2,750,000
496 12554-05-3
DEPARTMENT OF LAW
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
IT INITIATIVE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (36012208) (51919) ... 6,500,000 ......... (re. $6,500,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (36012008) (51919) ... 6,000,000 ......... (re. $2,752,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (36011908) (51919) ... 2,000,000 ............ (re. $80,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (36011808) (51919) ... 1,000,000 ............ (re. $11,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (36011708) (51919) ... 5,000,000 ............ (re. $30,000)
497 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Fund - Other ...... 92,000,000 727,239,000
---------------- ----------------
All Funds ........................ 92,000,000 727,239,000
================ ================
COMMUNITY ALCOHOLISM AND SUBSTANCE ABUSE FACILITIES (CCP) ... 64,500,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Minor Rehabilitation Purpose
For minor alterations and improvements to
various facilities, including the payment
of liabilities incurred prior to April 1,
2023, provided, however, that no expendi-
tures may be made from this appropriation
until a comprehensive plan of projects has
been approved by the director of the budg-
et (53032389) (11826) ........................ 5,500,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-Community Facilities Account - 32305
New Facilities Purpose
For the acquisition of property, design,
construction and extensive rehabilitation
of facilities for the purpose of deliver-
ing chemical dependence services, pursuant
to the mental hygiene law. No expenditure
shall be made from this appropriation
until a spending plan for proposed
projects has been submitted by the commis-
sioner of the office of addiction services
and supports and approved by the director
of the budget (53AA2307) (11828) ............ 24,000,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-Community Facilities Account - 32305
Preservation of Facilities Purpose
498 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS 2023-24
For alterations and improvements for preser-
vation of various facilities including
rehabilitation projects and the acquisi-
tion of property, provided, however, that
no expenditures may be made from this
appropriation until a comprehensive plan
of projects has been approved by the
director of the budget (53032303) (11827) ... 35,000,000
DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................... 6,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services or to the dormitory
authority of the state of New York for the
purpose of preparation and review of
plans, specifications, estimates,
services, construction management and
supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new projects
(53PP2330) (81088) ........................... 4,000,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
DASNY-OASAS Administration Account - 32308
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services or to the dormitory
authority of the state of New York for the
purpose of preparation and review of
plans, specifications, estimates,
services, construction management and
supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new projects
(53DC2330) (81088) ........................... 2,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 3,500,000
--------------
499 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs (53FM23MO) (81107) ..................... 3,500,000
INSTITUTIONAL SERVICES PROGRAM (CCP) ........................ 17,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Minor Rehabilitation Purpose
For minor alterations and improvements to
various facilities, including the payment
of liabilities incurred prior to April 1,
2023, provided, however, that no expendi-
tures may be made from this appropriation
until a comprehensive plan of projects has
been approved by the director of the budg-
et (53HD2389) (11833) ........................ 2,000,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-State Facilities Account - 32311
Preservation of Facilities Purpose
For alterations and improvements for preser-
vation of various facilities including
rehabilitation projects, provided, howev-
er, that no expenditures may be made from
this appropriation until a comprehensive
plan of projects has been approved by the
director of the budget. This appropriation
may be used for the cost of potential
claims against contracts awarded by the
dormitory authority of the state of New
York. Upon request of the commissioner of
the office of addiction services and
supports and approval by the director of
the budget, this appropriation may be
transferred or suballocated to any other
department, agency, or public authority
(53A22303) (81040) .......................... 15,000,000
NON-BONDABLE PROJECTS (CCP) .................................. 1,000,000
--------------
500 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Bondable Purpose
For transfer to the mental hygiene capital
improvement fund for reimbursement of the
non-bondable cost of community facilities
authorized by appropriations or reappro-
priations funded from the mental hygiene
capital improvement fund including liabil-
ities incurred prior to April 1, 2023 or
for payment to the dormitory authority of
the state of New York for defeasance of
bonds. Upon request of the commissioner of
the office of addiction services and
supports and approval by the director of
the budget, this appropriation may be
transferred to the dormitory authority of
the state of New York (53NB23NB) (81042) ..... 1,000,000
501 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
COMMUNITY ALCOHOLISM AND SUBSTANCE ABUSE FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Minor Rehabilitation Purpose
By chapter 54, section 1, of the laws of 2022:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2022,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53032289) (11826) ......................
5,500,000 ......................................... (re. $5,500,000)
By chapter 54, section 1, of the laws of 2021:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2021,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53032189) (11826) ......................
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2020:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2020,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53032089) (11826) ......................
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2019:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2019,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53031989) (11826) ......................
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2018:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2018,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53031889) (11826) ......................
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2017:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2017,
provided, however, that no expenditures may be made from this appro-
502 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
priation until a comprehensive plan of projects has been approved by
the director of the budget (53031789) (11826) ......................
10,000,000 ........................................ (re. $7,083,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
For services and expenses approved by the office of addiction services
and supports related to chemical dependency detection, prevention,
treatment and recovery, including, but not limited to, purchase of
equipment. Notwithstanding any other provision of law, the money
hereby appropriated may be transferred to any other state agency,
with the approval of the director of the budget (53CD1689) (12084)
... 5,014,000 ..................................... (re. $1,766,000)
By chapter 54, section 1, of the laws of 2013:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2013,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53031389) (11826) ......................
3,810,000 ........................................... (re. $422,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and/or rehabili-
tation of facilities to expand substance abuse supports and
services, including treatment, recovery and prevention services to
support efforts to develop, expand, and/or operate substance abuse
supports and services for treatment, recovery, and prevention of
heroin and opiate use and addiction disorders including but not
limited to the provision of housing services for affected popu-
lations. No expenditure shall be made from this appropriation until
a spending plan for the proposed projects has been submitted by the
commissioner of the office of addiction services and supports and
approved by the director of the budget. Notwithstanding sections 112
and 163 of the state finance law and section 142 of the economic
development law, or any other inconsistent provision of law, funds
available for expenditure pursuant to this appropriation for the
development, expansion, and/or operation of treatment, recovery,
prevention and/or housing services for persons with heroin and
opiate use and addiction disorders, may be allocated and distributed
by the commissioner of the office of addiction services and
supports, subject to approval of the director of the budget, without
a competitive bid or request for proposal process. Prior to an award
being granted to an applicant pursuant to this process, the commis-
sioner shall formally notify in writing the chair of the senate
503 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
finance committee and the chair of the assembly ways and means
committee of the intent to grant such an award. Such notice shall
include information regarding how the prospective recipient meets
objective criteria established by the commissioner. Expenditures
made from this appropriation shall reduce appropriations for grants
from the OASAS general fund local assistance account for the same
purpose by an equivalent amount, and such appropriation authority in
such account shall then be deemed to have lapsed to the extent of
such reduction (53CD1608) (11801) ..................................
10,000,000 ........................................ (re. $1,907,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-Community Facilities Account - 32305
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA2207) (11828) ...............................
24,000,000 ....................................... (re. $24,000,000)
By chapter 54, section 1, of the laws of 2021:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA2107) (11828) ...............................
24,000,000 ....................................... (re. $24,000,000)
By chapter 54, section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA2007) (11828) ...............................
34,000,000 ....................................... (re. $34,000,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
504 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1907) (11828) ...............................
40,000,000 ....................................... (re. $40,000,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1807) (11828) ...............................
40,000,000 ....................................... (re. $31,447,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1307) (11828) ...............................
34,773,000 ....................................... (re. $22,968,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1207) (11828) ...............................
42,273,000 ........................................ (re. $8,803,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1107) (11828) ...............................
40,273,000 ........................................ (re. $2,744,000)
505 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA1007) (11828) ...............................
42,273,000 ....................................... (re. $14,702,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA0907) (11828) ...............................
42,273,000 ....................................... (re. $18,678,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and extensive
rehabilitation of facilities for the purpose of delivering chemical
dependence services, pursuant to the mental hygiene law. No expendi-
ture shall be made from this appropriation until a spending plan for
proposed projects has been submitted by the commissioner of the
office of addiction services and supports and approved by the direc-
tor of the budget (53AA0807) (11828) ...............................
66,273,000 ........................................ (re. $6,710,000)
By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and rehabili-
tation of facilities for the purpose of delivering chemical depend-
ence services, which may include 100 community residential treatment
beds in Suffolk and Nassau counties, to be developed for operation
by voluntary-operated or local government operated chemical depend-
ency treatment providers. Notwithstanding any other inconsistent
provision of law, the moneys hereby appropriated may support up to
100 percent of approved capital costs of such chemical dependency
facilities. Notwithstanding any other inconsistent provision of law,
and subject to approval of the director of the budget, funds from
this appropriation may be paid to the dormitory authority of the
state of New York or the office of general services to the design
and construction management account pursuant to one or more certif-
icates approved by the director of the budget for purposes of carry-
ing out the projects provided for herein. No expenditure shall be
506 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
made from this appropriation until a spending plan for the proposed
projects has been submitted by the commissioner of the office of
addiction services and supports and approved by the director of the
budget (53010707) (11829) ... 26,600,000 ......... (re. $19,121,000)
For the acquisition of property, design, construction and rehabili-
tation of facilities for the purpose of delivering chemical depend-
ence services, which may include 100 intensive residential and/or
community residential beds for veterans, to be developed for opera-
tion by voluntary-operated or local government operated chemical
dependency treatment providers. Notwithstanding any other inconsist-
ent provision of law, the moneys hereby appropriated may support up
to 100 percent of approved capital costs of such chemical dependency
facilities.
Notwithstanding any other inconsistent provision of law, and subject
to approval of the director of the budget, funds from this appropri-
ation may be paid to the dormitory authority of the state of New
York or the office of general services to the design and
construction management account pursuant to one or more certificates
approved by the director of the budget for purposes of carrying out
the projects provided for herein. No expenditure shall be made from
this appropriation until a spending plan for the proposed projects
has been submitted by the commissioner of the office of addiction
services and supports and approved by the director of the budget
(53020707) (11830) ... 25,400,000 ................. (re. $6,686,000)
By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property design, construction and rehabili-
tation of facilities for the purpose of delivering chemical depend-
ence services, which may include 108 beds for adolescents and/or
women and their children, to be developed for operation by voluntar-
y-operated or local government operated chemical dependency treat-
ment providers. Notwithstanding any other inconsistent provision of
the law, the moneys hereby appropriated may support up to 100
percent of approved capital costs of such chemical dependency facil-
ities. Notwithstanding any other inconsistent provision of the law,
and subject to approval of the director of the budget, funds from
this appropriation may be paid to the dormitory authority of the
state of New York or the office of general services to the design
and construction management account pursuant to one or more certif-
icates approved by the director of the budget for purposes of carry-
ing out the projects provided for herein. No expenditure shall be
made from this appropriation until a spending plan for the proposed
projects has been submitted by the commissioner of the office of
addiction services and supports and approved by the director of the
budget (53010607) (11831) ... 24,900,000 .......... (re. $6,709,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-Community Facilities Account - 32305
507 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53032203) (11827) ..........
40,000,000 ....................................... (re. $40,000,000)
By chapter 54, section 1, of the laws of 2021:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53032103) (11827) ..........
40,000,000 ....................................... (re. $40,000,000)
By chapter 54, section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53032003) (11827) ..........
30,000,000 ....................................... (re. $30,000,000)
By chapter 54, section 1, of the laws of 2019:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031903) (11827) ..........
25,000,000 ....................................... (re. $25,000,000)
By chapter 54, section 1, of the laws of 2018:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031803) (11827) ..........
25,000,000 ....................................... (re. $25,000,000)
By chapter 54, section 1, of the laws of 2017:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031703) (11827) ..........
32,000,000 ....................................... (re. $13,534,000)
508 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2013:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031303) (11827) ..........
34,773,000 ....................................... (re. $33,573,000)
By chapter 54, section 1, of the laws of 2012:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031203) (11827) ..........
42,273,000 ....................................... (re. $40,773,000)
By chapter 54, section 1, of the laws of 2011:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53031103) (11827) ..........
40,273,000 ....................................... (re. $27,793,000)
By chapter 54, section 1, of the laws of 2008:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53030803) (11827) ..........
42,273,000 ........................................ (re. $7,658,000)
By chapter 54, section 1, of the laws of 2007:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53030703) (11827) ..........
27,423,000 ........................................ (re. $6,132,000)
By chapter 54, section 1, of the laws of 2006:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects and the acquisition of prop-
erty, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (53030603) (11827) ..........
17,243,000 ....................................... (re. $12,953,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
509 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
OASAS-Community Facilities Account - 32305
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and/or rehabili-
tation of facilities to expand substance abuse supports and
services, including treatment, recovery and prevention services to
support efforts to develop, expand and/or operate substance abuse
supports and services for treatment, recovery, and prevention of
heroin and opiate use and addiction disorders including but not
limited to the provision of housing services for affected popu-
lations.
Notwithstanding sections 112 and 163 of the state finance law and
section 142 of the economic development law, or any other inconsist-
ent provision of law, funds available for expenditure pursuant to
this appropriation for the development, expansion, and/or operation
of treatment, recovery, prevention and/or housing services for
persons with heroin and opiate use and addiction disorders, may be
allocated and distributed by the commissioner of the office of
addiction services and supports, subject to approval of the director
of the budget, without a competitive bid or request for proposal
process. Prior to an award being granted to an applicant pursuant to
this process, the commissioner shall formally notify in writing the
chair of the senate finance committee and the chair of the assembly
ways and means committee of the intent to grant such an award. Such
notice shall include information regarding how the prospective
recipient meets objective criteria established by the commissioner
(53MH1808) (11801) ... 10,000,000 ................. (re. $6,784,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
For the acquisition of property, design, construction and/or rehabili-
tation of facilities to expand substance abuse supports and
services, including treatment, recovery and prevention services to
support efforts to develop, expand and/or operate substance abuse
supports and services for treatment, recovery, and prevention of
heroin and opiate use and addiction disorders including but not
limited to the provision of housing services for affected popu-
lations. Notwithstanding sections 112 and 163 of the state finance
law and section 142 of the economic development law, or any other
inconsistent provision of law, funds available for expenditure
pursuant to this appropriation for the development, expansion,
and/or operation of treatment, recovery, prevention and/or housing
services for persons with heroin and opiate use and addiction disor-
ders, may be allocated and distributed by the commissioner of the
office of addiction services and supports, subject to approval of
the director of the budget, without a competitive bid or request for
proposal process. Prior to an award being granted to an applicant
pursuant to this process, the commissioner shall formally notify in
510 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
writing the chair of the senate finance committee and the chair of
the assembly ways and means committee of the intent to grant such an
award. Such notice shall include information regarding how the
prospective recipient meets objective criteria established by the
commissioner (53MH1708) (11801) ... 10,000,000 .... (re. $6,238,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Opioid Settlement Capital Account
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the acquisition of property, design, construction, and rehabili-
tation of facilities for the purpose of expanding access to
addiction treatment services associated with the implementation of
statewide opioid settlement agreements. Upon request of the commis-
sioner of the office of addiction services and supports and approval
by the director of the budget, funding made available pursuant to
this appropriation may be transferred to the dormitory authority of
the state of New York. No expenditure shall be made from this appro-
priation until a spending plan for proposed projects has been
submitted by the commissioner of the office of addiction services
and supports and approved by the director of the budget (53OS2207)
... 10,000,000 ................................... (re. $10,000,000)
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection, studies, appraisals, surveys, testing and environmental
impact statements for new projects (53PP2230) (81088) ..............
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection, studies, appraisals, surveys, testing and environmental
impact statements for new projects (53PP2130) (81088) ..............
4,000,000 ......................................... (re. $4,000,000)
511 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection, studies, appraisals, surveys, testing and environmental
impact statements for new projects (53PP2030) (81088) ..............
4,000,000 ......................................... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection, studies, appraisals, surveys, testing and environmental
impact statements for new projects (53PP1930) (81088) ..............
5,000,000 ......................................... (re. $3,631,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
DASNY-OASAS Administration Account - 32308
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority of the state of New York for
the purpose of preparation and review of plans, specifications,
estimates, services, construction management and supervision,
inspection, studies, appraisals, surveys, testing and environmental
impact statements for new projects (53DC2230) (81088) ..............
2,000,000 ......................................... (re. $2,000,000)
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(53FM22MO) (81107) ... 3,500,000 .................. (re. $2,876,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(53FM21MO) (81107) ... 3,000,000 .................. (re. $1,576,000)
512 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(53FM20MO) (81107) ... 3,000,000 .................. (re. $1,784,000)
INSTITUTIONAL SERVICES PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Minor Rehabilitation Purpose
By chapter 54, section 1, of the laws of 2022:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2022,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD2289) (11833) ......................
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2021:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2021,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD2189) (11833) ......................
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2020:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2020,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD2089) (11833) ......................
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2019:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2019,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1989) (11833) ......................
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2018:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2018,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1889) (11833) ......................
1,000,000 ........................................... (re. $999,000)
513 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2017,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1789) (11833) ......................
1,000,000 ......................................... (re. $1,000,000)
By chapter 55, section 1, of the laws of 2016:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2016,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1689) (11833) ......................
1,000,000 ........................................... (re. $979,000)
By chapter 54, section 1, of the laws of 2015:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2015,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1589) (11833) ......................
1,000,000 ........................................... (re. $377,000)
By chapter 54, section 1, of the laws of 2014:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2014,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1489) (11833) ......................
1,000,000 ........................................... (re. $608,000)
By chapter 54, section 1, of the laws of 2013:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2013,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1389) (11833) ......................
1,000,000 ........................................... (re. $233,000)
By chapter 54, section 1, of the laws of 2012:
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2012,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1289) (11833) ......................
1,000,000 ........................................... (re. $195,000)
By chapter 54, section 1, of the laws of 2011:
514 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For minor alterations and improvements to various facilities, includ-
ing the payment of liabilities incurred prior to April 1, 2011,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (53HD1189) (11833) ......................
1,000,000 ........................................... (re. $137,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OASAS-State Facilities Account - 32311
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A22203) (81040) ...
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A22103) (81040) ...
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A22003) (81040) ...
10,000,000 ....................................... (re. $10,000,000)
515 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21903) (81040) ...
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21803) (81040) ...
10,000,000 ........................................ (re. $7,703,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21703) (81040) ...
15,000,000 ....................................... (re. $12,031,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
516 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21603) (81040) ...
10,000,000 ........................................ (re. $5,320,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21503) (81040) ...
3,000,000 ......................................... (re. $2,611,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21303) (81040) ...
18,000,000 ........................................ (re. $1,902,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21203) (81040) ...
3,000,000 ........................................... (re. $212,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2020:
517 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21103) (81040) ...
7,000,000 ......................................... (re. $1,623,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A21003) (81040) ...
3,000,000 ............................................ (re. $96,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2020:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects, provided, however, that no
expenditures may be made from this appropriation until a comprehen-
sive plan of projects has been approved by the director of the budg-
et. This appropriation may be used for the cost of potential claims
against contracts awarded by the dormitory authority of the state of
New York. Upon request of the commissioner of the office of
addiction services and supports and approval by the director of the
budget, this appropriation may be transferred or suballocated to any
other department, agency, or public authority (53A20903) (81040) ...
3,000,000 ........................................... (re. $662,000)
NON-BONDABLE PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Bondable Purpose
By chapter 54, section 1, of the laws of 2022:
For transfer to the Mental Hygiene Capital Improvement Fund for
reimbursement of the non-bondable cost of community facilities
authorized by appropriations or reappropriations funded from the
518 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ADDICTION SERVICES AND SUPPORTS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Mental Hygiene Capital Improvement Fund including liabilities
incurred prior to April 1, 2022 or for payment to the dormitory
authority of the state of New York for defeasance of bonds. Upon
request of the commissioner of the office of addiction services and
supports and approval by the director of the budget, this appropri-
ation may be transferred to the dormitory authority of the state of
New York (53NB22NB) (81042) ........................................
1,000,000 ......................................... (re. $1,000,000)
519 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,451,472,000 2,860,793,000
---------------- ----------------
All Funds ........................ 1,451,472,000 2,860,793,000
================ ================
COMMUNITY MENTAL HEALTH FACILITIES (CCP) ................. 1,046,722,000
--------------
Notwithstanding any provision of law to the
contrary, no funds appropriated shall be
available for certification or payment of
inpatient bed creation or expansion until
(i) the director of the division of the
budget submits a plan to the temporary
president of the senate, the speaker of
the assembly, the chair of the senate
finance committee, the chair of the assem-
bly ways and means committee, the chair of
the senate mental health committee, and
the chair of the assembly mental health
committee including the location of the
facilities, amount of beds expected to
open, counties of the facility and amount
of funds needed to support the operation
and (ii) the temporary president of the
senate, the speaker of the assembly, and
the director of the budget agree and
approve of the location of the opening or
expansion.
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
State aid to municipalities and other public
and not-for-profit agencies for acquisi-
tion, rehabilitation, and/or improvements
to existing community mental health facil-
ities as required to address code
violations, health and safety issues,
and/or structural/mechanical deficiencies.
Additionally, this appropriation may be
used for payment to the design and
construction management account of the
520 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
centralized services fund of the New York
state office of general services for the
purpose of preparation and review of
plans, specifications, estimates,
services, construction management and
supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new, existing
and reappropriated capital projects and
programs. Notwithstanding any inconsistent
provision of law, within the amounts here-
by appropriated, the commissioner of the
office of mental health may provide state
aid grants of up to 100 per centum of
reasonable capital costs associated with
the acquisition, rehabilitation, and/or
improvements (501123A4) (37015) .............. 6,000,000
Capital Projects Funds - Other
Mental Health Facilities Capital Improvement Fund
OMH-Community Facilities Account - 32303
Infrastructure Purpose
For the acquisition of property,
construction and rehabilitation of new
facilities and/or relocation of existing
community mental health facilities under
the auspice of municipalities and other
public and not-for-profit agencies,
approved by the commissioner of the office
of mental health, pursuant to article 41
of the mental hygiene law. Additionally,
this appropriation may be used for payment
of personal service and nonpersonal
service, including fringe benefits related
to the administration of the community
capital program provided by the office of
mental health for new and reappropriated
community capital projects. Upon request
of the commissioner of mental health and
approval by the director of the budget,
this appropriation may be transferred to
the dormitory authority of the state of
New York (500123A4) (37015) .................. 5,722,000
For the acquisition of property,
construction, and rehabilitation of new
facilities and/or relocation of existing
community mental health facilities under
the auspice of municipalities and other
public and not-for-profit agencies,
521 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
approved by the commissioner of the office
of mental health, pursuant to article 41
of the mental hygiene law (50CR23A4)
(37024) ..................................... 60,000,000
For the design, predevelopment, acquisition
of property, construction of new facili-
ties and/or relocation of existing compre-
hensive psychiatric emergency programs
and/or psychiatric inpatient programs
under the auspice of municipalities and
other public and not-for-profit agencies,
dually licensed pursuant to both article
31 of the mental hygiene law and article
28 of the public health law (50CP23A4) ...... 60,000,000
For the design, predevelopment, acquisition
of property, construction, and rehabili-
tation of housing for people with mental
illness under the auspice of munici-
palities and other public and not-for-pro-
fit agencies, approved by the commissioner
of the office of mental health, pursuant
to article 41 of the mental hygiene law.
Notwithstanding section twenty-four of the
state finance law or any provision of law
to the contrary, $9,000,000 of funds from
this appropriation shall be allocated only
pursuant to a plan (i) approved by the
temporary president of the senate and the
director of the budget which sets forth
either an itemized list of grantees with
the amount to be received by each, or the
methodology for allocating such appropri-
ation, and (ii) which is thereafter
included in a senate resolution calling
for the expenditure of such funds, which
resolution must be approved by a majority
vote of all members elected to the senate
upon a roll call vote (50RI23A4) ........... 915,000,000
NON-BONDABLE PROJECTS (CCP) .................................. 1,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Bondable Purpose
For transfer to the Mental Hygiene Capital
Improvement Fund for reimbursement of the
non-bondable cost of projects for communi-
ty facilities authorized by appropriations
522 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
or reappropriations funded from the Mental
Hygiene Capital Improvement Fund including
liabilities incurred prior to April 1,
2023 or for payment to the dormitory
authority of the state of New York for
defeasance of bonds. Upon request of the
commissioner of mental health and approval
by the director of the budget, this appro-
priation may be transferred to the dormi-
tory authority of the state of New York
(500523NB) (81042) ........................... 1,000,000
STATE MENTAL HEALTH FACILITIES (CCP) ....................... 403,750,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
For payment of the cost of land acquisition,
construction, reconstruction, rehabili-
tation and improvements, including the
preparation of designs, plans, specifica-
tions and estimates, for new, existing,
and reappropriated capital projects and
programs, including, but not limited to,
preparation of plans, administration,
maintenance and improvement of existing
facilities, new facilities, energy conser-
vation, environmental protection or
improvement, health and safety, preserva-
tion of facilities, accreditation and
program improvement or program changes,
maintenance and operation of various
facilities and systems including personal
services, fringe benefits, and indirect
costs; provided, however, that no expendi-
tures may be made from this appropriation
until a comprehensive plan of projects has
been approved by the director of the budg-
et. Additionally, this appropriation may
be used for payment to the design and
construction management account of the
centralized services fund of the New York
state office of general services or to the
dormitory authority of the state of New
York for the purpose of preparation and
review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
523 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
appraisals, surveys, testing and environ-
mental impact statements for new, existing
and reappropriated capital projects and
programs. Upon request of the commissioner
of mental health and approval by the
director of the budget, this appropriation
may be transferred to the dormitory
authority of the state of New York.
Furthermore, upon approval of the director
of the budget, funds from this appropri-
ation may be suballocated or transferred
to any department, agency, or public
authority (50IS23A4) (37017) ................ 96,750,000
For payment of the cost of demolition,
including the preparation of designs,
plans, specifications and estimates, envi-
ronmental studies, and environmental reme-
diation related to the disposal of facili-
ties determined by the commissioner of
mental health to be in poor and/or uninha-
bitable condition and for which no state
agency has long-term use. This appropri-
ation may be used for payment to the
design and construction management account
of the centralized services fund of the
New York state office of general services
or to the dormitory authority of the state
of New York for the purpose of preparation
and review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements. Upon request of
the commissioner of mental health and
approval by the director of the budget,
this appropriation may be transferred to
the dormitory authority of the state of
New York (50DE23A4) ......................... 14,000,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Infrastructure Purpose
For payment of the cost of land acquisition,
construction, reconstruction, rehabili-
tation and improvements, including the
preparation of designs, plans, specifica-
tions and estimates, for new, existing and
reappropriated capital projects and
524 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
programs including, but not limited to,
preparation of plans, administration,
maintenance and improvement of existing
facilities, new facilities, energy conser-
vation, environmental protection or
improvement, health and safety, preserva-
tion of facilities, accreditation and
program improvement or program changes;
provided, however, that no expenditures
may be made from this appropriation until
a comprehensive plan of projects has been
approved by the director of the budget.
This appropriation may be used for payment
of personal service and nonpersonal
service, including fringe benefits, and
indirect cost recovery, related to the
administration of the capital projects and
programs provided by the office of mental
health. Additionally, this appropriation
may be used for payment to the design and
construction management account of the
centralized services fund of the New York
state office of general services or to the
dormitory authority of the state of New
York for the purpose of preparation and
review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new and
existing projects. Upon request of the
commissioner of mental health and approval
by the director of the budget, this appro-
priation may be suballocated or trans-
ferred to any department, agency, or
public authority (50A423A4) (37017) ........ 275,000,000
For payment of the cost of construction,
reconstruction, rehabilitation and
improvements, including the preparation of
designs, plans, specifications and esti-
mates for capital projects and programs
addressing the emergent need to expand
inpatient capacity within the office of
mental health's state-operated system and
may be used for payment to the design and
construction management account of the
centralized services fund of the New York
state office of general services or to the
dormitory authority of the state of New
York for the purpose of preparation and
525 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2023-24
review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new and
existing projects.
Notwithstanding section 8 of the public
buildings law, section 2879 of the public
authorities law, and section 142 of the
economic development law or any other
inconsistent provision of law, in order to
expedite projects, the office of general
services and the dormitory authority of
the state of New York are authorized to
award cost plus percentage fee contracts.
Funds available for expenditure pursuant
to this appropriation may be allocated and
distributed by the commissioner of the
office of mental health (50IE23A4) .......... 18,000,000
526 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
COMMUNITY MENTAL HEALTH FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501122A4) (37015) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501121A4) (37015) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
527 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501120A4) (37015) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501119A4) (37015) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
528 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501118A4) (37015) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501117A4) (37015) ... 6,000,000 .................. (re. $3,166,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(501116A4) (37015) ... 6,000,000 .................. (re. $2,766,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Minor Rehabilitation Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2021:
529 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50101389) (36972) ... 6,000,000 .................. (re. $3,733,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50101289) (36972) ... 6,000,000 .................. (re. $5,915,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
530 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50101189) (36972) ... 6,000,000 .................. (re. $2,473,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50101089) (36972) ... 6,000,000 .................... (re. $332,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50100989) (36972) ... 6,000,000 .................. (re. $2,833,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2021:
531 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50100889) (36972) ... 6,000,000 .................... (re. $166,000)
By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50100789) (36972) ... 6,000,000 .................... (re. $632,000)
By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2021:
State aid to municipalities and other public and not-for-profit agen-
cies for acquisition, rehabilitation, and/or improvements to exist-
ing community mental health facilities as required to address code
violations, health and safety issues, and/or structural/mechanical
deficiencies. Additionally, this appropriation may be used for
payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
532 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ronmental impact statements for new, existing and reappropriated
capital projects and programs. Notwithstanding any inconsistent
provision of law, within the amounts hereby appropriated, the
commissioner of the office of mental health may provide state aid
grants of up to 100 per centum of reasonable capital costs associ-
ated with the acquisition, rehabilitation, and/or improvements
(50100689) (36972) ... 6,000,000 .................... (re. $111,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 1994, for:
State aid to municipalities and other public and not-for-profit
private agencies for acquisition of property, design, construction
and rehabilitation of community mental health facilities and associ-
ated programs including, but not limited to, article 28 or article
31 community mental health facilities or supported housing beds, and
for state aid grants for facilities intended to serve mentally ill
persons (50239407) (36973) ... 16,070,000 ........... (re. $309,000)
Capital Projects Funds - Other
Mental Health Facilities Capital Improvement Fund
OMH-Community Facilities Account - 32303
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred to the dormitory authority of the state of New York
(500122A4) (37015) ... 5,722,000 .................. (re. $5,649,000)
For the acquisition of property, construction, and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50CR22A4) (37024) ... 60,000,000 ................ (re. $59,961,000)
For services and expenses of municipalities and not-for-profit agen-
cies licensed, certified, or approved by the office of mental
health, to support increased capacity and expansion of mental health
and substance use treatment services which may include but not be
533 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
limited to intensive crisis stabilization centers, intensive mobile
treatment, low barrier housing, supportive and reentry transitional
housing and inpatient alternatives to detention and treatment. A
portion of this appropriation may be suballocated to the office of
addiction services and supports for services and expenses related to
expanding mental health and substance use treatment services
(50IC22A4) (37062) ... 10,000,000 ................ (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred to the dormitory authority of the state of New York
(500121A4) (37015) ... 5,722,000 .................. (re. $4,837,000)
For the acquisition of property, construction, and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50CR21A4) (37024) ... 60,000,000 ................ (re. $59,361,000)
By chapter 54, section 1, of the laws of 2020:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred to the dormitory authority of the state of New York
(500120A4) (37015) ... 5,722,000 .................. (re. $5,047,000)
For the acquisition of property, construction, and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50CR20A4) (37024) ... 60,000,000 ................ (re. $57,296,000)
534 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred to the dormitory authority of the state of New York
(500119A4) (37015) ... 5,722,000 .................. (re. $4,642,000)
For the acquisition of property, construction, and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50CR19A4) (37024) ... 60,000,000 ................ (re. $40,344,000)
By chapter 54, section 1, of the laws of 2018:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred to the dormitory authority of the state of New York
(500118A4) (37015) ... 5,722,000 .................. (re. $4,210,000)
For the acquisition of property, construction, and rehabilitation of
new facilities, for purposes of developing residential crisis
programs, which may include the renovation of existing community
mental health facilities for such purposes, under the auspice of
municipalities and other public and not-for-profit agencies,
approved by the commissioner of the office of mental health, pursu-
ant to article 41 of the mental hygiene law (50CR18A4) (37024) .....
50,000,000 ....................................... (re. $50,000,000)
For services and expenses of not-for-profit agencies licensed, certi-
fied or approved by the office of mental health, to support the
preservation, restructuring, or expansion of children's behavioral
health services (501218A4) (37019) .................................
10,000,000 ........................................ (re. $7,000,000)
535 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York (500117A4) (37015) ...............................
5,722,000 ........................................... (re. $252,000)
By chapter 54, section 1, of the laws of 2017, as transferred by chapter
54, section 1, of the laws of 2018:
For services and expenses of not-for-profit agencies licensed, certi-
fied or approved by the office of mental health, to support the
preservation, restructuring, or expansion of children's behavioral
health services (501217A4) (37019) .................................
10,000,000 ........................................ (re. $6,159,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Additionally, this appropriation may be used for payment of personal
service and nonpersonal service, including fringe benefits related
to the administration of the community capital program provided by
the office of mental health for new and reappropriated community
capital projects. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York (500116A4) (37015) ...............................
5,722,000 ......................................... (re. $2,590,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OMH-Community Facilities Account - 32303
New Facilities Purpose
By chapter 54, section 1, of the laws of 2008:
For payment to municipalities and not-for-profit community providers
for the acquisition of property, design, construction and rehabili-
536 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation of housing for mentally ill persons. To the extent that any
portion of such appropriation is utilized to develop housing in any
city having a population of one million or more, that portion of the
appropriation shall be matched on a 50/50 basis. Notwithstanding any
other provision of law to the contrary, any of the amounts appropri-
ated herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50VY0807) (36975) ... 145,000,000 ............... (re. $51,457,000)
By chapter 54, section 1, of the laws of 2007:
For payment to municipalities and not-for-profit community providers
for the acquisition of property, design, construction and rehabili-
tation of housing for mentally ill persons. To the extent that any
portion of such appropriation is utilized to develop housing in any
city having a population of one million or more, that portion of the
appropriation shall be matched on a 50/50 basis. Notwithstanding any
other provision of law to the contrary, any of the amounts appropri-
ated herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50VY0707) (36975) ... 200,000,000 .............. (re. $113,234,000)
By chapter 54, section 1, of the laws of 2006:
For payment to municipalities and other public and not-for-profit
community providers approved by the commissioner of the office of
mental health, pursuant to mental hygiene law, for the acquisition
of property, construction and rehabilitation of supportive housing
for mentally ill homeless persons. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50VY0607) (36975) ... 211,000,000 ............... (re. $99,097,000)
By chapter 54, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2014:
537 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment to municipalities and not-for-profit community providers
for the acquisition of property, design, construction and rehabili-
tation of housing for mentally ill persons. Of such appropriation up
to eighty percent shall be matched on a 50/50 basis. Notwithstanding
any other provision of law to the contrary, any of the amounts
appropriated herein may be increased or decreased by interchange or
transfer without limit with any appropriation of the office of
mental health capital projects budget, upon the request of the
commissioner of mental health and with the approval of the director
of the budget, who shall file such approval with the department of
audit and control and copies thereof with the chairman of the senate
finance committee and the chairman of the assembly ways and means
committee (50VY0507) (36975) ... 75,000,000 ...... (re. $22,154,000)
By chapter 54, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2014:
For payment to municipalities and not-for-profit community providers
for the acquisition of property, design, construction and rehabili-
tation of housing for mentally ill persons. Of such appropriation up
to eighty percent shall be matched on a 50/50 basis. Notwithstanding
any other provision of law to the contrary, any of the amounts
appropriated herein may be increased or decreased by interchange or
transfer without limit with any appropriation of the office of
mental health capital projects budget, upon the request of the
commissioner of mental health and with the approval of the director
of the budget, who shall file such approval with the department of
audit and control and copies thereof with the chairman of the senate
finance committee and the chairman of the assembly ways and means
committee (50VY0307) (36975) ... 65,000,000 ...... (re. $23,365,000)
By chapter 54, section 1, of the laws of 1999, as amended by chapter 54,
section 1, of the laws of 2014:
For payment to municipalities and not-for-profit community providers
for the acquisition of property, design, construction and rehabili-
tation of housing for mentally ill persons. Of such appropriation
eighty percent shall be matched on a 50/50 basis and twenty percent
shall not require a match. Notwithstanding any other provision of
law to the contrary, any of the amounts appropriated herein may be
increased or decreased by interchange or transfer without limit with
any appropriation of the office of mental health capital projects
budget, upon the request of the commissioner of mental health and
with the approval of the director of the budget, who shall file such
approval with the department of audit and control and copies thereof
with the chairman of the senate finance committee and the chairman
of the assembly ways and means committee (50VY9907) (36975) ........
50,000,000 ....................................... (re. $15,102,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OMH-Community Facilities Account - 32303
538 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2013:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50231303) (36977) ... 5,000,000 ..................... (re. $97,000)
By chapter 54, section 1, of the laws of 2012:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50231203) (36977) ... 5,000,000 ..................... (re. $25,000)
By chapter 54, section 1, of the laws of 2011:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50231103) (36977) ... 5,000,000 .................... (re. $135,000)
By chapter 54, section 1, of the laws of 2010:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50231003) (36977) ... 5,000,000 .................... (re. $979,000)
By chapter 54, section 1, of the laws of 2009:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law
(50230903) (36977) ... 5,000,000 .................... (re. $279,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2014:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Notwithstanding any other provision of law to the contrary, any of
539 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50230803) (36977) ........................
28,000,000 ....................................... (re. $10,931,000)
By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2014:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50230703) (36977) ........................
112,000,000 ...................................... (re. $25,864,000)
By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2014:
For the acquisition of property, construction and rehabilitation of
new facilities and/or relocation of existing community mental health
facilities under the auspice of municipalities and other public and
not-for-profit agencies, approved by the commissioner of the office
of mental health, pursuant to article 41 of the mental hygiene law.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50230603) (36977) ........................
15,000,000 .......................................... (re. $770,000)
By chapter 54, section 1, of the laws of 2001:
For the acquisition of property, construction, rehabilitation and/or
relocation of existing community mental health facilities under the
auspice of municipalities and other public and not-for-profit agen-
540 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cies, approved by the commissioner of the office of mental health,
pursuant to article 41 of the mental hygiene law (50230103) (36977)
... 5,000,000 ........................................ (re. $30,000)
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environmental Protection or Improvements Purpose
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates for environmental protection (50EP1306) (81066) ......
5,911,000 ............................................. (re. $9,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2013:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Upon request of the
commissioner of mental health and approval by the director of the
budget, this appropriation may be transferred to the dormitory
authority of the state of New York (50HS1301) (81028) ..............
6,274,000 ........................................... (re. $201,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Accreditation Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
541 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50061302) (36910) ... 28,188,000 ................. (re. $2,292,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50061202) (36910) ... 14,441,000 ................. (re. $1,228,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
542 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
committee and the chairman of the assembly ways and means committee
(50061102) (36910) ... 36,477,000 ................... (re. $100,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York (50061002) (36910) ..............
9,565,000 ........................................... (re. $739,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50060902) (36910) ... 347,480,000 ................ (re. $1,436,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction and improvements, including the preparation of designs,
plans, specifications and estimates related to accreditation
improvements to existing facilities and programs. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
543 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50060802) (36910) ... 95,624,000 ................. (re. $2,535,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50011301) (81028) ... 28,737,000 ................ (re. $13,831,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
544 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50011201) (81028) ... 24,920,000 ................... (re. $828,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50011101) (81028) ... 33,114,000 ................... (re. $104,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
545 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50011001) (81028) ... 37,066,000 ................... (re. $682,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50010901) (81028) ... 38,125,000 ................. (re. $1,394,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, for health and safety improvements to existing facil-
ities and programs, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. This appropriation
may be used for payment of personal service, indirect cost recovery,
and fringe benefit costs associated with New York State employees
assigned to such capital projects. Upon request of the commissioner
of mental health and approval by the director of the budget, this
appropriation may be transferred or suballocated to the dormitory
authority of the state of New York. Notwithstanding any other
546 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
provision of law to the contrary, any of the amounts appropriated
herein may be increased or decreased by interchange or transfer
without limit with any appropriation of the office of mental health
capital projects budget, upon the request of the commissioner of
mental health and with the approval of the director of the budget,
who shall file such approval with the department of audit and
control and copies thereof with the chairman of the senate finance
committee and the chairman of the assembly ways and means committee
(50010801) (81028) ... 60,276,000 ................. (re. $1,308,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, and minor rehabilitation and improvements for the
preservation of existing facilities and programs, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget. This appropriation may be used for payment of personal
service, indirect cost recovery, and fringe benefit costs associated
with New York State employees assigned to such capital projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50031303) (81010) ........................
51,546,000 ....................................... (re. $13,827,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, and minor rehabilitation and improvements for the
preservation of existing facilities and programs, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget. This appropriation may be used for payment of personal
service, indirect cost recovery, and fringe benefit costs associated
547 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with New York State employees assigned to such capital projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50031203) (81010) ........................
48,743,000 ........................................ (re. $9,623,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, and minor rehabilitation and improvements for the
preservation of existing facilities and programs, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget. This appropriation may be used for payment of personal
service, indirect cost recovery, and fringe benefit costs associated
with New York State employees assigned to such capital projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50031103) (81010) ........................
59,543,000 ........................................ (re. $4,750,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, and minor rehabilitation and improvements for the
preservation of existing facilities and programs, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget. This appropriation may be used for payment of personal
service, indirect cost recovery, and fringe benefit costs associated
548 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
with New York State employees assigned to such capital projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50031003) (81010) ........................
110,767,000 ...................................... (re. $12,564,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates, and minor rehabilitation and improvements for the
preservation of existing facilities and programs, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget. This appropriation may be used for payment of personal
service, indirect cost recovery, and fringe benefit costs associated
with New York State employees assigned to such capital projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Notwithstanding any other provision of law to the contrary, any of
the amounts appropriated herein may be increased or decreased by
interchange or transfer without limit with any appropriation of the
office of mental health capital projects budget, upon the request of
the commissioner of mental health and with the approval of the
director of the budget, who shall file such approval with the
department of audit and control and copies thereof with the chairman
of the senate finance committee and the chairman of the assembly
ways and means committee (50030903) (81010) ........................
45,396,000 ........................................ (re. $1,645,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
549 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York. Notwithstanding any other provision of law to the
contrary, any of the amounts appropriated herein may be increased or
decreased by interchange or transfer without limit with any appro-
priation of the office of mental health capital projects budget,
upon the request of the commissioner of mental health and with the
approval of the director of the budget, who shall file such approval
with the department of audit and control and copies thereof with the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee (50081308) (81063) ...............
22,878,000 ........................................ (re. $4,503,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York. Notwithstanding any other provision of law to the
contrary, any of the amounts appropriated herein may be increased or
decreased by interchange or transfer without limit with any appro-
priation of the office of mental health capital projects budget,
upon the request of the commissioner of mental health and with the
approval of the director of the budget, who shall file such approval
with the department of audit and control and copies thereof with the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee (50081208) (81063) ...............
36,455,000 ........................................ (re. $2,351,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York. Notwithstanding any other provision of law to the
contrary, any of the amounts appropriated herein may be increased or
decreased by interchange or transfer without limit with any appro-
priation of the office of mental health capital projects budget,
upon the request of the commissioner of mental health and with the
approval of the director of the budget, who shall file such approval
with the department of audit and control and copies thereof with the
chairman of the senate finance committee and the chairman of the
550 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
assembly ways and means committee (50081108) (81063) ...............
31,784,000 ........................................... (re. $79,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York (50081008) (81063) ...............................
16,937,000 .......................................... (re. $894,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York. Notwithstanding any other provision of law to the
contrary, any of the amounts appropriated herein may be increased or
decreased by interchange or transfer without limit with any appro-
priation of the office of mental health capital projects budget,
upon the request of the commissioner of mental health and with the
approval of the director of the budget, who shall file such approval
with the department of audit and control and copies thereof with the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee (50080908) (81063) ...............
85,185,000 ........................................ (re. $1,669,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the cost of construction, reconstruction and improve-
ments, including the preparation of designs, plans, specifications
and estimates related to improvements or changes to existing facili-
ties and programs. Upon request of the commissioner of mental health
and approval by the director of the budget, this appropriation may
be transferred or suballocated to the dormitory authority of the
state of New York. Notwithstanding any other provision of law to the
contrary, any of the amounts appropriated herein may be increased or
decreased by interchange or transfer without limit with any appro-
priation of the office of mental health capital projects budget,
upon the request of the commissioner of mental health and with the
approval of the director of the budget, who shall file such approval
with the department of audit and control and copies thereof with the
chairman of the senate finance committee and the chairman of the
551 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
assembly ways and means committee (50080808) (81063) ...............
32,952,000 ........................................ (re. $1,010,000)
NON-BONDABLE PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Bondable Purpose
By chapter 54, section 1, of the laws of 2022:
For transfer to the Mental Hygiene Capital Improvement Fund for
reimbursement of the non-bondable cost of projects for community
facilities authorized by appropriations or reappropriations funded
from the Mental Hygiene Capital Improvement Fund including liabil-
ities incurred prior to April 1, 2022 or for payment to the dormito-
ry authority of the state of New York for defeasance of bonds. Upon
request of the commissioner of mental health and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York (500522NB) (81042) ...
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2000:
For transfer to the Mental Hygiene Capital Improvement Fund for
reimbursement of the non-bondable cost of institutional projects
authorized by appropriations or reappropriations funded from the
Mental Hygiene Capital Improvement Fund including liabilities
incurred prior to April 1, 2000 or for payment to the dormitory
authority of the state of New York for defeasance of bonds. Upon
request of the commissioner of mental health and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York (50FO00NB) (81042) ....
8,000,000 ......................................... (re. $5,045,000)
STATE MENTAL HEALTH FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
552 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS22A4) (37017) ... 86,750,000 ................ (re. $68,950,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS21A4) (37017) ... 86,750,000 ................ (re. $21,347,000)
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2021:
553 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS20A4) (37017) ... 91,750,000 ................ (re. $19,478,000)
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
554 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS19A4) (37017) ... 86,750,000 ................ (re. $11,638,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS18A4) (37017) ... 86,750,000 ................. (re. $7,295,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes, maintenance and operation of various
facilities and systems including personal services, fringe benefits,
and indirect costs; provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
555 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
has been approved by the director of the budget. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new, existing and reappro-
priated capital projects and programs. Upon request of the commis-
sioner of mental health and approval by the director of the budget,
this appropriation may be transferred to the dormitory authority of
the state of New York. Furthermore, upon approval of the director of
the budget, funds from this appropriation may be suballocated or
transferred to any department, agency, or public authority
(50IS17A4) (37017) ... 97,248,000 ................ (re. $11,564,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. Addi-
tionally, this appropriation may be used for payment to the design
and construction management account of the centralized services fund
of the New York state office of general services or to the dormitory
authority of the state of New York for the purpose of preparation
and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new, existing and reappropriated capital projects and programs.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred to
the dormitory authority of the state of New York. Furthermore, upon
approval of the director of the budget, funds from this appropri-
ation may be transferred to the office for people with developmental
disabilities and the office of addiction services and supports for
payment to the dormitory authority of the state of New York in
relation to the preparation of plans (50IS16A4) (37017) ............
84,450,000 ........................................ (re. $4,109,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2020:
556 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. Addi-
tionally, this appropriation may be used for payment to the design
and construction management account of the centralized services fund
of the New York state office of general services or to the dormitory
authority of the state of New York for the purpose of preparation
and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new, existing and reappropriated capital projects and programs.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred to
the dormitory authority of the state of New York. Furthermore, upon
approval of the director of the budget, funds from this appropri-
ation may be transferred to the office for people with developmental
disabilities and the office of addiction services and supports for
payment to the dormitory authority of the state of New York in
relation to the preparation of plans (50IS15A4) (37017) ............
35,750,000 .......................................... (re. $366,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing, and reappropriated capital projects and programs, includ-
ing, but not limited to, preparation of plans, administration, main-
tenance and improvement of existing facilities, new facilities,
energy conservation, environmental protection or improvement, health
and safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. Addi-
tionally, this appropriation may be used for payment to the design
and construction management account of the centralized services fund
of the New York state office of general services or to the dormitory
authority of the state of New York for the purpose of preparation
and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new, existing and reappropriated capital projects and programs.
557 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred to
the dormitory authority of the state of New York. Furthermore, upon
approval of the director of the budget, funds from this appropri-
ation may be transferred to the office for people with developmental
disabilities and the office of addiction services and supports for
payment to the dormitory authority of the state of New York in
relation to the preparation of plans (50IS14A4) (37017) ............
36,950,000 ........................................ (re. $9,254,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
MH Capital Improvement Account - 32309
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally,
this appropriation may be used for payment to the design and
construction management account of the centralized services fund of
the New York state office of general services or to the dormitory
authority of the state of New York for the purpose of preparation
and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects. Upon request of the commissioner of
mental health and approval by the director of the budget, this
appropriation may be suballocated or transferred to any department,
agency, or public authority (50A422A4) (37017) .....................
275,000,000 ..................................... (re. $275,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
558 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be suballocated
or transferred to any department, agency, or public authority
(50A421A4) (37017) ... 375,000,000 .............. (re. $374,835,000)
By chapter 54, section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be suballocated
or transferred to any department, agency, or public authority
(50A420A4) (37017) ... 375,000,000 .............. (re. $371,681,000)
559 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be suballocated
or transferred to any department, agency, or public authority
(50A419A4) (37017) ... 375,000,000 .............. (re. $341,196,000)
By chapter 54, section 1, of the laws of 2018:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
560 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be suballocated
or transferred to any department, agency, or public authority
(50A418A4) (37017) ... 275,000,000 .............. (re. $184,349,000)
By chapter 54, section 1, of the laws of 2017:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be suballocated
or transferred to any department, agency, or public authority
(50A417A4) (37017) ... 275,000,000 .............. (re. $199,502,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
561 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Furthermore, upon approval of the director of the budget, funds from
this appropriation may be transferred to the office for people with
developmental disabilities and the office of addiction services and
supports for payment to the dormitory authority of the state of New
York in relation to the preparation of plans (50A416A4) (37017) ....
275,000,000 ..................................... (re. $100,719,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Furthermore, upon approval of the director of the budget, funds from
this appropriation may be transferred to the office for people with
developmental disabilities and the office of addiction services and
supports for payment to the dormitory authority of the state of New
562 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
York in relation to the preparation of plans (50A415A4) (37017) ....
275,000,000 ...................................... (re. $37,821,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2020:
For payment of the cost of land acquisition, construction, recon-
struction, rehabilitation and improvements, including the prepara-
tion of designs, plans, specifications and estimates, for new,
existing and reappropriated capital projects and programs including,
but not limited to, preparation of plans, administration, mainte-
nance and improvement of existing facilities, new facilities, energy
conservation, environmental protection or improvement, health and
safety, preservation of facilities, accreditation and program
improvement or program changes; provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget. This
appropriation may be used for payment of personal service and
nonpersonal service, including fringe benefits, and indirect cost
recovery, related to the administration of the capital projects and
programs provided by the office of mental health. Additionally, this
appropriation may be used for payment to the design and construction
management account of the centralized services fund of the New York
state office of general services or to the dormitory authority of
the state of New York for the purpose of preparation and review of
plans, specifications, estimates, services, construction management
and supervision, inspection, studies, appraisals, surveys, testing
and environmental impact statements for new and existing projects.
Upon request of the commissioner of mental health and approval by
the director of the budget, this appropriation may be transferred or
suballocated to the dormitory authority of the state of New York.
Furthermore, upon approval of the director of the budget, funds from
this appropriation may be transferred to the office for people with
developmental disabilities and the office of addiction services and
supports for payment to the dormitory authority of the state of New
York in relation to the preparation of plans (50A414A4) (37017) ....
51,493,000 .......................................... (re. $294,000)
(APPROPRIATED TO THE FACILITIES DEVELOPMENT CORPORATION)
EXECUTIVE DIRECTION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 1, section 8, of the laws of 1965, as amended by chapter 54,
section 1, of the laws of 2020:
(1) The payment of all claims for personal injury, death or property
damage for which the New York State Medical Care Facilities Finance
Agency or the facilities development corporation or the dormitory
563 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority might be liable occurring upon, in or about any projects
covered by the Agreement of Lease entered into by the facilities
development corporation, the department of mental hygiene and the
New York State Medical Care Facilities Finance Agency under date of
October 1, 1987 as from time to time amended and supplemented and
any and all penalties, costs, including attorneys' fees, claims,
demands and causes of action due directly or indirectly to the use,
disuse, misuse or interest in such projects; (2) in the case of
damage, loss or destruction of any such project, or any part of any
such project, the payment of the costs of repairing, restoring,
rebuilding or replacing the same in accordance with the obligations
of the facilities development corporation so to do from the proceeds
of insurance under the provisions of paragraph (b) of section 3.04
of the Agreement of Lease; and (3) payments to the New York State
Medical Care Facilities Finance Agency of moneys at the times and in
the amounts that annual rentals would be due with respect to each
project during such time or times as each such project may be
damaged or destroyed and not available for use by the department of
mental hygiene in accordance with the terms of the Agreement of
Lease.
Notwithstanding the provisions of any general or special law, the
facilities development corporation may assign to the New York State
Medical Care Facilities Finance Agency all or any portion of the
moneys hereby appropriated for the purposes hereinabove set forth.
Notwithstanding the foregoing, in the event the appropriation is
insufficient to cover the losses, upon notification from the Facili-
ties Development Corporation, the director of the division of the
budget shall submit a request for additional appropriations to cover
the additional losses. Upon approval by the director of the budget,
funds from this appropriation may be transferred to the office for
people with developmental disabilities and the office of addiction
services and supports for payment to the dormitory authority of the
state of New York (00638103) (36978) ...............................
4,000,000 ......................................... (re. $2,445,000)
564 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 119,450,000 543,791,000
---------------- ----------------
All Funds ........................ 119,450,000 543,791,000
================ ================
COMMUNITY AND INSTITUTIONAL SERVICES PROGRAM (CCP) .......... 62,450,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
For acquisition, alterations, improvements,
and preservation of various community
program and institutional program facili-
ties, including, but not limited to, reha-
bilitation projects, health and safety
projects, fire safety projects and other
capital and administrative costs related
to this purpose. For state aid, to munici-
palities and other public and not-for-pro-
fit agencies, including the payment of
liabilities incurred prior to April 1,
2023 for up to 100 per centum of the net
cost of feasibility studies, property
options, capital renovations, acquisition
of property, construction, rehabilitation
and capital costs incidental and appurten-
ant to facilities required to be licensed
pursuant to article 16, as defined in the
mental hygiene law, and for services and
expenses related to the maintenance and
improvement inclusive of fire safety and
life safety upgrades of voluntary not-for-
profit provider operated community resi-
dential and day service programs and envi-
ronmental modifications and adaptive
technology services at voluntary not-for-
profit provider operated community resi-
dential facilities, certified family care
homes and private residences, as a loan
and/or grant to family care providers, for
payment to other public housing agencies,
including municipal, county, state and
565 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
federal housing agencies, public benefit
corporations or authorities, or private
corporations and for capital development,
improvements and alterations of residen-
tial housing or day program alternatives
not currently defined in the mental
hygiene law. Notwithstanding section 163
of the state finance law, section 142 of
the economic development law, and article
41 of the mental hygiene law, the commis-
sioner of the office for people with
developmental disabilities may make the
funds appropriated herein available as
state aid, a loan or a grant, pursuant to
terms and conditions established by the
commissioner of the office for people with
developmental disabilities, to cover a
portion of the development costs of
private, public and/or non-profit organ-
izations, including corporations and part-
nerships established pursuant to the
private housing finance law and/or any
other statutory provisions. Further, the
office for people with developmental disa-
bilities shall have a lien on the real
property developed with such state aid,
loans or grants, which shall be in the
amount of the loan or grant, for a maximum
term of 30 years, or other longer term
consistent with the requirements of anoth-
er regulatory agency. Upon request of the
commissioner of the office for people with
developmental disabilities and approval by
the director of the budget, the funds
appropriated herein may be suballocated or
transferred to any other public housing
agencies, including municipal, county,
state and federal housing agencies, public
benefit corporations or authorities, or
private corporations, provided, however,
that no expenditures may be made from this
appropriation until a comprehensive plan
of projects has been approved by the
director of the budget (510123A4) (37884) ... 41,600,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
Infrastructure Purpose
566 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
For acquisition, alterations, improvements,
and preservation of various community
program and institutional program facili-
ties, including, but not limited to, reha-
bilitation projects, health and safety
projects, fire safety projects and other
capital and administrative costs related
to this purpose. For state aid, to munici-
palities and other public and not-for-pro-
fit agencies, including the payment of
liabilities incurred prior to April 1,
2023 for up to 100 per centum of the net
cost of feasibility studies, property
options, capital renovations, acquisition
of property, construction, rehabilitation
and capital costs incidental and appurten-
ant to facilities required to be licensed
pursuant to article 16, as defined in the
mental hygiene law, and for services and
expenses related to the maintenance and
improvement inclusive of fire safety and
life safety upgrades of voluntary not-for-
profit provider operated community resi-
dential and day service programs and envi-
ronmental modifications and adaptive
technology services at voluntary not-for-
profit provider operated community resi-
dential facilities, certified family care
homes and private residences, as a loan
and/or grant to family care providers, for
payment to other public housing agencies,
including municipal, county, state and
federal housing agencies, public benefit
corporations or authorities, or private
corporations and for capital development,
improvements and alterations of residen-
tial housing or day program alternatives
not currently defined in the mental
hygiene law. Notwithstanding section 163
of the state finance law, section 142 of
the economic development law, and article
41 of the mental hygiene law, the commis-
sioner of the office for people with
developmental disabilities may make the
funds appropriated herein available pursu-
ant to terms and conditions established by
the commissioner of the office for people
with developmental disabilities, to cover
a portion of the development costs of
private, public and/or non-profit organ-
567 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
izations, including corporations and part-
nerships established pursuant to the
private housing finance law and/or any
other statutory provisions, for supportive
housing units that have been set aside for
individuals with intellectual and develop-
mental disabilities. The funds appropri-
ated herein may also be made available for
the payment to municipalities and other
public and not-for-profit community
providers approved by the commissioner of
the office for people with developmental
disabilities, for the acquisition of prop-
erty, construction and rehabilitation of
supportive housing units for individuals
with intellectual and developmental disa-
bilities. Further, the office for people
with developmental disabilities shall have
a lien on the real property developed with
such state aid, loans or grants, which
shall be in the amount of the loan or
grant, for a maximum term of 30 years, or
other longer term consistent with the
requirements of another regulatory agency.
Upon request of the commissioner of the
office for people with developmental disa-
bilities and approval by the director of
the budget, the funds appropriated herein
may be suballocated or transferred to any
public housing agencies, including munici-
pal, county, state or federal agencies,
public benefit corporations or authori-
ties, or private corporations for the
purposes stated above, provided, however,
that no expenditures may be made from this
appropriation until a comprehensive plan
of projects has been approved by the
director of the budget (510223A4) (37884) ... 20,850,000
DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 13,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services or to the dormitory
568 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
authority for the purpose of preparation
and review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new and
existing projects associated with the
community services and institutional
services programs. Upon the request of the
commissioner of the office for people with
developmental disabilities and the
approval of the director of the budget,
this appropriation may be transferred or
suballocated to the dormitory authority of
the state of New York. Upon approval by
the director of the budget, funds from
this appropriation may be transferred to
the office of mental health and the office
of addiction services and supports for
payment to the dormitory authority of the
state of New York for the preparation of
plans purpose (51F22330) (81088) ............. 6,000,000
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
DASNY-OPWDD Administration Account - 32307
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services or to the dormitory
authority for the purpose of preparation
and review of plans, specifications, esti-
mates, services, construction management
and supervision, inspection, studies,
appraisals, surveys, testing and environ-
mental impact statements for new and
existing projects associated with the
institutional services program and the
community services program. Upon the
request of the commissioner of the office
for people with developmental disabilities
and the approval of the director of the
budget, this appropriation may be trans-
ferred or suballocated to the dormitory
authority of the state of New York. Upon
approval by the director of the budget,
funds from this appropriation may be
transferred to the office of mental health
569 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2023-24
and the office of addiction services and
supports for payment to the dormitory
authority of the state of New York for the
preparation of plans purpose (51F12330)
(81088) ...................................... 7,000,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 44,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs (51FM23MO) (81107) .................... 44,000,000
570 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
COMMUNITY AND INSTITUTIONAL SERVICES PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2022 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state
finance law, section 142 of the economic development law, and arti-
cle 41 of the mental hygiene law, the commissioner of the office for
people with developmental disabilities may make the funds appropri-
ated herein available as state aid, a loan or a grant, pursuant to
terms and conditions established by the commissioner of the office
for people with developmental disabilities, to cover a portion of
the development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
571 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ities, or private corporations, provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget
(510122A4) (37884) ... 41,600,000 ................ (re. $37,828,000)
By chapter 54, section 1, of the laws of 2021:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2021 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available as state aid, a loan or a grant, pursuant to terms
and conditions established by the commissioner of the office for
people with developmental disabilities, to cover a portion of the
development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
ities, or private corporations, provided, however, that no expendi-
572 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tures may be made from this appropriation until a comprehensive plan
of projects has been approved by the director of the budget
(510121A4) (37884) ... 39,600,000 ................ (re. $25,709,000)
By chapter 54, section 1, of the laws of 2020:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2020 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available as state aid, a loan or a grant, pursuant to terms
and conditions established by the commissioner of the office for
people with developmental disabilities, to cover a portion of the
development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
ities, or private corporations, provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
573 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of projects has been approved by the director of the budget
(510120A4) (37884) ... 39,600,000 ................. (re. $6,491,000)
By chapter 54, section 1, of the laws of 2019:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2019 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available as state aid, a loan or a grant, pursuant to terms
and conditions established by the commissioner of the office for
people with developmental disabilities, to cover a portion of the
development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
ities, or private corporations, provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
574 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of projects has been approved by the director of the budget
(510119A4) (37884) ... 31,400,000 ................... (re. $342,000)
By chapter 54, section 1, of the laws of 2018:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2018 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available as state aid, a loan or a grant, pursuant to terms
and conditions established by the commissioner of the office for
people with developmental disabilities, to cover a portion of the
development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
ities, or private corporations, provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
575 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of projects has been approved by the director of the budget
(510118A4) (37884) ... 31,400,000 ................... (re. $228,000)
By chapter 54, section 1, of the laws of 2017:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2017 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available as state aid, a loan or a grant, pursuant to terms
and conditions established by the commissioner of the office for
people with developmental disabilities, to cover a portion of the
development costs of private, public and/or non-profit organiza-
tions, including corporations and partnerships established pursuant
to the private housing finance law and/or any other statutory
provisions. Further, the office for people with developmental disa-
bilities shall have a lien on the real property developed with such
state aid, loans or grants, which shall be in the amount of the loan
or grant, for a maximum term of 30 years, or other longer term
consistent with the requirements of another regulatory agency. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, the
funds appropriated herein may be suballocated or transferred to any
other public housing agencies, including municipal, county, state
and federal housing agencies, public benefit corporations or author-
ities, or private corporations, provided, however, that no expendi-
tures may be made from this appropriation until a comprehensive plan
576 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of projects has been approved by the director of the budget
(510117A4) (37884) ... 21,000,000 .................... (re. $44,000)
By chapter 54, section 1, of the laws of 2014:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2014 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other state and federal housing agencies,
private corporations and for capital development, improvements and
alterations of residential housing or day program alternatives not
currently defined in the mental hygiene law. Upon request of the
commissioner of the office for people with developmental disabili-
ties and approval by the director of the budget, this appropriation
may be transferred to the dormitory authority of the state of New
York, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (510114A4) (37884) ..........
22,910,000 ........................................... (re. $45,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
Infrastructure Purpose
By chapter 54, section 1, of the laws of 2022:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2022 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
577 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state
finance law, section 142 of the economic development law, and arti-
cle 41 of the mental hygiene law, the commissioner of the office for
people with developmental disabilities may make the funds appropri-
ated herein available pursuant to terms and conditions established
by the commissioner of the office for people with developmental
disabilities, to cover a portion of the development costs of
private, public and/or non-profit organizations, including corpo-
rations and partnerships established pursuant to the private housing
finance law and/or any other statutory provisions, for supportive
housing units that have been set aside for individuals with intel-
lectual and developmental disabilities. The funds appropriated here-
in may also be made available for the payment to municipalities and
other public and not-for-profit community providers approved by the
commissioner of the office for people with developmental disabili-
ties, for the acquisition of property, construction and rehabili-
tation of supportive housing units for individuals with intellectual
and developmental disabilities. Further, the office for people with
developmental disabilities shall have a lien on the real property
developed with such state aid, loans or grants, which shall be in
the amount of the loan or grant, for a maximum term of 30 years, or
other longer term consistent with the requirements of another regu-
latory agency. Upon request of the commissioner of the office for
people with developmental disabilities and approval by the director
of the budget, the funds appropriated herein may be suballocated or
transferred to any public housing agencies, including municipal,
county, state or federal agencies, public benefit corporations or
authorities, or private corporations for the purposes stated above,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (510222A4) (37884) ......................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2021:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
578 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2021 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available pursuant to terms and conditions established by the
commissioner of the office for people with developmental disabili-
ties, to cover a portion of the development costs of private, public
and/or non-profit organizations, including corporations and partner-
ships established pursuant to the private housing finance law and/or
any other statutory provisions, for supportive housing units that
have been set aside for individuals with intellectual and develop-
mental disabilities. The funds appropriated herein may also be made
available for the payment to municipalities and other public and
not-for-profit community providers approved by the commissioner of
the office for people with developmental disabilities, for the
acquisition of property, construction and rehabilitation of support-
ive housing units for individuals with intellectual and develop-
mental disabilities. Further, the office for people with develop-
mental disabilities shall have a lien on the real property developed
with such state aid, loans or grants, which shall be in the amount
of the loan or grant, for a maximum term of 30 years, or other long-
er term consistent with the requirements of another regulatory agen-
cy. Upon request of the commissioner of the office for people with
developmental disabilities and approval by the director of the budg-
et, the funds appropriated herein may be suballocated or transferred
to any public housing agencies, including municipal, county, state
or federal agencies, public benefit corporations or authorities, or
private corporations for the purposes stated above, provided, howev-
er, that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
579 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the budget (510221A4) (37884) ......................................
15,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2020:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2020 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available pursuant to terms and conditions established by the
commissioner of the office for people with developmental disabili-
ties, to cover a portion of the development costs of private, public
and/or non-profit organizations, including corporations and partner-
ships established pursuant to the private housing finance law and/or
any other statutory provisions, for supportive housing units that
have been set aside for individuals with intellectual and develop-
mental disabilities. The funds appropriated herein may also be made
available for the payment to municipalities and other public and
not-for-profit community providers approved by the commissioner of
the office for people with developmental disabilities, for the
acquisition of property, construction and rehabilitation of support-
ive housing units for individuals with intellectual and develop-
mental disabilities. Further, the office for people with develop-
mental disabilities shall have a lien on the real property developed
with such state aid, loans or grants, which shall be in the amount
of the loan or grant, for a maximum term of 30 years, or other long-
er term consistent with the requirements of another regulatory agen-
cy. Upon request of the commissioner of the office for people with
580 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
developmental disabilities and approval by the director of the budg-
et, the funds appropriated herein may be suballocated or transferred
to any public housing agencies, including municipal, county, state
or federal agencies, public benefit corporations or authorities, or
private corporations for the purposes stated above, provided, howev-
er, that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (510220A4) (37884) ... 15,000,000 ..... (re. $12,000,000)
By chapter 54, section 1, of the laws of 2019:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2019 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available pursuant to terms and conditions established by the
commissioner of the office for people with developmental disabili-
ties, to cover a portion of the development costs of private, public
and/or non-profit organizations, including corporations and partner-
ships established pursuant to the private housing finance law and/or
any other statutory provisions, for supportive housing units that
have been set aside for individuals with intellectual and develop-
mental disabilities. The funds appropriated herein may also be made
available for the payment to municipalities and other public and
not-for-profit community providers approved by the commissioner of
the office for people with developmental disabilities, for the
acquisition of property, construction and rehabilitation of support-
ive housing units for individuals with intellectual and develop-
581 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental disabilities. Further, the office for people with develop-
mental disabilities shall have a lien on the real property developed
with such state aid, loans or grants, which shall be in the amount
of the loan or grant, for a maximum term of 30 years, or other long-
er term consistent with the requirements of another regulatory agen-
cy. Upon request of the commissioner of the office for people with
developmental disabilities and approval by the director of the budg-
et, the funds appropriated herein may be suballocated or transferred
to any public housing agencies, including municipal, county, state
or federal agencies, public benefit corporations or authorities, or
private corporations for the purposes stated above, provided, howev-
er, that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (510219A4) (37884) ... 15,000,000 ..... (re. $11,500,000)
By chapter 54, section 1, of the laws of 2018:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2018 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available pursuant to terms and conditions established by the
commissioner of the office for people with developmental disabili-
ties, to cover a portion of the development costs of private, public
and/or non-profit organizations, including corporations and partner-
ships established pursuant to the private housing finance law and/or
any other statutory provisions, for supportive housing units that
have been set aside for individuals with intellectual and develop-
582 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental disabilities. The funds appropriated herein may also be made
available for the payment to municipalities and other public and
not-for-profit community providers approved by the commissioner of
the office for people with developmental disabilities, for the
acquisition of property, construction and rehabilitation of support-
ive housing units for individuals with intellectual and develop-
mental disabilities. Further, the office for people with develop-
mental disabilities shall have a lien on the real property developed
with such state aid, loans or grants, which shall be in the amount
of the loan or grant, for a maximum term of 30 years, or other long-
er term consistent with the requirements of another regulatory agen-
cy. Upon request of the commissioner of the office for people with
developmental disabilities and approval by the director of the budg-
et, the funds appropriated herein may be suballocated or transferred
to any public housing agencies, including municipal, county, state
or federal agencies, public benefit corporations or authorities, or
private corporations for the purposes stated above, provided, howev-
er, that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (510218A4) (37884) ... 15,000,000 ..... (re. $12,407,000)
By chapter 54, section 1, of the laws of 2017:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2017 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other public housing agencies, including
municipal, county, state and federal housing agencies, public bene-
fit corporations or authorities, or private corporations and for
capital development, improvements and alterations of residential
housing or day program alternatives not currently defined in the
mental hygiene law. Notwithstanding section 163 of the state finance
law, section 142 of the economic development law, and article 41 of
the mental hygiene law, the commissioner of the office for people
with developmental disabilities may make the funds appropriated
herein available pursuant to terms and conditions established by the
583 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
commissioner of the office for people with developmental disabili-
ties, to cover a portion of the development costs of private, public
and/or nonprofit organizations, including corporations and partner-
ships established pursuant to the private housing finance law and/or
any other statutory provisions, for supportive housing units that
have been set aside for individuals with intellectual and develop-
mental disabilities. The funds appropriated herein may also be made
available for the payment to municipalities and other public and
not-for-profit community providers approved by the commissioner of
the office for people with developmental disabilities, for the
acquisition of property, construction and rehabilitation of support-
ive housing units for individuals with intellectual and develop-
mental disabilities. Further, the office for people with develop-
mental disabilities shall have a lien on the real property developed
with such state aid, loans or grants, which shall be in the amount
of the loan or grant, for a maximum term of 30 years, or other long-
er term consistent with the requirements of another regulatory agen-
cy. Upon request of the commissioner of the office for people with
developmental disabilities and approval by the director of the budg-
et, the funds appropriated herein may be suballocated or transferred
to any public housing agencies, including municipal, county, state
or federal agencies, public benefit corporations or authorities, or
private corporations for the purposes stated above, provided, howev-
er, that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (510217A4) (37884) ... 15,000,000 ...... (re. $4,376,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2016 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
homes and private residences, as a loan and/or grant to family care
providers, for payment to other state and federal housing agencies,
private corporations and for capital development, improvements and
alterations of residential housing or day program alternatives not
584 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
currently defined in the mental hygiene law. Notwithstanding section
163 of the state finance law, section 142 of the economic develop-
ment law, and article 41 of the mental hygiene law, the commissioner
of the office for people with developmental disabilities may make
the funds appropriated herein available pursuant to terms and condi-
tions established by the commissioner of the office for people with
developmental disabilities, to cover a portion of the development
costs of private, public and/or non-profit organizations, including
corporations and partnerships established pursuant to the private
housing finance law and/or any other statutory provisions, for
supportive housing units that have been set aside for individuals
with intellectual and developmental disabilities. The funds appro-
priated herein may also be made available for the payment to munici-
palities and other public and not-for-profit community providers
approved by the commissioner of the office for people with develop-
mental disabilities, for the acquisition of property, construction
and rehabilitation of supportive housing units for individuals with
intellectual and developmental disabilities. Further, the office for
people with developmental disabilities shall have a lien on the real
property developed with such state aid, loans or grants, which shall
be in the amount of the loan or grant, for a maximum term of 30
years, or other longer term consistent with the requirements of
another regulatory agency. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York,
or the New York state housing finance agency, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (510216A4) (37884) ... 10,000,000 ........ (re. $186,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
For acquisition, alterations, improvements, and preservation of vari-
ous community program and institutional program facilities, includ-
ing, but not limited to, rehabilitation projects, health and safety
projects, fire safety projects and other capital and administrative
costs related to this purpose. For state aid, to municipalities and
other public and not-for-profit agencies, including the payment of
liabilities incurred prior to April 1, 2014 for up to 100 per centum
of the net cost of feasibility studies, property options, capital
renovations, acquisition of property, construction, rehabilitation
and capital costs incidental and appurtenant to facilities required
to be licensed pursuant to article 16, as defined in the mental
hygiene law, and for services and expenses related to the mainte-
nance and improvement inclusive of fire safety and life safety
upgrades of voluntary not-for-profit provider operated community
residential and day service programs and environmental modifications
and adaptive technology services at voluntary not-for-profit provid-
er operated community residential facilities, certified family care
585 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
homes and private residences, as a loan and/or grant to family care
providers, for payment to other state and federal housing agencies,
private corporations and for capital development, improvements and
alterations of residential housing or day program alternatives not
currently defined in the mental hygiene law. Upon request of the
commissioner of the office for people with developmental disabili-
ties and approval by the director of the budget, this appropriation
may be suballocated or transferred to the dormitory authority of the
state of New York, provided, however, that no expenditures may be
made from this appropriation until a comprehensive plan of projects
has been approved by the director of the budget (510214A4) (37884)
... 10,000,000 ................................... (re. $10,000,000)
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred or suballocated to the dormitory authority of the state
of New York. Upon approval by the director of the budget, funds from
this appropriation may be transferred to the office of mental health
and the office of addiction services and supports for payment to the
dormitory authority of the state of New York for the preparation of
plans purpose (51F22230) (81088) ... 6,000,000 .... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred or suballocated to the dormitory authority of the state
of New York. Upon approval by the director of the budget, funds from
586 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
this appropriation may be transferred to the office of mental health
and the office of addiction services and supports for payment to the
dormitory authority of the state of New York for the preparation of
plans purpose (51F22130) (81088) ... 6,000,000 .... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred or suballocated to the dormitory authority of the state
of New York. Upon approval by the director of the budget, funds from
this appropriation may be transferred to the office of mental health
and the office of addiction services and supports for payment to the
dormitory authority of the state of New York for the preparation of
plans purpose (51F22030) (81088) ... 6,000,000 .... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred or suballocated to the dormitory authority of the state
of New York. Upon approval by the director of the budget, funds from
this appropriation may be transferred to the office of mental health
and the office of addiction services and supports for payment to the
dormitory authority of the state of New York for the preparation of
plans purpose (51F21930) (81088) ... 6,000,000 .... (re. $1,713,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
587 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred or suballocated to the dormitory authority of the state
of New York. Upon approval by the director of the budget, funds from
this appropriation may be transferred to the office of mental health
and the office of addiction services and supports for payment to the
dormitory authority of the state of New York for the preparation of
plans purpose (51F21830) (81088) ... 6,000,000 .... (re. $5,744,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the community services and
institutional services programs. Upon the request of the commission-
er of the office for people with developmental disabilities and the
approval of the director of the budget, this appropriation may be
transferred to the dormitory authority of the state of New York.
Upon approval by the director of the budget, funds from this appro-
priation may be transferred to the office of mental health and the
office of addiction services and supports for payment to the dormi-
tory authority of the state of New York for the preparation of plans
purpose (51F21730) (81088) ... 6,000,000 ............ (re. $571,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2020:
For: (1) the payment of all claims for personal injury, death or prop-
erty damage for which the New York State Medical Care Facilities
Finance Agency, the facilities development corporation, or the
dormitory authority of the state of New York might be liable occur-
ring upon, in or about any projects covered by the Agreement of
Lease entered into by the facilities development corporation, the
department of mental hygiene and the New York State Medical Care
Facilities Finance Agency under date of October 1, 1987 as from time
to time amended and supplemented and any and all penalties, costs,
including attorneys' fees, claims, demands and causes of action due
directly or indirectly to the use, disuse, misuse or interest in
such projects; (2) in the case of damage, loss or destruction of any
such project, or any part of any such project, the payment of the
costs of repairing, restoring, rebuilding or replacing the same in
accordance with the obligations of the facilities development corpo-
ration so to do from the proceeds of insurance under the provisions
of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
payments to the New York State Medical Care Facilities Finance Agen-
588 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cy of moneys at the times and in the amounts that annual rentals
would be due with respect to each project during such time or times
as each such project may be damaged or destroyed and not available
for use by the department of mental hygiene in accordance with the
terms of the Agreement of Lease.
Notwithstanding the provisions of any general or special law, the
facilities development corporation may assign to the New York State
Medical Care Facilities Finance Agency all or any portion of the
moneys hereby appropriated for the purposes hereinabove set forth.
Notwithstanding the foregoing, in the event the appropriation is
insufficient to cover the losses, upon notification from the facili-
ties development corporation, the director of the budget shall
submit a request for additional appropriations to cover the addi-
tional losses. Upon approval by the director of the budget, funds
from this appropriation may be transferred to the office of mental
health and the office of addiction services and supports for payment
to the dormitory authority of the state of New York for the prepara-
tion of plans purpose (51WC1430) (81094) ...........................
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2020:
For: (1) the payment of all claims for personal injury, death or prop-
erty damage for which the New York State Medical Care Facilities
Finance Agency, the facilities development corporation, or the
dormitory authority of the state of New York might be liable occur-
ring upon, in or about any projects covered by the Agreement of
Lease entered into by the facilities development corporation, the
department of mental hygiene and the New York State Medical Care
Facilities Finance Agency under date of October 1, 1987 as from time
to time amended and supplemented and any and all penalties, costs,
including attorneys' fees, claims, demands and causes of action due
directly or indirectly to the use, disuse, misuse or interest in
such projects; (2) in the case of damage, loss or destruction of any
such project, or any part of any such project, the payment of the
costs of repairing, restoring, rebuilding or replacing the same in
accordance with the obligations of the facilities development corpo-
ration so to do from the proceeds of insurance under the provisions
of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
payments to the New York State Medical Care Facilities Finance Agen-
cy of moneys at the times and in the amounts that annual rentals
would be due with respect to each project during such time or times
as each such project may be damaged or destroyed and not available
for use by the department of mental hygiene in accordance with the
terms of the Agreement of Lease.
Notwithstanding the provisions of any general or special law, the
facilities development corporation may assign to the New York State
Medical Care Facilities Finance Agency all or any portion of the
moneys hereby appropriated for the purposes hereinabove set forth.
589 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding the foregoing, in the event the appropriation is
insufficient to cover the losses, upon notification from the facili-
ties development corporation, the director of the budget shall
submit a request for additional appropriations to cover the addi-
tional losses. Upon approval by the director of the budget, funds
from this appropriation may be transferred to the office of mental
health and the office of addiction services and supports for payment
to the dormitory authority of the state of New York for the prepara-
tion of plans purpose (51WC1330) (81094) ...........................
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2020:
For: (1) the payment of all claims for personal injury, death or prop-
erty damage for which the New York State Medical Care Facilities
Finance Agency, the facilities development corporation, or the
dormitory authority of the state of New York might be liable occur-
ring upon, in or about any projects covered by the Agreement of
Lease entered into by the facilities development corporation, the
department of mental hygiene and the New York State Medical Care
Facilities Finance Agency under date of October 1, 1987 as from time
to time amended and supplemented and any and all penalties, costs,
including attorneys' fees, claims, demands and causes of action due
directly or indirectly to the use, disuse, misuse or interest in
such projects; (2) in the case of damage, loss or destruction of any
such project, or any part of any such project, the payment of the
costs of repairing, restoring, rebuilding or replacing the same in
accordance with the obligations of the facilities development corpo-
ration so to do from the proceeds of insurance under the provisions
of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
payments to the New York State Medical Care Facilities Finance Agen-
cy of moneys at the times and in the amounts that annual rentals
would be due with respect to each project during such time or times
as each such project may be damaged or destroyed and not available
for use by the department of mental hygiene in accordance with the
terms of the Agreement of Lease.
Notwithstanding the provisions of any general or special law, the
facilities development corporation may assign to the New York State
Medical Care Facilities Finance Agency all or any portion of the
moneys hereby appropriated for the purposes hereinabove set forth.
Notwithstanding the foregoing, in the event the appropriation is
insufficient to cover the losses, upon notification from the facili-
ties development corporation, the director of the budget shall
submit a request for additional appropriations to cover the addi-
tional losses. Upon approval by the director of the budget, funds
from this appropriation may be transferred to the office of mental
health and the office of addiction services and supports for payment
to the dormitory authority of the state of New York for the prepara-
tion of plans purpose (51WC1230) (81094) ...........................
2,000,000 ........................................... (re. $346,000)
590 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
DASNY-OPWDD Administration Account - 32307
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the institutional services
program and the community services program. Upon the request of the
commissioner of the office for people with developmental disabili-
ties and the approval of the director of the budget, this appropri-
ation may be transferred or suballocated to the dormitory authority
of the state of New York. Upon approval by the director of the budg-
et, funds from this appropriation may be transferred to the office
of mental health and the office of addiction services and supports
for payment to the dormitory authority of the state of New York for
the preparation of plans purpose (51F12230) (81088) ................
7,000,000 ......................................... (re. $7,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
new and existing projects associated with the institutional services
program and the community services program. Upon the request of the
commissioner of the office for people with developmental disabili-
ties and the approval of the director of the budget, this appropri-
ation may be transferred or suballocated to the dormitory authority
of the state of New York. Upon approval by the director of the budg-
et, funds from this appropriation may be transferred to the office
of mental health and the office of addiction services and supports
for payment to the dormitory authority of the state of New York for
the preparation of plans purpose (51F12130) (81088) ................
7,000,000 ......................................... (re. $7,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services or to the dormitory authority for the purpose of prepara-
tion and review of plans, specifications, estimates, services,
construction management and supervision, inspection, studies,
appraisals, surveys, testing and environmental impact statements for
591 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
new and existing projects associated with the institutional services
program and the community services program. Upon the request of the
commissioner of the office for people with developmental disabili-
ties and the approval of the director of the budget, this appropri-
ation may be transferred or suballocated to the dormitory authority
of the state of New York. Upon approval by the director of the budg-
et, funds from this appropriation may be transferred to the office
of mental health and the office of addiction services and supports
for payment to the dormitory authority of the state of New York for
the preparation of plans purpose (51F12030) (81088) ................
7,000,000 ......................................... (re. $5,222,000)
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(51FM22MO) (81107) ... 43,000,000 ................ (re. $31,674,000)
The appropriation made by chapter 54, section 1, of the laws of 2021,
as supplemented by a transfer in accordance with state finance law,
is hereby amended and reappropriated to read:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(51FM21MO) (81107) ... [41,000,000] 41,629,000 ...... (re. $841,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(51FM20MO) (81107) ... 41,000,000 ................. (re. $1,572,000)
By chapter 54, section 1, of the laws of 2019:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(51FM19MO) (81107) ... 40,000,000 ................... (re. $199,000)
By chapter 54, section 1, of the laws of 2018:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(51FM18MO) (81107) ... 37,000,000 ................... (re. $246,000)
INSTITUTIONAL SERVICES PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
592 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2013:
For alterations and improvements for health and safety projects at
various facilities. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (51H11301) (81078) ... 5,000,000 .......... (re. $90,000)
By chapter 54, section 1, of the laws of 2012:
For alterations and improvements for health and safety projects at
various facilities. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (51H11201) (81078) ... 3,447,000 .......... (re. $68,000)
By chapter 54, section 1, of the laws of 2011:
For alterations and improvements for health and safety projects at
various facilities. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York (51H11101) (81078) ....
7,700,000 ........................................... (re. $544,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2011:
For alterations and improvements for health and safety projects at
various facilities. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York (51H11001) (81078) ....
7,600,000 ............................................ (re. $74,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2013:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects. This appropriation may be
used for the cost of potential claims against contracts awarded by
the dormitory authority of the state of New York. Upon request of
the commissioner of the office for people with developmental disa-
bilities and approval by the director of the budget, this appropri-
ation may be transferred to the dormitory authority of the state of
New York, provided, however, that no expenditures may be made from
593 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
this appropriation until a comprehensive plan of projects has been
approved by the director of the budget (51P11303) (81040) ..........
5,100,000 ........................................... (re. $100,000)
For minor maintenance, preservation and alterations of facilities on
the grounds of former developmental centers. Upon request of the
commissioner of the office for people with developmental disabili-
ties and approval by the director of the budget, this appropriation
may be transferred to the dormitory authority of the state of New
York, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (51M21303) (37855) ..........
5,600,000 ........................................... (re. $579,000)
By chapter 54, section 1, of the laws of 2011:
For minor maintenance, preservation and alterations of facilities on
the grounds of former developmental centers. Upon request of the
commissioner of the office for people with developmental disabili-
ties and approval by the director of the budget, this appropriation
may be transferred to the dormitory authority of the state of New
York (51M21103) (37855) ... 5,000,000 ................ (re. $46,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2011:
For minor maintenance, preservation and alterations of facilities on
the grounds of former developmental centers. Upon request of the
commissioner of the office for people with developmental disabili-
ties and approval by the director of the budget, this appropriation
may be transferred to the dormitory authority of the state of New
York (51M21003) (37855) ... 4,500,000 ............... (re. $495,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2011:
For alterations and improvements for preservation of various facili-
ties including rehabilitation projects. This appropriation may be
used for the cost of potential claims against contracts awarded by
the dormitory authority of the state of New York. Upon request of
the commissioner of the office for people with developmental disa-
bilities and approval by the director of the budget, this appropri-
ation may be transferred to the dormitory authority of the state of
New York (51P10803) (81040) ... 7,600,000 ............ (re. $14,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
594 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (51H31301) (81078) ......................
42,000,000 ....................................... (re. $36,429,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (51H31201) (81078) ......................
28,830,000 ....................................... (re. $21,910,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(51H31101) (81078) ... 44,855,000 ................ (re. $18,693,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(51H31001) (81078) ... 40,500,000 ................. (re. $8,256,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
595 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(51H30801) (81078) ... 33,200,000 ................. (re. $7,589,000)
By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(51H30701) (81078) ... 32,290,000 ................. (re. $4,957,000)
By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for health and safety projects at
various facilities. This appropriation may be used for the cost of
potential claims against contracts awarded by the dormitory authori-
ty of the state of New York. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(51H30601) (81078) ... 32,143,000 ................... (re. $209,000)
NON-BONDABLE PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Bondable Purpose
By chapter 54, section 1, of the laws of 2014:
For transfer to the mental hygiene capital improvement fund for
reimbursement of non-bondable costs of projects authorized by appro-
priations or reappropriations funded from the mental hygiene capital
improvement fund including liabilities incurred prior to April 1,
2014 or for payment to the dormitory authority of the state of New
York for defeasance of bonds. Upon request of the commissioner of
the office for people with developmental disabilities and approval
by the director of the budget, this appropriation may be transferred
to the dormitory authority of the state of New York (51FL14NB)
(81042) ... 1,000,000 ............................... (re. $954,000)
STATE-OPERATED COMMUNITY SERVICES PROGRAM (CCP)
Capital Projects Funds - Other
596 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2013:
For alterations and improvements of sites leased for state-operated
programs, and for the purchase of furniture and equipment for state-
operated programs. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (51L11307) (37858) ... 4,700,000 ....... (re. $4,693,000)
By chapter 54, section 1, of the laws of 2012:
For alterations and improvements of sites leased for state-operated
programs, and for the purchase of furniture and equipment for state-
operated programs. Upon request of the commissioner of the office
for people with developmental disabilities and approval by the
director of the budget, this appropriation may be transferred to the
dormitory authority of the state of New York, provided, however,
that no expenditures may be made from this appropriation until a
comprehensive plan of projects has been approved by the director of
the budget (51L11207) (37858) ... 4,600,000 ......... (re. $422,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
Fire Safety Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for fire safety and life safety
upgrades of state-owned community residential and day program facil-
ities for persons with developmental disabilities. Upon request of
the commissioner of the office for people with developmental disa-
bilities and approval by the director of the budget, this appropri-
ation may be suballocated or transferred to the dormitory authority
of the state of New York, provided, however, that no expenditures
may be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget (51FS13F3)
(37880) ... 16,000,000 ........................... (re. $13,434,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For alterations and improvements for fire safety and life safety
upgrades of state-owned community residential and day program facil-
ities for persons with developmental disabilities. Upon request of
the commissioner of the office for people with developmental disa-
bilities and approval by the director of the budget, this appropri-
597 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ation may be suballocated or transferred to the dormitory authority
of the state of New York, provided, however, that no expenditures
may be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget (51FS12F3)
(37880) ... 24,500,000 ............................ (re. $6,869,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
New Facilities Purpose
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition and alterations and improvements of property to be
used as state-operated community residential facilities. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York. Upon request of the commissioner
of the office for people with developmental disabilities, and
approval by the director of the budget, this appropriation may be
used for the acquisition and alterations and improvements of proper-
ty to be used as not-for-profit facilities licensed pursuant to
articles 16 and 41 of the mental hygiene law (51R11107) (37858)
31,000,000 ....................................... (re. $31,000,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition and alterations and improvements of property to be
used as state-operated community residential facilities. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York. Upon request of the commissioner
of the office for people with developmental disabilities, and
approval by the director of the budget, this appropriation may be
used for the acquisition and alterations and improvements of proper-
ty to be used as not-for-profit facilities licensed pursuant to
articles 16 and 41 of the mental hygiene law (51R11007) (37858) ....
28,325,000 ....................................... (re. $28,324,000)
By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition and alterations and improvements of property to be
used as state-operated community residential facilities. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York. Upon request of the commissioner
of the office for people with developmental disabilities, and
598 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
approval by the director of the budget, this appropriation may be
used for the acquisition and alterations and improvements of proper-
ty to be used as not-for-profit facilities licensed pursuant to
articles 16 and 41 of the mental hygiene law (51R10907) (37858) ....
14,675,000 ........................................ (re. $3,797,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For the acquisition and alterations and improvements of property to be
used as state-operated community residential facilities. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York. Upon request of the commissioner
of the office for people with developmental disabilities, and
approval by the director of the budget, this appropriation may be
used for the acquisition and alterations and improvements of proper-
ty to be used as not-for-profit facilities licensed pursuant to
articles 16 and 41 of the mental hygiene law (51R10807) (37858) ....
24,575,000 ........................................ (re. $4,846,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-State Facilities Account - 32310
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For renovation and minor rehabilitation and improvements of state-
owned community residential and day program facilities for persons
with developmental disabilities. Upon request of the commissioner of
the office for people with developmental disabilities and approval
by the director of the budget, this appropriation may be suballo-
cated or transferred to the dormitory authority of the state of New
York, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (51PR1303) (37857) ..........
1,000,000 ......................................... (re. $1,000,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For renovation and minor rehabilitation and improvements of state-
owned community residential and day program facilities for persons
with developmental disabilities. Upon request of the commissioner of
the office for people with developmental disabilities and approval
by the director of the budget, this appropriation may be suballo-
cated or transferred to the dormitory authority of the state of New
York, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
599 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
approved by the director of the budget (51PR1203) (37857) ..........
1,000,000 ........................................... (re. $812,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For renovation and minor rehabilitation and improvements of state-
owned community residential and day program facilities for persons
with developmental disabilities. Upon request of the commissioner of
the office for people with developmental disabilities and approval
by the director of the budget, this appropriation may be suballo-
cated or transferred to the dormitory authority of the state of New
York (51PR1103) (37857) ... 1,000,000 ............... (re. $297,000)
By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For renovation and minor rehabilitation and improvements of state-
owned community residential and day program facilities for persons
with developmental disabilities. Upon request of the commissioner of
the office for people with developmental disabilities and approval
by the director of the budget, this appropriation may be suballo-
cated or transferred to the dormitory authority of the state of New
York (51PR0803) (37857) ... 1,000,000 ................ (re. $18,000)
VOLUNTARY-OPERATED COMMUNITY FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2013:
For state aid, to municipalities and other public and not-forprofit
agencies, including the payment of liabilities incurred prior to
April 1, 2013 for up to 100 per centum of the net cost of feasibil-
ity studies, property options, capital renovations, acquisition of
property, construction, rehabilitation and capital costs incidental
and appurtenant to facilities required to be licensed pursuant to
article 16, as defined in the mental hygiene law, and for services
and expenses related to environmental modifications and adaptive
technology services at voluntary not-for-profit provider operated
community residential facilities, certified family care homes and
private residences, as a loan and/or grant to family care providers,
for payment to other state and federal housing agencies, private
corporations and for capital development of residential housing or
day program alternatives not currently defined in the mental hygiene
law, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (51B11307) (37860) ..........
5,900,000 ......................................... (re. $5,900,000)
By chapter 54, section 1, of the laws of 2012:
600 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For state aid, to municipalities and other public and not-forprofit
agencies, including the payment of liabilities incurred prior to
April 1, 2012 for up to 100 per centum of the net cost of feasibil-
ity studies, property options, capital renovations, acquisition of
property, construction, rehabilitation and capital costs incidental
and appurtenant to facilities required to be licensed pursuant to
article 16, as defined in the mental hygiene law, and for services
and expenses related to environmental modifications and adaptive
technology services at voluntary not-for-profit provider operated
community residential facilities, certified family care homes and
private residences, as a loan and/or grant to family care providers,
for payment to other state and federal housing agencies, private
corporations and for capital development of residential housing or
day program alternatives not currently defined in the mental hygiene
law, provided, however, that no expenditures may be made from this
appropriation until a comprehensive plan of projects has been
approved by the director of the budget (51B11207) (37860) ..........
5,740,000 ......................................... (re. $5,740,000)
By chapter 54, section 1, of the laws of 2011:
For state aid, to municipalities and other public and not-for-profit
agencies, including the payment of liabilities incurred prior to
April 1, 2011 for up to 100 per centum of the net cost of feasibil-
ity studies, property options, capital renovations, acquisition of
property, construction, rehabilitation and capital costs incidental
and appurtenant to facilities required to be licensed pursuant to
article 16, as defined in the mental hygiene law, and for services
and expenses related to environmental modifications and adaptive
technology services at voluntary not-for-profit provider operated
community residential facilities, certified family care homes and
private residences, as a loan and/or grant to family care providers,
for payment to other state and federal housing agencies, private
corporations and for capital development of residential housing or
day program alternatives not currently defined in the mental hygiene
law (51B11107) (37860) ... 5,370,000 .............. (re. $5,370,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2013:
For state aid, to municipalities and other public and not-forprofit
agencies, including the payment of liabilities incurred prior to
April 1, 2013, for up to 100 per centum of the net cost of services
and expenses related to the maintenance and improvement inclusive of
fire safety and life safety upgrades of voluntary not-for-profit
provider operated community residential and day service programs,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
601 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the director of the budget (51201303) (37859) ......................
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2012:
For state aid, to municipalities and other public and not-for-profit
agencies, including the payment of liabilities incurred prior to
April 1, 2012, for up to 100 per centum of the net cost of services
and expenses related to the maintenance and improvement inclusive of
fire safety and life safety upgrades of voluntary not-for-profit
provider operated community residential and day service programs,
provided, however, that no expenditures may be made from this appro-
priation until a comprehensive plan of projects has been approved by
the director of the budget (51201203) (37859) ......................
5,000,000 ........................................... (re. $588,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-Community Facilities Account - 32304
Community Facilities Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,
and for the acquisition of property, construction and rehabiliation,
including the payment of preoperational costs incurred prior to
occupancy, of article 16 community mental retardation facilities and
associated programs and facilities and under the auspice of munici-
palities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of the
state of New York bonds, provided, however, that no expenditures may
be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York (513213H2) (37861) ..............
7,400,000 ......................................... (re. $7,400,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,
and for the acquisition of property, construction and rehabili-
tation, including the payment of preoperational costs incurred prior
602 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to occupancy, of article 16 community mental retardation facilities
and associated programs and facilities and under the auspice of
municipalities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of
thestate of New York bonds, provided, however, that no expenditures
may be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York (513212H2) (37861) ..............
7,280,000 ......................................... (re. $7,280,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,
and for the acquisition of property, construction and rehabili-
tation, including the payment of preoperational costs incurred prior
to occupancy, of article 16 community mental retardation facilities
and associated programs and facilities and under the auspice of
municipalities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of the
state of New York bonds. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(513211H2) (37861) ... 7,000,000 .................. (re. $7,000,000)
By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,and
for the acquisition of property, construction and rehabilitation,
including the payment of preoperational costs incurred prior to
occupancy, of article 16 community mental retardation facilities and
associated programs and facilities and under the auspice of munici-
palities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of the
603 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
state of New York bonds. Upon request of the commissioner of the
office for people with developmental disabilities and approval by
the director of the budget, this appropriation may be suballocated
or transferred to the dormitory authority of the state of New York
(513210H2) (37861) ... 6,710,000 .................. (re. $6,710,000)
Capital Projects Funds - Other
Mental Hygiene Facilities Capital Improvement Fund
OPWDD-Community Facilities Account - 32304
Fire Safety Purpose
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,
and for alterations and improvements for fire safety and life safety
upgrades of article 16 community mental retardation facilities and
associated programs and facilities and under the auspice of munici-
palities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of the
state of New York bonds, provided, however, that no expenditures may
be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget. Upon
request of the commissioner of the office for people with develop-
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York (51FV13F3) (37881) ..............
30,000,000 ....................................... (re. $30,000,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For the comprehensive construction programs, purposes and projects as
herein specified, and for departmental administrative costs related
thereto, consistent with section 41.34 of the mental hygiene law,
and for alterations and improvements for fire safety and life safety
upgrades of article 16 community mental retardation facilities and
associated programs and facilities and under the auspice of munici-
palities and other public and not-for-profit private agencies
approved by the commissioner of the office for people with develop-
mental disabilities, pursuant to article 41 of the mental hygiene
law and for management fees associated with voluntary not-for-profit
operated projects to be financed through dormitory authority of the
state of New York bonds, provided, however, that no expenditures may
be made from this appropriation until a comprehensive plan of
projects has been approved by the director of the budget. Upon
request of the commissioner of the office for people with develop-
604 12554-05-3
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental disabilities and approval by the director of the budget, this
appropriation may be suballocated or transferred to the dormitory
authority of the state of New York (51FV12F3) (37881) ..............
31,000,000 ....................................... (re. $31,000,000)
605 12554-05-3
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 6,618,222,000
---------------- ----------------
All Funds ........................ 0 6,618,222,000
================ ================
METROPOLITAN TRANSPORTATION AUTHORITY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transit Purpose
By chapter 54, section 1, of the laws of 2020:
For the costs of the metropolitan transportation authority's 2020-2024
capital program including an amount set aside subject to a memoran-
dum of understanding pursuant to section 13 of subpart B of part ZZZ
of chapter 59 of the laws of 2019. Funds appropriated herein shall
be made available in the event that the state elects to meet its
commitment through direct payments (26MF20MT) (43812) ..............
3,000,000,000 ................................. (re. $3,000,000,000)
By chapter 54, section 1, of the laws of 2019:
For the costs of the metropolitan transportation authority's 2015-2019
capital program, pursuant to chapter 54 of the laws of 2016 regard-
ing the commitment of the state of New York to fund, over a multi-
year period, $7,336,000,000 of capital costs related to such
program. Funds appropriated herein shall be made available in the
event that the state elects to meet its commitment through direct
payments (26JW19MT) (43809) ........................................
1,467,200,000 ................................. (re. $1,467,200,000)
For the payment by the state, as an advance to the metropolitan trans-
portation authority for the capital project costs of the planning,
design, acquisition and construction, required or expected to be
required to implement the central business district tolling infras-
tructure and collection system, as defined in the "MTA reform and
traffic mobility act," enacted as a part of the state fiscal year
2019-20 state budget. No portion of this appropriation shall be
available for expenditure until the Metropolitan Transportation
Authority has entered into a repayment agreement with the director
of budget providing for repayment to the state of an amount equal to
the amount disbursed from this appropriation and any associated
financing costs. A copy of such agreement shall be filed with the
state comptroller, the chair of the senate finance committee and
chair of the assembly ways and means committee (26CT19MT) (43811)
... 100,000,000 ................................. (re. $100,000,000)
By chapter 54, section 1, of the laws of 2018:
For the costs of the metropolitan transportation authority's 2015-2019
capital program, pursuant to chapter 54 of the laws of 2016 regard-
ing the commitment of the state of New York to fund, over a multi-
year period, $7,336,000,000 of capital costs related to such
program. Funds appropriated herein shall be made available in the
606 12554-05-3
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
event that the state elects to meet its commitment through direct
payments (26JW18MT) (43809) ........................................
1,467,200,000 ................................. (re. $1,467,200,000)
By chapter 54, section 1, of the laws of 2017:
For the costs of the metropolitan transportation authority's 2015-2019
capital program, pursuant to chapter 54 of the laws of 2016 regard-
ing the commitment of the state of New York to fund, over a multi-
year period, $7,336,000,000 of capital costs related to such
program. Funds appropriated herein shall be made available in the
event that the state elects to meet its commitment through direct
payments (26JW17MT) (43809) ........................................
1,467,200,000 ................................... (re. $161,966,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transportation and Rail Freight Purpose
TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY
The appropriation made by chapter 314, section 30, of the laws of 1981,
as amended by chapter 54, section 1, of the laws of 2022, is hereby
amended and reappropriated to read:
Advance for: The sum of thirty-six million dollars ($36,000,000), or
so much thereof as may be necessary, is hereby appropriated as an
advance from the capital projects fund to the Triborough bridge and
tunnel authority for replacements of the authority's insurance
reserve and operating contingency reserve for the period beginning
April 1, [2022] 2023 and ending March 31, [2023] 2024. The advance
appropriation shall be made available and paid only if the Tribor-
ough bridge and tunnel authority's insurance reserve and operating
contingency reserve is needed for the purposes for which the
reserves were created.
Notwithstanding the provisions of any general or special law, no part
of any such appropriation shall be available for the purposes desig-
nated until a certificate of approval of availability shall have
been issued by the director of the budget, and a copy of such
certificate filed with the state comptroller, the chairman of the
senate finance committee and the chairman of the assembly ways and
means committee. Such certificate may be amended from time to time
subject to the approval of the director of the budget, and a copy of
each such amendment shall be filed with the state comptroller, the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee (03310912) (43807) ...............
.................................................. (re. $36,000,000)
URBAN AND COMMUTER MASS TRANSPORTATION BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew New York (Bondable) - 30000
Mass Transit Purpose
607 12554-05-3
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and section 1270-f of the
public authorities law, of capital projects to be reimbursed from
bond fund proceeds for the planning and design, acquisition,
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation and preservation, including the acquisition of
real property and interests therein required or expected to be
required in connection therewith, of urban and commuter passenger,
freight rail, omnibus, mass transit and rapid transit systems,
facilities and equipment, including acquisition, which are capital
elements set forth in the 2005-2009 capital program plans approved
by the metropolitan transportation authority capital program review
board (26BA09MT) (43805) ... 82,000,000 .......... (re. $82,000,000)
By chapter 55, section 1, of the laws of 2008:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and section 1270-f of the
public authorities law, of capital projects to be reimbursed from
bond fund proceeds for the planning and design, acquisition,
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation and preservation, including the acquisition of
real property and interests therein required or expected to be
required in connection therewith, of urban and commuter passenger,
freight rail, omnibus, mass transit and rapid transit systems,
facilities and equipment, including acquisition, which are capital
elements set forth in the 2005-2009 capital program plans approved
by the metropolitan transportation authority capital program review
board (26BA08MT) (43805) ... 487,000,000 ........ (re. $303,400,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and section 1270-f of the
public authorities law, of capital projects to be reimbursed from
bond fund proceeds for the planning and design, acquisition,
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation and preservation, including the acquisition of
real property and interests therein required or expected to be
required in connection therewith, of urban and commuter passenger,
freight rail, omnibus, mass transit and rapid transit systems,
facilities and equipment, including acquisition, which are capital
elements set forth in the 2005-2009 capital program plans approved
by the metropolitan transportation authority capital program review
board (26BA07MT) (43805) ... 352,000,000 ............ (re. $456,000)
608 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes, and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 71,108,000 166,019,000
Capital Projects Funds - Federal ... 108,613,000 189,518,000
---------------- ----------------
All Funds ........................ 179,721,000 355,537,000
================ ================
DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 13,801,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
Alterations and improvements for the preser-
vation of facilities including liabilities
incurred prior to April 1, 2023 (07SP2303)
(38709) ..................................... 13,801,000
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 14,920,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (07FM23MO)
(81107) ...................................... 7,307,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
609 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS 2023-24
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (07MF23MO)
(81107) ...................................... 7,613,000
MAINTENANCE AND IMPROVEMENTS (CCP) ......................... 151,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
Alterations and improvements for the preser-
vation of facilities including liabilities
incurred prior to April 1, 2023 (07MB2303)
(81010) ..................................... 25,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
For the cost of studies, planning, design,
construction, reconstruction, renovation,
and equipment related to the development
of federal military and state organized
militia facilities including related
departmental administrative costs incurred
prior to April 1, 2023 (07LA2308) ........... 25,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Preservation of Facilities Purpose
Alterations and improvements for the preser-
vation of facilities including liabilities
incurred prior to April 1, 2023 (07FO2303)
(81010) ..................................... 26,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Program Improvement or Program Change Purpose
For the cost of studies, planning, design,
construction, reconstruction, renovation,
and equipment related to the development
of federal military and state organized
militia including related departmental
administrative costs incurred prior to
April 1, 2023 (07FL2308) .................... 75,000,000
610 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
DESIGN AND CONSTRUCTION SUPERVISION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2020:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2020 (07SN2007) (81089) .................
3,000,000 ......................................... (re. $1,359,000)
By chapter 54, section 1, of the laws of 2019:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2019 (07SN1907) (81089) .................
3,000,000 ........................................... (re. $145,000)
By chapter 54, section 1, of the laws of 2013:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2013 (07SN1307) (81089) .................
2,200,000 ............................................ (re. $16,000)
By chapter 54, section 1, of the laws of 2012:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2012 (07SN1207) (81089) .................
3,200,000 ........................................... (re. $201,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2022 (07SP2203)
(38709) ... 13,801,000 ........................... (re. $12,506,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2021 (07SP2103)
(38709) ... 13,200,000 ............................ (re. $3,794,000)
611 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2020 (07SP2003)
(38709) ... 10,200,000 ............................ (re. $1,126,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2019 (07SP1903)
(38709) ... 10,200,000 .............................. (re. $977,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2018 (07SP1803)
(38709) ... 13,200,000 .............................. (re. $866,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2017 (07OB1703)
(81109) ... 3,000,000 ............................... (re. $129,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2016 (07SP1603)
(38709) ... 6,000,000 ............................... (re. $449,000)
By chapter 54, section 1, of the laws of 2015:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2015 (07SP1503)
(38709) ... 2,000,000 ................................ (re. $24,000)
By chapter 54, section 1, of the laws of 2014:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2014 (07SP1403)
(38709) ... 5,000,000 ................................ (re. $13,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2013 (07SP1303)
(38709) ... 3,000,000 ................................ (re. $18,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Military Museum Account - 32225
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements including design and related departmental
administrative costs for program improvement or program change of
the New York state military museum and veterans research center,
through the use of donated funds (07MM2008) (81115) ................
10,000,000 ....................................... (re. $10,000,000)
612 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
New Facilities Purpose
By chapter 54, section 1, of the laws of 2018:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2018 (07NF1807) (81089) .................
8,000,000 ......................................... (re. $8,000,000)
By chapter 54, section 1, of the laws of 2017:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2017 (07NF1707) (81089) .................
8,000,000 ......................................... (re. $3,490,000)
By chapter 55, section 1, of the laws of 2016:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2016 (07NF1607) (81089) .................
1,000,000 ......................................... (re. $1,000,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Preservation of Facilities Purpose
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2016 (07FP1603)
(38709) ... 3,000,000 ............................. (re. $1,680,000)
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (07FM22MO) (81107) ...
4,000,000 ......................................... (re. $4,000,000)
613 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (07FM21MO) (81107) .........
4,000,000 ........................................... (re. $975,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (07FM20MO) (81107) .........
4,000,000 ............................................ (re. $44,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (07MF22MO) (81107) .....
7,000,000 ......................................... (re. $7,000,000)
By chapter 54, section 1, of the laws of 2021:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (07MF21MO) (81107) ...
7,000,000 ......................................... (re. $2,790,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (07MF20MO) (81107) .........
7,000,000 ......................................... (re. $2,670,000)
By chapter 54, section 1, of the laws of 2019:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (07MF19MO) (81107) .........
7,000,000 ........................................... (re. $592,000)
614 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2018:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs.
Notwithstanding any other law to the contrary, all or a portion of the
funds appropriated herein may be suballocated or transferred to any
department, agency, or public authority (07MF18MO) (81107) .........
7,000,000 ......................................... (re. $2,040,000)
MAINTENANCE AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2015:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2015 (07SF1507) (81025) .................
7,000,000 ......................................... (re. $6,916,000)
By chapter 54, section 1, of the laws of 2013:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2013 (07SF1307) (81025) .................
1,000,000 ........................................... (re. $404,000)
By chapter 54, section 1, of the laws of 2012:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2012 (07SF1207) (81025) .................
11,000,000 ........................................ (re. $1,773,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2022 (07MB2203)
(81010) ... 25,000,000 ........................... (re. $24,980,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2021 (07MB2103)
(81010) ... 15,000,000 ........................... (re. $12,462,000)
615 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2020 (07MB2003)
(81010) ... 25,000,000 ........................... (re. $21,366,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2019 (07MB1903)
(81010) ... 25,000,000 ........................... (re. $10,498,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2018 (07MB1803)
(81010) ... 20,000,000 ............................ (re. $2,119,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2017 (07MB1703)
(81010) ... 17,000,000 ............................ (re. $1,931,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2016 (07SO1603)
(81010) ... 7,200,000 ............................. (re. $2,202,000)
By chapter 54, section 1, of the laws of 2015:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2015 (07SO1503)
(81010) ... 3,200,000 ................................ (re. $38,000)
By chapter 54, section 1, of the laws of 2014:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2014 (07SO1403)
(81010) ... 6,200,000 ............................... (re. $364,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2013 (07SO1303)
(81010) ... 7,000,000 ............................... (re. $132,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2012 (07SO1203)
(81010) ... 7,000,000 ............................... (re. $148,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2011 (07SO1103)
(81010) ... 7,000,000 ................................ (re. $65,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
616 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020:
For the cost of studies, planning, design, construction, recon-
struction, renovation, and equipment related to the development of
federal military and state organized militia facilities including
related departmental administrative costs incurred prior to April 1,
2020 (07JA2008) (81063) ... 40,000,000 ........... (re. $34,189,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
New Facilities Purpose
By chapter 55, section 1, of the laws of 2016:
For the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment related to
the development of federal military and state organized militia
facilities including related departmental administrative costs
incurred prior to April 1, 2016 (07FF1607) (81025) .................
10,000,000 ....................................... (re. $10,000,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2022 (07FO2203)
(81010) ... 26,000,000 ........................... (re. $26,000,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2021 (07FO2103)
(81010) ... 26,000,000 ........................... (re. $21,606,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2020 (07FO2003)
(81010) ... 26,000,000 ........................... (re. $19,743,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2019 (07FO1903)
(81010) ... 26,000,000 ............................ (re. $3,328,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2018 (07FO1803)
(81010) ... 18,000,000 ............................ (re. $4,133,000)
617 12554-05-3
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2017 (07FO1703)
(81010) ... 18,000,000 ............................ (re. $4,453,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements for the preservation of facilities
including liabilities incurred prior to April 1, 2016 (07FO1603)
(81010) ... 12,000,000 ............................ (re. $5,169,000)
For preventive maintenance on state facilities including personal
services, non-personal services, fringe benefits and the contractual
services provided by private firms, including the payment of liabil-
ities incurred prior to April 1, 2016 (07FM1603) (38711) ...........
5,000,000 ......................................... (re. $2,986,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DMNA Federal Capital Account - 31365
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020:
For the cost of studies, planning, design, construction, recon-
struction, renovation, and equipment related to the development of
federal military and state organized militia facilities including
related departmental administrative costs incurred prior to April 1,
2020 (07FJ2008) (81063) ... 100,000,000 .......... (re. $72,628,000)
618 12554-05-3
DEPARTMENT OF MOTOR VEHICLES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 333,969,000 476,434,000
---------------- ----------------
All Funds ........................ 333,969,000 476,434,000
================ ================
TRANSPORTATION SUPPORT (CCP) ............................... 333,969,000
--------------
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Transportation Support Purpose
For services and expenses of the department
of motor vehicles.
The items shown in the schedule below shall
be for projects with a common purpose and
may be interchanged without limitation
subject to the approval of the director of
the budget.
Notwithstanding any other provision of law
to the contrary, the OGS Interchange and
Transfer Authority and the IT Interchange
and Transfer Authority as defined in the
state fiscal year state operations appro-
priation for the budget division program
of the division of the budget, are deemed
fully incorporated herein and a part of
this appropriation as if fully stated
(39012).
Personal service (231123TS) (50000) .......... 140,692,000
Nonpersonal service (231223TS) (57050) ........ 94,470,000
Fringe benefits (231323TS) (60090) ............ 93,981,000
Indirect costs (231423TS) (58850) .............. 4,826,000
619 12554-05-3
DEPARTMENT OF MOTOR VEHICLES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
TRANSPORTATION SUPPORT (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Transportation Support Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses of the department of motor vehicles.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the state fiscal year state operations
appropriation for the budget division program of the division of the
budget, are deemed fully incorporated herein and a part of this
appropriation as if fully stated (39012).
Personal service (231122TS) (50000) ..................................
146,279,000 ..................................... (re. $146,279,000)
Nonpersonal service (231222TS) (57050) ...............................
191,152,000 ..................................... (re. $191,152,000)
Fringe benefits (231322TS) (60090) ... 88,123,000 .. (re. $51,802,000)
Indirect costs (231422TS) (58850) ... 4,984,000 ..... (re. $3,192,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses of the department of motor vehicles.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the state fiscal year state operations
appropriation for the budget division program of the division of the
budget, are deemed fully incorporated herein and a part of this
appropriation as if fully stated (39012).
Personal service (231121TS) (50000) ..................................
140,692,000 ...................................... (re. $19,328,000)
Nonpersonal service (231221TS) (57050) ...............................
94,470,000 ........................................ (re. $4,507,000)
Fringe benefits (231321TS) (60090) ... 84,550,000 ... (re. $9,041,000)
Indirect costs (231421TS) (58850) ... 4,826,000 ..... (re. $1,268,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses of the department of motor vehicles.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2019-20 state fiscal year state
operations appropriation for the budget division program of the
620 12554-05-3
DEPARTMENT OF MOTOR VEHICLES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (39012).
Personal service (231120TS) (50000) ..................................
140,692,000 ...................................... (re. $21,046,000)
Nonpersonal service (231220TS) (57050) ...............................
92,154,000 ....................................... (re. $17,478,000)
Fringe benefits (231320TS) (60090) ... 84,550,000 .. (re. $10,070,000)
Indirect costs (231420TS) (58850) ... 4,826,000 ..... (re. $1,271,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2012:
For services and expenses of the department of motor vehicles
(230103TS).
Maintenance undistributed
For services and expenses related to the establishment, operation and
maintenance of stationary offices in any city within the county of
Monroe with a population of two hundred thousand or more and in any
hamlet within the town of Brookhaven within the county of Suffolk
with a population of not less than seven thousand nor more than ten
thousand (39012) ... 2,500,000 .................... (re. $2,500,000)
621 12554-05-3
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 90,000,000 112,948,000
---------------- ----------------
All Funds ........................ 90,000,000 112,948,000
================ ================
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP) ... 90,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
The sum of $10,000,000 is hereby appropri-
ated for services and expenses related to
maintenance of olympic and ski facilities,
including but not limited to energy effi-
ciency projects, lift maintenance, build-
ing maintenance and other infrastructure
and preventive maintenance projects,
including personal service and the payment
of liabilities incurred prior to April 1,
2023 (20022303) (44704) ..................... 10,000,000
The sum of $80,000,000 is hereby appropri-
ated for services and expenses related to
the upgrade, renovation, and modernization
of olympic, ski, and other facilities
owned and operated by the olympic regional
development authority, including personal
service and the payment of liabilities
incurred prior to April 1, 2023. The
availability of funds from this appropri-
ation shall be subject to the approval of
a strategic modernization and investment
plan by the director of the division of
the budget (20222304) (44705) ............... 80,000,000
622 12554-05-3
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
The sum of $10,000,000 is hereby appropriated for services and
expenses related to maintenance of olympic and ski facilities,
including but not limited to energy efficiency projects, lift main-
tenance, building maintenance and other infrastructure and preven-
tive maintenance projects, including personal service and the
payment of liabilities incurred prior to April 1, 2022 (20022203)
(44704) ... 10,000,000 ............................ (re. $7,356,000)
The sum of $92,500,000 is hereby appropriated for services and
expenses related to the upgrade, renovation, and modernization of
olympic, ski, and other facilities owned and operated by the olympic
regional development authority, including personal service and the
payment of liabilities incurred prior to April 1, 2022. The avail-
ability of funds from this appropriation shall be subject to the
approval of a strategic modernization and investment plan by the
director of the division of the budget (20222204) (44705) ..........
92,500,000 ....................................... (re. $92,500,000)
By chapter 54, section 1, of the laws of 2021:
The sum of $92,500,000 is hereby appropriated for services and
expenses related to the upgrade, renovation, and modernization of
olympic, ski, and other facilities owned and operated by the olympic
regional development authority, including personal service and the
payment of liabilities incurred prior to April 1, 2021. The avail-
ability of funds from this appropriation shall be subject to the
approval of a strategic modernization and investment plan by the
director of the division of the budget (20012103) (44705) ..........
92,500,000 ....................................... (re. $12,600,000)
By chapter 54, section 1, of the laws of 2019:
The sum of $70,000,000 is hereby appropriated for services and
expenses related to the upgrade, renovation, and modernization of
olympic, ski, and other facilities owned and operated by the olympic
regional development authority, including personal service and the
payment of liabilities incurred prior to April 1, 2019. The avail-
ability of funds from this appropriation shall be subject to the
approval of a strategic modernization and investment plan by the
director of the division of the budget (20011903) (44705) ..........
70,000,000 .......................................... (re. $312,000)
623 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 374,900,000 682,445,000
Capital Projects Funds - Federal ... 20,000,000 67,269,000
---------------- ----------------
All Funds ........................ 394,900,000 749,721,000
================ ================
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 21,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs (49FM23MO) (81107) .................... 21,000,000
FEDERAL CAPITAL PROJECTS FUND (CCP) ......................... 20,000,000
--------------
Capital Projects Funds - Federal
Federal Capital Projects Fund
OPRHP-Federal Capital Projects Account - 31363
Preservation of Facilities Purpose
For the federal government's share of the
cost to prepare and review plans, specifi-
cations and estimates, for the acquisition
of property and for the construction,
expansion and rehabilitation of state
facilities for recreation. Portions of
this appropriation may be suballocated to
other state agencies for such eligible
projects subject to the approval of the
director of the budget (49FE2303) (39911) ... 20,000,000
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)... 101,400,000
--------------
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Capital Miscellaneous Gifts Account - 32214
Preservation of Facilities Purpose
For alterations, rehabilitation and improve-
ments of various park facilities and
624 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2023-24
historic sites, including personal service
and the payment of liabilities incurred
prior to April 1, 2023, including suballo-
cation to other state departments and
agencies (49GI2303) (39926) ................. 54,000,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Minekill State Park Account - 32202
Preservation of Facilities Purpose
For rehabilitation and improvements at Mine-
kill State Park, including the payment of
liabilities incurred prior to April 1,
2023 (49PA2303) (39926) ........................ 500,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Miscellaneous CP Resource Account - 32203
Preservation of Facilities Purpose
For rehabilitation and improvements at vari-
ous parks and historic sites, including
the payment of liabilities incurred prior
to April 1, 2023, including suballocation
to other state departments and agencies
(49RA2303) (39926) ............................. 300,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Parks Capital Investment Account - 32207
Preservation of Facilities Purpose
For rehabilitation, replacement and refur-
bishment of facilities at various parks
and historic sites, including the payment
of liabilities incurred prior to April 1,
2023 (49RR2303) (39926) ........................ 500,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Parks and Recreation Resource Account - 32209
Preservation of Facilities Purpose
For rehabilitation and improvements at vari-
ous parks and historic sites, including
the payment of liabilities incurred prior
to April 1, 2023, including suballocation
to other state departments and agencies
(49NR2303) (39926) ........................... 1,500,000
Capital Projects Funds - Other
625 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2023-24
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Engineering Services Purpose
For state park engineering services and
expenses, including the preparation of
plans and designs; specifications and
estimates; construction management and
supervision; surveys and testing; environ-
mental impact and historic project assess-
ment; and related services for state parks
infrastructure fund projects including the
payment of contractual services, travel
expenses and supplies and fringe benefits
charges (490623ES) (39927) ................... 5,800,000
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preservation of Facilities Purpose
For alterations, rehabilitation and improve-
ments of various park facilities and
historic sites including personal service
and the payment of liabilities incurred
prior to April 1, 2023, including suballo-
cation to other state departments and
agencies (49032303) (81010) ................. 33,600,000
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preventive Maintenance Purpose
For preventive maintenance at various parks
and historic sites, including personal
services and fringe benefits (49ZZ23PM)
(39928) ...................................... 5,200,000
NEW YORK WORKS (CCP) ....................................... 252,500,000
--------------
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preservation of Facilities Purpose
For services and expenses related to New
York Works Infrastructure projects at
state parks and historic sites, including
for publicly accessible electric vehicle
charging stations, and for the repair,
626 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2023-24
rehabilitation, maintenance and improve-
ment of the Empire State Trail, provided
that not less than $2,500,000 is provided
to the olympic regional development
authority, including $500,000 for
Belleayre Mountain Ski Center, including
but not limited to lift maintenance,
building maintenance and other infrastruc-
ture and preventive maintenance projects,
including personal service and the payment
of liabilities incurred prior to April 1,
2023. All or a portion of the funds appro-
priated hereby may be suballocated or
transferred to any department, agency or
public authority (49NY2303) (39944) ........ 202,500,000
For additional services and expenses related
to New York Works Infrastructure projects
at state parks and historic sites, includ-
ing for publicly accessible electric vehi-
cle charging stations ....................... 50,000,000
627 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
FACILITIES MAINTENANCE AND OPERATIONS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
By chapter 54, section 1, of the laws of 2022:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(49FM22MO) (81107) ... 21,000,000 ................. (re. $9,280,000)
The appropriation made by chapter 54, section 1, of the laws of 2021, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(49FM21MO) (81107) ... [21,000,000] 21,155,000 ...... (re. $873,000)
By chapter 54, section 1, of the laws of 2020:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(49FM20MO) (81107) ... 21,000,000 ................. (re. $1,933,000)
By chapter 54, section 1, of the laws of 2019:
For the maintenance and operation of various facilities and systems
including personal services, fringe benefits and indirect costs
(49FM19MO) (81107) ... 21,000,000 ................... (re. $869,000)
FEDERAL CAPITAL PROJECTS FUND (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
OPRHP-Federal Capital Projects Account - 31363
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE2203)
(39911) ... 20,000,000 ........................... (re. $20,000,000)
By chapter 54, section 1, of the laws of 2021:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE2103)
(39911) ... 20,000,000 ........................... (re. $20,000,000)
628 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE2003)
(39911) ... 20,000,000 ........................... (re. $13,498,000)
By chapter 54, section 1, of the laws of 2019:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1903)
(39911) ... 20,000,000 ............................ (re. $4,223,000)
By chapter 54, section 1, of the laws of 2018:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1803)
(39911) ... 20,000,000 ............................ (re. $6,277,000)
By chapter 54, section 1, of the laws of 2017:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1703)
(39911) ... 4,000,000 ............................... (re. $468,000)
By chapter 55, section 1, of the laws of 2016:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1603)
(39911) ... 4,000,000 ................................. (re. $3,000)
By chapter 54, section 1, of the laws of 2015:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
629 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
subject to the approval of the director of the budget (49FE1503)
(39911) ... 4,000,000 ............................... (re. $176,000)
By chapter 54, section 1, of the laws of 2013:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1303)
(39911) ... 4,000,000 ............................... (re. $231,000)
By chapter 54, section 1, of the laws of 2012:
For the federal government's share of the cost to prepare and review
plans, specifications and estimates, for the acquisition of property
and for the construction, expansion and rehabilitation of state
facilities for recreation. Portions of this appropriation may be
suballocated to other state agencies for such eligible projects
subject to the approval of the director of the budget (49FE1203)
(39911) ... 4,000,000 ............................... (re. $356,000)
MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Capital Miscellaneous Gifts Account - 32214
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2022, including
suballocation to other state departments and agencies (49GI2203)
(39926) ... 24,000,000 ........................... (re. $24,000,000)
By chapter 54, section 1, of the laws of 2021:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2021, including
suballocation to other state departments and agencies (49GI2103)
(39926) ... 24,000,000 ........................... (re. $24,000,000)
By chapter 54, section 1, of the laws of 2020:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2020, including
suballocation to other state departments and agencies (49GI2003)
(39926) ... 24,000,000 ........................... (re. $24,000,000)
By chapter 54, section 1, of the laws of 2019:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
630 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
payment of liabilities incurred prior to April 1, 2019, including
suballocation to other state departments and agencies (49GI1903)
(39926) ... 24,300,000 ........................... (re. $24,175,000)
By chapter 54, section 1, of the laws of 2018:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2018, including
suballocation to other state departments and agencies (49GI1803)
(39926) ... 24,300,000 ........................... (re. $10,727,000)
By chapter 54, section 1, of the laws of 2017:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2017, including
suballocation to other state departments and agencies (49GI1703)
(39926) ... 24,300,000 ........................... (re. $15,897,000)
By chapter 55, section 1, of the laws of 2016:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2016, including
suballocation to other state departments and agencies (49GI1603)
(39926) ... 25,000,000 ............................ (re. $9,844,000)
By chapter 54, section 1, of the laws of 2015:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2015, including
suballocation to other state departments and agencies (49GI1503)
(39926) ... 25,000,000 ............................ (re. $5,888,000)
By chapter 54, section 1, of the laws of 2014:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2014, including
suballocation to other state departments and agencies (49GI1403)
(39926) ... 25,000,000 ............................ (re. $3,408,000)
By chapter 54, section 1, of the laws of 2013:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2013, including
suballocation to other state departments and agencies (49GI1303)
(39926) ... 25,000,000 .............................. (re. $439,000)
By chapter 54, section 1, of the laws of 2012:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2012, including
suballocation to other state departments and agencies (49GI1203)
(39926) ... 25,000,000 .............................. (re. $393,000)
631 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2012:
For alterations, rehabilitation and improvements of various park
facilities and historic sites, including personal service and the
payment of liabilities incurred prior to April 1, 2011, including
suballocation to other state departments and agencies (49GI1103)
(39926) ... 10,000,000 ............................ (re. $1,350,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
I Love NY Water Vessel Access Account - 32212
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV2103) (39926) ... 2,000,000 .................. (re. $1,893,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV2003) (39926) ... 2,000,000 .................... (re. $706,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1903) (39926) ... 2,000,000 ..................... (re. $31,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1803) (39926) ... 2,000,000 .................. (re. $1,531,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1703) (39926) ... 2,000,000 .................... (re. $570,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1603) (39926) ... 1,300,000 ..................... (re. $28,000)
By chapter 54, section 1, of the laws of 2015:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1503) (39926) ... 1,300,000 ..................... (re. $31,000)
By chapter 54, section 1, of the laws of 2014:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1403) (39926) ... 1,300,000 ..................... (re. $40,000)
632 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2013:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1303) (39926) ... 1,300,000 ...................... (re. $3,000)
By chapter 54, section 1, of the laws of 2012:
For services and expenses related to boating access and maintenance in
accordance with a plan to be approved by the director of the budget
(49LV1203) (39926) ... 1,300,000 ..................... (re. $12,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Minekill State Park Account - 32202
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2022
(49PA2203) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 54, section 1, of the laws of 2021:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2021
(49PA2103) (39926) ... 500,000 ....................... (re. $58,000)
By chapter 54, section 1, of the laws of 2020:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2020
(49PA2003) (39926) ... 500,000 ...................... (re. $376,000)
By chapter 54, section 1, of the laws of 2019:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2019
(49PA1903) (39926) ... 500,000 ...................... (re. $100,000)
By chapter 54, section 1, of the laws of 2018:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2018
(49PA1803) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 54, section 1, of the laws of 2017:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2017
(49PA1703) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 55, section 1, of the laws of 2016:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2016
(49PA1603) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 54, section 1, of the laws of 2015:
633 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2015
(49PA1503) (39926) ... 500,000 ...................... (re. $246,000)
By chapter 54, section 1, of the laws of 2014:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2014
(49PA1403) (39926) ... 500,000 ...................... (re. $316,000)
By chapter 54, section 1, of the laws of 2012:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2012
(49PA1203) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 54, section 1, of the laws of 2011:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2011
(49PA1103) (39926) ... 500,000 ...................... (re. $500,000)
By chapter 55, section 1, of the laws of 2010:
For rehabilitation and improvements at Minekill State Park, including
the payment of liabilities incurred prior to April 1, 2010
(49PA1003) (39926) ... 500,000 ...................... (re. $417,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Miscellaneous CP Resource Account - 32203
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2022, including suballocation to other state departments and
agencies (49RA2203) (39926) ... 300,000 ............. (re. $300,000)
By chapter 54, section 1, of the laws of 2021:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2021, including suballocation to other state departments and
agencies (49RA2103) (39926) ... 300,000 ............. (re. $289,000)
By chapter 54, section 1, of the laws of 2020:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2020, including suballocation to other state departments and
agencies (49RA2003) (39926) ... 300,000 ............. (re. $300,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Parks Capital Investment Account - 32207
Preservation of Facilities Purpose
634 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2022 (49RR2203) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2021:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2021 (49RR2103) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2020:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2020 (49RR2003) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2019:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2019 (49RR1903) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2018:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2018 (49RR1803) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2017:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2017 (49RR1703) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 55, section 1, of the laws of 2016:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2016 (49RR1603) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2015:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2015 (49RR1503) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2014:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
635 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ities incurred prior to April 1, 2014 (49RR1403) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2013:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2013 (49RR1303) (39926) ...........
500,000 ............................................. (re. $500,000)
By chapter 54, section 1, of the laws of 2012:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2012 (49RR1203) (39926) ...........
500,000 ............................................. (re. $119,000)
The appropriation made by chapter 54, section 1, of the laws of 2011, is
hereby amended and reappropriated to read:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2011 [(49RR1003)](49RR11003)
(39926) ... 500,000 ................................. (re. $270,000)
By chapter 55, section 1, of the laws of 2010:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2010 (49RR1003) (39926) ...........
500,000 ............................................. (re. $445,000)
By chapter 55, section 1, of the laws of 2009:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2009 (49RR0903) (39926) ...........
500,000 ............................................. (re. $208,000)
By chapter 55, section 1, of the laws of 2008:
For rehabilitation, replacement and refurbishment of facilities at
various parks and historic sites, including the payment of liabil-
ities incurred prior to April 1, 2008 (49RR0803) (39926) ...........
500,000 .............................................. (re. $67,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Parks and Recreation Resource Account - 32209
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2022, including suballocation to other state departments and
agencies (49NR2203) (39926) ... 1,500,000 ......... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2021:
636 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2021, including suballocation to other state departments and
agencies (49NR2103) (39926) ... 1,500,000 ......... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2020:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2020, including suballocation to other state departments and
agencies (49NR2003) (39926) ... 1,500,000 ......... (re. $1,500,000)
By chapter 54, section 1, of the laws of 2019:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2019, including suballocation to other state departments and
agencies (49NR1903) (39926) ... 1,500,000 ......... (re. $1,473,000)
By chapter 54, section 1, of the laws of 2018:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2018, including suballocation to other state departments and
agencies (49NR1803) (39926) ... 1,500,000 ........... (re. $774,000)
By chapter 54, section 1, of the laws of 2017:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2017, including suballocation to other state departments and
agencies (49NR1703) (39926) ... 1,500,000 ........... (re. $969,000)
By chapter 55, section 1, of the laws of 2016:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2016, including suballocation to other state departments and
agencies (49NR1603) (39926) ... 1,500,000 ........... (re. $975,000)
By chapter 54, section 1, of the laws of 2015:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2015, including suballocation to other state departments and
agencies (49NR1503) (39926) ... 1,500,000 ........... (re. $230,000)
By chapter 54, section 1, of the laws of 2014:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2014, including suballocation to other state departments and
agencies (49NR1403) (39926) ... 1,500,000 ........... (re. $530,000)
By chapter 54, section 1, of the laws of 2013:
For rehabilitation and improvements at various parks and historic
sites, including the payment of liabilities incurred prior to April
1, 2013, including suballocation to other state departments and
agencies (49NR1303) (39926) ... 1,500,000 ............ (re. $14,000)
637 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State Park Infrastructure Fund
In accordance with Section 97-mm of the state finance law, all funds
received and designated by the commissioner of parks, recreation and
historic preservation to the credit of SPIF, shall be directed to
state park infrastructure projects including engineering services
costs.
A portion of the amounts included within these appropriations, subject
to the approval of the director of the budget, may be made available
to the New York State Office of General Services for payment to the
design and construction management account of the centralized
services fund of the New York State Office of General Services, to
accomplish the purpose of these appropriations. All or a portion of
the disbursements made pursuant to the following appropriations may
be repaid from proceeds of bonds issued by the environmental facili-
ties corporation in state fiscal year 1992-1993.
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Energy Conservation Purpose
By chapter 54, section 1, of the laws of 2022:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2022 (49EC2205) (81036) ..........................
700,000 ............................................. (re. $674,000)
By chapter 54, section 1, of the laws of 2021:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2021 (49EC2105) (81036) ..........................
700,000 ............................................. (re. $586,000)
By chapter 54, section 1, of the laws of 2020:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2020 (49EC2005) (81036) ..........................
700,000 ............................................. (re. $401,000)
By chapter 54, section 1, of the laws of 2019:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2019 (49EC1905) (81036) ..........................
700,000 ............................................. (re. $276,000)
By chapter 54, section 1, of the laws of 2018:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2018 (49EC1805) (81036) ..........................
700,000 ............................................. (re. $230,000)
638 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2017 (49EC1705) (81036) ..........................
700,000 ............................................. (re. $342,000)
By chapter 55, section 1, of the laws of 2016:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2016 (49EC1605) (81036) ..........................
700,000 ............................................. (re. $155,000)
By chapter 54, section 1, of the laws of 2015:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2015 (49EC1505) (81036) ..........................
700,000 ............................................. (re. $647,000)
By chapter 54, section 1, of the laws of 2014:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2014 (49EC1405) (81036) ..........................
700,000 .............................................. (re. $57,000)
By chapter 54, section 1, of the laws of 2013:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2013 (49EC1305) (81036) ..........................
700,000 ............................................. (re. $491,000)
By chapter 54, section 1, of the laws of 2012:
For energy conservation purposes at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2012 (49EC1205) (81036) ..........................
700,000 ............................................. (re. $125,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Engineering Services Purpose
By chapter 54, section 1, of the laws of 2022:
For state park engineering services and expenses, including the prepa-
ration of plans and designs; specifications and estimates;
construction management and supervision; surveys and testing; envi-
ronmental impact and historic project assessment; and related
services for state parks infrastructure fund projects including the
payment of contractual services, travel expenses and supplies and
fringe benefits charges (490622ES) (39927) .........................
5,800,000 ......................................... (re. $3,666,000)
By chapter 54, section 1, of the laws of 2021:
639 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For state park engineering services and expenses, including the prepa-
ration of plans and designs; specifications and estimates;
construction management and supervision; surveys and testing; envi-
ronmental impact and historic project assessment; and related
services for state parks infrastructure fund projects including the
payment of contractual services, travel expenses and supplies and
fringe benefits charges (490621ES) (39927) .........................
5,800,000 ........................................... (re. $245,000)
By chapter 54, section 1, of the laws of 2020:
For state park engineering services and expenses, including the prepa-
ration of plans and designs; specifications and estimates;
construction management and supervision; surveys and testing; envi-
ronmental impact and historic project assessment; and related
services for state parks infrastructure fund projects including the
payment of contractual services, travel expenses and supplies and
fringe benefits charges (490620ES) (39927) .........................
5,800,000 ......................................... (re. $1,822,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Facilities for the Physically Disabled Purpose
By chapter 54, section 1, of the laws of 2022:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2022 (49042204) (81061)
... 700,000 ......................................... (re. $700,000)
By chapter 54, section 1, of the laws of 2021:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2021 (49042104) (81061)
... 700,000 ......................................... (re. $549,000)
By chapter 54, section 1, of the laws of 2020:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2020 (49042004) (81061)
... 700,000 ......................................... (re. $591,000)
By chapter 54, section 1, of the laws of 2019:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2019 (49041904) (81061)
... 700,000 ......................................... (re. $543,000)
By chapter 54, section 1, of the laws of 2018:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
640 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of liabilities incurred prior to April 1, 2018 (49041804) (81061)
... 700,000 ......................................... (re. $400,000)
By chapter 54, section 1, of the laws of 2017:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2017 (49041704) (81061)
... 700,000 ......................................... (re. $162,000)
By chapter 55, section 1, of the laws of 2016:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2016 (49041604) (81061)
... 700,000 ......................................... (re. $257,000)
By chapter 54, section 1, of the laws of 2015:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2015 (49041504) (81061)
... 700,000 ......................................... (re. $686,000)
By chapter 54, section 1, of the laws of 2014:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2014 (49041404) (81061)
... 700,000 .......................................... (re. $98,000)
By chapter 54, section 1, of the laws of 2013:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2013 (49041304) (81061)
... 700,000 ......................................... (re. $689,000)
By chapter 54, section 1, of the laws of 2012:
To improve accessibility of facilities for the disabled at various
parks and historic sites, including personal service and the payment
of liabilities incurred prior to April 1, 2012 (49041204) (81061)
... 700,000 ......................................... (re. $123,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2022, including suballocation to other state
departments and agencies (49012201) (81028) ........................
4,700,000 ......................................... (re. $4,551,000)
By chapter 54, section 1, of the laws of 2021:
641 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2021, including suballocation to other state
departments and agencies (49012101) (81028) ........................
4,700,000 ......................................... (re. $3,297,000)
By chapter 54, section 1, of the laws of 2020:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2020, including suballocation to other state
departments and agencies (49012001) (81028) ........................
4,700,000 ......................................... (re. $2,516,000)
By chapter 54, section 1, of the laws of 2019:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2019, including suballocation to other state
departments and agencies (49011901) (81028) ........................
4,700,000 ......................................... (re. $1,670,000)
By chapter 54, section 1, of the laws of 2018:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2018, including suballocation to other state
departments and agencies (49011801) (81028) ........................
4,700,000 ......................................... (re. $1,229,000)
By chapter 54, section 1, of the laws of 2017:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2017, including suballocation to other state
departments and agencies (49011701) (81028) ........................
4,700,000 ......................................... (re. $1,089,000)
By chapter 55, section 1, of the laws of 2016:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2016, including suballocation to other state
departments and agencies (49011601) (81028) ........................
4,700,000 ........................................... (re. $566,000)
By chapter 54, section 1, of the laws of 2015:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2015, including suballocation to other state
departments and agencies (49011501) (81028) ........................
4,700,000 ........................................... (re. $936,000)
By chapter 54, section 1, of the laws of 2014:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2014, including suballocation to other state
642 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
departments and agencies (49011401) (81028) ........................
4,700,000 ........................................... (re. $979,000)
By chapter 54, section 1, of the laws of 2013:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2013, including suballocation to other state
departments and agencies (49011301) (81028) ........................
4,700,000 ........................................... (re. $114,000)
By chapter 54, section 1, of the laws of 2012:
For health and safety projects at various parks and historic sites,
including personal service and the payment of liabilities incurred
prior to April 1, 2012, including suballocation to other state
departments and agencies (49011201) (81028) ........................
4,683,000 ......................................... (re. $1,181,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
New Facilities Purpose
By chapter 55, section 1, of the laws of 2005, as added by chapter 54,
section 4, of the laws of 2005:
For services and expenses including but not limited to construction,
reconstruction, engineering services and rehabilitation for Tioga
State Park (49TS0503) (81025) ... 1,000,000 ......... (re. $881,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2022, including
suballocation to other state departments and agencies (49032203)
(81010) ... 27,500,000 ........................... (re. $27,500,000)
By chapter 54, section 1, of the laws of 2021:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2021, including
suballocation to other state departments and agencies (49032103)
(81010) ... 27,500,000 ........................... (re. $15,952,000)
By chapter 54, section 1, of the laws of 2020:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2020, including
643 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
suballocation to other state departments and agencies (49032003)
(81010) ... 27,500,000 ........................... (re. $12,031,000)
By chapter 54, section 1, of the laws of 2019:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2019, including
suballocation to other state departments and agencies (49031903)
(81010) ... 24,500,000 ............................ (re. $7,902,000)
By chapter 54, section 1, of the laws of 2018:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2018, including
suballocation to other state departments and agencies (49031803)
(81010) ... 24,500,000 ............................ (re. $3,753,000)
By chapter 54, section 1, of the laws of 2017:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2017, including
suballocation to other state departments and agencies (49031703)
(81010) ... 18,500,000 ............................ (re. $2,644,000)
By chapter 55, section 1, of the laws of 2016:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2016, including
suballocation to other state departments and agencies (49031603)
(81010) ... 15,500,000 ............................ (re. $1,423,000)
By chapter 54, section 1, of the laws of 2015:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2015, including
suballocation to other state departments and agencies (49031503)
(81010) ... 14,500,000 .............................. (re. $862,000)
By chapter 54, section 1, of the laws of 2014:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2014, including
suballocation to other state departments and agencies (49031403)
(81010) ... 9,500,000 ............................... (re. $145,000)
By chapter 54, section 1, of the laws of 2013:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2013, including
suballocation to other state departments and agencies (49031303)
(81010) ... 9,500,000 ............................... (re. $757,000)
644 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2012:
For alterations, rehabilitation and improvements of various park
facilities and historic sites including personal service and the
payment of liabilities incurred prior to April 1, 2012, including
suballocation to other state departments and agencies (49031203)
(81010) ... 15,118,000 .............................. (re. $565,000)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preventive Maintenance Purpose
By chapter 54, section 1, of the laws of 2022:
For preventive maintenance at various parks and historic sites,
including personal services and fringe benefits (49ZZ22PM) (39928)
... 5,200,000 ..................................... (re. $4,281,000)
By chapter 54, section 1, of the laws of 2021:
For preventive maintenance at various parks and historic sites,
including personal services and fringe benefits (49ZZ21PM) (39928)
... 5,200,000 ..................................... (re. $1,543,000)
By chapter 54, section 1, of the laws of 2020:
For preventive maintenance at various parks and historic sites,
including personal services and fringe benefits (49ZZ20PM) (39928)
... 5,200,000 ..................................... (re. $1,401,000)
NATURAL HERITAGE TRUST (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 1996:
State aid for services and expenses for: Museum of Ceramic Art at
Alfred (20039408) (39929) ... 1,000,000 ............. (re. $300,000)
NEW YORK WORKS (CCP)
Capital Projects Funds - Other
State Park Infrastructure Fund
State Park Infrastructure Account - 30351
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, including for publicly
accessible electric vehicle charging stations, and for the repair,
rehabilitation, maintenance and improvement of the Empire State
Trail, provided that not less than $2,500,000 is provided to the
olympic regional development authority, including $500,000 for
645 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Belleayre Mountain Ski Center, including but not limited to lift
maintenance, building maintenance and other infrastructure and
preventive maintenance projects, including personal service and the
payment of liabilities incurred prior to April 1, 2022. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency or public authority (49NY2203)
(39944) ... 202,500,000 ......................... (re. $202,500,000)
For additional services and expenses related to New York Works Infras-
tructure projects at state parks and historic sites, including for
publicly accessible electric vehicle charging stations. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(49NY2203) [(399544)](39944) ... 50,000,000 ...... (re. $50,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, and for the repair,
rehabilitation, maintenance and improvement of the Empire State
Trail, provided that not less than $2,500,000 is provided to the
olympic regional development authority, including $500,000 for
Belleayre Mountain Ski Center, including but not limited to lift
maintenance, building maintenance and other infrastructure and
preventive maintenance projects, including personal service and the
payment of liabilities incurred prior to April 1,2021. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency or public authority (49NY2103)
(39944) ... 112,500,000 .......................... (re. $54,742,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, provided that not less
than $2.5 million is provided to the olympic regional development
authority, including $500,000 for Belleayre Mountain Ski Center,
including but not limited to lift maintenance, building maintenance
and other infrastructure and preventive maintenance projects,
including personal service and the payment of liabilities incurred
prior to April 1, 2020. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency
or public authority (49NY2003) (39944) .............................
112,500,000 ...................................... (re. $27,759,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, provided that not less
than $2.5 million is provided to the olympic regional development
authority, including $500,000 for Belleayre Mountain Ski Center,
including but not limited to lift maintenance, building maintenance
and other infrastructure and preventive maintenance projects,
including personal service and the payment of liabilities incurred
prior to April 1, 2019. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency
646 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or public authority (49NY1903) (39944) .............................
112,500,000 ....................................... (re. $9,780,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, provided that not less
than $2.5 million is provided to the olympic regional development
authority, including $500,000 for Belleayre Mountain Ski Center,
including but not limited to lift maintenance, building maintenance
and other infrastructure and preventive maintenance projects,
including personal service and the payment of liabilities incurred
prior to April 1, 2018. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency
or public authority (49NY1803) (39944) .............................
92,500,000 ........................................ (re. $7,765,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, provided that not less
than $2.5 million is provided to the olympic regional development
authority, including $500,000 for Belleayre Mountain Ski Center,
including but not limited to lift maintenance, building maintenance
and other infrastructure and preventive maintenance projects,
including personal service and the payment of liabilities incurred
prior to April 1, 2017. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency
or public authority (49NY1703) (39944) .............................
122,500,000 ...................................... (re. $12,484,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses related to New York Works Infrastructure
projects at state parks and historic sites, provided that not less
than $2.5 million is provided to the olympic regional development
authority, including $500,000 for Belleayre Mountain Ski Center,
including but not limited to lift maintenance, building maintenance
and other infrastructure and preventive maintenance projects,
including personal service and the payment of liabilities incurred
prior to April 1, 2016. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency
or public authority (49NY1603) (39944) .............................
92,500,000 ........................................ (re. $3,777,000)
OUTDOOR RECREATION DEVELOPMENT FUND (CCP)
Capital Projects Funds - Other
Outdoor Recreation Development Bond Fund
Outdoor Recreation Development Bond Fund Account - 30750
Bond Proceeds Purpose
By chapter 558, section 19, of the laws of 1965, and chapter 558,
section 20, of the laws of 1965, as consolidated by chapter 54,
647 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
section 7, of the laws of 1976, and as amended by chapter 55,
section 1, of the laws of 1996, for:
The sale of bonds as authorized pursuant to the provisions of chapter
five hundred fifty-eight of the laws of nineteen hundred sixty-five
known as the "Outdoor Recreation Development Bond Act" for payment
to the capital projects fund as created by section ninety-three of
the state finance law for disbursements from such fund pursuant to
appropriations for the development and acquisition of lands for
outdoor recreation and for historic sites for the purposes, in the
manner and to the extent specified in the outdoor recreation devel-
opment act as enacted by chapter five hundred fifty-eight of the
laws of nineteen hundred sixty-five, and as such disbursements are
hereinafter referred to as "Outdoor Recreation Development and
Acquisition of Lands Disbursements" and "Outdoor Recreation Develop-
ment and Acquisition of Land for Historic Sites Disbursements"
(01377210) (80918) .................................. (re. $230,000)
PARKS - EQBA 86 (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 1989:
For payment of the state share of the costs of historic preservation
and municipal park projects in accordance with the provisions of
title 9 of article 52 of the environmental conservation law, for
projects, included in the following schedule, including costs inci-
dental and appurtenant thereto, hereinafter referred to as "Historic
Preservation and Municipal Park Disbursements."
The commissioner shall submit to the chairmen of the senate finance
committee and the assembly ways and means committee a list of
proposed grants and the amounts thereof not less than 14 days prior
to approval of such grants.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for historic preserva-
tion and municipal park expenditures for approved historic preserva-
tion and municipal park projects in accordance with section 52-0901
of the environmental conservation law upon the issuance of a certif-
icate of approval of availability by the director of the division of
the budget.
The state comptroller shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
the office of parks, recreation and historic preservation, the
chairman of the senate finance committee, and the chairman of the
assembly ways and means committee the amounts disbursed from this
appropriation for Historic Preservation and Municipal Park Disburse-
ments for the month preceding such certification (49EQ8907) (39909)
... 30,000,000 ...................................... (re. $196,000)
By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
section 3, of the laws of 1989:
648 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the state share of the costs of historic preservation,
municipal park, and urban cultural park projects in accordance with
the provisions of title 9 of article 52 of the environmental conser-
vation law, for projects, included in the following schedule,
including costs incidental and appurtenant thereto, hereinafter
referred to as "Historic Preservation, Municipal Park and Urban
Cultural Park Disbursements." The commissioner shall submit to the
chairmen of the senate finance committee and the assembly ways and
means committee a list of proposed grants and the amounts thereof
not less than 14 days prior to approval of such grants.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for historic preserva-
tion, municipal park, and urban cultural park expenditures for
approved historic preservation, municipal park, and urban cultural
park projects in accordance with section 52-0901 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller, shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
the office of parks, recreation and historic preservation, the
chairman of the senate finance committee, and the chairman of the
assembly ways and means committee the amounts disbursed from this
appropriation for Historic Preservation, Municipal Park and Urban
Cultural Park Disbursements for the month preceding such certif-
ication (49EQ8807) (39909) ... 35,000,000 ........... (re. $595,000)
By chapter 54, section 1, of the laws of 1987:
For payment of the state share of the costs of historic preservation,
municipal parks and urban cultural park projects in accordance with
the provisions of title nine of article fifty-two of the environ-
mental conservation law, for projects, included in the following
schedule, including costs incidental and appurtenant thereto, here-
inafter referred to as "Historic Preservation, Municipal Park and
Urban Cultural Parks Disbursements." The commissioner shall submit
to the chairmen of the senate finance committee and the assembly
ways and means committee a list of proposed grants and the amounts
thereof not less than fourteen days prior to approval of such
grants.
Notwithstanding the provisions of any general or special law, the
moneys hereby appropriated shall be available for historic preserva-
tion, municipal park and urban cultural park expenditures for
approved historic preservation, municipal park and urban cultural
park projects in accordance with section 52-0901 of the environ-
mental conservation law upon the issuance of a certificate of
approval of availability by the director of the division of the
budget.
The state comptroller, shall at the commencement of each month certify
to the director of the division of the budget, the commissioner of
environmental conservation, the chairman of the senate finance
committee, and the chairman of the assembly ways and means committee
the amounts disbursed from this appropriation for Historic Preserva-
649 12554-05-3
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tion, Municipal Park and Urban Cultural Park Disbursements for the
month preceding such certification (49EQ8707) (39909) ..............
30,000,000 ........................................ (re. $1,007,000)
650 12554-05-3
NEW YORK POWER AUTHORITY
CAPITAL PROJECTS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 7,500,000 10,795,000
---------------- ----------------
All Funds ........................ 7,500,000 10,795,000
================ ================
CANAL DEVELOPMENT PROGRAM (CCP) .............................. 7,500,000
--------------
Capital Projects Funds - Other
New York State Canal System Development Fund
Canal System Account - 30301
Canals and Waterways Purpose
For the maintenance, construction, recon-
struction, development or promotion of the
New York State Canal System in accordance
with the provisions of section 92-u of the
state finance law including the payment of
liabilities prior to April 1, 2023.
(95012316)(46201) ............................ 7,500,000
651 12554-05-3
NEW YORK POWER AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
EMPIRE STATE TRAIL (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2017:
For the costs and expenses, including personal services, nonpersonal
services, fringe benefits and indirect costs of projects related to
improvements, alterations, rehabilitation and completion of the
Empire State Trail network in the hudson river valley, champlain
valley and along the erie canal, including the payment of liabil-
ities incurred prior to April 1, 2017. All or a portion of the funds
appropriated herein may be suballocated or transferred to any
department, agency or public authority (95ET17ER) (81112) ..........
77,000,000 ....................................... (re. $10,795,000)
652 12554-05-3
PUBLIC EMPLOYMENT RELATIONS BOARD
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 2,500,000
---------------- ----------------
All Funds ........................ 0 2,500,000
================ ================
PUBLIC EMPLOYMENT RELATIONS BOARD (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For system modernizations for the Public Employment Relations Board
regarding electronic mail and registration systems for faster proc-
essing of applications for assistance and faster correspondence
between the agency and applicants (31012208) (48001) ...............
2,500,000 ......................................... (re. $2,500,000)
653 12554-05-3
DEPARTMENT OF STATE
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 202,000,000 646,231,000
---------------- ----------------
All Funds ........................ 202,000,000 646,231,000
================ ================
DOWNTOWN REVITALIZATION (CCP) .............................. 200,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
For services and expenses, loans, grants,
and costs associated with program adminis-
tration, including the payment of liabil-
ities incurred prior to April 1, 2023. All
or a portion of the funds appropriated
hereby may be suballocated or transferred
to any department, agency, or public
authority, according to the following:
For payments related to a downtown revitali-
zation program designed and executed by
the department of state and the division
of housing and community renewal for
transformative housing, economic develop-
ment, transportation, and community
projects, including those designed to
increase the property tax base.
An amount up to $100,000,000 is hereby
appropriated for services and expenses
related to the economic development,
transportation, and community projects
administered through the NY Forward
program designed and executed by the
department of state (19CP2309) (51275) ..... 200,000,000
MAINTENANCE AND REPAIR (CCP) ................................. 2,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For payments to provide for the regulation
of cemetery corporations and maintenance
of abandoned cemetery property and the
654 12554-05-3
DEPARTMENT OF STATE
CAPITAL PROJECTS 2023-24
repair of vandalized gravesites under
paragraph (h) of section 1507 of the not-
for-profit corporation law (19CR2303)
(51272) ...................................... 2,000,000
655 12554-05-3
DEPARTMENT OF STATE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
DOWNTOWN REVITALIZATION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses, loans, grants, and costs associated with
program administration, including the payment of liabilities
incurred prior to April 1, 2022. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base.
An amount up to $100,000,000 is hereby appropriated for services and
expenses related to the economic development, transportation, and
community projects administered through the NY Forward program
designed and executed by the department of state (19CP2209) (51275)
... 200,000,000 ................................. (re. $200,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses, loans, grants, and costs associated with
program administration, including the payment of liabilities
incurred prior to April 1, 2021. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base (19CP2109) (51275) ..................
100,000,000 ..................................... (re. $100,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses, loans, grants, and costs associated with
program administration, including the payment of liabilities
incurred prior to April 1, 2020. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base (19002009) (51275) ..................
100,000,000 ....................................... (re. 97,697,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses, loans, grants, and costs associated with
program administration, including the payment of liabilities
656 12554-05-3
DEPARTMENT OF STATE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
incurred prior to April 1, 2019. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base (19001909) (51275) ..................
100,000,000 ...................................... (re. $84,106,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses, loans, grants, and costs associated with
program administration, including the payment of liabilities
incurred prior to April 1, 2018. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base (19001809) (51275) ..................
100,000,000 ...................................... (re. $83,501,000)
Capital Projects Funds - Other
Dedicated Infrastructure Investment Fund
Infrastructure Investment Account - 33050
Economic Development Purpose
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2020:
For services and expenses, loans, grants, and costs associated with
program administration, of projects and purposes authorized by
section 93-b of the state finance law to receive funding from the
dedicated infrastructure investment fund - infrastructure investment
account, including the payment of liabilities incurred prior to
April 1, 2017. All or a portion of the funds appropriated hereby may
be suballocated or transferred to any department, agency, or public
authority, according to the following:
For payments related to a downtown revitalization program designed and
executed by the department of state and the division of housing and
community renewal for transformative housing, economic development,
transportation, and community projects, including those designed to
increase the property tax base (19011709) (51275) ..................
98,562,566 ....................................... (re. $76,926,000)
MAINTENANCE AND REPAIR (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
657 12554-05-3
DEPARTMENT OF STATE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payments to provide for the regulation of cemetery corporations
and maintenance of abandoned cemetery property and the repair of
vandalized gravesites under paragraph (h) of section 1507 of the
not-for-profit corporation law [(19CR2103)](19CR2203) (51272) ......
2,000,000 ......................................... (re. $2,000,000)
By chapter 54, section 1, of the laws of 2021:
For payments to provide for the regulation of cemetery corporations
and maintenance of abandoned cemetery property and the repair of
vandalized gravesites under paragraph (h) of section 1507 of the
not-for-profit corporation law (19CR2103) (51272) ..................
2,000,000 ......................................... (re. $1,670,000)
SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP)
Capital Projects Funds - Other
Hazardous Waste Remedial Fund
Hazardous Waste Oversight and Assistance Account - 31505
Hazardous Waste Purpose
By chapter 54, section 1, of the laws of 2013:
For the following purposes: non-bondable services and expenses associ-
ated with the brownfield cleanup and hazardous waste remediation
projects; grants authorized pursuant to section 970-r of the general
municipal law; and, suballocation to other state departments and
agencies; and for other brownfield site cleanup hazardous waste
purposes (191313F7) (81096) ... 10,000,000 .......... (re. $331,000)
658 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Fund - Other ...... 237,464,000 186,925,000
---------------- ----------------
All Funds ........................ 237,464,000 186,925,000
================ ================
FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 9,982,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (06FM23MO)
(81107) ...................................... 9,982,000
LAW ENFORCEMENT (CCP) ....................................... 60,000,000
--------------
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Equitable Sharing-DSP - Justice Account - 32220
Program Improvement or Program Change Purpose
For moneys to the division of state police
for the justice department federal equita-
ble sharing agreement to be used for law
enforcement purposes distributed pursuant
to a plan prepared by superintendent of
the division of state police and approved
by the director of the budget.
Notwithstanding any provision of law to the
contrary, upon approval of the director of
the budget, the funding appropriated here-
in may be suballocated, interchanged, or
transferred and may be used for the
payment of prior year liabilities
(06JU2308) (50109) .......................... 30,000,000
Capital Projects Funds - Other
659 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2023-24
Miscellaneous Capital Projects Fund
Equitable Sharing-DSP - Treasury Account - 32221
Program Improvement or Program Change Purpose
For moneys to the division of state police
for the treasury department federal equi-
table sharing agreement to be used for law
enforcement purposes distributed pursuant
to a plan prepared by superintendent of
the division of state police and approved
by the director of the budget.
Notwithstanding any provision of law to the
contrary, upon approval of the director of
the budget, the funding appropriated here-
in may be suballocated, interchanged, or
transferred and may be used for the
payment of prior year liabilities
(06TR2308) (50111) .......................... 30,000,000
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) .... 55,482,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
Alterations and improvements for health and
safety including liabilities incurred
prior to April 1, 2023 (06HS2301) (81028) .... 2,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
Alterations and improvements for the preser-
vation of facilities and the replacement,
maintenance and repair of equipment and
equipment parts including liabilities
incurred prior to April 1, 2023 (06PF2303)
(81010) ..................................... 53,482,000
NEW FACILITIES (CCP) ....................................... 112,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
For services and expenses associated with
the design, construction and outfitting of
new stations and zone headquarters,
including, but not limited to the costs of
660 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2023-24
property acquisition, studies, appraisals,
surveys, preparations of plans, design,
construction, equipment and furnishings,
including liabilities incurred prior to
April 1, 2023 (06NF2307) (81009) ............ 12,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
State Police Forensic Laboratory
For services and expenses associated with
the design, construction, reconstruction
and outfitting of forensic laboratory
facilities, including, but not limited to
the costs of property acquisition,
studies, appraisals, surveys, preparations
of plans, design, construction, equipment
and furnishings, including liabilities
incurred prior to April 1, 2023 (06SL2307) . 100,000,000
661 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
IT INITIATIVE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2017:
For services and expenses related to the development of a records
management system. Funds appropriated herein may be suballocated to
the office of information technology services to achieve this
purpose. The division of criminal justice services, after consulta-
tion with the division of state police and the office of information
technology, shall submit a plan to the legislative leaders setting
forth the plan to develop such a records management system and
assessing any privacy and security implications, and no expenditures
may be made from this appropriation until the plan has been approved
by the legislative leaders (06SC1408) (51919) ......................
10,000,000 ....................................... (re. $10,000,000)
MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2022 (06HS2201) (81028) ...........
2,000,000 ......................................... (re. $1,606,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2021 (06HS2101) (81028) ...........
2,000,000 ........................................... (re. $993,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2020 (06HS2001) (81028) ...........
2,000,000 ......................................... (re. $1,474,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2019 (06HS1901) (81028) ...........
2,000,000 ......................................... (re. $1,897,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2018 (06HS1801) (81028) ...........
2,000,000 ......................................... (re. $1,946,000)
By chapter 54, section 1, of the laws of 2017:
662 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Alterations and improvements for health and safety including liabil-
ities incurred prior to April 1, 2017 (06HS1701) (81028) ...........
2,000,000 ......................................... (re. $1,444,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2022
(06PF2203) (81010) ... 46,635,000 ................ (re. $38,701,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2021
(06PF2103) (81010) ... 45,500,000 ................ (re. $28,153,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2020
(06PF2003) (81010) ... 45,500,000 ................ (re. $18,080,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2019
(06PF1903) (81010) ... 45,500,000 ................ (re. $14,961,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2018
(06PF1803) (81010) ... 40,500,000 ................. (re. $7,129,000)
By chapter 54, section 1, of the laws of 2017:
Alterations and improvements for the preservation of facilities and
the replacement, maintenance and repair of equipment and equipment
parts including liabilities incurred prior to April 1, 2017
(06PF1703) (81010) ... 35,500,000 ................. (re. $1,816,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvements Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
663 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2022
(06EV2208) (50121) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2021
(06EV2108) (50121) ... 6,000,000 .................. (re. $5,351,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2020
(06EV2008) (50121) ... 6,000,000 .................. (re. $5,833,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2019
(06EV1908) (50121) ... 6,000,000 .................. (re. $5,845,000)
By chapter 54, section 1, of the laws of 2018:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2018
(06EV1808) (50121) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses associated with the design, construction and
renovation of evidence storage facilities at troop headquarters,
including but not limited to the costs of studies, appraisals,
surveys, preparation of plans, design, construction, equipment, and
renovations including liabilities incurred prior to April 1, 2017
(06EV1708) (50121) ... 6,000,000 .................. (re. $4,819,000)
By chapter 55, section 1, of the laws of 2016:
For services and expenses associated with the design and construction
of evidence storage facilities at troop headquarters, including but
not limited to the costs of studies, appraisals, surveys, prepara-
tion of plans, design, construction, equipment, and renovations
including liabilities incurred prior to April 1, 2016 (06EV1608)
(50121) ... 6,000,000 ............................. (re. $5,756,000)
664 12554-05-3
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NEW FACILITIES (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
New Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses associated with the design, construction and
outfitting of new stations and zone headquarters, including, but not
limited to the costs of property acquisition, studies, appraisals,
surveys, preparations of plans, design, construction, equipment and
furnishings, including liabilities incurred prior to April 1, 2022
(06NF2207) (81009) ... 6,000,000 ................... (re. 6,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses associated with the design, construction and
outfitting of new stations and zone headquarters, including, but not
limited to the costs of property acquisition, studies, appraisals,
surveys, preparations of plans, design, construction, equipment and
furnishings, including liabilities incurred prior to April 1, 2021
(06NF2107) (81009) ... 6,000,000 .................. (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses associated with the design, construction and
outfitting of new stations and zone headquarters, including, but not
limited to the costs of property acquisition, studies, appraisals,
surveys, preparations of plans, design, construction, equipment and
furnishings, including liabilities incurred prior to April 1, 2020
(06NF2007) (81009) ... 6,000,000 .................. (re. $3,400,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses associated with the design, construction and
outfitting of new stations and zone headquarters, including, but not
limited to the costs of property acquisition, studies, appraisals,
surveys, preparations of plans, design, construction, equipment and
furnishings, including liabilities incurred prior to April 1, 2019
(06NF1907) (81009) ... 6,000,000 .................. (re. $3,721,000)
665 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,869,003,000 4,861,622,000
---------------- ----------------
All Funds ........................ 1,869,003,000 4,861,622,000
================ ================
FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................ 203,695,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Maintenance and Operations Purpose
For the maintenance and operation of various
facilities and systems including personal
services, fringe benefits and indirect
costs. Notwithstanding any other law to
the contrary, all or a portion of the
funds appropriated herein may be suballo-
cated or transferred to any department,
agency, or public authority (28FM23MO)
(81107) .................................... 203,695,000
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ............... 1,460,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For services and expenses related to alter-
ations and improvements to existing facil-
ities for capital maintenance, including
but not limited to capital design,
construction, reconstruction, rehabili-
tation, in-kind replacement of accessory
and support structures as well as equip-
ment; for in-kind replacement of buildings
and facilities upon demonstration, through
multi-factor benefit-cost analysis of
capital costs and life-cycle operating
costs comparing existing facility, reno-
vated facility, and new construction, that
replacement is more cost-effective and
energy-efficient than full renovation and
does not exceed existing square footage
666 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
except incidentally where necessary to
provide accessibility, mechanical effi-
ciency, or required accessory and minor
support structures; for health and safety,
preservation of facilities, program
improvement or program change, environ-
mental protection, energy conservation,
accreditation, facilities for the phys-
ically disabled, preventative maintenance
and related projects, including costs
incurred prior to April 1, 2023 and
subject to a plan developed and submitted
annually by the state university of New
York and approved by the director of the
budget, and which may include, but not be
limited to, projects in the following
schedule (28F12303) (45913) ................ 650,000,000
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................ 11,661
Alfred Ceramics
Campus-wide maintenance projects ................... 915
Alfred State
Campus-wide maintenance projects ................. 2,474
Binghamton
Campus-wide maintenance projects ................ 12,829
Brockport
Campus-wide maintenance projects ................. 5,591
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,947
Buffalo College
Campus-wide maintenance projects ................. 6,403
Buffalo University
Campus-wide maintenance projects ................ 23,721
Canton
Campus-wide maintenance projects ................. 2,026
Cobleskill
Campus-wide maintenance projects ................. 2,129
Cornell
Campus-wide maintenance projects ................ 10,332
Cortland
Campus-wide maintenance projects ................. 5,369
Delhi
Campus-wide maintenance projects ................. 2,071
Empire State
Campus-wide maintenance projects ................... 461
Environmental Science and Forestry
667 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
Campus-wide maintenance projects ................. 2,585
Farmingdale
Campus-wide maintenance projects ................. 6,409
Fredonia
Campus-wide maintenance projects ................. 3,729
Geneseo
Campus-wide maintenance projects ................. 3,732
Maritime
Campus-wide maintenance projects ................. 2,056
Morrisville
Campus-wide maintenance projects ................. 2,395
New Paltz
Campus-wide maintenance projects ................. 5,376
Old Westbury
Campus-wide maintenance projects ................. 3,287
Oneonta
Campus-wide maintenance projects ................. 4,496
Optometry
Campus-wide maintenance projects ..................1,060
Oswego
Campus-wide maintenance projects ................. 6,177
Plattsburgh
Campus-wide maintenance projects ................. 4,256
Potsdam
Campus-wide maintenance projects ................. 3,948
Purchase
Campus-wide maintenance projects ................. 6,266
State Univ Plaza
Campus-wide maintenance projects ................. 1,685
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 29,359
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,270
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,285
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or
capital improvement projects to support
the preservation of facilities ................. 468,700
--------------
Total .......................................... 650,000
--------------
For services and expenses related to alter-
ations and improvements to facilities and
capital maintenance for educational oppor-
tunity centers (28E02303) ................... 10,000,000
Capital Projects Funds - Other
668 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For services and expenses related to alter-
ations and improvements to various facili-
ties including but not limited to capital
design, construction, reconstruction,
rehabilitation, and equipment; for health
and safety, preservation of facilities,
program improvement or program change,
environmental protection, energy conserva-
tion, accreditation, facilities for the
physically disabled, preventative mainte-
nance and related projects, including
costs incurred prior to April 1, 2023 and
subject to a plan developed and submitted
annually by the state university of New
York and approved by the director of the
budget (28F22308) (45939) .................. 100,000,000
For additional services and expenses related
to alterations and improvements to various
facilities including but not limited to
capital design, construction, recon-
struction, rehabilitation, and equipment;
for health and safety, preservation of
facilities, program improvement or program
change, environmental protection, energy
conservation, accreditation, facilities
for the physically disabled, preventative
maintenance and related projects, includ-
ing costs incurred prior to April 1, 2023
and subject to a plan developed and
submitted annually by the state university
of New York and approved by the director
of the budget (28F32308) ................... 350,000,000
For services and expenses related to alter-
ations and improvements to research facil-
ities including but not limited to capital
design, construction, reconstruction,
rehabilitation, and equipment; for health
and safety, preservation of facilities,
program improvement or program change,
environmental protection, energy conserva-
tion, and accreditation, including costs
incurred prior to April 1, 2023 and
subject to a plan approved by the chancel-
lor of the state university of New York
and the director of the budget (28FL2308) .. 200,000,000
669 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
University at Buffalo
For university-wide projects ................... 100,000
Stony Brook University
For university-wide projects ................... 100,000
--------------
Total ........................................ 200,000
==============
For services and expenses of state universi-
ty of New York hospitals for alterations,
improvements, services and expenses, and
new facilities, including costs incurred
prior to April 1, 2023 subject to a plan
developed by the state university and
approved by the director of the budget
(28FI2303) (45921) ......................... 150,000,000
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Downstate University Hospital
For university-wide projects .................... 50,000
Stony Brook University Hospital ................... 50,000
For university-wide projects
Upstate University Hospital ....................... 50,000
For university-wide projects
--------------
Total ........................................ 150,000
==============
PROJECT ADMINISTRATION (CCP) ................................ 26,353,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
For payment to the state university
construction fund, for services and
expenses of the state university
construction fund including payments for
personal service, fringe benefits charges,
supplies and materials, contractual
services, equipment, travel expenses,
indirect costs and liabilities incurred
prior to April 1, 2023 (28SF2350) (45904) ... 26,353,000
670 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2023-24
STATE UNIVERSITY RESIDENCE HALL REHABILITATION FUND (CCP) ... 75,000,000
--------------
Capital Projects Funds - Other
SUNY Residence Halls Rehabilitation and Repair Fund
SUNY Residence Halls Rehabilitation and Repair Account -
30100
Preservation of Facilities Purpose
Alterations and improvements for residence
hall rehabilitation projects and for resi-
dence hall renovations including services
and expenses, to be financed by a transfer
from the debt service fund state universi-
ty dormitory income fund or other external
revenue sources subject to a plan devel-
oped by the state university and approved
by the director of the budget. Notwith-
standing any other law to the contrary,
all or a portion of the amounts hereby
appropriated may be transferred or subal-
located to the dormitory authority and/or
the state university of New York for such
purpose (28D32303) (45926) .................. 75,000,000
671 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 106,020,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
For services and expenses for the state
share of financial assistance to community
colleges for alterations and improvements
to various facilities, including service
contracts, memoranda of understanding,
capital design, construction, acquisition,
reconstruction, rehabilitation, equipment
and personal service costs; for health and
safety, preservation of facilities, tech-
nology upgrades, new facilities, program
improvements or program changes, environ-
mental protection, energy conservation,
accreditation, facilities for the phys-
ically disabled, and related projects,
including costs incurred prior to April 1,
2023, subject to a plan submitted by the
state university and approved by the
director of the budget. Notwithstanding
any other law to the contrary, all or a
portion of the amounts hereby appropriated
may be suballocated or transferred to the
state university construction fund or the
dormitory authority of the state of New
York for such purposes (28CC2308) (45931) .. 106,020,000
672 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
section 3, of the laws of 2016:
Advance for campus core component projects including services and
expenses for alterations and improvements to various facilities,
capital design including the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; underground utilities; acquisi-
tion of property and operation of parking facilities; construction,
reconstruction and rehabilitation; construction management and
supervision; appraisals, surveys, testing and environmental impact
statements; equipment costs; and the payment of liabilities incurred
prior to April 1, 1998 (28F898C1) (45914) ... ....................
947,326,000 ....................................... (re. $3,125,000)
Advance for campus technology/campus development component projects
including services and expenses for alterations and improvements to
various facilities, capital design including the cost of services
provided by private firms, including but not limited to the prepara-
tion of designs, plans, specifications and estimates; underground
utilities; acquisition of property; construction, reconstruction and
rehabilitation; construction management and supervision; appraisals,
surveys, testing and environmental impact statements; equipment
costs; including not more than $8,467,000 for design, construction
and development of a health and wellness center at Alfred Ceramics,
provided, however that any previous allocation from this appropri-
ation for the center for ceramic education at Alfred Ceramics shall
be deemed repealed and the payment of liabilities incurred prior to
April 1, 1998 (28F698C1) (45915) ... .............................
187,038,000 ....................................... (re. $2,175,000)
Advance for systemwide component projects including services and
expenses for alterations and improvements to various facilities,
capital design including the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; underground utilities; acquisi-
tion of property and operation of parking facilities; construction,
reconstruction and rehabilitation; construction management and
supervision; appraisals, surveys, testing and environmental impact
statements; equipment costs; and the payment of liabilities incurred
prior to April 1, 1998 (28F498C1) (45918) ... ....................
73,125,000 .......................................... (re. $244,000)
Advance for campus improvement/quality of life component projects
including services and expenses for alterations and improvements to
various facilities, capital design including the cost of services
provided by private firms, including but not limited to the prepara-
tion of designs, plans, specifications and estimates; underground
utilities; acquisition of property; construction, reconstruction and
673 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
rehabilitation; construction management and supervision; appraisals,
surveys, testing and environmental impact statements; equipment
costs for state university educational facility projects; and the
payment of liabilities incurred prior to April 1, 1998 (28F398C1)
(45919) ... ... 45,120,000 ........................ (re. $473,000)
Advance for the hospital facility program including services and
expenses for alterations and improvements to various facilities,
capital design including the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; underground utilities; acquisi-
tion of property and operation of parking facilities; construction,
reconstruction and rehabilitation; construction management and
supervision; appraisals, surveys, testing and environmental impact
statements; equipment costs; and the payment of liabilities incurred
prior to April 1, 1998 (28F198C1) (45920) ... ....................
75,000,000 .......................................... (re. $454,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2022 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F12203) (45913) ... 550,000,000 .............. (re. $547,315,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,849
Alfred Ceramics
Campus-wide maintenance projects ................... 776
Alfred State
Campus-wide maintenance projects ................. 2,113
Binghamton
Campus-wide maintenance projects ................ 10,559
Brockport
Campus-wide maintenance projects ................. 4,820
Brooklyn Health Science Center (HSC)
674 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 3,370
Buffalo College
Campus-wide maintenance projects ................. 5,649
Buffalo University
Campus-wide maintenance projects ................ 19,437
Canton
Campus-wide maintenance projects ................. 1,740
Cobleskill
Campus-wide maintenance projects ................. 1,813
Cornell
Campus-wide maintenance projects ................. 8,850
Cortland
Campus-wide maintenance projects ................. 4,529
Delhi
Campus-wide maintenance projects ................. 1,801
Empire State
Campus-wide maintenance projects ................... 369
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,200
Farmingdale
Campus-wide maintenance projects ................. 5,494
Fredonia
Campus-wide maintenance projects ................. 3,182
Geneseo
Campus-wide maintenance projects ................. 3,204
Maritime
Campus-wide maintenance projects ................. 1,796
Morrisville
Campus-wide maintenance projects ................. 2,076
New Paltz
Campus-wide maintenance projects ................. 4,584
Old Westbury
Campus-wide maintenance projects ................. 2,929
Oneonta
Campus-wide maintenance projects ................. 3,929
Optometry
Campus-wide maintenance projects ................... 900
Oswego
Campus-wide maintenance projects ................. 5,271
Plattsburgh
Campus-wide maintenance projects ................. 3,645
Potsdam
Campus-wide maintenance projects ................. 3,386
Purchase
Campus-wide maintenance projects ................. 5,343
State Univ Plaza
Campus-wide maintenance projects ................. 1,430
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 24,649
Syracuse Health Science Center (HSC)
675 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 2,616
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,091
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or
capital improvement projects to support
the preservation of facilities ................. 396,600
--------------
Total .......................................... 550,000
--------------
For services and expenses related to alterations and improvements to
facilities and capital maintenance for educational opportunity
centers (28E02203) ... 10,000,000 ................ (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2021 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F12103) (45913) ... 550,000,000 .............. (re. $496,515,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,632
Alfred Ceramics
Campus-wide maintenance projects ................... 798
Alfred State
Campus-wide maintenance projects ................. 2,157
Binghamton
Campus-wide maintenance projects ................ 10,522
Brockport
Campus-wide maintenance projects ................. 5,114
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,322
Buffalo College
Campus-wide maintenance projects ................. 5,777
Buffalo University
676 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................ 19,338
Canton
Campus-wide maintenance projects ................. 1,761
Cobleskill
Campus-wide maintenance projects ................. 1,866
Cornell
Campus-wide maintenance projects ................. 8,887
Cortland
Campus-wide maintenance projects ................. 4,554
Delhi
Campus-wide maintenance projects ................. 1,767
Empire State
Campus-wide maintenance projects ................... 458
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,281
Farmingdale
Campus-wide maintenance projects ................. 5,523
Fredonia
Campus-wide maintenance projects ................. 3,294
Geneseo
Campus-wide maintenance projects ................. 3,303
Maritime
Campus-wide maintenance projects ................. 1,819
Morrisville
Campus-wide maintenance projects ................. 2,123
New Paltz
Campus-wide maintenance projects ................. 4,608
Old Westbury
Campus-wide maintenance projects ................. 2,901
Oneonta
Campus-wide maintenance projects ................. 3,886
Optometry
Campus-wide maintenance projects ................... 906
Oswego
Campus-wide maintenance projects ................. 5,359
Plattsburgh
Campus-wide maintenance projects ................. 3,708
Potsdam
Campus-wide maintenance projects ................. 3,496
Purchase
Campus-wide maintenance projects ................. 5,194
State Univ Plaza
Campus-wide maintenance projects ................. 1,343
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 23,974
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 2,635
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,094
University-wide Alterations and Improvements
677 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Maintenance undistributed
For priority capital maintenance or
capital improvement projects to support
the preservation of facilities ............... 396,600
--------------
Total .......................................... 550,000
--------------
For services and expenses related to alterations and improvements to
facilities and capital maintenance for educational opportunity
centers (28E02103) (45936) ... 10,000,000 ........ (re. $10,000,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2020 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F12003) (45913) ... 550,000,000 .............. (re. $373,935,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,720
Alfred Ceramics
Campus-wide maintenance projects ................... 797
Alfred State
Campus-wide maintenance projects ................. 2,131
Binghamton
Campus-wide maintenance projects ................ 10,373
Brockport
Campus-wide maintenance projects ................. 5,217
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,262
Buffalo College
Campus-wide maintenance projects ................. 5,792
Buffalo University
Campus-wide maintenance projects ................ 19,125
Canton
Campus-wide maintenance projects ................. 1,781
Cobleskill
678 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 1,877
Cornell
Campus-wide maintenance projects ................. 8,829
Cortland
Campus-wide maintenance projects ................. 4,550
Delhi
Campus-wide maintenance projects ................. 1,793
Empire State
Campus-wide maintenance projects ................... 455
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,283
Farmingdale
Campus-wide maintenance projects ................. 5,403
Fredonia
Campus-wide maintenance projects ................. 3,326
Geneseo
Campus-wide maintenance projects ................. 3,339
Maritime
Campus-wide maintenance projects ................. 1,813
Morrisville
Campus-wide maintenance projects ................. 2,199
New Paltz
Campus-wide maintenance projects ................. 4,594
Old Westbury
Campus-wide maintenance projects ................. 2,941
Oneonta
Campus-wide maintenance projects ................. 3,878
Optometry
Campus-wide maintenance projects ................... 899
Oswego
Campus-wide maintenance projects ................. 5,413
Plattsburgh
Campus-wide maintenance projects ................. 3,799
Potsdam
Campus-wide maintenance projects ................. 3,549
Purchase
Campus-wide maintenance projects ................. 5,252
State Univ Plaza
Campus-wide maintenance projects ................. 1,354
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 23,948
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 2,627
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,081
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or
capital improvement projects to support the
preservation of facilities ................... 396,600
679 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
--------------
Total .......................................... 550,000
--------------
By chapter 54, section 1, of the laws of 2019:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2019 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F11903) (45913) ... 550,000,000 .............. (re. $191,936,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,744
Alfred Ceramics
Campus-wide maintenance projects ................... 806
Alfred State
Campus-wide maintenance projects ................. 2,174
Binghamton
Campus-wide maintenance projects ................ 10,268
Brockport
Campus-wide maintenance projects ................. 5,309
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 2,626
Buffalo College
Campus-wide maintenance projects ................. 6,162
Buffalo University
Campus-wide maintenance projects ................ 19,484
Canton
Campus-wide maintenance projects ................. 1,801
Cobleskill
Campus-wide maintenance projects ................. 1,878
Cornell
Campus-wide maintenance projects ................. 9,132
Cortland
Campus-wide maintenance projects ................. 4,606
Delhi
Campus-wide maintenance projects ................. 1,885
Empire State
680 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................... 400
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,324
Farmingdale
Campus-wide maintenance projects ................. 5,496
Fredonia
Campus-wide maintenance projects ................. 3,383
Geneseo
Campus-wide maintenance projects ................. 3,385
Maritime
Campus-wide maintenance projects ................. 1,893
Morrisville
Campus-wide maintenance projects ................. 2,250
New Paltz
Campus-wide maintenance projects ................. 4,731
Old Westbury
Campus-wide maintenance projects ................. 2,877
Oneonta
Campus-wide maintenance projects ................. 3,953
Optometry
Campus-wide maintenance projects ................... 927
Oswego
Campus-wide maintenance projects ................. 5,404
Plattsburgh
Campus-wide maintenance projects ................. 3,847
Potsdam
Campus-wide maintenance projects ................. 3,753
Purchase
Campus-wide maintenance projects ................. 5,042
State Univ Plaza
Campus-wide maintenance projects ................. 1,159
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 23,289
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 2,328
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,084
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or capi-
tal improvement projects to support the
preservation of facilities ..................... 396,600
--------------
Total .......................................... 550,000
==============
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2019 subject to a plan developed by the
681 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
state university and approved by the director of the budget
(28FI1903) (45921) ... 100,000,000 .............. (re. $100,000,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Upstate University Hospital ....................... 50,000
For university-wide projects
Stony Brook University Hospital ................... 50,000
For university-wide projects
--------------
Total ........................................ 100,000
==============
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2018 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F11803) (45913) ... 350,000,000 ............... (re. $47,195,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,685
Alfred Ceramics
Campus-wide maintenance projects ................... 857
Alfred State
Campus-wide maintenance projects ................. 2,358
Binghamton
Campus-wide maintenance projects ................ 10,762
Brockport
Campus-wide maintenance projects ................. 5,521
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,681
Buffalo College
Campus-wide maintenance projects ................. 6,476
Buffalo University
Campus-wide maintenance projects ................ 18,002
Canton
682 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 1,827
Cobleskill
Campus-wide maintenance projects ................. 1,927
Cornell
Campus-wide maintenance projects ................. 9,924
Cortland
Campus-wide maintenance projects ................. 4,799
Delhi
Campus-wide maintenance projects ................. 1,849
Empire State
Campus-wide maintenance projects ................... 411
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,423
Farmingdale
Campus-wide maintenance projects ................. 4,999
Fredonia
Campus-wide maintenance projects ................. 3,763
Geneseo
Campus-wide maintenance projects ................. 3,571
Maritime
Campus-wide maintenance projects ................. 1,809
Morrisville
Campus-wide maintenance projects ................. 2,316
New Paltz
Campus-wide maintenance projects ................. 4,898
Old Westbury
Campus-wide maintenance projects ................. 2,521
Oneonta
Campus-wide maintenance projects ................. 4,016
Optometry
Campus-wide maintenance projects ................... 901
Oswego
Campus-wide maintenance projects ................. 5,760
Plattsburgh
Campus-wide maintenance projects ................. 3,756
Potsdam
Campus-wide maintenance projects ................. 3,896
Purchase
Campus-wide maintenance projects ................. 4,183
State Univ Plaza
Campus-wide maintenance projects ................. 1,479
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 21,315
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 2,676
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,039
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or
683 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital improvement projects to support the
preservation of facilities ..................... 196,600
--------------
Total .......................................... 350,000
==============
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
tation, in-kind replacement of accessory and support structures as
well as equipment; for health and safety, preservation of facili-
ties, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2018 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28FU1803) (45930) ... 200,000,000 ............... (re. $33,297,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................ 12,627
Alfred Ceramics
Campus-wide maintenance projects ................. 1,117
Alfred State
Campus-wide maintenance projects ................. 3,074
Binghamton
Campus-wide maintenance projects ................ 14,031
Brockport
Campus-wide maintenance projects ................. 7,198
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 4,799
Buffalo College
Campus-wide maintenance projects ................. 8,441
Buffalo University
Campus-wide maintenance projects ................ 23,471
Canton
Campus-wide maintenance projects ................. 2,382
Cobleskill
Campus-wide maintenance projects ................. 2,512
Cornell
Campus-wide maintenance projects ................ 12,939
Cortland
Campus-wide maintenance projects ................. 6,257
Delhi
Campus-wide maintenance projects ................. 2,411
Empire State
684 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................... 536
Environmental Science and Forestry
Campus-wide maintenance projects ................. 3,159
Farmingdale
Campus-wide maintenance projects ................. 6,518
Fredonia
Campus-wide maintenance projects ................. 4,906
Geneseo
Campus-wide maintenance projects ................. 4,656
Maritime
Campus-wide maintenance projects ................. 2,359
Morrisville
Campus-wide maintenance projects ................. 3,020
New Paltz
Campus-wide maintenance projects ................. 6,386
Old Westbury
Campus-wide maintenance projects ................. 3,287
Oneonta
Campus-wide maintenance projects ................. 5,236
Optometry
Campus-wide maintenance projects ................. 1,175
Oswego
Campus-wide maintenance projects ................. 7,510
Plattsburgh
Campus-wide maintenance projects ................. 4,897
Potsdam
Campus-wide maintenance projects ................. 5,080
Purchase
Campus-wide maintenance projects ................. 5,454
State Univ Plaza
Campus-wide maintenance projects ................. 1,928
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 27,790
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,489
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,355
--------------
Total .......................................... 200,000
==============
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2018 subject to a plan developed by the
state university and approved by the director of the budget
(28FI1803) (45921) ... 100,000,000 ............... (re. $68,858,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
685 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Upstate University Hospital ....................... 50,000
For university-wide projects
Stony Brook University Hospital ................... 50,000
For university-wide projects
--------------
Total ........................................ 100,000
==============
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2018 subject to a plan developed by the
state university and approved by the director of the budget
(28FJ1803) (45934) ... 77,300,000 ................ (re. $62,331,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Upstate University Hospital ....................... 40,800
For university-wide projects
Stony Brook University Hospital ................... 36,500
For university-wide projects
--------------
Total ......................................... 77,300
==============
For services and expenses related to alterations and improvements to
facilities and capital maintenance for educational opportunity
centers (28E01803) (45936) ... 10,000,000 ......... (re. $9,361,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2022:
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2018 subject to a plan developed by the
state university and approved by the director of the budget.
Notwithstanding any provision of law to the contrary, the state
university construction fund is hereby authorized to transfer up to
$3,600,000 in state university capital funds from this appropriation
to the Health Science Center at Brooklyn Foundation, Inc. or other
appropriate corporation pursuant to an agreement for the transfer of
title of a property located at 329 Clarkson Avenue in Brooklyn, with
such transferred funds to be used exclusively for the purpose of
satisfying an existing mortgage on the property (28FK1803) (45935)
... 78,564,000 ................................... (re. $78,564,000)
By chapter 54, section 1, of the laws of 2017:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to capital design, construction, reconstruction, rehabili-
686 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation, and equipment; for health and safety, preservation of facil-
ities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, preventative maintenance and related projects,
including costs incurred prior to April 1, 2017 and subject to a
plan developed and submitted annually by the state university of New
York and approved by the director of the budget, and which may
include, but not be limited to, projects in the following schedule
(28F11703) (45913) ... 450,000,000 ............... (re. $53,969,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 9,447
Alfred Ceramics
Campus-wide maintenance projects ................... 843
Alfred State
Campus-wide maintenance projects ................. 2,283
Binghamton
Campus-wide maintenance projects ................ 10,604
Brockport
Campus-wide maintenance projects ................. 5,708
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,687
Buffalo College
Campus-wide maintenance projects ................. 6,594
Buffalo University
Campus-wide maintenance projects ................ 17,756
Canton
Campus-wide maintenance projects ................. 1,771
Cobleskill
Campus-wide maintenance projects ................. 1,979
Cornell
Campus-wide maintenance projects ................. 9,723
Cortland
Campus-wide maintenance projects ................. 4,691
Delhi
Campus-wide maintenance projects ................. 1,867
Empire State
Campus-wide maintenance projects ................... 405
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,452
Farmingdale
Campus-wide maintenance projects ................. 4,841
Fredonia
Campus-wide maintenance projects ................. 3,655
Geneseo
Campus-wide maintenance projects ................. 3,697
Maritime
687 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 1,813
Morrisville
Campus-wide maintenance projects ................. 2,310
New Paltz
Campus-wide maintenance projects ................. 4,664
Old Westbury
Campus-wide maintenance projects ................. 2,583
Oneonta
Campus-wide maintenance projects ................. 3,962
Optometry
Campus-wide maintenance projects ................... 895
Oswego
Campus-wide maintenance projects ................. 5,736
Plattsburgh
Campus-wide maintenance projects ................. 3,832
Potsdam
Campus-wide maintenance projects ................. 3,957
Purchase
Campus-wide maintenance projects ................. 4,289
State Univ Plaza
Campus-wide maintenance projects ................. 1,585
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 21,138
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,578
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,055
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or capi-
tal improvement projects to support the
preservation of facilities ................... 296,600
--------------
Total .......................................... 450,000
==============
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2017 and subject to a plan developed and submitted annually
by the state university of New York and approved by the director of
the budget, and which may include, but not be limited to, projects
in the following schedule (28F41703) (45930) .......................
100,000,000 ...................................... (re. $64,748,000)
688 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects ............................. 6,159
Alfred Ceramics
Campus-wide projects ............................... 550
Alfred State
Campus-wide projects ............................. 1,489
Binghamton
Campus-wide projects ............................. 6,912
Brockport
Campus-wide projects ............................. 3,721
Brooklyn Health Science Center (HSC)
Campus-wide projects ............................. 2,403
Buffalo College
Campus-wide projects ............................. 4,299
Buffalo University
Campus-wide projects ............................ 11,575
Canton
Campus-wide projects ............................. 1,155
Cobleskill
Campus-wide projects ............................. 1,290
Cornell
Campus-wide projects ............................. 6,338
Cortland
Campus-wide projects ............................. 3,058
Delhi
Campus-wide projects ............................. 1,217
Empire State
Campus-wide projects ............................... 264
Environmental Science and Forestry
Campus-wide projects ............................. 1,598
Farmingdale
Campus-wide projects ............................. 3,156
Fredonia
Campus-wide projects ............................. 2,383
Geneseo
Campus-wide projects ............................. 2,410
Maritime
Campus-wide projects ............................. 1,182
Morrisville
Campus-wide projects ............................. 1,506
New Paltz
Campus-wide projects ............................. 3,041
Old Westbury
Campus-wide projects ............................. 1,684
Oneonta
Campus-wide projects ............................. 2,583
Optometry
689 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide projects ............................... 584
Oswego
Campus-wide projects ............................. 3,739
Plattsburgh
Campus-wide projects ............................. 2,498
Potsdam
Campus-wide projects ............................. 2,580
Purchase
Campus-wide projects ............................. 2,796
State Univ Plaza
Campus-wide projects ............................. 1,029
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide projects ............................ 13,780
Syracuse Health Science Center (HSC)
Campus-wide projects ............................. 2,333
SUNY Polytechnic
Campus-wide projects ............................... 688
--------------
Total .......................................... 100,000
==============
By chapter 55, section 1, of the laws of 2016, as amended by chapter 53,
section 3, of the laws of 2016:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to services and expenses, service agreements or service
contracts and memoranda of understanding; for capital design includ-
ing the cost of services provided by private firms, including prepa-
ration of designs, plans, specifications and estimates; facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 88, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2016 subject to
a plan developed by the state university of New York and approved by
the director of the budget (28F11603) (45913) ......................
200,000,000 ....................................... (re. $4,945,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
690 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 9,500
Alfred Ceramics
Campus-wide maintenance projects ................... 800
Alfred State
Campus-wide maintenance projects ................. 2,300
Binghamton
Campus-wide maintenance projects ................ 10,600
Brockport
Campus-wide maintenance projects ................. 5,700
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,700
Buffalo College
Campus-wide maintenance projects ................. 6,700
Buffalo University
Campus-wide maintenance projects ................ 17,300
Canton
Campus-wide maintenance projects ................. 1,800
Cobleskill
Campus-wide maintenance projects ................. 2,100
Cornell
Campus-wide maintenance projects ................. 9,600
Cortland
Campus-wide maintenance projects ................. 4,700
Delhi
Campus-wide maintenance projects ................. 1,900
Empire State
Campus-wide maintenance projects ................... 400
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,500
Farmingdale
Campus-wide maintenance projects ................. 4,800
Fredonia
Campus-wide maintenance projects ................. 3,800
Geneseo
Campus-wide maintenance projects ................. 3,700
Maritime
Campus-wide maintenance projects ................. 1,800
Morrisville
Campus-wide maintenance projects ................. 2,200
New Paltz
Campus-wide maintenance projects ................. 4,700
Old Westbury
Campus-wide maintenance projects ................. 2,400
Oneonta
Campus-wide maintenance projects ................. 4,100
Optometry
Campus-wide maintenance projects ................... 900
Oswego
Campus-wide maintenance projects ................. 6,100
Plattsburgh
691 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 3,900
Potsdam
Campus-wide maintenance projects ................. 4,000
Purchase
Campus-wide maintenance projects ................. 4,300
State Univ Plaza
Campus-wide maintenance projects ................. 1,600
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................ 21,000
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,500
SUNY Polytechnic
Campus-wide maintenance projects ................. 1,000
University-wide Alterations and Improvements
Maintenance undistributed
For university-wide capital maintenance or
capital improvement costs, including
costs attributable to executive order
88; ADA and code compliance claims;
environmental hazards; emergencies
health and safety, and energy conserva-
tion needs, asbestos and PCB remedi-
ation; fire alarms and sprinklers; elec-
trical, mechanical, plumbing and heating
and cooling system requirements and
other similar university-wide needs .......... 16,600
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or capi-
tal improvement projects to support the
preservation of facilities .................... 30,000
--------------
Total .......................................... 200,000
==============
For additional services and expenses related to alterations and
improvements to existing facilities for capital maintenance, includ-
ing but not limited to services and expenses, service agreements or
service contracts and memoranda of understanding; for capital design
including the cost of services provided by private firms, including
preparation of designs, plans, specifications and estimates; facili-
ty reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 88, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
692 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2016 subject to
a plan developed by the state university of New York and approved by
the director of the budget (28F21603) (45932) ......................
60,000,000 ........................................ (re. $3,197,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................. 2,800
Alfred Ceramics
Campus-wide maintenance projects ................... 200
Alfred State
Campus-wide maintenance projects ................... 700
Binghamton
Campus-wide maintenance projects ................. 3,100
Brockport
Campus-wide maintenance projects ................. 1,700
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 1,100
Buffalo College
Campus-wide maintenance projects ................. 2,000
Buffalo University
Campus-wide maintenance projects ................. 5,100
Canton
Campus-wide maintenance projects ................... 500
Cobleskill
Campus-wide maintenance projects ................... 600
Cornell
Campus-wide maintenance projects ................. 2,800
Cortland
Campus-wide maintenance projects ................. 1,400
Delhi
Campus-wide maintenance projects ................... 600
Empire State
Campus-wide maintenance projects ................... 100
Environmental Science and Forestry
Campus-wide maintenance projects ................... 700
Farmingdale
Campus-wide maintenance projects ................. 1,400
Fredonia
Campus-wide maintenance projects ................. 1,100
Geneseo
Campus-wide maintenance projects ................. 1,100
Maritime
Campus-wide maintenance projects ................... 500
Morrisville
693 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................... 700
New Paltz
Campus-wide maintenance projects ................. 1,400
Old Westbury
Campus-wide maintenance projects ................... 700
Oneonta
Campus-wide maintenance projects ................. 1,200
Optometry
Campus-wide maintenance projects ................... 300
Oswego
Campus-wide maintenance projects ................. 1,800
Plattsburgh
Campus-wide maintenance projects ................. 1,200
Potsdam
Campus-wide maintenance projects ................. 1,200
Purchase
Campus-wide maintenance projects ................. 1,300
State Univ Plaza
Campus-wide maintenance projects ................... 500
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide maintenance projects ................. 6,200
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 1,000
SUNY Polytechnic
Campus-wide maintenance projects ................... 300
University-wide Alterations and Improvements
Maintenance undistributed
For university-wide capital maintenance or
capital improvement costs, including
costs attributable to executive order
88; ADA and code compliance claims;
environmental hazards; emergencies
health and safety, and energy conserva-
tion needs, asbestos and PCB remedi-
ation; fire alarms and sprinklers; elec-
trical, mechanical, plumbing and heating
and cooling system requirements and
other similar university-wide needs ............ 5,700
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or capi-
tal improvement projects to support the
preservation of facilities ....................... 9,000
--------------
Total ........................................... 60,000
==============
By chapter 55, section 1, of the laws of 2016, as amended by chapter 73,
section 1 of part M, of the laws of 2016:
694 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For additional services and expenses related to alterations and
improvements to various facilities for capital projects, including
but not limited to services and expenses, service agreements or
service contracts and memoranda of understanding; for capital design
including the cost of services provided by private firms, including
preparation of designs, plans, specifications and estimates; for
property acquisition, facility construction, reconstruction, reha-
bilitation, equipment; for health and safety improvements and
upgrades to preserve or enhance facility functioning; for program
improvements or program change; to support improvements in technolo-
gy, research, environmental protection, energy and resource conser-
vation, and accreditation; to finance costs attributable to execu-
tive order 88, ADA and code compliance needs, claims, emergencies
and remediation of environmental hazards; to ensure the functionali-
ty of major building systems such as fire alarms and sprinklers,
electrical, mechanical, plumbing, heating/cooling systems and
supporting infrastructure, including underground utilities; and to
provide for facilities for the disabled and related projects includ-
ing costs incurred prior to April 1, 2016 subject to a plan devel-
oped by the state university of New York and approved by the direc-
tor of the budget (28F31603) (45933) ...............................
30,000,000 ........................................ (re. $5,611,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects ............................. 1,400
Alfred Ceramics
Campus-wide projects ............................... 100
Alfred State
Campus-wide projects ............................... 350
Binghamton
Campus-wide projects ............................. 1,550
Brockport
Campus-wide projects ............................... 850
Brooklyn Health Science Center (HSC)
Campus-wide projects ............................... 550
Buffalo College
Campus-wide projects ............................. 1,000
Buffalo University
Campus-wide projects ............................. 2,550
Canton
Campus-wide projects ............................... 250
Cobleskill
Campus-wide projects ............................... 300
Cornell
Campus-wide projects ............................. 1,400
Cortland
695 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide projects ............................... 700
Delhi
Campus-wide projects ............................... 300
Empire State
Campus-wide projects ................................ 50
Environmental Science and Forestry
Campus-wide projects ............................... 350
Farmingdale
Campus-wide projects ............................... 700
Fredonia
Campus-wide projects ............................... 550
Geneseo
Campus-wide projects ............................... 550
Maritime
Campus-wide projects ............................... 250
Morrisville
Campus-wide projects ............................... 350
New Paltz
Campus-wide projects ............................... 700
Old Westbury
Campus-wide projects ............................... 350
Oneonta
Campus-wide projects ............................... 600
Optometry
Campus-wide projects ............................... 150
Oswego
Campus-wide projects ............................... 900
Plattsburgh
Campus-wide projects ............................... 600
Potsdam
Campus-wide projects ............................... 600
Purchase
Campus-wide projects ............................... 650
State Univ Plaza
Campus-wide projects ............................... 250
Stony Brook, incl Health Science Center
(HSC) and Long Island State Veterans Home:
Campus-wide projects ............................. 3,100
Syracuse Health Science Center (HSC)
Campus-wide projects ............................... 500
SUNY Polytechnic
Campus-wide projects ............................... 150
University-wide Alterations and Improvements
Maintenance undistributed
For university-wide capital project costs,
including costs attributable to executive
order 88; ADA and code compliance claims;
environmental hazards; emergencies health
and safety, and energy conservation needs,
asbestos and PCB remediation; fire alarms
and sprinklers; electrical, mechanical,
696 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
plumbing and heating and cooling system
requirements and other university-wide
needs ............................................ 2,850
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital projects ...................... 4,500
--------------
Total ........................................... 30,000
==============
By chapter 54, section 1, of the laws of 2015:
For services and expenses related to alterations and improvements to
existing facilities for capital maintenance, including but not
limited to services and expenses, service agreements or service
contracts and memoranda of understanding; for capital design includ-
ing the cost of services provided by private firms, including prepa-
ration of designs, plans, specifications and estimates; facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 88, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2015 subject to
a plan developed by the state university of New York and approved by
the director of the budget (28F11503) (45913) ......................
200,000,000 ....................................... (re. $7,561,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide maintenance projects ................ 10,412
Alfred Ceramics
Campus-wide maintenance projects ................... 897
Alfred State
Campus-wide maintenance projects ................. 2,411
Binghamton
Campus-wide maintenance projects ................ 11,026
Brockport
Campus-wide maintenance projects ................. 6,054
Brooklyn Health Science Center (HSC)
Campus-wide maintenance projects ................. 4,007
Buffalo College
697 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 7,305
Buffalo University
Campus-wide maintenance projects ................ 18,271
Canton
Campus-wide maintenance projects ................. 1,949
Cobleskill
Campus-wide maintenance projects ................. 2,156
Cornell
Campus-wide maintenance projects ................ 10,294
Cortland
Campus-wide maintenance projects ................. 5,182
Delhi
Campus-wide maintenance projects ................. 1,938
Empire State
Campus-wide maintenance projects ................... 396
Environmental Science and Forestry
Campus-wide maintenance projects ................. 2,694
Farmingdale
Campus-wide maintenance projects ................. 5,038
Fredonia
Campus-wide maintenance projects ................. 4,064
Geneseo
Campus-wide maintenance projects ................. 3,988
Maritime
Campus-wide maintenance projects ................. 1,916
Morrisville
Campus-wide maintenance projects ................. 2,416
New Paltz
Campus-wide maintenance projects ................. 4,924
Old Westbury
Campus-wide maintenance projects ................. 2,774
Oneonta
Campus-wide maintenance projects ................. 4,474
Optometry
Campus-wide maintenance projects ................... 974
Oswego
Campus-wide maintenance projects ................. 6,651
Plattsburgh
Campus-wide maintenance projects ................. 4,101
Potsdam
Campus-wide maintenance projects ................. 4,228
Purchase
Campus-wide maintenance projects ................. 4,367
State Univ Plaza
Campus-wide maintenance projects ................. 1,683
Stony Brook, incl Health Science Center (HSC)
Campus-wide maintenance projects ................ 22,223
Syracuse Health Science Center (HSC)
Campus-wide maintenance projects ................. 3,627
SUNY Polytechnic
698 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide maintenance projects ................. 1,060
University-wide Alterations and Improvements
Maintenance undistributed
For university-wide capital maintenance or
capital improvement costs, including
costs attributable to executive order
88; ADA and code compliance claims;
environmental hazards; emergencies
health and safety, and energy conserva-
tion needs, asbestos and PCB remedi-
ation; fire alarms and sprinklers; elec-
trical, mechanical, plumbing and heating
and cooling system requirements and
other similar university-wide needs ........... 16,500
University-wide Alterations and Improvements
Maintenance undistributed
For priority capital maintenance or
capital improvement projects to support the
preservation of facilities .................... 20,000
--------------
Total .......................................... 200,000
==============
For services and expenses for alterations and improvements to existing
facilities for capital maintenance, at Stony Brook, including the
health science center (HSC), including but not limited to service
agreements or service contracts and memoranda of understanding; for
capital design including the cost of services provided by private
firms, including preparation of designs, plans, specifications and
estimates; facility reconstruction, rehabilitation, equipment; for
health and safety improvements and upgrades to preserve or enhance
facility functioning; for program improvements or program change; to
support improvements in technology, research, environmental
protection, energy and resource conservation, and accreditation; to
finance costs attributable to executive order 88, ADA and code
compliance needs, claims, emergencies and remediation of environ-
mental hazards; to ensure the functionality of major building
systems such as fire alarms and sprinklers, electrical, mechanical,
plumbing, heating/cooling systems and supporting infrastructure,
including underground utilities; and to provide for facilities for
the disabled and related projects including costs incurred prior to
April 1, 2015 (28F21503) (45929) ... 19,000,000 ..... (re. $148,000)
By chapter 54, section 1, of the laws of 2014:
Advances for alterations and improvements to existing facilities for
capital critical maintenance, including but not limited to services
and expenses, service agreements or service contracts and memoranda
of understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; facility reconstruction, rehabili-
tation, equipment; for health and safety improvements and upgrades
699 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to preserve or enhance facility functioning; for program improve-
ments or program change; to support improvements in technology,
research, environmental protection, energy and resource conserva-
tion, and accreditation; to finance costs attributable to executive
order 88, ADA and code compliance needs, claims, emergencies and
remediation of environmental hazards; to ensure the functionality of
major building systems such as fire alarms and sprinklers, elec-
trical, mechanical, plumbing, heating/cooling systems and supporting
infrastructure, including underground utilities; and to provide for
facilities for the disabled and related projects including costs
incurred prior to April 1, 2014 subject to a plan developed by the
state university and approved by the director of the budget
(28F11403) (45913) ... 402,000,000 ............... (re. $12,749,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide critical maintenance projects ....... 28,595
Alfred Ceramics
Campus-wide critical maintenance projects ........ 2,520
Alfred State
Campus-wide critical maintenance projects ........ 6,753
Binghamton
Campus-wide critical maintenance projects ....... 30,196
Brockport
Campus-wide critical maintenance projects ....... 17,755
Brooklyn Health Science Center (HSC)
Campus-wide critical maintenance projects ....... 11,273
Buffalo College
Campus-wide critical maintenance projects ....... 21,376
Buffalo University
Campus-wide critical maintenance projects ....... 61,150
Canton
Campus-wide critical maintenance projects ........ 5,818
Cobleskill
Campus-wide critical maintenance projects ........ 6,178
Cornell
Campus-wide critical maintenance projects ....... 29,967
Cortland
Campus-wide critical maintenance projects ....... 14,771
Delhi
Campus-wide critical maintenance projects ........ 6,083
Empire State
Campus-wide critical maintenance projects ........ 1,183
Environmental Science and Forestry
Campus-wide critical maintenance projects ........ 7,492
Farmingdale
Campus-wide critical maintenance projects ....... 14,524
Fredonia
700 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide critical maintenance projects ....... 12,161
Geneseo
Campus-wide critical maintenance projects ....... 12,120
Maritime
Campus-wide critical maintenance projects ........ 5,486
Morrisville
Campus-wide critical maintenance projects ........ 7,336
New Paltz
Campus-wide critical maintenance projects ....... 14,827
Old Westbury
Campus-wide critical maintenance projects ........ 9,465
Oneonta
Campus-wide critical maintenance projects ....... 12,784
Optometry
Campus-wide critical maintenance projects ........ 2,693
Oswego
Campus-wide critical maintenance projects ....... 18,628
Plattsburgh
Campus-wide critical maintenance projects ....... 12,173
Potsdam
Campus-wide critical maintenance projects ....... 12,132
Purchase
Campus-wide critical maintenance projects ....... 15,913
State Univ Plaza
Campus-wide critical maintenance projects ........ 4,400
Stony Brook, incl Health Science Center (HSC)
Campus-wide critical maintenance projects ....... 64,659
Syracuse Health Science Center (HSC)
Campus-wide critical maintenance projects ........ 9,996
Utica-Rome
Campus-wide critical maintenance projects ........ 3,093
University-wide Alterations and Improvements
Maintenance undistributed
For university-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to execu-
tive order 88; ADA and code compliance
claims; environmental hazards; emergen-
cies health and safety, and energy
conservation needs, asbestos and PCB
remediation; fire alarms and sprinklers;
electrical, mechanical, plumbing and
heating and cooling system requirements
and other similar university-wide needs ....... 16,500
Less an amount to be allocated by the
board of trustees ........................... (98,000)
--------------
Total .......................................... 402,000
==============
701 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Advances for alterations and improvements to various facilities
including services and expenses, service contracts, memoranda of
understanding, capital design, construction, acquisition, recon-
struction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, technology, environment protection, energy conserva-
tion, accreditation, facilities for the physically disabled, and
related projects, including costs incurred prior to April 1, 2014,
subject to an annual plan developed by the state university of New
York and approved by the director of the budget (28F31403) (45905)
... 82,000,000 ................................... (re. $10,269,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Morrisville
Campus-wide Electrical Feeders and
Distribution ................................... 3,000
Oneonta
Campus Welcome Center ............................ 5,000
Milne Library Reconstruction ..................... 8,000
Potsdam
Child Care Center ................................ 6,000
Stony Brook, incl Health Science Center (HSC)
Mezzanine ....................................... 60,000
--------------
Total ........................................... 82,000
==============
Advances for alterations and improvements to existing facilities for
capital critical maintenance, including but not limited to services
and expenses, service agreements or service contracts and memoranda
of understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; facility reconstruction, rehabili-
tation, equipment; for health and safety improvements and upgrades
to preserve or enhance facility functioning; for program improve-
ments or program change; to support improvements in technology,
research, environmental protection, energy and resource conserva-
tion, and accreditation; to finance costs attributable to executive
order 88, ADA and code compliance needs, claims, emergencies and
remediation of environmental hazards; to ensure the functionality of
major building systems such as fire alarms and sprinklers, elec-
trical, mechanical, plumbing, heating/cooling systems and supporting
infrastructure, including underground utilities; and to provide for
facilities for the disabled and related projects including costs
incurred prior to April 1, 2014 subject to a plan developed by the
state university and approved by the director of the budget
(28F21403) (45929) ... 19,000,000 ................... (re. $514,000)
702 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Stony Brook, incl Health Science Center
(HSC) Campus-wide projects, including
facility rehabilitation and research lab
renovations ..................................... 19,000
Notwithstanding any provision of law this appropriation shall be allo-
cated only pursuant to a plan setting forth an itemized list of
projects with the amount to be received by each, or the methodology
for allocating such appropriation. Such plan shall be subject to the
approval of the temporary president of the senate and the director
of the budget and thereafter shall be included in a resolution call-
ing for the expenditure of such monies, which resolution must be
approved by a majority vote of all members elected to the senate
upon a roll call vote (28F41403) (45906) ...........................
49,000,000 ........................................ (re. $4,311,000)
By chapter 54, section 1, of the laws of 2013:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2013 subject to
a plan developed by the state university and approved by the direc-
tor of the budget (28F21303) (45913) ...............................
60,000,000 .......................................... (re. $884,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Stony Brook, incl Health Science Center
(HSC) Campus-wide projects, including
improvements to the Campus Electrical
Distribution System ............................. 60,000
703 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2012:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2012 subject to
a plan developed by the state university and approved by the direc-
tor of the budget. Notwithstanding any provision of law, rule or
regulation to the contrary, amounts designated as university-wide,
may be made available for projects identified and approved by the
governor and the chancellor of the state university of New York
pursuant to the NY-SUNY 2020 challenge grant program (28F11203)
(45913) ... 550,000,000 ........................... (re. $5,158,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects, including Fire Alarm
Upgrades to Downtown Campus ..................... 32,477
Alfred Ceramics
Campus-wide projects, including Satellite
Boilers .......................................... 2,836
Alfred State
Campus-wide projects, including Rehabili-
tation of Campus Quad for ADA Compliance
and Hinkle Library ............................... 7,799
Binghamton
Campus-wide projects, including Rehabili-
tation of University Union North Phase II ....... 31,360
Brockport
Campus-wide projects, including Rehabili-
tation of Exterior Decks & Plaza ................ 19,430
Brooklyn Health Science Center (HSC)
Campus-wide projects, including New Utili-
ty Chases - BSB ................................. 12,699
Buffalo College
704 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide projects, including Renovation
of Underground Utilities ........................ 24,305
Buffalo University
Campus-wide projects, including ADA
Improvements .................................... 65,903
Canton
Campus-wide projects, including Rehabili-
tation of Mechanical/Electrical/Plumbing ......... 5,830
Cobleskill
Campus-wide projects, including Renovate
Old Gym for Business School ...................... 7,001
Cornell
Campus-wide projects, including Energy
Conservation-Multiple Buildings ................. 32,862
Cortland
Campus-wide projects, including Replace-
ment of Neubig Roof ............................. 16,417
Delhi
Campus-wide projects, including Site Util-
ities Study & Site Infrastructure Improve-
ments ............................................ 6,351
Empire State
Campus-wide projects, including Rehab of
Elevators in Union Facility ...................... 1,168
Environmental Science and Forestry
Campus-wide projects, including Site
Improvements, Phase II ........................... 8,328
Farmingdale
Campus-wide projects, including Nold Hall
Generator ....................................... 15,243
Fredonia
Campus-wide projects, including Rehabili-
tation and Elevator Upgrades .................... 13,382
Geneseo
Campus-wide projects, including Sidewalk &
Drainage Improvements, Phase A .................. 13,769
Maritime
Campus-wide projects, including Replace
Exterior Doors in Various Buildings .............. 6,363
Morrisville
Campus-wide projects, including Renovate
Charlton Hall, Phase I ........................... 8,229
New Paltz
Campus-wide projects, including Upgrade
Electrical Distribution ......................... 16,680
Old Westbury
Campus-wide projects, including Repave
Access and Ring Road ............................. 9,513
Oneonta
Campus-wide projects, including Upgrade
705 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tele Communication and Data Systems ............. 13,896
Optometry
Campus-wide projects, Bathroom Renovations ....... 3,103
Oswego
Campus-wide projects, including Rehabili-
tation of Roadways and Walkways ................. 21,032
Plattsburgh
Campus-wide projects, including Replace
Insulation on High Temperature Water Heat-
ers in Various Buildings ........................ 13,676
Potsdam
Campus-wide projects, including Masonry
Restoration to Various Buildings ................ 13,850
Purchase
Campus-wide projects, including Rehabili-
tation of Exterior of Academic Buildings ........ 18,360
State Univ Plaza
Campus-wide projects, including General
Infrastructure and Space Rehabilitation .......... 4,384
Stony Brook, incl Health Science Center (HSC)
Campus-wide projects, including Replace-
ment of Electrical Feeders ...................... 74,524
Syracuse Health Science Center (HSC)
Campus-wide projects, including Upgrade
Steam Plant ...................................... 9,607
Utica-Rome
Campus-wide projects, including South
Plaza Rehabilitation-Campus Center ............... 3,123
University-wide Alterations and Improvements
Maintenance Undistributed
For university-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to executive
order 111; ADA and code compliance claims;
environmental hazards; emergencies health
and safety, and energy conservation needs,
asbestos and PCB remediation; fire alarms
and sprinklers; electrical, mechanical,
plumbing and heating and cooling system
requirements and other similar universi-
ty-wide needs ................................... 16,500
Total .......................................... 550,000
==============
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2012:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
706 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such as fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2011 subject to
a plan developed by the state university and approved by the direc-
tor of the budget. Notwithstanding any provision of law, rule or
regulation to the contrary, amounts designated as university-wide,
may be made available for projects identified and approved by the
governor and the chancellor of the state university of New York
pursuant to the NY-SUNY 2020 challenge grant program (28F11103)
(45913) ... 550,000,000 ........................... (re. $7,078,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects, including
Rehabilitation/Preservation of Podium
Structures ...................................... 32,830
Alfred Ceramics
Campus-wide projects, including McMahon
Hall-Replace Windows ............................. 2,776
Alfred State
Campus-wide projects, including Adminis-
tration Building ADA Improvements ................ 7,503
Binghamton
Campus-wide projects, including Exterior
Building Reconstruction ......................... 31,269
Brockport
Campus-wide projects, including Exterior
ADA Improvements ................................ 18,806
Brooklyn Health Science Center (HSC)
Campus-wide projects, including Basic
Science Building-Additional Vertical Util-
ity Chases ...................................... 12,738
Buffalo College
Campus-wide projects, including ADA
Improvements .................................... 24,779
Buffalo University
Campus-wide projects, including Hayes Hall
707 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Renovation ...................................... 65,913
Canton
Campus-wide projects, including Reno-
vations to Chaney Dining Center .................. 5,612
Cobleskill
Campus-wide projects, including Renovate
Home Economics-Old Quad Building ................. 7,163
Cornell
Campus-wide projects, including Renovate
Ken Post Greenhouse Loop Steam Distrib-
ution ........................................... 32,058
Cortland
Campus-wide projects, including Art & Art
History Dept. Safety Upgrades ................... 16,418
Delhi
Campus-wide projects, including Road and
Sidewalk Improvements ............................ 6,269
Empire State
Campus-wide projects, including Security
System Upgrades .................................. 1,301
Environmental Science and Forestry
Campus-wide projects, including Illick
Hall Interior Rehab .............................. 8,355
Farmingdale
Campus-wide projects, including Rehab
Campus Walkways and Plazas ...................... 15,542
Fredonia
Campus-wide projects, including Rockefel-
ler Arts Center Roof and Exterior Rehab ......... 13,234
Geneseo
Campus-wide projects, including Security
Upgrades/Card Access Installation ............... 13,885
Maritime
Campus-wide projects, including Replace
Roof-Heritage Hall ............................... 6,268
Morrisville
Campus-wide projects, including Renovate
Bailey Hall ...................................... 8,162
New Paltz
Campus-wide projects, including Renovate
Elting Gymnasium ................................ 16,991
Old Westbury
Campus-wide projects, including Rehab
Campus Center Envelope Bldgs 51 & 56 ............. 9,147
Oneonta
Campus-wide projects, including Rehab
Physical Education Building ..................... 13,805
Optometry
Campus-wide projects, including Rehab
Office Areas ..................................... 3,108
Oswego
708 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide projects, including Rehab
Lanigan Hall Ph. II ............................. 20,826
Plattsburgh
Campus-wide projects, including Field
House Mechanical Rehab .......................... 13,877
Potsdam
Campus-wide projects, including Rebuild
Exterior Plazas ................................. 13,752
Purchase
Campus-wide projects, including Masonry
Repairs-Natural Science Building ................ 18,572
State Univ Plaza
Campus-wide projects, including Plaza Bldg
Boiler Replacement ............................... 4,595
Stony Brook, incl Health Science Center (HSC)
Campus-wide projects, including Rehab
Mechanical Systems-Various Bldgs ................ 74,679
Syracuse Health Science Center (HSC)
Campus-wide projects, including Abate/
Renovate Academic Labs-6 South Univ Hospi-
tal ............................................. 10,092
Utica-Rome
Campus-wide projects, including Upgrade
Parking/Landscape-Student Cntr/Field House ....... 3,175
University-wide Alterations and Improvements
Maintenance Undistributed
For university-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to executive
order 111; ADA and code compliance claims;
environmental hazards; emergencies health
and safety, and energy conservation needs,
asbestos and PCB remediation; fire alarms
and sprinklers; electrical, mechanical,
plumbing and heating and cooling system
requirements and other similar university-
wide needs ...................................... 16,500
--------------
Total .......................................... 550,000
==============
By chapter 53, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2012:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
709 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such a fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2010 subject to
a plan developed by the state university and approved by the direc-
tor of the budget. Notwithstanding any provision of law, rule or
regulation to the contrary, amounts designated as university-wide,
may be made available for projects identified and approved by the
governor and the chancellor of the state university of New York
pursuant to the NY-SUNY 2020 challenge grant program (28F11003)
(45913) ... 550,000,000 ........................... (re. $6,700,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects, including Renovate
University Library ............................ 33,006
Alfred Ceramics
Campus-wide projects, including Binns
Merrill Hall-Structural Upgrades ............... 2,736
Alfred State
Campus-wide projects, including Replace
Roof-Orvis Gym ................................. 7,293
Binghamton
Campus-wide projects, including Replace
Electrical Systems-Various Bldgs .............. 31,910
Brockport
Campus-wide projects, including Replace
Roofs-Various Bldgs, Ph I ..................... 19,150
Brooklyn Health Science Center (HSC)
Campus-wide projects, including Replace
Windows-Basic Sci Bldg, Ph I .................. 12,683
Buffalo College
Campus-wide projects, including Modify/
Replace Storm Sewer Syst Components ........... 24,433
Buffalo University
Campus-wide projects, including Site
Lighting Renewal, North Campus, Ph I .......... 66,230
Canton
Campus-wide projects, including Reno-
vations to Chaney Dining Center ................ 5,401
Cobleskill
Campus-wide projects, including Rehab
710 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Locker Rooms-Bldg. 14A ......................... 7,150
Cornell
Campus-wide projects, including Martha Van
Rensselaer & E. Wing Renovation-Ph, IB ........ 32,212
Cortland
Campus-wide projects, including Art & Art
History Dept. Safety Upgrades ................. 16,476
Delhi
Campus-wide projects, including Interior
Upgrades-Alumni Hall ............................. 6,137
Empire State
Campus-wide projects, including Security
System Upgrades ................................ 1,108
Environmental Science and Forestry
Campus-wide projects, including Illick
Hall Interior Rehab ............................ 8,371
Farmingdale
Campus-wide projects, including Replace
Site Lighting-Various Locations ............... 15,278
Fredonia
Campus-wide projects, including Upgrade UG
Electrical Distribution, Study & Ph I ......... 13,390
Geneseo
Campus-wide projects, including Letchworth
Dining Hall Renovations ....................... 13,757
Maritime
Campus-wide projects, including HVAC Rehab
Ph I-Marvin & Tode ............................. 6,093
Morrisville
Campus-wide projects, including Renovate
Bailey Hall .................................... 8,367
New Paltz
Campus-wide projects, including Site Reno-
vation-Ph II .................................. 16,664
Old Westbury
Campus-wide projects, including Rehab
Campus Center Envelope Bldgs 51 & 56 ........... 8,922
Oneonta
Campus-wide projects, including Rehab
Physical Science Building ..................... 13,657
Optometry
Campus-wide projects, including Replace
Switchgear/Upgrade Electrical Feeders .......... 3,060
Oswego
Campus-wide projects, including C-wide
Utilities & Infrastructure-Program Study ...... 21,181
Plattsburgh
Campus-wide projects, including Replace
Parking ....................................... 14,045
Potsdam
Campus-wide projects, including Rehab HVAC
711 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Systems-Kellas & Timerman Halls ............... 14,080
Purchase
Campus-wide projects, including Expansion
of University Police Department ............... 18,483
State Univ Plaza
Campus-wide projects, including Renovate
Plaza Bldg-3rd Floor South ..................... 4,592
Stony Brook, incl Health Science Center (HSC)
Campus-wide projects, including Rehab
Mechanical Systems-Various Bldgs .............. 75,205
Syracuse Health Science Center (HSC)
Campus-wide projects, including Abate/
Renovate Academic Labs-6 South Univ
Hospital ....................................... 9,122
Utica-Rome
Campus-wide projects, including Upgrade
Parking/Landscape-Student Cntr/Field
House .......................................... 3,308
University-wide Alterations and Improvements
Maintenance Undistributed
For university-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to execu-
tive order 111; ADA and code compliance
claims; environmental hazards; emergen-
cies health and safety, and energy
conservation needs, asbestos and PCB
remediation; fire alarms and sprin-
klers; electrical, mechanical, plumbing
and heating and cooling system require-
ments and other similar university wide
needs ......................................... 16,500
Total .......................................... 550,000
==============
By chapter 53, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2012:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
712 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
functionality of major building systems such a fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2009 subject to
a plan developed by the state university and approved by the direc-
tor of the budget. Notwithstanding any provision of law, rule or
regulation to the contrary, amounts designated as university-wide,
may be made available for projects identified and approved by the
governor and the chancellor of the state university of New York
pursuant to the NY-SUNY 2020 challenge grant program (28F10903)
(45913) ... 550,000,000 ........................... (re. $3,772,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide projects, including Renovate
Health Center ................................. 33,927
Alfred Ceramics
Campus-wide projects, including McMahon
Hall Full interior Rehab - Phase I ............. 2,845
Alfred State
Campus-wide projects, including Rehab
Central Dining Hall - Phase II ................. 7,343
Binghamton
Campus-wide projects, including Central
Campus Quad Site Reconstruction ............... 32,129
Brockport
Campus-wide projects, including Infras-
tructure Improvements - Tuttle N, Phase
II ............................................ 19,429
Brooklyn Health Science Center (HSC)
Campus-wide projects, including Renovate
for New Labs - Basic Science Building ......... 12,884
Buffalo College
Campus-wide projects, including UG Steam
Distribution System Rehab Butler .............. 23,974
Buffalo University
Campus-wide projects, including IT
Infrastructure Renewal ............................ 67,395
Canton
Campus-wide projects, including Campus
Standby Power System & Sub Stn Rehab ........... 5,174
Cobleskill
Campus-wide projects, including Roof
Replacement - Various Buildings ................ 6,989
Cornell
Campus-wide projects, including Warren
713 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Hall Renovation ............................... 32,817
Cortland
Campus-wide projects, including Moffett
Renovation .................................... 16,646
Delhi
Campus-wide projects, including Renovate
Sanford Hall ................................... 6,150
Empire State
Campus-wide projects, including Site Rehab
- Parking Lot, No 1 Union Ave .................... 872
Environmental Science and Forestry
Campus-wide projects, including Illick
Hall Interior Rehab ............................ 8,386
Farmingdale
Campus-wide projects, including Rehab
Whitman Hall .................................. 15,095
Fredonia
Campus-wide projects, including William's
Center Interior Rehab ......................... 13,396
Geneseo
Campus-wide projects, including Bailey
Hall Renovation ............................... 14,191
Maritime
Campus-wide projects, including Replace
Roof - Reisenberg Gym .......................... 6,049
Morrisville
Campus-wide projects, including Renovate
Charlton Hall .................................. 8,428
New Paltz
Campus-wide projects, including Comprehen-
sive Renov/Demol - Wooster Science Bldg ...... 16,020
Old Westbury
Campus-wide projects, including Replace
Heat/Chill Plant & Distribution System ......... 9,158
Oneonta
Campus-wide projects, including Rehab
Physical Science Building ..................... 13,957
Optometry
Campus-wide projects, including HVAC Rehab
- Phase I ...................................... 3,176
Oswego
Campus-wide projects, including Piez Hall
Reconstruction ................................ 21,400
Plattsburgh
Campus-wide projects, including Renovate
Beaumont Hall - Phase I ....................... 14,233
Potsdam
Campus-wide projects, including Raymond/
Sisson Halls - Replace Windows ................ 13,837
Purchase
Campus-wide projects, including Rehab HVAC
714 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
- Visual Arts Bldg ............................ 18,143
State Univ Plaza
Campus-wide projects, including Repair
Facade - Historic Plaza Building ............... 4,596
Stony Brook, incl Health Science Center (HSC)
Campus-wide projects, including Interior
Rehab - Various Bldgs ......................... 73,847
Syracuse Health Science Center (HSC)
Campus-wide projects, including Renovate
Weiskotten Basement Central Core ............... 7,862
Utica-Rome
Campus-wide projects, including Site
Lighting Upgrades - Campuswide ................. 3,152
University-wide Alterations and Improvements
Maintenance Undistributed
For university-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to executive
order 111; ADA and code compliance claims;
environmental hazards; emergencies health
and safety, and energy conservation needs,
asbestos and PCB remediation; fire alarms
and sprinklers; electrical, mechanical,
plumbing and heating and cooling system
requirements and other similar university
wide needs ...................................... 16,500
--------------
Total .......................................... 550,000
==============
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2012:
Advances for alterations and improvements to facilities for capital
critical maintenance, including but not limited to services and
expenses, service agreements or service contracts and memoranda of
understanding; for capital design including the cost of services
provided by private firms, including preparation of designs, plans,
specifications and estimates; for property acquisition, and facility
reconstruction, rehabilitation, equipment; for health and safety
improvements and upgrades to preserve or enhance facility function-
ing; for program improvements or program change; to support improve-
ments in technology, research, environmental protection, energy and
resource conservation, and accreditation; to finance costs attribut-
able to executive order 111, ADA and code compliance needs, claims,
emergencies and remediation of environmental hazards; to ensure the
functionality of major building systems such a fire alarms and
sprinklers, electrical, mechanical, plumbing, heating/cooling
systems and supporting infrastructure, including underground utili-
ties; and to provide for facilities for the disabled and related
projects including costs incurred prior to April 1, 2008 subject to
a plan developed by the state university and approved by the direc-
715 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tor of the budget. Notwithstanding any provision of law, rule or
regulation to the contrary, amounts designated as university-wide,
may be made available for projects identified and approved by the
governor and the chancellor of the state university of New York
pursuant to the NY-SUNY 2020 challenge grant program (28F10803)
(45913) ... 550,000,000 ........................... (re. $3,850,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide critical maintenance projects
such as Relocation of the Data Center ........ 33,755
Alfred Ceramics
Campus-wide critical maintenance projects
such as McMahon Hall Window Replacement ....... 2,924
Alfred State
Campus-wide critical maintenance projects
such as Classroom/Lab Upgrades and
Central Dining Hall Renovation, Phase II ....... 7,707
Binghamton
Campus-wide critical maintenance projects
such as Science II, IV and V Renovations ...... 32,568
Brockport
Campus-wide critical maintenance projects
such as Smith Hall Infrastructure/
Exterior Renovations .......................... 19,927
Brooklyn Health Science Center (HSC)
Campus-wide critical maintenance projects
such as Elevator Upgrades and HVAC
Replacement ................................... 13,087
Buffalo College
Campus-wide critical maintenance projects
such as Rockwell Hall Renovations ............. 24,908
Buffalo University
Campus-wide critical maintenance projects
such as Underground Utility Renovations
on both North and South campuses .............. 64,027
Canton
Campus-wide critical maintenance projects
such as Structural Renovations to Dana
Hall ........................................... 5,286
Cobleskill
Campus-wide critical maintenance projects
such as Dairy Complex Infrastructure
Improvements ................................... 7,057
Cornell
Campus-wide critical maintenance projects
such as Warren Hall Renovation ................ 33,624
Cortland
716 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus-wide critical maintenance projects
such as Power Plant Upgrades and Lusk
Field House Renovations ....................... 16,916
Delhi
Campus-wide critical maintenance projects
such as Upgrades to Alumni Hall and Road
& Sidewalk Improvements ........................ 6,068
Empire State
Campus-wide critical maintenance projects
such as Security System Upgrades ................. 736
Environmental Science and Forestry
Campus-wide critical maintenance projects
such as Electrical Substation Replace-
ment and Illick Hall Exterior Reno-
vations ........................................ 8,515
Farmingdale
Campus-wide critical maintenance projects
such as Roof and Elevator Replacements ........ 15,199
Fredonia
Campus-wide critical maintenance projects
such as Fenton Hall Renovations and
Campus Code Compliance, Phase II .............. 13,857
Geneseo
Campus-wide critical maintenance projects
such as Security Upgrades and Newton
Hall Renovation, Phase II ..................... 14,607
Maritime
Campus-wide critical maintenance projects
such as Reisenberg Gym HVAC Upgrades and
Roof Replacement ............................... 5,971
Morrisville
Campus-wide critical maintenance projects
such as Minor Renovation Projects .............. 8,693
New Paltz
Campus-wide critical maintenance projects
such as Elting Gymnasium Renovation ........... 16,456
Old Westbury
Campus-wide critical maintenance projects
such as Campus Center Renovations .............. 9,194
Oneonta
Campus-wide critical maintenance projects
such as Electrical Upgrades and Heating
Plant Renovation, Phase II .................... 14,285
Optometry
Campus-wide critical maintenance projects
such as Restroom Renovations, Phase I &
II ............................................. 3,248
Oswego
Campus-wide critical maintenance projects
such as Penfield Library Renovation and
717 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Utilities & Infrastructure Program Study ...... 21,931
Plattsburgh
Campus-wide critical maintenance projects
such as Hudson Hall Renovation, Phase II ...... 13,824
Potsdam
Campus-wide critical maintenance projects
such as Stowell & Flagg Hall HVAC Reha-
bilitations ................................... 14,233
Purchase
Campus-wide critical maintenance projects
such as various HVAC Rehabilitations .......... 16,015
State Univ Plaza
Campus-wide critical maintenance projects
such as Plaza Building Window Replace-
ments .......................................... 5,141
Stony Brook, incl Health Science
Center (HSC)
Campus-wide critical maintenance projects
such as Old Chemistry Building Reno-
vation ........................................ 72,893
Syracuse Health Science Center (HSC)
Campus-wide critical maintenance projects
such as various Weiskotten Hall Reno-
vations ........................................ 7,839
Utica-Rome
Campus-wide critical maintenance projects
such as Underground Electrical Upgrades/
Replacements ................................... 3,009
University-wide Alterations and Improvements
For University-wide capital critical main-
tenance or capital improvement costs,
including costs attributable to execu-
tive order 111; ADA compliance claims;
environmental hazards; emergencies for
health and safety, and energy conserva-
tion needs, asbestos and PCB remedi-
ation; fire alarms and sprinklers; elec-
trical, mechanical, plumbing and heating
and cooling system requirements along
with other similar university-wide needs ...... 16,500
--------------
Total ........................................ 550,000
==============
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
718 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2022 and subject to a plan developed and submitted annually
by the state university of New York and approved by the director of
the budget (28F22208) (45939) ... 425,000,000 ... (re. $425,000,000)
For additional services and expenses related to alterations and
improvements to various facilities including but not limited to
capital design, construction, reconstruction, rehabilitation, and
equipment; for health and safety, preservation of facilities,
program improvement or program change, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, preventative maintenance and related projects, including
costs incurred prior to April 1, 2022 and subject to a plan devel-
oped and submitted annually by the state university of New York and
approved by the director of the budget (28F32208) ..................
225,000,000 ..................................... (re. $225,000,000)
For services and expenses of state university of New York hospitals
for alterations, improvements, services and expenses, and new facil-
ities, including costs incurred prior to April 1, 2022 subject to a
plan developed by the state university and approved by the director
of the budget (28FI2203) (45921) ...................................
150,000,000 ..................................... (re. $150,000,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Downstate University Hospital
For university-wide projects .................... 50,000
Stony Brook University Hospital ................... 50,000
For university-wide projects
Upstate University Hospital ....................... 50,000
For university-wide projects
--------------
Total ........................................ 150,000
==============
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to alterations and improvements to
various facilities including but not limited to capital design,
construction, reconstruction, rehabilitation, and equipment; for
health and safety, preservation of facilities, program improvement
or program change, environmental protection, energy conservation,
accreditation, facilities for the physically disabled, preventative
maintenance and related projects, including costs incurred prior to
April 1, 2021 and subject to a plan developed and submitted annually
by the state university of New York and approved by the director of
the budget (28F22108) (45939) ... 100,000,000 .... (re. $99,883,000)
719 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For services and expenses of state university of New York hospitals
for alterations, improvements, services and expenses, and new facil-
ities, including costs incurred prior to April 1, 2021 subject to a
plan developed by the state university and approved by the director
of the budget (28FI2103) (45921) ...................................
150,000,000 ..................................... (re. $150,000,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Downstate University Hospital
For university-wide projects .................... 50,000
Stony Brook University Hospital ................... 50,000
For university-wide projects
Upstate University Hospital ....................... 50,000
For university-wide projects
--------------
Total ........................................ 150,000
==============
By chapter 54, section 1, of the laws of 2020:
For services and expenses of state university of New York hospitals
for alterations, improvements, services and expenses, and new facil-
ities, including costs incurred prior to April 1, 2020 subject to a
plan developed by the state university and approved by the director
of the budget (28FI2003) (45921) ...................................
150,000,000 ..................................... (re. $142,463,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Downstate University Hospital
For university-wide projects .................... 50,000
Stony Brook University Hospital ................... 50,000
For university-wide projects
Upstate University Hospital ....................... 50,000
For university-wide projects
--------------
Total ........................................ 150,000
==============
By chapter 54, section 1, of the laws of 2017, as transferred by chapter
54, section 1, of the laws of 2018:
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2017 subject to a plan developed by the
state university and approved by the director of the budget
(28FI1708) (45921) ... 100,000,000 ............... (re. $17,859,000)
720 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Upstate University Hospital ....................... 50,000
For university-wide projects
Stony Brook University Hospital ................... 50,000
For university-wide projects
--------------
Total ........................................ 100,000
==============
By chapter 55, section 1, of the laws of 2016, as transferred by chapter
54, section 1, of the laws of 2018:
For services and expenses of upstate university hospital capital
projects and facilities. Moneys from this appropriation shall be
made available only as matching funds up to an equal amount of funds
awarded to upstate university hospital through the capital restruc-
turing financing program pursuant to section 2825 of the public
health law, including costs incurred prior to April 1, 2016
(28FH1608) (45903) ... 75,000,000 ................ (re. $45,308,000)
For services and expenses of SUNY hospitals for alterations, improve-
ments, services and expenses, and new facilities, including costs
incurred prior to April 1, 2016 subject to a plan developed by the
state university and approved by the director of the budget
(28FI1608) (45921) ... 100,000,000 ............... (re. $17,736,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Upstate University Hospital ....................... 50,000
For university-wide projects
Stony Brook University Hospital ................... 50,000
For university-wide projects
--------------
Total ........................................ 100,000
==============
By chapter 54, section 1, of the laws of 2015:
For services and expenses of studies, site acquisitions, planning,
design, construction, reconstruction, renovation, and equipment
necessary to establish a school of pharmacy at the state university
of New York at Binghamton. Amounts appropriated herein shall be in
addition to $25,000,000 appropriated in the urban development corpo-
ration projects budget (28F21508) (45922) ..........................
25,000,000 ........................................ (re. $4,662,000)
By chapter 54, section 1, of the laws of 2014:
Advances for the cost of studies, site acquisitions, planning, design,
construction, reconstruction, renovation, and equipment necessary to
721 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
establish a school of pharmacy at the state university of New York
at Binghamton (28F11408) (45922) ... 10,000,000 ..... (re. $916,000)
By chapter 54, section 1, of the laws of 2013:
Advances for the design and construction of an emerging technology and
entrepreneurial complex, as identified and approved by the governor
and the chancellor of the state of New York pursuant to the NY-SUNY
2020 challenge grant program for the state university of New York at
Albany, including but not limited to services and expenses, service
agreements or service contracts and memoranda of understanding; for
capital design including the cost of services provided by private
firms, including preparation of designs, plans, specifications and
estimates; for property acquisition, and facility construction or
reconstruction and equipment; claims, emergencies and remediation of
environmental hazards (28201308) (45922) ...........................
88,000,000 ....................................... (re. $25,209,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
Advances for the relocation and construction of a medical school and
biomedical sciences facility, as identified and approved by the
governor and the chancellor of the state of New York pursuant to the
NY-SUNY 2020 challenge grant program for the state university of New
York at Buffalo, including but not limited to services and expenses,
service agreements or service contracts and memoranda of understand-
ing; for capital design including the cost of services provided by
private firms, including preparation of designs, plans, specifica-
tions and estimates; for property acquisition, and facility
construction or reconstruction and equipment; claims, emergencies
and remediation of environmental hazards. Notwithstanding any incon-
sistent provision of law to the contrary, the state university
construction fund is hereby authorized to enter into a service
agreement to transfer $25,000,000 of this appropriation to universi-
ty at Buffalo-affiliated entities for design, construction, property
acquisition and equipment costs related to the relocation and
construction of the medical school and biomedical sciences facility
and related facilities (28201208) (45922) ..........................
215,000,000 ......................................... (re. $164,000)
By chapter 53, section 1, of the laws of 2008:
Advances to SUNY hospitals for alterations, improvements services and
expenses, and new facilities, including costs incurred prior to
April 1, 2008 subject to a plan developed by the state university
and approved by the director of the budget (28FH0808) (45921) ......
450,000,000 ...................................... (re. $48,343,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Brooklyn ......................................... 150,000
722 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For university-wide projects which may
include but are not limited to:
-Ambulatory Services Expansion, Phase I
-Ongoing Critical Maintenance Projects
Syracuse ......................................... 150,000
For university-wide projects which may
include but are not limited to:
-Heart Center Renovations
-Cancer Center Design and Construction
-UH North and West Wing Renovations
-Ancillary Services Facilities
Stony Brook ...................................... 150,000
For university-wide projects which may
include but are not limited to:
-Intensive Care Building Design and
Construction
-Level 8 & 9 Hospital Floor Rehabili-
tation
-Hospital Building Exterior Renovation
-Neorointerventional Program Facilities
--------------
Total .......................................... 450,000
==============
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
Advances for alterations and improvements to various facilities
including services and expenses, service contracts, memoranda of
understanding, capital design, construction, acquisition, recon-
struction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, technology, environment protection, energy conserva-
tion, accreditation, facilities for the physically disabled, and
related projects, including costs incurred prior to April 1, 2008,
subject to an annual plan developed by the state university of New
York and approved by the director of the budget. Of the amount
appropriated herein, up to $400,000 may be suballocated or trans-
ferred to the office of general services for capital costs related
to the NY Network (28F20808) (45922) ...............................
1,675,613,000 .................................... (re. $50,758,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Albany
Construct Business School ......... 54,000
Campus Center Expansion/
Improvements ...................... 30,000
Campus Revitalization/Site
723 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Improvements, Phase II ............. 5,000
Alfred Ceramics
Infill Project-VariousBuildings .... 9,000
Alfred State
Student Union / Student Activities
Center ............................ 27,500
Dining Hall ........................ 6,000
Binghamton
Nursing Facility ................... 3,000
Center for Excellence Building .... 15,000
Nursing Facility ................... 5,000
Upgrade to Events Center ........... 1,000
Brockport
Construct Academic Building ....... 29,300
Brooklyn Health Science Center (HSC)
Life & Health Safety
Improvements ...................... 25,300
Construct Academic Bldg for School
of Public Health ................. 100,000
Expansion of Administration
Complex ........................... 17,600
Traditional and Alternative
Notwithstanding any inconsis-
tent provision of law to the
contrary, the state univer-
sity construction fund is
authorized to enter into a
service agreement to transfer
up to $6,000,000 in state
university capital construction
funds to Bio-Bat, Inc., to be
administered by The Research
Foundation of State University
of New York, for the construc-
tion, reconstruction, rehabil-
itation and redevelopment of
energy sources development at
the Brooklyn Army Terminal
biotechnology commercial and
research center. Bio-Bat, Inc.,
or its designee is authorized
to construct, reconstruct,
rehabilitate and redevelop
energy sources for such facil-
ity using funds transferred
from the state university
construction fund to Bio-Bat,
Inc. ............................. 6,000
Buffalo College
Renovate/Addition Science
Building - Phase I ................ 45,000
724 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Renovate/Addition Science
Building - Phase II ............... 48,262
Buffalo University
UB Gateway & Urban Technology
Incubator Phases I, II, III
Downtown. Notwithstanding
any inconsistent
provision of law to the
contrary, the State University
Construction Fund is hereby
authorized to enter into a
service agreement to transfer
up to $32,000,000 of this
appropriation in
State University capital
construction funds to the Buffalo
2020 Development Corporation for
the purpose of constructing,
acquiring, or creating a
Clinical/Translational Research
facility on the downtown
campus, an incubator facility
on the downtown campus, the UB
Gateway project, and reimbursing
the University at Buffalo
Foundation for property
acquisition for the Educational
Opportunity Center and the UB
Gateway project, provided,
that all contracts for the
construction of any such
facilities shall require compliance
with the provisions of
section two hundred twenty of
the labor law and shall be subject
to article XV-a of the executive
law ............................... 32,000
Construct Clinical/Transitional
Research Facility - Ph III.
Notwithstanding any inconsistent
provision of law to the contrary,
the State University Construction
Fund is hereby authorized to enter
into a service agreement to transfer
up to $100,000,000 of this
appropriation to the Buffalo 2020
Development Corporation for the
purpose of constructing, acquiring,
or creating a Clinical/Translational
Research facility and an incubator
facility on the downtown campus,
725 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
provided, that all contracts for
the construction of any such
facilities shall require compliance
with the provisions of section two
hundred twenty of the labor law and
shall be subject to article XV-a of
the executive law ................ 100,000
UB Gateway, Phase IV.
Notwithstanding any law to the
contrary, the State University
Construction Fund is hereby
authorized to enter into a service
agreement to transfer up to $6,000,000
of this appropriation to the Buffalo
2020 Development Corporation for the
purpose of constructing or creating
the UB Gateway project, and
reimbursing the University at
Buffalo Foundation for property
acquisition for the Educational
Opportunity Center and the UB
Gateway project, provided, however
that to the extent any portion of
such appropriation is utilized for
construction purposes, all contracts
for the construction of such facilities
shall require compliance with
the provisions of section two
hundred twenty of the labor law and
shall be subject to article XV-a of
the executive law .................. 6,000
Canton
Center for Athletics/Recreational
Complex Phase II .................. 21,200
Cobleskill
Construct Environmental Science
& Technology Center ................ 3,700
Construct Agriculture & Technology
Center ............................ 38,200
Cornell
Stocking Hall Renovation and
Replacement ....................... 64,000
Construct Surge Space for Stocking
Hall .............................. 16,000
Replacement of the Dairy Barn ...... 7,000
Cortland
Construct Student Life Center ..... 51,200
Delhi
Campus Utility Master Plan ......... 1,000
Farnsworth Hall .................... 6,000
Empire State
726 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Construct Regional Center-Suffolk
CC Amermann Campus Facility ....... 12,900
Environmental Science and Forestry
Construct Gateway Building ........ 22,000
Renovation and addition for Marshall
Hall and Illick hall ............... 6,000
Adirondack Ecological Center ....... 2,500
Student Recreation Center at
Ranger School ........................ 250
Farmingdale
Construct School of Business ...... 28,900
New Daycare Center ................. 7,500
Covered Practice Field ............... 175
Physical Infrastructure .............. 750
Applied Mathematics Center ......... 1,000
Information Commons/Green
Library ............................ 1,000
Fredonia
Construct/Renovate Science
Technology Building ............... 38,000
Addition/Renovate Rockefeller
Arts Center ....................... 40,000
Geneseo
College Stadium Rehab &
Renovation ........................ 16,300
Brody Hall ........................... 800
HVAC Improvements .................. 1,500
Track Improvements ................... 750
Maritime
Construct Academic Building ....... 30,000
Laboratory Accreditation Upgrades .. 4,500
Morrisville
Upgrade Athletic Fields ............ 5,000
Landscape/Campus Beautification .... 1,000
New Paltz
Library Renovation ................ 12,800
Construct Science Building ........ 48,026
Old Westbury
Renovation of Library/Academic
Space ............................. 13,000
Oneonta
Rehabilitate Fitzelle Hall ........ 36,000
Rehabilitate Physical Science
Building .......................... 30,000
Optometry
Renovate to Improve Clinical
Space .............................. 2,200
Campus Center for Student Life
& Learning ......................... 4,500
Oswego
727 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
General Science Lab ............... 69,500
Plattsburgh
Renovate/Expand School of
Business .......................... 20,400
Potsdam
Performing Arts Building .......... 55,000
Purchase
Renovate/Construct Center for
Integrated Technology Learning .... 20,900
Renovate for Theater Arts &
Film Programs ..................... 10,400
State Univ Plaza
Site Rehabilitation / Plaza
Renovation ......................... 5,000
Stony Brook, incl Health Science Center (HSC)
Construct Student Recreation
Center - Phase II ................. 18,000
Construct Computer Science
Building .......................... 40,800
To support development of academic
and student program space at Stony
Brook Southampton campus ........... 5,000
Renovate/modernize classroom
buildings, laboratories and
new student learning spaces
at Stony Brook Southampton ......... 7,500
Construct Marine Science Bldg -
Southampton ........................ 6,900
Long Island State Veteran's
Home ............................... 5,000
Computational Biomedicine Visual-
ization and drug development magnet
facility at Stony Brook University . 2,000
Stony Brook Long Island Children's
Hospital / MART Center ............. 3,000
Planning of Stony Brook Law
School ............................... 250
Stadium Expansion .................. 2,700
Stony Brook Long Island Children's
Hospital / MART Center ............ 45,000
University/Basketball Arena ....... 12,300
Syracuse Health Science Center (HSC)
Lab Addition/Surge Space -
Institute for Human Performance ... 72,000
Construct Academic Building ....... 36,000
Cord Blood Center Phase II ........ 10,000
Utica-Rome
Center for Advanced Technol-
ogy. Notwithstanding any
provision of law to the
contrary, the state
728 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
university construction
fund is hereby authorized
to enter into a service
agreement to transfer up
to $27,500,000 in state
university capital
construction funds to the
fort schuyler management
corporation, or other
appropriate corporation,
pursuant to appropriation
for the construction of a
center for advanced tech-
nology and other related
facilities for the state
university college of
technology at utica-rome ........ 27,500
Renovate for Tiered Class-
room. Notwithstanding any
provision of law to the
contrary, the state
university construction
fund is hereby authorized
to enter into a service
agreement to transfer up
to $400,000 in state
university capital
construction funds to the
fort schuyler management
corporation, or other
appropriate corporation,
pursuant to appropriation
for the construction of a
center for advanced tech-
nology and other related
facilities for the state
university college of
technology at utica-rome ........... 400
Student Center - Equipment ......... 1,250
Field House Equipment .............. 1,750
Statewide
New York Network ................... 2,000
Castle Renovation - Notwith-
standing any provision of
law to the contrary, all
or a portion of the funds
appropriated hereby may be
suballocated or trans-
ferred to any department,
agency, or public authori-
ty pursuant to a plan
729 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
developed by the urban
development corporation
and approved by the direc-
tor of the division of the
budget to support capital
costs associated with the
implementation of the plan ...... 12,450
Albany Emerging Technology
and Entrepreneurial Complex,
or other project identified
and approved by the governor
and the chancellor of the
state university of New York,
pursuant to the NY-SUNY 2020
challenge grant program ........... 42,000
--------------
Schedule Subtotal ............ 1,675,613
==============
By chapter 53, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
Advance for alterations and improvements to various facilities includ-
ing services and expenses, service contracts, memorandum of under-
standing, capital design, construction, acquisition, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, new facilities, program improvement or program change,
technology, environmental, protection, energy conservation, accredi-
tation, facilities for the physically disabled and related projects
including costs incurred prior to April 1, 2007 subject to a plan
developed by the state university and approved by the director of
the budget. Notwithstanding any provision of law, rule or regulation
to the contrary, amounts designated as university-wide, may be made
available for projects identified and approved by the governor and
the chancellor of the state university of New York pursuant to the
NY-SUNY 2020 challenge grant program (28F10708) (45922) ............
379,700,000 ...................................... (re. $16,663,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus-wide critical maintenance projects
such as Classroom Renovations & Upgrades,
Phase I .......................................... 5,988
Alfred Ceramics
Campus-wide critical maintenance projects
such as Harder Hall Window Replacement ............. 515
Alfred State
Campus-wide critical maintenance projects
730 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
such as Administration Building Repairs .......... 1,391
Binghamton
Campus-wide critical maintenance projects
such as East Gym Repairs ......................... 5,766
Brockport
Special Events Recreation Center Construc-
tion ............................................ 24,000
Campus-wide critical maintenance projects
such as Smith Hall Renovations ................... 3,572
Brooklyn Health Science Center (HSC)
Campus-wide critical maintenance projects
such as Basic Science Building Heating &
Air Conditioning Renovations ..................... 1,968
Buffalo College
Campus-wide critical maintenance projects
such as Replace Underground Water-Lines .......... 4,384
Buffalo University
Campus-wide critical maintenance projects
such as Alumni Hall Replace Pool Condens-
ing Units ....................................... 11,004
Canton
Campus-wide critical maintenance projects
such as Payson Hall Repairs ........................ 938
Cobleskill
Warm Water Aquaculture Center Construction
& Facility Conversion ............................ 3,500
Campus-wide critical maintenance projects
such as Electric Distribution System Reno-
vation ........................................... 1,264
Cornell
Campus-wide critical maintenance projects
such as Heating & Air Conditioning
Upgrades & Energy Conservation ................... 6,038
Cortland
Studio West Expansion & Renovation .............. 15,000
Campus-wide critical maintenance projects
such as Campus Roads & Sidewalk Repairs,
Phase I .......................................... 3,043
Delhi
Farnsworth Hall .................................. 6,700
Campus-wide critical maintenance projects
such as Classroom and Laboratory Upgrades ........ 1,085
Empire State
Construct Regional Center ....................... 15,660
Campus-wide critical maintenance projects
such as Union Ave Renovations ...................... 167
Environmental Science and Forestry
Renovation and addition for Marshall Hall
and Illick Hall ................................. 23,000
Campus-wide critical maintenance projects
such as Replace Underground Communications
731 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Cabling .......................................... 1,523
Farmingdale
Student Center Renovation Phase II .............. 18,400
Campus-wide critical maintenance projects
such as Roof Replacements ........................ 2,724
Fredonia
Child Care Center Construction ................... 4,600
Campus-wide critical maintenance projects
such as Code Compliance Upgrades ................. 2,485
Geneseo
Doty Building Renovations ....................... 12,000
Campus-wide critical maintenance projects
such as Bailey Hall Renovations .................. 2,545
Maritime
Health, Safety & Facility Upgrades .............. 18,850
Campus-wide critical maintenance projects
such as Reisenberg Gym Heating & Air
Conditioning Repairs ............................. 1,072
Morrisville
Campus-wide critical maintenance projects
such as Charlton & Hamilton Halls Roof
Repairs .......................................... 1,497
New Paltz
Old Main Renovation ............................. 10,740
Campus-wide critical maintenance projects
such as Roof Replacements ........................ 2,988
Old Westbury
Academic Village Construction ................... 51,275
Campus-wide critical maintenance projects
such as Heating & Air Conditioning Instal-
lation ........................................... 1,479
Oneonta
Campus-wide critical maintenance projects
such as Fire Alarm Upgrades ...................... 2,545
Optometry
Safety & Facility Upgrades, Phase I .............. 9,000
Campus-wide critical maintenance projects
such as Emergency Power Generator Instal-
lation ............................................. 577
Oswego
Campus-wide critical maintenance projects
such as Wilber Hall Renovation ................... 3,817
Plattsburgh
Combined Science Facilities Renovations &
Additions ....................................... 23,000
Campus-wide critical maintenance projects
such as Field House Mechanical System
Repairs .......................................... 2,459
Potsdam
Campus-wide critical maintenance projects
such as Maxcy, Stillman & Raymond Halls
732 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Renovations ...................................... 2,474
Purchase
Visual Arts Facility - Heating & Air
Conditioning Renovations ......................... 8,500
Campus-wide critical maintenance projects
such as Heating & Air Conditioning
Repairs, Phase II ................................ 2,807
State University Plaza
Campus-wide critical maintenance projects
such as Electrical Switchgear Repairs &
Replacement ........................................ 917
Stony Brook, including Health Science Center
(HSC)
Southampton Campus Renovations .................. 20,800
LI Veterans Home (Matching Grant Funds) .......... 1,000
Campus-wide critical maintenance projects
such as Campus Walkway & Lighting Upgrades ...... 13,267
Syracuse Health Science Center (HSC)
Weiskotten Hall Renovations ..................... 13,675
Campus-wide critical maintenance projects
such as Restrooms Renovations for ADA
Compliance ....................................... 2,165
Utica-Rome
Campus-wide critical maintenance projects
such as Campus Electrical System Upgrade ........... 536
University-wide Alterations and Improvements
For university-wide critical maintenance or
capital improvement costs, including costs
attributable to executive order 111; ADA
and code compliance; claims; environmental
hazards; emergencies, health and safety,
and energy conservation needs; asbestos
and PCB remediation; fire alarms and
sprinklers; electrical distribution and
heating and cooling system requirements;
and other similar university-wide need ........... 5,000
--------------
Total ............................................ 379,700
==============
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2014:
Advance for alterations and improvements to various facilities includ-
ing services and expenses, service contracts, memorandum of under-
standing, capital design, construction, acquisition, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, new facilities, program improvement or program change,
technology, environmental, protection, energy conservation, accredi-
tation, facilities for the physically disabled and related projects
including costs incurred prior to April 1, 2006 subject to a plan
733 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
developed by the state university and approved by the director of
the budget (28F10608) (45922) ... 49,723,000 ........ (re. $992,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Old Westbury
Academic village new construction ............... 22,300
Empire State
Center for Distance Learning construction ........ 6,000
Critical maintenance and high priority
projects
Universitywide .................................... 16,423
For services and expenses related to the
acquisition, renovation, reconstruction,
design, construction or equipping the Neil
D. Levin graduate institute of interna-
tional relations and commerce .................... 5,000
--------------
Total ........................................... 49,723
==============
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
An additional advance for alterations and improvements to various
facilities including services and expenses, service contracts, memo-
randum of understanding, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, technology, environmental protection, energy conser-
vation, accreditation, facilities for the physically disabled and
related projects including costs incurred prior to April 1, 2006
subject to an annual plan developed by the state university of New
York which shall include projects in the following schedule
(28F20608) (45923) ... 436,503,000 ............... (re. $10,813,000)
Project Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Albany
Campus Revitalization Project ................... 25,000
Alfred State College
Grazing/Organic Management at Centennial
Farm ............................................. 4,900
Binghamton
Engineering Science Research and Develop-
ment ............................................ 60,000
Brockport
New Student Recreation Center/Multipurpose
734 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Fieldhouse ...................................... 15,000
Brooklyn HSC
Basic Science Building Renovation ............... 20,000
Brooklyn Army Terminal. Notwithstanding any
inconsistent provision of law to the
contrary, the state university
construction fund is hereby authorized to
enter into a service agreement to transfer
up to $36,000,000 in state university
capital construction funds to Bio-Bat,
Inc., to be administered by The Research
Foundation of State University of New
York, for the construction, recon-
struction, rehabilitation and redevelop-
ment of the Brooklyn Army Terminal for use
as a biotechnology commercial and research
center. Bio-Bat, Inc., or other appropri-
ate corporation, is authorized to
construct, reconstruct, rehabilitate and
redevelop such facility using funds trans-
ferred from the state university
construction fund to Bio-Bat, Inc.,
including costs, not to exceed $1,000,000,
for costs incurred before July 1, 2006 .......... 36,000
Buffalo State
Athletic Stadium ................................. 2,577
Buffalo University
School of Engineering ........................... 24,600
Canton
Convocation, Athletic & Recreation Center ....... 18,000
Ceramic
Kazuo Inamori School of Engineering .............. 5,000
Cobleskill
Old Quad/Wheeler Hall ........................... 11,300
Frisbee Hall Renovation .......................... 6,500
Cornell
ILR faculty Building Cost Escalation ............. 2,000
Agriculture Food Technology Park
Construction. Notwithstanding any incon-
sistent provision of law to the contrary,
the state university construction fund is
hereby authorized to enter into a service
agreement to transfer $1,000,000 in state
university capital construction funds to
the Cornell Agriculture and Food Technolo-
gy Park (CAFTP) for the partial costs of
constructing the flexible technology
research facility and related site
improvements on the parcel of land trans-
ferred by the state to Cornell University
and leased to the CAFTP for this purpose
735 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
pursuant to chapter 463 of the laws of
2001 ............................................. 1,000
Martha Van Rensselaer Hall Building
Replacement Project .............................. 5,000
Cortland
Bowers Hall/Upgrade Science/Tech ................ 20,000
Delhi
Farnsworth Hall ................................. 10,000
Farmingdale
Dental Hygiene Care Center ....................... 1,700
Construction of Student Center .................. 20,000
Forestry
Renovation and addition for Marshall Hall
and Illick Hall ................................. 15,000
Fredonia
Dunkirk Incubator ................................ 1,700
Morrisville
Dairy Facility Reconfiguration ................... 8,500
New Paltz
Old Main Building ............................... 10,000
Oneonta
Renovation of Cooperstown Facility ............... 6,000
Optometry
Health and Safety Upgrades ....................... 4,000
Oswego
Renovations/Additions to Science Facili-
ties, Phase I ................................... 25,000
Plattsburgh
Electrical Projects .............................. 6,226
Purchase
Campuswide renovations including HVAC ............ 8,100
Purchase College Heritage Site ................... 6,000
Stony Brook
Southampton Campus - Renovations ................ 10,000
Stadium .......................................... 3,000
Gyrodene - Upgrade and renovations ............... 6,000
Basketball Arena ................................. 8,000
The Living Skin and Cellular Therapy
Production Facility ................................ 400
Utica-Rome
Field House ..................................... 20,000
University-wide
For services and expenses of a not-for-
profit corporation to be created for the
development of the East Campus of the
State university of New York at Albany for
use as biotechnology research and technol-
ogy center. Notwithstanding any provisions
of law to the contrary, the state univer-
sity construction fund is hereby author-
ized to enter into a service agreement to
736 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transfer up to $10,000,000 in state
university capital construction funds to a
not-for-profit corporation to be created
for the development of biotechnology
research and technology center on the East
Campus of the State university of New York
at Albany ....................................... 10,000
--------------
Total .......................................... 436,503
==============
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2014:
Advance for alterations and improvements to various facilities includ-
ing services and expenses, service contracts, memorandum of under-
standing, capital design, construction, acquisition, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, new facilities, program improvement or program change,
technology, environmental, protection, energy conservation, accredi-
tation, facilities for the physically disabled and related projects
including costs incurred prior to April 1, 2005 subject to a plan
developed by the state university and approved by the director of
the budget. Notwithstanding any provision of law, rule or regulation
to the contrary, amounts designated as university-wide, may be made
available for projects identified and approved by the governor and
the chancellor of the state university of New York pursuant to the
NY-SUNY 2020 challenge grant program (28F10508) (45922) ............
234,400,000 ......................................... (re. $203,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
(thousands of dollars)
Albany
-CESTM power substation
construction. Nothwith-
standing any provision of
law to the contrary, the
state university
construction fund is here-
by authorized to enter
into a service agreement
to transfer up to
$5,000,000 in state
university capital
construction funds to the
Fuller road management
corporation, pursuant to
appropriation, for the
construction of a power
substation for the center
737 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
for environmental sciences
and logy management build-
ing and other related
facilities on the univer-
sity at Albany campus.
Fuller road management
corporation is authorized
to construct such facility
using funds transferred
from the state university
construction fund to Full-
er road management corpo-
ration, and other funds
available to Fuller road
management corporation,
pursuant to the terms of
an executed lease agree-
ment with the state
university of New York
trustees as authorized by
chapter 643 of the laws of
1997 ............................. 5,000
-ASML High Tech Center
construction. Notwith-
standing any provision of
law to the contrary, the
state university
construction fund is here-
by authorized to enter
into a service agreement
to transfer up to
$75,000,000 in state
university capital
construction funds to the
Fuller road management
corporation, or other
appropriate corporation,
pursuant to appropriation,
for the construction of a
high tech center for ASML
and other related facili-
ties on the university at
Albany campus. Fuller road
management corporation, or
other appropriate corpo-
ration, is authorized to
construct such facility
using funds transferred
from the state university
construction fund to the
Fuller road management
738 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
corporation, or other
appropriate corporation,
and other funds available
to Fuller road management
corporation, or other
appropriate corporation,
pursuant to the terms of
an executed lease agree-
ment with the state
university of New York
trustees as authorized by
chapter 643 of the laws of
1997 ............................ 75,000
Buffalo University
-Pharmacy School construction ..... 27,000
Cornell
-Martha Van Rensselaer
construction ..................... 9,000
Empire State College
-Construction ..................... 20,000
Fredonia
-Heating system replacement ....... 14,000
Stony Brook
-Long Island Veterans' Home
improvements ...................... 400
Universitywide
-Campuswide priority proj-
ects including the Monroe
Community College-New Down-
town Campus and the Orange
County Community College-
Newburgh Campus according to
the following schedule ............ 83,000
sub-schedule
Universitywide
-Campuswide projects ........... 50,000
-Monroe Community
College New Downtown
Campus (State Share)........... 18,000
-Orange County Com-
munity College New-
burgh Campus (State
(Share) ....................... 15,000
----------
Total ...................... 234,400
==========
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2020:
An additional advance for alterations and improvements to various
facilities including services and expenses, service contracts, memo-
739 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
randum of understanding, capital design, construction, acquisition,
reconstruction, rehabilitation and equipment; for health and safety,
preservation of facilities, new facilities, program improvement or
program change, technology, environmental protection, energy conser-
vation, accreditation, facilities for the physically disabled and
related projects including costs incurred prior to April 1, 2005
subject to an annual plan developed by the state university of New
York which shall include projects in the following schedule
(28F20508) (45923) ... 415,775,000 ............... (re. $12,819,000)
Project Schedule
Project Amount
--------------------------------------------
(thousands of dollars)
Albany
Nanotechnology Research Facility
and Equipment for the Interna-
tional Venture for Nanotech-
nology (INVENT). Notwithstand-
ing any provision of law to
the contrary, the state
university construction fund
is hereby authorized to enter
into a service agreement to
transfer up to $75,000,000 in
state university capital
construction funds to the
Fuller road management corpo-
ration, pursuant to appropri-
ation, for the construction of
a nanotechnology research
facility and equipment for the
international venture for
nanotechnology on the univer-
sity at Albany campus. Fuller
road management corporation is
authorized to construct such
facility using funds trans-
ferred from the state univer-
sity construction fund to
Fuller road management corpo-
ration, and other funds avail-
able to Fuller road management
corporation, pursuant to the
terms of an executed lease
agreement with the state
university of New York trus-
tees as authorized by chapter
643 of the laws of 1997 ......... 75,000
East Campus Cancer Research
Bldg/Equipment School of
740 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Public Health Expansion.
Notwithstanding any inconsist-
ent provision of law to the
contrary, the state university
construction fund is hereby
authorized to enter into a
service agreement to transfer
up to $25,000,000 in state
university capital
construction funds to the
university of Albany founda-
tion or its designee for
construction of a cancer
research center at the east
campus and equipment and
infrastructure for the school
of public health expansion,
pursuant to appropriation
therefor ........................ 25,000
Life Sciences Bldg Equipment ...... 14,000
New Entry/Admissions Bldg
Equipment ........................ 3,500
New Entry/Admissions Bldg
Site/Plaza Improvements .......... 5,000
Life Sciences Bldg
Complete Shelled Wing ............ 2,000
Brubacher Hall ..................... 1,000
Alfred Ceramics
Expansion of the School of Arts
& Design ........................ 10,000
Binghamton
Nanotech Center .................... 6,000
Athletic Fields .................... 5,000
Downtown Campus .................... 4,000
Brooklyn HSC
Notwithstanding any inconsistent
provision of law to the con-
trary, the state university
construction fund is hereby
authorized to enter into a
service agreement to transfer
up to $3,000,000 in state
university capital construction
funds to the Research
Foundation of State University of
New York, for the construction
of phase III incubator for SUNY
Downstate's Biotechnology
Incubator Project ................ 3,000
Canton
741 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nevaldine Hall Improvements ........ 6,000
Cornell
ILR Faculty Wing Restoration ....... 3,000
Cortland
Child Care Center ................. 10,000
Empire State
Additional Construction ............ 5,000
Farmingdale
Library Renovations, Roof and
Renovations ...................... 1,500
Athletic Complex Renovation ........ 500
Student & Financial Information
Sys. Soft/Hardware ............... 1,000
Forestry
Bio Fuel Initiative .................. 500
Distance Learning .................. 3,150
Public Display ..................... 3,150
Fredonia
High Tech Incubator ................ 3,000
Geneseo
Integrated Science Building
Project ......................... 14,500
Maritime
Campus-wide Projects ................. 700
Pier Replacement and expansion .... 10,000
Morrisville
Automotive Performance Center
Rehabilitation ................... 2,500
New Paltz
Student Union Building
Renovation and Improvements ..... 10,000
Oneonta
Fine Arts Building ................. 8,000
Oswego
Renovation of Television and
radio facilities ................... 875
Plattsburgh
Electrical Systems Upgrade ......... 3,000
Emergency Power System ............. 3,000
Potsdam
Cogeneration Facility .............. 8,000
Purchase
Central Plaza Renovations and
Improvements .................... 15,000
Stony Brook
Student Recreation Center ......... 19,500
Athletic Department ................ 1,500
Expansion and outdoor athletics
stadium and new engineering
building ........................ 22,200
Stony Brook Long Island Children's
742 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Hospital / MART Center ........... 5,000
Southampton Acquisition ........... 35,000
Utica-Rome
Auxiliary Services Building ....... 13,600
University at Buffalo
School of Engineering - Phase 1 ... 25,000
University-wide
For services and expenses
for the development of a
high-tech portal to be
developed pursuant to a
memorandum of understand-
ing to be executed by the
Commission on Independent
Colleges and Universities
(CICU) and the state
university of New York
(SUNY) ........................... 2,500
New York Network ................... 1,600
Educational Opportunity
Centers Construction, acqui-
sition, renovation or reha-
bilitation of a facility
including equipment and
other necessary and inci-
dental costs related to a
new Educational Opportunity
Center to be located in the
City of Rochester ................. 12,000
Construction, acquisition,
renovation or rehabilitation
of a facility including
equipment and other neces-
sary and incidental costs
related to a new Educational
Opportunity Center to be
located in the City of
Buffalo ........................... 12,000
-----------
Total ............................ 415,775
===========
By chapter 53, section 1, of the laws of 2005, as amended by chapter 62,
section 3, of the laws of 2005:
An advance to SUNY hospitals for alterations, improvements, service
and expenses, and new facilities including costs incurred prior to
April 1, 2005 (28FH0508) (45921) ... 69,000,000 .. (re. $19,122,000)
Project Schedule
AMOUNT
--------------------------------------------
743 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Brooklyn
Emergency Department Expansion
including Bio-terrorism
Readiness construction and
renovation ......................... 5,000
Emergency system Expansion and
Information Technology
Infrastructure ..................... 3,000
Cardiovascular Service
restoration and expansion .......... 4,000
Intensive Care Unit Expansion ........ 2,000
Ambulatory Services Expansion and
rehabilitation ..................... 3,000
Parking Services Expansion and
Rehabilitation ..................... 2,000
Clinical Laboratory Relocation ....... 3,000
Additional Hospital-wide
priorities ......................... 1,000
Syracuse
Additional costs related to
medical/surgical expansion ........ 10,000
East Wing Ambulatory Cancer
Center ............................ 10,000
Additional Hospital-wide
priorities ......................... 3,000
Stonybrook HSC
Cancer Center ..................... 23,000
----------
69,000
==========
By chapter 53, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2012:
Advance for alterations and improvements to various facilities including
services and expenses, service contracts, memorandum of understand-
ing, capital design, construction, acquisition, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, new facilities, program improvement or program change,
technology, environmental, protection, energy conservation, accredi-
tation, facilities for the physically disabled and related projects
including costs incurred prior to April 1, 2004 subject to a plan
developed by the state university and approved by the director of
the budget. Notwithstanding any provision of law, rule or regulation
to the contrary, amounts designated as university-wide, may be made
available for projects identified and approved by the governor and
the chancellor of the state university of New York pursuant to the
NY-SUNY 2020 challenge grant program (28F80408) (45922) ............
1,612,000,000 ..................................... (re. $3,386,000)
744 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2004, as amended by chapter 53,
section 1, of the laws of 2010:
Alterations and improvements for projects university-wide, including
services and expenses and minor rehabilitation and improvement,
including costs incurred prior to April 1, 2004 (28R80408) (45924)
... 25,002,000 ....................................... (re. $86,000)
By chapter 53, section 1, of the laws of 2003:
Advance to SUNY hospitals for alterations, improvements, services and
expenses, and new facilities including costs incurred prior to April
1, 2003 subject to a plan developed by the state university and
approved by the director of the budget (28FH0308) (45921) ..........
350,000,000 ....................................... (re. $6,213,000)
Schedule
PROJECT AMOUNT
----------------------------------------------------------
(thousands of dollars)
Brooklyn .......................................... 74,700
For university-wide projects which may
include but are not limited to:
-Cancer Center
-Children's Center
-General and Ambulatory Surgery
-Transplant and Renal Services
-Geriatrics Center
Syracuse ......................................... 126,700
For university-wide projects which may
include but are not limited to:
-Medical/Surgical Expansion
-Cancer Center
-Pediatric Center
-Northwing Renovation
-Operating Room Expansion
Stony Brook ...................................... 123,600
For university-wide projects which may
include but are not limited to:
-Cardiovascular Expansion
-Cancer Center
-Neo-natal Intensive Care Unit and Obstet-
rics
-Expansion Ambulatory Surgery Expansion
-Medical/Surgical Expansion
University-wide Hospital Projects ................. 25,000
-Subject to a plan developed by the state
university and approved by the director
of the budget
--------------
Total .......................................... 350,000
==============
745 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2016:
For additional General Maintenance and improvements (28R89808) (45923)
... 100,250,000 ................................... (re. $1,476,000)
STATE UNIVERSITY CAPITAL PROJECTS FUND (CCP)
Capital Projects Funds - Other
State University Capital Projects Fund
State University Capital Projects Account - 32400
Administration Purpose
By chapter 54, section 1, of the laws of 2014:
Alterations and improvements for projects university-wide including,
services and expenses, new facilities, and projects approved pursu-
ant to the NY-SUNY 2020 challenge grant program, which may include
revenue transfers from various external revenue sources and the
payment of liabilities prior to April 1, 2014 (28C11450) (45925) ...
150,000,000 ...................................... (re. $35,332,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements for projects university-wide including,
services and expenses, new facilities, and projects approved pursu-
ant to the NY-SUNY 2020 challenge grant program, which may include
revenue transfers from various external revenue sources and the
payment of liabilities prior to April 1, 2013 (28C11350) (45925) ...
25,000,000 ....................................... (re. $16,586,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements for projects university-wide including,
services and expenses, new facilities, and projects approved pursu-
ant to the NY-SUNY 2020 challenge grant program. May include revenue
transfers from various external revenue sources and the payment of
liabilities prior to April 1, 2012 (28C11250) (45925) ..............
184,000,000 ...................................... (re. $24,831,000)
By chapter 53, section 1, of the laws of 2008:
Alterations and improvements for projects university-wide including
services and expenses and new facilities. May include revenue trans-
fer from various external revenue sources and the payment of liabil-
ities incurred prior to April 1, 2008 (28C10850) (45925) ...........
500,000,000 ...................................... (re. $99,496,000)
By chapter 53, section 1, of the laws of 2004, as added by chapter 55,
section 4, of the laws of 2004:
Alterations and improvements for projects university-wide including
services and expenses and new facilities. May include revenue trans-
fer from various external revenue sources and the payment of liabil-
ities incurred prior to April 1, 2004 (28080450) (45925) ...........
150,000,000 ...................................... (re. $17,401,000)
746 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2002:
Alterations and improvements for projects university-wide including
new facilities. May include revenue transfer from various external
revenue sources and the payment of liabilities incurred prior to
April 1, 2002 (28C10250) (45925) ... 20,000,000 ... (re. $9,896,000)
Capital Projects Funds - Other
State University Capital Projects Fund
State University Capital Projects Account - 32400
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for projects university-wide including,
services and expenses, new facilities, and projects approved pursu-
ant to the NY-SUNY 2020 challenge grant program, which may include
revenue transfers from various external revenue sources and the
payment of liabilities prior to April 1, 2020 (28C12003) (45925) ...
100,000,000 ...................................... (re. $99,952,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for projects university-wide including,
services and expenses, new facilities, and projects approved pursu-
ant to the NY-SUNY 2020 challenge grant program, which may include
revenue transfers from various external revenue sources and the
payment of liabilities prior to April 1, 2018 (28C11803) (45925) ...
100,000,000 ...................................... (re. $46,714,000)
Capital Projects Funds - Other
State University Capital Projects Fund
State University Capital Projects Account - 32400
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2022:
For services and expenses of capital improvements, available to state
university of New York state-operated and statutory colleges as
defined in section 352 of the education law subject to a plan
approved by the director of the budget. Funding from this appropri-
ation shall be available for, but not limited to, service contracts,
memoranda of understanding, capital design, construction, acquisi-
tion, reconstruction, rehabilitation, equipment and personal service
costs including costs incurred prior to April 1, 2020 (28MB2008)
(45938) ... 100,000,000 ......................... (re. $100,000,000)
STATE UNIVERSITY RESIDENCE HALL REHABILITATION FUND (CCP)
Capital Projects Funds - Other
SUNY Residence Halls Rehabilitation and Repair Fund
SUNY Residence Halls Rehabilitation and Repair Account - 30100
Preservation of Facilities Purpose
747 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D32203) (45926) ... 75,000,000 ................ (re. $75,000,000)
By chapter 54, section 1, of the laws of 2021:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D32103) (45926) ... 75,000,000 ................ (re. $64,663,000)
By chapter 54, section 1, of the laws of 2020:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D32003) (45926) ... 75,000,000 ................ (re. $48,618,000)
By chapter 54, section 1, of the laws of 2019:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31903) (45926) ... 50,000,000 ................. (re. $7,488,000)
By chapter 54, section 1, of the laws of 2018:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
748 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31803) (45926) ... 50,000,000 ................ (re. $10,000,000)
By chapter 55, section 1, of the laws of 2016:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31603) (45926) ... 50,000,000 ................. (re. $4,985,000)
By chapter 54, section 1, of the laws of 2015:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31503) (45926) ... 50,000,000 ................. (re. $3,343,000)
By chapter 54, section 1, of the laws of 2014:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31403) (45926) ... 50,000,000 ................. (re. $2,802,000)
By chapter 54, section 1, of the laws of 2013:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
749 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31303) (45926) ... 50,000,000 ................. (re. $2,597,000)
By chapter 54, section 1, of the laws of 2012:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred or suballocated to the dormitory authori-
ty and/or the state university of New York for such purpose
(28D31203) (45926) ... 45,000,000 ................. (re. $3,805,000)
By chapter 54, section 1, of the laws of 2011:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund or other external revenue
sources subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be transferred to the dormitory authority and/or the
state university of New York for such purpose (28D31103) (45926) ...
90,000,000 ........................................ (re. $1,877,000)
By chapter 53, section 1, of the laws of 2008:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund - 330 or other external
revenue sources subject to a plan developed by the state university
and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be transferred to the dormitory authority and/or
the State University of New York for such purposes (28D30803)
(45926) ... 123,000,000 ........................... (re. $1,131,000)
By chapter 53, section 1, of the laws of 2003:
Alterations and improvements for residence hall rehabilitation
projects and for residence hall renovations including services and
expenses, to be financed by a transfer from the debt service fund
state university dormitory income fund - 330 or other external
revenue sources subject to a plan developed by the state university
and approved by the director of the budget.
Notwithstanding any other law to the contrary, all or a portion of the
amounts hereby appropriated may be transferred to the dormitory
750 12554-05-3
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority for such purposes (28D30303) (45926) .....................
100,000,000 ......................................... (re. $184,000)
751 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Administration Purpose
By chapter 53, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2016:
For additional state financial assistance to community colleges for
alterations and improvements to various facilities including capital
design, construction, acquisition, reconstruction, rehabilitation
and equipment; for health and safety, preservation of facilities,
new facilities, program improvement or program change, environmental
protection, energy conservation, accreditation, facilities for the
physically disabled, and related projects. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund for such purposes (28PR98C1) (45908) .............
25,000,000 .......................................... (re. $201,000)
By chapter 53, section 1, of the laws of 1998, as amended by chapter 54,
section 1, of the laws of 2018:
For an additional advance for state financial assistance to community
colleges for alterations and improvements to various facilities
including capital design, construction, acquisition, reconstruction,
rehabilitation and equipment; for health and safety, preservation of
facilities, new facilities, program improvement or program change,
environmental protection, energy conservation, accreditation, facil-
ities for the physically disabled, and related projects including
plan preparation costs incurred prior to April 1, 1998. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28NF98C1) (81067) .........
175,000,000 ....................................... (re. $1,000,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Health and Safety Purpose
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2012:
State financial assistance to community colleges for alterations and
improvements to various facilities including service contracts,
memorandum of understanding, capital design, construction, acquisi-
tion, reconstruction, rehabilitation, equipment and personal service
costs; for health and safety, preservation of facilities, technology
upgrades, new facilities, program improvements or program changes,
environmental protection, energy conservation, accreditation, facil-
ities for the physically disabled, and related projects, including
752 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
costs incurred prior to April 1, 2008, subject to a plan submitted
by the state university and approved by the director of the budget.
Notwithstanding any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund for such purposes (28R80801)
(45909) ... 20,000,000 ........................... (re. $19,441,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
-------------------------------------------------------------
(thousands of dollars)
Statewide
Subject to a plan developed
by the state university
and approved by the
director of the budget
Critical Maintenance, Safety
and Security ...................... 40,000 20,000
------- -------
Total ................................. 40,000 20,000
======= =======
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement or Program Change Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities, including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2022, subject to a plan submitted by the state university
and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the state univer-
sity construction fund or the dormitory authority of the state of
New York for such purposes (28CC2208) (45931) ......................
56,883,000 ....................................... (re. $55,464,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
753 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2021, subject to a plan submitted by the state university
and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the state univer-
sity construction fund or the dormitory authority of the state of
New York for such purposes (28CC2108) (45931) ......................
14,617,000 ....................................... (re. $14,042,000)
By chapter 54, section 1, of the laws of 2020:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2020, subject to a plan submitted by the state university
and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the state univer-
sity construction fund or the dormitory authority of the state of
New York for such purposes (28CC2008) (45931) ......................
46,038,000 ....................................... (re. $36,552,000)
By chapter 54, section 1, of the laws of 2019:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2019, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1908) (45931) .........
37,060,000 ....................................... (re. $18,475,000)
Project Schedule
754 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ESTIMATED ESTIMATED
TOTAL SHARE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Campus critical maintenance
projects ..................... 1,366 683
Broome County Community College
CEA Center for Integrated
Research ..................... 250 125
Campus critical maintenance
projects ..................... 96 48
Cayuga County Community College
Cornell Cooperative Extension
Building Renovation .......... 4,800 2,400
Childcare Facilities Renovation. 1,000 500
Infrastructure Improvements .... 200 100
Corning Community College
Planetarium Renovations ........ 450 225
Campus critical maintenance
projects ..................... 280 140
Academic Buildings - Safety
Upgrades ..................... 150 75
Dutchess County Community College
Aviation Maintenance and
Education Center ............. 5,000 2,500
Roof Replacements .............. 3,188 1,594
Hudson Hall Critical Maintenance
Projects ..................... 100 50
Erie Community College
Campus critical maintenance
projects ..................... 5,200 2,600
Fashion Institute of Technology
Energy Savings Projects -
Campuswide.................... 7,840 3,920
HVAC Projects - Campuswide ..... 4,602 2,301
Facade Rehabilitation .......... 1,346 673
Finger Lakes Community College
Campus critical maintenance
projects ..................... 1,280 640
CMAC Renovation ................ 616 308
Parking and Utility Rehabilita-
tion ......................... 600 300
Master Plan .................... 250 125
Athletic Fields Renovation ..... 200 100
Fulton-Montgomery Community College
Campus critical maintenance
projects ..................... 1,150 575
Lab and Classroom Renovations .. 1,000 500
Genesee Community College
755 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Backup Power Improvements ...... 700 350
Herkimer County Community College
Smart Grid Laboratory
Improvements ................. 192 96
External Stairs Rehabilitation.. 100 50
Swimming Pool Rehabilitation ... 60 30
Hudson Valley Community College
Guenther Enrollment Service
Center Repair and Renovation.. 1,310 655
Master Plan .................... 350 175
Parking Improvements ........... 320 160
Jamestown Community College
Campus critical maintenance
projects ..................... 1,116 558
Mohawk Valley Community College
Airframe & Powerplant Hangar
Renovation ................... 1,000 500
Campus Wayfinding & Signage .... 84 42
North Country Community College
Campus critical maintenance
projects ..................... 300 150
Orange County Community College
Campus critical maintenance
projects ..................... 1,436 718
Schenectady Community College
Begley Hall Renovations ........ 9,492 4,746
Suffolk County Community College
Campus critical maintenance
projects ..................... 5,150 2,575
Campus Safety Improvements ..... 200 100
Ulster County Community College
Roof Replacement and Exterior
Improvements ................. 4,490 2,245
Campus critical maintenance
projects ..................... 1,600 800
Campus Sitework ................ 1,500 750
Equipment and Technology Upgrade 754 377
Westchester Community College
Technology Upgrades ............ 1,300 650
Library Building A/C Equipment
Replacement .................. 1,100 550
Roof Replacement Phase V -
Campuswide ................... 602 301
---------- ----------
Total ........................ 74,120 37,060
========== ==========
By chapter 54, section 1, of the laws of 2018:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
756 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2018, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1808) (45931) .........
74,270,000 ....................................... (re. $44,560,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL SHARE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Campus wide improvements ......... 798 399
Furniture Fixtures and
Equipment Culinary Center ...... 300 150
Columbia-Greene Community College
Renovations and Improvements ..... 20,000 10,000
Classroom Upgrades ............... 300 150
Corning Community College
Critical Maintenance Items ....... 500 250
Dutchess County Community College
Facility Master Planning ......... 500 250
Fire Alarm Upgrade ............... 824 412
Erie Community College
Building Infrastructure
Improvements/Renovations ......... 1,000 500
College-wide Sitework ............ 800 400
Code Compliance Upgrades ......... 600 300
Roof Replacement and Water-
proofing ....................... 2,000 1,000
Mechanical, Electrical and
Plumbing Improvements .......... 1,000 500
College-wide Preservation ........ 600 300
Fashion Institute of Technology
Energy Savings and Refurbishment
Projects ....................... 7,372 3,686
Classroom Renovations ............ 300 150
College Bookstore Ph 1 ........... 1,328 664
New Academic Building ............ 40,754 20,377
Finger Lakes Community College
Parking and Utility Upgrades ..... 750 375
757 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Athletic Fields Renovation ....... 5,000 2,500
Critical Maintenance Items ....... 1,000 500
Herkimer County Community College
Bookstore/Library Renovations .... 300 150
Roofs: RMCC/Tech Centers ......... 1,500 750
Stadium Turf Replacement ......... 700 350
Hudson Valley Community College
Center: Manufacturing Skills ..... 11,600 5,800
Update Mechanical Systems ...... 1,022 511
Jamestown Community College
Critical Maintenance ............. 1,000 500
Mohawk Valley Community College
Data/WiFi Infrastructure ......... 200 100
Athletic Field Revitalization .... 500 250
Science/Tech Building Expansion .. 450 225
ACC Basement Flooding Mitigation . 250 125
Monroe Community College
Renovate Science Labs ............ 3,856 1,928
Nassau County Community College
Historic Theater Building Renova-
tion ........................... 6,000 3,000
Tunnel Repair .................. 4,200 2,100
Campus-wide Facilities Up-
grade ........................ 3,000 1,500
Culinary Food Service Renova-
tion ......................... 3,000 1,500
Road and Parking Rehabilitation. 2,350 1,175
Infrastructure and Master
Plan ......................... 2,252 1,126
Road Parking and Paving ........ 2,000 1,000
Concrete Repairs ............... 1,200 600
Renovation to Cluster C ........ 700 350
Building Systems Upgrades ...... 500 250
Various Facilities Upgrades .... 500 250
Elevator Restoration ........... 200 100
North Country Community College
Maintenance Upgrades ............. 310 155
Dining Services Upgrades ......... 200 100
Orange County Community College
Horton Hall Site Repairs ......... 350 175
Pumps and Motors Replacement ..... 300 150
Campus Wayfinding ................ 260 130
Instructional Equipment .......... 500 250
Kaplan Facade Repair ............. 60 30
Schenectady Community College
Elston Hall Exterior Renovations . 350 175
Begley Learning Commons Ph 1 ..... 672 336
Campus Safety Office Relocation .. 142 71
Campus Wayfinding ................ 178 89
Suffolk County Community College
758 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Infrastructure Improvements Ph II. 5,150 2,575
SUNY Sullivan
Facility Master Planning ......... 200 100
Ulster County Community College
Infrastructure: Public Safety Fa-
cility ......................... 4,552 2,276
Westchester Community College
Site Improvement/Upgrade Ph II ... 750 375
Technology Upgrades On-Campus
Cycle 2 Ph I ................... 1,236 618
Technology Upgrades Off-Campus
Cycle 2 Ph I ................... 100 50
Facility Master Planning ......... 224 112
---------- ----------
Total .......................... 148,540 74,270
========== ==========
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2017, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1708) (45931) .........
55,079,000 ....................................... (re. $16,771,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL SHARE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Purchase and Improvements ............ 180 90
Campus wide improvements ............. 620 310
Energy Improvements .................. 100 50
Warren hall/Student Success .......... 400 200
Furniture Fixtures and
Equipment ........................ 1,300 650
Clinton Community College
759 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Main Building Upgrades ............ 12,000 6,000
Columbia-Greene Community College
Critical Maintenance and Safety ...... 100 50
Transformer Upgrades ................. 150 75
Corning Community College
Health Education Center ............ 1,000 500
Dutchess County Community College
Aviation and Powerplant Program .... 8,090 4,045
Erie Community College
Building Infrastructure
Improvements/Renovations ........... 2,000 1,000
College-wide Sitework .............. 1,300 650
Code Compliance Upgrades ............. 750 375
Roof Replacement and Water-
proofing ......................... 2,000 1,000
Mechanical, Electrical and
Plumbing Improvements ............ 1,000 500
Fashion Institute of Technology
Energy Savings and Elevator/
Escalator Refurbishment ......... 10,556 5,278
Info Lab ............................. 300 150
Finger Lakes Community College
Maintenance Upgrades ............... 1,508 754
Telephone Upgrade .................... 800 400
Greenhouse Replacement ............... 100 50
Athletic Fields Renovation ........... 100 50
Fulton Montgomery Community College
Administrative and Community
Center ........................... 2,600 1,300
Bathroom and Locker Room Upgrades .. 2,200 1,100
Campus Upgrades ...................... 900 450
Herkimer County Community College
Energy Savings Projects ............ 1,898 949
Jamestown Community College
Maintenance Upgrades ............... 1,000 500
Mohawk Valley Community College
Technology Upgrades .................. 400 200
Nassau County Community College
Space Consolidation ................ 8,000 4,000
Brick Cafe Renovation .............. 6,000 3,000
Building Systems Upgrade ........... 1,000 500
Concrete Repairs ..................... 500 250
Utility Repairs .................... 2,000 1,000
Roof Repairs ....................... 1,200 600
Academic Dept Renovation ........... 3,000 1,500
Infrastructure Upgrades ............ 1,000 500
Parking and Paving ................. 6,200 3,100
Cluster C Upgrades ................. 4,000 2,000
Roof and Parking Upgrades .......... 2,950 1,475
Health and Safety .................. 1,000 500
Library Renovation ................. 1,000 500
760 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ADA Compliance ..................... 1,200 600
North Country Community College
Maintenance Upgrades ............... 1,550 775
Orange County Community College
Parking Improvements ................. 400 200
Heating Upgrades ..................... 376 188
Cooling Tower ........................ 252 126
Schenectady Community College
Elston Hall Facility Improvements .. 2,160 1,080
Master Plan ........................... 30 15
Suffolk County Community College
Roof Upgrade ......................... 408 204
Health and Sports Facility ......... 4,000 2,000
Tompkins Cortland Community College
Childcare Facility ................. 3,000 1,500
Ulster County Community College
Roof and Exterior Upgrades ........... 396 198
Other Sitework ........................ 60 30
Infrastructure Upgrades ............ 1,352 676
Westchester Community College
Phase 4 Roof Replacement ........... 1,886 943
Infrastructure Upgrades .............. 786 393
Technology Upgrades On-Campus
Phase V .......................... 1,000 500
Technology Upgrades Off-Campus
Phase V ............................ 100 50
---------- ----------
Total .......................... 110,158 55,079
========== ==========
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2016, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1608) (45931) .........
23,053,000 ........................................ (re. $5,689,000)
Project Schedule
761 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ESTIMATED ESTIMATED
TOTAL SHARE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Broome County Community College
Disabilities Access .................. 500 250
HVAC and Roof Replacements ........... 540 270
Roads, Parking and Walkway
Replacement ........................ 740 370
Clinton Community College
Mechanical Equipment Replacement ..... 250 125
Learning Commons Renovations ....... 3,000 1,500
Columbia-Greene Community College
Emergency Repairs and Critical
Maintenance and Safety ............. 100 50
Erie Community College
Building Infrastructure
Improvements/Renovations ........... 1,200 600
College-wide Sitework .............. 1,000 500
Roof Replacement and Water-
proofing ......................... 2,000 1,000
Fashion Institute of Technology
Energy Savings Upgrades ........... 10,698 5,349
Finger Lakes Community College
Classroom Upgrades .................. 356 178
Site and Building Improvements ....... 946 473
Genesee County Community College
Dining Hall/Kitchen Expansion ........ 450 225
Herkimer County Community College
Master Planning ...................... 100 50
Hudson Valley Community College
Athletics Facility Upgrades ........ 1,000 500
Mohawk Valley Community College
Bookstore and Student Commons ........ 900 450
Campus Way-finding and Signage ........ 76 38
Learning Commons Development and
Related Renovation ................. 400 200
Monroe Community College
Property Preservation Phase 2 ...... 3,604 1,802
Orange County Community College
PE Building Reconstruction ........... 120 60
Roof Reconstruction .................. 400 200
Building Demolition/Parking
Expansion .......................... 180 90
Morrison Hall: Heat Pumps
Replacement ........................ 300 150
Safety/Security: Cameras Phase II .... 300 150
Schenectady Community College
Elston Hall Facility Improvements .. 1,276 638
Roof Repairs Phase 3 ................. 300 150
762 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Boiler Replacements .................. 120 60
Suffolk County Community College
Infrastructure Improvements ........ 5,150 2,575
Storm Water Initiative ............... 786 393
Improvements to New and Existing
Facilities ....................... 1,000 500
Ulster County Community College
Backup Generators .................... 994 497
HVAC Controllers ..................... 300 150
Leach Field .......................... 208 104
Vanderlyn Pedestrian Bridge .......... 176 88
Interior Renovation and Equipment .... 150 75
Gym Wall Replacement ................. 114 57
Technology Facility Upgrades ......... 300 150
Water Supply Extension to Public
Water ............................ 3,004 1,502
Kelder House Renovation .............. 142 71
Westchester Community College
Site Improvements/Upgrade Phase I .. 1,626 813
Technology Upgrades On-Campus
Phase IV ......................... 1,200 600
Technology Upgrades Off-Campus
Phase IV ........................... 100 50
---------- ----------
Total ........................... 46,106 23,053
========== ==========
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2015, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28C11508) (45931) .........
81,176,000 ....................................... (re. $27,324,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
763 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Broome County Community College
Carnegie Building ............... 10,000 5,000
Cayuga Community College
Karpinski Stadium ............... 6,000 3,000
Fashion Institute of Technology
Renovation: Amphitheater ........ 12,000 6,000
Classroom Renovation ............ 18,000 9,000
Genesee County Community College
Admissions Relocation ........... 256 128
Admissions Renovation ........... 896 448
Success Center .................. 5,188 2,594
Event Center .................... 13,850 6,925
Herkimer County Community College
Johnson Hall .................... 50 25
Jefferson Community College
Collaborative Learning Center ... 12,300 6,150
Dewey Building .................. 1,700 850
Monroe Community College
Downtown Campus ................. 13,212 6,606
Niagara Community College
New Learning Commons: Design .... 1,000 500
New Learning Commons: Construc-
tion .......................... 24,000 12,000
Onondaga Community College
West Quad Renovation:
Ferante/Coulter ................. 17,600 8,800
Orange County Community College
Biotech Building Renovation ..... 6,800 3,400
Suffolk County Community College
STEM Building ................... 19,500 9,750
---------- ----------
Total ......................... 162,352 81,176
========== ==========
For services and expenses for the state share of financial assistance
to community colleges for alterations and improvements to various
facilities including service contracts, memoranda of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2015, subject to a plan submitted by the state university
and approved by the director of the budget, and which may include,
but not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
764 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1508) (45912) .........
62,153,000 ....................................... (re. $14,188,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack County Community College
Critical Maintenance and Facilities
Improvements ................... 1,630 815
STEM Building Renovation ......... 21,000 10,500
Broome County Community College
Site Improvements ................ 1,200 600
Electrical System Upgrades ....... 350 175
Clinton County Community College
Athletic Facilities Renovation ... 300 150
Columbia-Green Community College
Emergency Repairs ................ 70 35
Erie County Community College
Roof Replacements and Waterproof-
ing ............................ 6,000 3,000
College Wide Code Compliance .... 300 150
Finger Lakes Community College
Capital Improvements ............ 2,750 1,375
Sanitary Improvements ........... 190 95
Site Improvements ............... 200 100
Geneva Campus ................... 1,148 574
Fulton Montgomery County Community
College
Site Work and Campus Safety ..... 1,000 500
Infrastructure Upgrades ......... 1,876 938
Student Union Improvements ...... 2,330 1,165
Hudson Valley Community College
Athletic Facilities Renovation .. 3,500 1,750
Jefferson Community College
Maintenance and Facility Upgrades 7,000 3,500
Mohawk Valley Community College
Plumley Addition & Renovation ... 29,224 14,612
Payne Hall Restoration .......... 520 260
Trades Building Renovation ...... 2,950 1,475
Nassau Community College
Building Systems Renovations .... 1,500 750
Master Plan Construction ........ 5,338 2,669
Hospitality Program Renovation .. 1,500 750
Various Facilities Upgrades ..... 500 250
Concrete Repairs ................ 1,200 600
ADA Renovations ................. 700 350
Site Improvements ............... 950 475
765 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Site and Road Improvements ...... 1,400 700
Academic Building Renovation .... 2,000 1,000
Critical Maintenance Projects ... 5,000 2,500
Niagara Community College
Grounds Storage and Site Modifica-
tion ........................... 300 150
Orange County Community College
Site Improvements ................ 220 110
Boiler Replacements .............. 710 355
Critical/Deferred Maintenance .... 200 100
Safety and Security Systems ...... 250 125
Schenectady County Community College
Phase 2 Roof Repairs ............. 350 175
Suffolk County Community College
Master Plan Update ............... 500 250
Sullivan County Community College
Energy Savings Improvements ...... 9,000 4,500
Roadway Improvements ............. 950 475
Ulster County Community College
Kingston Extension Center ........ 7,058 3,529
Westchester County Community College
On Campus Technology Upgrades .... 1,042 521
Off Campus Technology Upgrades ... 100 50
---------- ----------
Total .......................... 124,306 62,153
========== ==========
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to existing facilities
including service contracts, memorandum of understanding, capital
design, construction, reconstruction, rehabilitation, equipment and
personal service costs; for health and safety, preservation of
facilities, technology upgrades, program improvements or program
changes, environmental protection, energy conservation, accredi-
tation, facilities for the physically disabled, and related
projects, including costs incurred prior to April 1, 2014, subject
to a plan submitted by the state university and approved by the
director of the budget, and which may include, but not be limited
to, projects in the following schedule. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund or the dormitory authority of the state of New
York for such purposes (28CC1408) (45912) ..........................
32,129,000 ....................................... (re. $13,400,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
766 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Campus Renovations ................... 710 355
Critical/Deferred Maintenance ........ 268 134
Health/Safety Projects ............... 854 427
Broome County Community College
Rehabilitate Campus Buildings ..... 19,500 9,750
HVAC and Roof Replacements ........... 500 250
Update Facilities Master Plan ........ 300 150
Music Practice Suite Renovation ...... 500 250
Clinton Community College
Science Building Emergency Power ..... 550 275
Columbia-Greene Community College
Update Facilities Master Plan ........ 120 60
Erie Community College
Roof Repair and Replacement ........ 1,600 800
Masonry Repairs ...................... 150 75
Infrastructure Improvements .......... 500 250
Fashion Institute of Technology
Building Fire Alarm Upgrades ....... 6,000 3,000
Renovation: Museum ................ 2,800 1,400
Classroom Renovation ................. 200 100
Finger Lakes Community College
Geneva Campus Renovation ........... 1,424 712
Canandaigua Campus Renovation ........ 700 350
Fulton-Montgomery Community College
Technology Upgrades .................. 800 400
Genesee County Community College
Main Building Entrance Renovation .... 135 68
Herkimer County Community College
Flood Damage Reconstruction ........... 20 10
Jamestown Community College
Food Service Renovation ............ 1,540 770
Mohawk Valley Community College
Exterior Renovations ................. 147 74
Community Room Renovation ............ 345 172
Campus Wayfinding and Signage ........ 469 235
Monroe Community College
Library Renovation ................. 1,004 502
Services for Students Renovation ... 2,000 1,000
Science Lab Renovation ............... 864 432
Nassau Community College
Information Technology Upgrades ...... 760 380
Window Restoration Program ......... 2,000 1,000
Infrastructure Repairs ............. 2,000 1,000
Elevator Replacement Program ....... 2,000 1,000
Health and Safety Projects ......... 1,000 500
Security Upgrades .................. 2,200 1,100
North Country Community College
767 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campus Wide Capital Renovations ...... 400 200
Orange County Community College
Roof Repair and Replacement .......... 320 160
Road and Parking Rehabilitation ...... 500 250
Swimming Pool Renovations ............ 310 155
Update Facilities Master Plan ........ 150 75
Student Services Renovation .......... 268 134
Schenectady Community College
Workforce Development Renovation ..... 500 250
Generator and Transformer ............ 400 200
Suffolk County Community College
Kreiling Hall Renovation ........... 3,180 1,590
Sullivan County Community College
Critical Maintenance Upgrades ........ 500 250
Road and Parking Rehabilitation ...... 950 475
Site Stabilization ................. 1,000 500
Equipment Replacement ................ 250 125
Instructional Facility Renovation ... 500 250
Westchester Community College
Historic Roof Replacement .......... 1,068 534
---------- ----------
Total ........................... 64,256 32,129
========== ==========
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2013, subject to a plan submitted by the state university and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1308) (45912) .........
38,499,000 ....................................... (re. $11,405,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
768 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Renovations: Student Center .......... 850 425
Cayuga County Community College
Building System Upgrades ............. 786 393
Clinton Community College
Roofs ................................ 150 75
Fire Safety and Security Systems ...... 60 30
Corning Community College
Facilities Master Plan ............... 180 90
Erie Community College
Roofs .............................. 2,000 1,000
Window and Door Replacement ........ 1,000 500
Code Compliance ...................... 400 200
Fashion Institute of Technology
Building System Upgrades ........... 3,000 1,500
Renovation: Museum ................ 2,000 1,000
Classroom Renovation ............... 1,800 900
Finger Lakes Community College
Infrastructure Project ............. 1,220 610
Herkimer County Community College
Renovation of Alumni Hall .......... 1,000 500
Monroe Community College
Property Preservation ............. 23,180 11,590
Site Improvements .................. 2,400 1,200
Renovation of Public Safety
Building ......................... 6,140 3,070
Nassau Community College
Energy/Sustainability Projects ....... 310 155
Orange County Community College
HVAC Rehabilitation ................. 596 298
Critical Maintenance and Safety
Projects ........................... 316 158
Exterior Renovations ................. 300 150
Rockland Community College
Building System Upgrades ........... 1,400 700
Suffolk County Community College
Infrastructure Improvements ....... 10,300 5,150
Site Improvements .................. 3,740 1,870
Renovation: Plant Operations ...... 3,650 1,825
Renovation: Warehouse ............... 680 340
Tompkins-Cortland Community College
Master Plan Items .................. 7,050 3,525
Westchester Community College
Roofs .............................. 1,210 605
Technology Upgrades ................ 1,280 640
---------- ----------
Total ........................... 76,998 38,499
========== ==========
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
769 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2011, subject to a plan submitted by the state university and
approved by the director of the budget, and which may include, but
not be limited to, projects in the following schedule. Notwith-
standing any other law to the contrary, all or a portion of the
amounts hereby appropriated may be suballocated or transferred to
the state university construction fund or the dormitory authority of
the state of New York for such purposes (28CC1208) (45912) .........
86,969,000 ....................................... (re. $23,108,000)
Project Schedule
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Capital Improvement Program
Projects ............................ 544 272
Broome Community College
Science Technology Building,
Construction ....................... 2,000 1,000
Cayuga County Community College
Fulton Campus Expansion ............ 5,200 2,600
Performing Arts Center ............. 2,920 1,460
Clinton Community College
Boiler System Project .............. 2,500 1,250
Corning Community College
Renovation and Revitalization:
A/C ............................... 12,724 6,362
Dutchess Community College Roof
Replacement .......................... 450 225
Erie Community College
New Academic Building: North
Campus ............................ 30,000 15,000
Masonry Project: City Campus ...... 2,000 1,000
Roofs: College-wide ............... 4,000 2,000
North Campus Cooling System ........ 2,000 1,000
Fire Alarm Systems: College-
wide ................................. 500 250
Infrastructure Improvements:
College-wide ......................... 500 250
Burt Flickinger Athletic Cen-
Ter Renovation ....................... 354 177
770 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Code Compliance: College-
wide ................................. 200 100
Fashion Institute of Technology
Pomerantz Pavilion .................. 1,000 500
Fire Alarm Replacement .............. 3,000 1,500
Haft Auditorium: Construc-
tion ................................ 1,000 500
Finger Lakes Community College
Maintenance Capital Projects ........ 1,000 500
Viticulture Capital Project ......... 2,526 1,263
Fulton Montgomery Community College
Physical Education Building/
College Union Renovation ............ 2,276 1,138
Jamestown Community College
ARSC Building: Expansion/
Renovation .......................... 4,150 2,075
MTI Building: Expansion/
Renovation .......................... 1,884 942
Land Acquisition, Carnathan
Building Renovation ................. 1,600 800
CSCE Demolition ....................... 350 175
Mohawk Valley Community College
Field House/Jorgenson Center:
Construction .......................... 200 100
Monroe Community College
Public Safety Building/Build-
ing 12 .............................. 3,790 1,895
Window Replacement .................. 2,500 1,250
Parking & Loop Road Improve-
ments ............................... 1,200 600
Nassau Community College
Cluster C: Construction ............ 16,000 8,000
Space Consolidation: Con-
struction ........................... 8,000 4,000
IT Phased Infrastructure Up-
grades .............................. 8,000 4,000
Window Replacements ................. 4,000 2,000
Health and Safety Project ............. 500 250
Physical Plant Equipment and
Vehicles .............................. 600 300
Public Safety Building .............. 1,000 500
ADA Upgrades: Campus-wide ............ 500 250
NCC Fountain House .................... 120 60
IT Equipment Upgrades ............... 1,000 500
Niagara Community College
Culinary Arts/Hospitality/
Tourism Center ..................... 3,000 1,500
Orange County Community College
Science Engineering and
Technology Center ................. 21,100 10,550
Main Power Plant Upgrade ............ 1,000 500
771 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Greenhouse II: Replace Green-
house Building ........................ 300 150
Security/Safety Cameras:
Campus-wide ........................... 250 125
Schenectady County Community College
Roof Repair ........................... 830 415
Elevator Repair/Renovation ............ 362 181
Land Acquisition ...................... 260 130
Electrical Master Plan ................. 40 20
Flood Repair Project ................ 3,000 1,500
Suffolk County Community College
Infrastructure Improvements ........ 10,300 5,150
Parking Expansion: Ammerman
Campus ................................ 240 120
Westchester Community College
Technology Upgrades ................ 1,168 584
---------- ----------
Total .......................... 173,938 86,969
========== ==========
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2011, subject to a plan submitted by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund or the dormitory authority of the state of New
York for such purposes (28CC1108) (45912) ..........................
31,571,000 ........................................ (re. $4,739,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Capital Improvement Program
2011 ............................. 1,458 729
Fashion Institute of Technology
Gladys Marcus Library
Collections Facility ............. 1,000 500
772 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Broadcast Studio ................. 1,372 686
Wellness Center .................. 1,000 500
Finger Lakes Community College
Capital Improvement Program ...... 1,000 500
Niagara Community College
Hospitality & Tourism Institute
Project-Culinary ................. 9,650 4,825
Nassau County Community College
Rehab Plaza, Ph. II .............. 100 50
Renovation to Building C-Design .. 950 475
Renovation to Building V-Design .. 650 325
Renovation to Library-Design ..... 4,000 2,000
Elevator Renovations ............. 2,000 1,000
Space Consolidation Project-
Design ........................... 1,000 500
Infrastructure Assessment & MP
Update ........................... 500 250
Energy Savings Initiatives ....... 6,000 3,000
Repair Water Damaged Buildings ... 3,000 1,500
Health & Safety Improvements ..... 500 250
Tennis Facilities ................ 400 200
Orange County Community College
Newburgh Project ................. 10,708 5,354
Suffolk County Community College
Infrastructure Improvements ...... 10,300 5,150
Westchester Community College
Safety and Security Improve-
ments ............................ 1,742 871
Classroom Building Renovations ... 284 142
Gateway Building ................. 5,528 2,764
---------- ----------
Total .......................... 63,142 31,571
========== ==========
For additional advances for the state share of financial assistance to
community colleges for alterations and improvements to various
facilities including service contracts, memorandum of understanding,
capital design, construction, acquisition, reconstruction, rehabili-
tation, equipment and personal service costs; for health and safety,
preservation of facilities, technology upgrades, new facilities,
program improvements or program changes, environmental protection,
energy conservation, accreditation, facilities for the physically
disabled, and related projects, including costs incurred prior to
April 1, 2011, subject to a plan submitted by the state university
and approved by the director of the budget. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the state univer-
sity construction fund for such purposes (28CL1108) (45911) ........
799,750 ............................................. (re. $799,000)
Project Schedule
773 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
Jamestown Community College
Renovation of Carnahan
Center ......................... 1,199,500 599,750
Acquisition of land adjacent
to Jamestown campus .............. 400,000 200,000
---------- ----------
By chapter 53, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2010, subject to a plan submitted by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund or the dormitory authority of the state of New
York for such purposes (28CC1008) (45910) ..........................
22,426,000 ........................................ (re. $4,062,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Cayuga Community College
Purchase New Fulton Campus
And Expansion ................... 10,904 5,452
Performing Arts Center ............ 4,800 2,400
Finger Lakes Community College
Master Plan Project, Ph I .......... 5,516 2,758
Wayne County Science Lab-
Equipment .......................... 290 145
Fulton-Montgomery Community College
Classroom Building Ph, II .......... 2,500 1,250
Fashion Institute of Technology
FIT Labs Increase .................. 4,500 2,250
Gladys Marcus Library Special
Collections ...................... 1,000 500
774 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Haft Auditorium .................... 2,000 1,000
Orange County Community College
Campus Electric Power
Distribution ..................... 1,150 575
Parking Lot Paving ................... 500 250
Nassau County Community College
Banner Project/Life Sciences Build-
ing ................................ 1,612 806
Parking ............................ 4,000 2,000
Health and Safety
Infrastructure Assessment
and Master Plan Update ........... 570 285
North Country Community College
Capital Planning, Architec-
tural and Engineering Site
Analysis ........................... 220 110
Suffolk County Community College
Security Notification ................ 900 450
Infrastructure Improvements .......... 300 150
Westchester Community College
Safety and Security Improve-
ments ............................ 4,090 2,045
---------- ----------
Total ........................... 44,852 22,426
========== ==========
By chapter 53, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2009, subject to a plan submitted by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund or the dormitory authority of the state of New
York for such purposes (28CC0908) (45910) ..........................
45,700,000 ....................................... (re. $11,138,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
775 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(thousands of dollars)
Adirondack Community College
Facilities Master Plan and
Facilities Capital Improvement
Plan .......................... 1,270 635
Corning Community College
Athletic Center - Field House 10,274 5,137
Commons Renovation ............ 1,013 507
Library Expansion and Renova-
tion ........................ 10,992 5,496
Fulton-Montgomery Community
College
Critical Maintenance Projects
Campuswide .................. 1,250 625
Fashion Institute of Technology
Improvement Projects Campus-
wide .......................... 4,338 2,169
Jamestown Community College
Critical Maintenance Projects
Campuswide .................. 2,000 1,000
ARSC Third Floor Renovations .. 2,000 1,000
Demolition of Dilapidated
Housing ..................... 500 250
Parking Lot Expansion
(Cattaraugus) ............... 1,000 500
Library Learning Center Impv
(Cattaraugus) ............... 1,000 500
North County Center Purchase .. 4,000 2,000
New Science Building .......... 12,000 6,000
Monroe Community College
Building 9 Renovations,
Phase II .................... 4,380 2,190
Property Preservation ......... 7,600 3,800
Nassau Community College
Security System Expansion ..... 700 350
Fire Alarm Upgrades ........... 2,000 1,000
Road and Parking Lot Paving ... 9,600 4,800
Onondaga Community College
Renovate the Poor Farm
and Van Duyn Buildings ........ 6,200 3,100
Tompkins-Cortland Community
College
Upgrade/Modernization of
Electrical Panel ............ 1,600 800
Classroom Upgrade ............. 2,000 1,000
Westchester Community College
Health and Safety Improve-
ments, PH I ................. 2,292 1,146
To supplement campus-wide
improvements for projects
previously approved:
776 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Campuswide site; Hartford
Hall; Health Sci.; Admin
and PE Buildings ............ 3,390 1,695
---------- ----------
Total ....................... 91,400 45,700
========== ==========
By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, technology upgrades, new facilities, program
improvements or program changes, environmental protection, energy
conservation, accreditation, facilities for the physically disabled,
and related projects, including costs incurred prior to April 1,
2008, subject to a plan submitted by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund or the dormitory authority of the state of New
York for such purposes (28CC0808) (45910) ..........................
370,153,000 ..................................... (re. $128,376,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
-------------------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Regional Higher Education Center ............ 556 278
Broome Community College
Technology Building ...................... 10,000 5,000
Wales Building ............................ 3,000 1,500
Columbia-Greene Community College
Rehabilitation and Improvement-
Various Projects .......................... 1,900 950
Corning Community College
Renovations & Revitalization
Phase 2 .................................. 13,090 6,545
Alterations & Additions to Goff
Road Facility ............................. 1,436 718
Dutchess Community College
Hudson Hall Renovation ...................... 962 481
Campus Infrastructure ..................... 3,586 1,793
Washington Hall - Retaining Wall
and Lab Exhaust ............................. 460 230
Miscellaneous Repairs ....................... 200 100
777 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Browne Hall Renovations ..................... 600 300
Hudson Hall MEP ........................... 2,656 1,328
CBI Emergency Generator ..................... 508 254
Taconic Hall Addition and
Renovations ............................... 6,000 3,000
Falcon Hall Improvements .................... 200 100
Sitework Repairs and Modifications-
Parking Lot B ............................... 400 200
Drumlin and Dutchess Renovation ............. 934 467
Fashion Institute of Technology
Toy Design and Development Lab .............. 300 150
C2 Building ............................. 148,000 74,000
Finger Lakes Community College
Auditorium and Performing Arts
Facility ................................. 16,000 8,000
Finger Lakes Community College
Geneva Expansion ......................... 12,000 6,000
Fulton-Montgomery Community College
Upgrades to Waste Water Treatment
Plant ....................................... 422 211
Herkimer County Community College
Library Additions & Renovations .............. 50 25
Science Lab Updating and
Remodeling ................................ 2,200 1,100
Hudson Valley Community College
New Parking Structure .................... 15,600 7,800
Brahan Science Center and
Related Building Renovations ............. 54,400 27,200
Jamestown Community College
Facilities Master Plan Update ............... 140 70
Science Building and Facility
Enhancements ............................. 12,000 6,000
Mohawk Valley Community College
Campus Wide Improvements .................. 5,400 2,700
Field house .............................. 11,000 5,500
Monroe Community College
ATEC/DCC Building ........................ 12,900 6,450
ATEC/Building 9, Phase I ................. 12,000 6,000
Nassau Community College
Window Replacement ........................ 1,200 600
Road and Parking Paving ................... 4,000 2,000
Energy Savings Initiatives ................ 6,000 3,000
Fire Alarms and Public Address
System .................................... 4,200 2,100
New Performing Arts Building ............. 41,600 20,800
Niagara County Community College
Construct New Culinary Arts
Facility ................................. 13,200 6,600
Onondaga Community College
Athletics Complex ........................ 33,000 16,500
Technology Improvements ................... 1,782 891
778 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Upgrade Biology Laboratories .............. 2,700 1,350
Mawhinney Hall Renovation-
Phase 3 ................................... 4,118 2,059
Construct New Academic/Admini-
strative Building on East Quad ........... 18,900 9,450
Site Improvements ......................... 5,948 2,974
Relocate President's Suite ................ 1,012 506
Prepare Program Study of
Coulter Library ............................. 300 150
Campus-Wide Energy Projects ................. 676 338
Orange County Community College
Science, Engineering and
Tech Center .............................. 38,900 19,450
Improvements to Classroom
Facilities ................................ 2,000 1,000
Rockland Community College
Multi-Purpose Language Lab .................. 600 300
Master Plan Update .......................... 126 63
Academic II Building ........................ 500 250
Art Gallery and Art Studio/
Cultural Arts Center ........................ 200 100
Day Care Center ............................. 500 250
Building Energy Conservation .............. 1,000 500
Elevators Rehabilitation .................. 1,800 900
Library Roof Replacement .................. 1,100 550
Cultural Arts Center Roof
Replacement ................................. 736 368
Field House Resurface ....................... 400 200
Campus Site Improvements .................... 400 200
Tennis Court Resurface ....................... 76 38
Swimming Pool Repairs ....................... 250 125
Boiler Equipment Upgrade .................... 300 150
Cultural Arts Center HVAC
Upgrade ..................................... 150 75
Parking Lot and Road Repairs .............. 1,250 625
Academic I Roof Replacement ................. 500 250
Field House Roof Replacement .............. 1,000 500
Library Improvements and
Renovations .............................. 10,000 5,000
Field House Interior and Ext-
erior Improvements ........................ 1,800 900
Installation of Emergency No-
tification System ........................... 400 200
Special Projects ............................ 300 150
Schenectady County Community College
Building Renovations ...................... 2,410 1,205
Athletic Fields Relocation .................. 850 425
Building Renovations ...................... 1,146 573
Infrastructure Improvements ............... 1,182 591
Athletic Field Access/Roadways .............. 252 126
HVAC Upgrades ............................. 1,574 787
779 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Building Renovations ........................ 650 325
HVAC Upgrades ............................. 1,396 698
Infrastructure Improvements ............... 2,602 1,301
Landscaping ................................. 500 250
HVAC Upgrades ............................. 1,374 687
Infrastructure Improvements ............... 2,416 1,208
Building Renovations ...................... 1,382 691
Athletic Fields Enhancements .............. 1,846 923
Infrastructure Improvements ............... 1,034 517
Public Safety/Business Center ............ 23,800 11,900
Campus Connecting Walkway ................. 4,700 2,350
Building Renovations ...................... 4,224 2,112
Property Acquisition ........................ 250 125
Gateway Building Addition ................. 1,700 850
Property Acquisition ........................ 250 125
Property Acquisition ........................ 250 125
Parking Garage ........................... 22,800 11,400
Suffolk County Community College
Fire Sprinkler Infrastructure ................ 74 37
Reconstruction of Central Plaza ............. 750 375
Renovations to Sagikos Bldg ............... 6,100 3,050
Health and Sports Facilities-
Eastern Campus ........................... 17,750 8,875
Learning Resource Center-Grant
Campus ................................... 32,400 16,200
Air Conditioning-College-wide ............. 7,550 3,775
Sullivan County Community College
Safety Equipment Across Campus .............. 800 400
Upgrade Current Computer Labs ............. 1,000 500
Replacement of Roofs ...................... 2,250 1,125
Complete Mainframe Computer
Upgrade ................................... 2,400 1,200
Center for Advanced Science and
Technology ................................ 6,000 3,000
Renovations for Instructional ............... 250 125
Center for Advanced Science and
Technology/Green Building
Initiative ............................... 15,000 7,500
Ulster County Community College
Update Facilities Master Plan
Phase 1 ..................................... 840 420
Improvements to Classroom
Facilities ................................ 2,000 1,000
Westchester Community College
Administration Building
Renovations ............................... 2,548 1,274
Air Conditioning and CFC .................... 244 122
Physical Education Field
Improvements .............................. 2,866 1,433
Physical Education Building
Renovations ............................... 4,196 2,098
780 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Health Science Building
Renovations ............................... 2,174 1,087
Technology Improvements ................... 2,702 1,351
------- -------
Total ................................. 740,306 370,153
======= =======
By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for the state share of financial assistance to community
colleges for alterations and improvements to various facilities
including service contracts, memorandum of understanding, capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, new facilities, program improvement or program
change, environmental protection, energy conservation, accredi-
tation, facilities for the physically disabled and relate projects
including costs incurred prior to April 1, 2006 subject to a plan
submitted by the SUNY trustees and approved by the director of the
budget. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the state university construction fund or the dormi-
tory authority of the state of New York for such purposes (28FE0608)
(45907) ... 41,700,000 .............................. (re. $669,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
------------------------------------------------------------
(thousands of dollars)
Cayuga County Community College
Master Plan Projects 800 400
Finger Lakes Community College
Student Services Center and
Auditorium, Phase 1B
Renovations 12,000 6,000
Herkimer County Community College
Library Addition and Renovation
Phase II 6,850 3,400
Jamestown Community College
Master Plan Phases II and III 5,400 2,700
Jefferson Community College
Renovation and Revitalization Project
Phase II 2,400 1,200
Monroe Community College
Athletic Field House 12,000 6,000
Niagara County Community College
Bookstore Expansion Project 1,000 500
Orange County Community College
781 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Newburgh Campus 30,000 15,000
Westchester Community College
Master Plan Projects 13,000 6,500
------- -------
Total ............................ 83,400 41,700
======= =======
Additional advance for state financial assistance to community
colleges for alterations and improvements to various facilities
including capital design, construction, acquisition, reconstruction,
rehabilitation, equipment and personal service costs; for health and
safety, preservation of facilities, new facilities, program improve-
ment or program change, environmental protection, energy conserva-
tion, accreditation, facilities for the physically disabled and
related projects including costs incurred prior to April 1, 2006.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the state university construction fund or the dormitory authority
of the state of New York for such purposes (28FD0608) (45908) ......
40,936,000 ........................................ (re. $2,808,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
------------------------------------------------------------
(thousands of dollars)
Adirondack Community College
Regional Higher Education Center .... 4,000 2,000
Erie Community College
Industrial Refrigeration Lab ........ 400 200
Fashion Institute of Technology
Bill Blass Center ................... 400 200
Hudson Valley Community College
Site Improvements and Improvements
for Pedestrian and Vehicular
Circulation ......................... 2,000 1,000
Jefferson Community College
McVean Gymnasium/Renovation Projects . 2,926 1,463
Nassau County Community College
Performing Arts Center Design ....... 4,500 2,250
Plaza Reconstruction Phase 2 ........ 5,300 2,650
Fire Alarm Upgrade Phase 1 .......... 500 250
Rockland Community College
Children's Day Care Center .......... 800 400
Simulated Nursing Skills
Training Center ..................... 400 200
Suffolk County Community College
Culinary Equipment & Technology Expenses 300 150
Fire Sprinkler System ............... 546 273
782 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Science and Technology Building ..... 15,000 7,500
Tompkins Cortland Community College
Master Plan Amendment Increase ...... 4,800 2,400
Westchester Community College
Additional Master Plan Projects ..... 40,000 20,000
------- -------
Total.............................. 81,872 40,936
======= =======
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, new facilities, program improvement or program
change, environmental protection, energy conservation, accredi-
tation, facilities for the physically disabled and related projects
including costs incurred prior to April 1, 2005. Notwithstanding any
other law to the contrary, all or a portion of the amounts hereby
appropriated may be suballocated or transferred to the state univer-
sity construction fund or the dormitory authority of the state of
New York for such purposes (28FC0508) (45907) ......................
53,270,000 ........................................ (re. $1,858,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
------------------------------------------------------------
(thousands of dollars)
Tompkins Cortland Community College
College Athletic Complex ............ 21,200 10,600
Hudson Valley Community College
Facility Design and Planning ........ 1,000 500
Master Plan ......................... 11,400 5,700
Finger Lakes Community College
Auditorium and Performing Arts
Program Facility .................... 2,000 1,000
Orange County Community College
Master Plan ......................... 1,618 809
Erie Community College
North Campus conversion of
Lab Space to Classrooms ............. 30 15
North Campus Industrial
Refrigeration Technology
Center .............................. 600 300
Corning Community College
Academic and Career Advancement
Center .............................. 1,000 500
Onondaga Community College
783 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Academic Building - HVAC,
electrical, mechancial
systems upgrades .................... 526 263
Children's Learning Center .......... 2,500 1,250
Coulter Library - HVAC, elec-
trical, mechanical systems
upgrades ............................ 2,750 1,375
Coulter Library - Safety and
Security Enhancements ............... 1,838 919
Gordon Student Center ............... 2,852 1,426
Health and Physical Education
Building - Humdification sys-
tem and renovations ................. 1,598 799
J. Stanley Coyne Building -
HVAC, electrical, mechanical
systems upgrades .................... 300 150
Roof Replacement - Gordon
Student Center and Ferrante
Hall ................................ 946 473
Service and Maintenance
Building - HVAC, electrical,
mechanical systems upgrades ......... 570 285
Technology upgrades and
Expansion ........................... 1,984 992
Ulster Community College
Microbiology Lab Upgrades ........... 572 286
Fashion Institute of Technology
For the Establishment of a
Bill Blass Center for
Innovative Design ................... 400 200
Schenectady Community College
Workforce training program in
superconductive tech ................ 1,110 555
The completion of the Master Plan ... 10,000 5,000
Jefferson Community College
Construction ........................ 2,400 1,200
Suffolk County Community College
Construction ........................ 14,276 7,138
Westchester Community College
Technology Bldg Renovation .......... 14,097 7,049
Classroom Building Renovation ....... 2,895 1,448
Academic Arts Building
Renovation .......................... 4,078 2,039
Broome Community College
Capital Projects ................... 2,000 1,000
------- -------
Total ........................... 106,540 53,270
======== =======
By chapter 53, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2012:
784 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State financial assistance to community colleges for alterations and
improvements to various facilities including services and expenses,
capital design, construction, acquisition, reconstruction, rehabili-
tation and equipment; for health and safety, preservation of facili-
ties, new facilities, program improvement or program change, envi-
ronmental protection, energy conservation, accreditation, facilities
for the physically disabled, and related projects including costs
incurred prior to April 1, 2003 subject to a plan developed by the
state university and approved by the director of the budget.
Notwithstanding any other law to the contrary, all or a portion of
the amounts hereby appropriated may be suballocated or transferred
to the state university construction fund for such purposes
(28RC0308) (45910) ... 25,000,000 ................. (re. $5,130,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College ........... 700 350
Broome County College ................ 1,358 679
Cayuga Community College ............... 634 317
Clinton Community College .............. 452 226
Columbia-Greene Community College ...... 376 188
Corning Community College .............. 974 487
Dutchess Community College ........... 1,518 759
Erie Community College ............... 3,108 1,554
Fashion Institute of Technology ...... 2,720 1,360
Finger Lakes Community College ....... 1,084 542
Fulton-Montgomery Community College .... 516 258
Genesee Community College ............ 1,036 518
Herkimer County Community College ...... 754 377
Hudson Valley Community College ...... 2,472 1,236
Jamestown Community College ............ 880 440
Jefferson Community College ............ 726 363
Mohawk Valley Community College ...... 1,342 671
Monroe Community College ............. 4,060 2,030
Nassau Community College ............. 5,134 2,567
Niagara County Community College ..... 1,292 646
North Country Community College ........ 286 143
Onondaga Community College ........... 1,932 966
Orange County Community College ...... 1,236 618
Rockland Community College ........... 1,524 762
Schenectady County Community College ... 790 395
Suffolk County Community College ..... 4,372 2,186
Sullivan County Community College ...... 380 190
Tompkins-Cortland Community College .... 806 403
Ulster County Community College ........ 674 337
Westchester Community College ........ 3,164 1,582
University-Wide
785 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For University-wide projects
which may include, but are not
limited to funding for a comm-
unity college capital condition
assessment study ................... 3,700 1,850
--------
Total .............................. 25,000
========
State financial assistance to community colleges for alterations and
improvements for technology including costs incurred prior to April
1, 2003 subject to a plan developed by the state university and
approved by the director of the budget. Notwithstanding any other
law to the contrary, all or a portion of the amounts hereby appro-
priated may be suballocated or transferred to the state university
construction fund for such purposes (28RT0308) (45911) .............
10,000,000 ........................................... (re. $71,000)
By chapter 53, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2018:
An advance for state financial assistance to community colleges for
alterations and improvements to various facilities including capital
design, construction, acquisition, reconstruction, rehabilitation,
equipment and personal service costs; for health and safety, preser-
vation of facilities, new facilities, program improvement or program
change, environmental protection, energy conservation, accredi-
tation, facilities for the physically disabled, and related projects
including costs incurred prior to April 1, 2003 subject to a plan
developed by the state university and approved by the director of
the budget. Notwithstanding any other law to the contrary, all or a
portion of the amounts hereby appropriated may be suballocated or
transferred to the state university construction fund or the dormi-
tory authority of the state of New York for such purposes (28FC0308)
(45912) ... 175,000,000 .......................... (re. $17,335,000)
Project Schedule
ESTIMATED ESTIMATED
TOTAL STATE 50 PERCENT
& LOCAL SHARE STATE SHARE
----------------------------------------------------------
(thousands of dollars)
Adirondack Community College ......... 5,000 2,500
For university-wide projects which
may include, but are not limited to:
-Humanities Building expansion
-Student Center and Randles Hall
renovation
-Eisenhart Hall renovation
Broome Community College ............. 9,600 4,800
For university-wide projects which
may include, but are not limited to:
786 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
-Parking lot relocation and repair
-Boiler replacement
-Student Center expansion
Cayuga Community College ............. 4,600 2,300
For university-wide projects which
may include, but are not limited to:
-Mechanical and electrical improve-
ments
-Roof repair
-HVAC System improvements
Clinton Community College ............ 3,200 1,600
For university-wide projects which
may include, but are not limited to:
-Campus Master Plan update
-Emergency Generator replacement
-Stucco repair
Columbia-Greene Community College .... 2,800 1,400
For university-wide projects which
may include, but are not limited to:
-Master plan update
-Kiln Building construction
-Water Tank Rehabilitation
Corning Community College ............ 7,000 3,500
For university-wide projects which
may include, but are not limited to:
-Health and Safety renovations
-Gymnasium renovations
-Learning Center roof replacement
Dutchess Community College .......... 10,800 5,400
For university-wide projects which
may include, but are not limited to:
-Property acquisition
-Master plan development
-Brown Hall renovations
Erie Community College .............. 21,800 10,900
For university-wide projects which
may include, but are not limited to:
-Dental Hygiene Clinic renovations
-Masonry restoration
-Heating Plant renovations
Fashion Institute of Technology ..... 19,200 9,600
For university-wide projects which
may include, but are not limited to:
-Fire alarm and sprinkler upgrade
-Turbine retrofit
-Instructional space addition
Finger Lakes Community College ....... 7,600 3,800
For university-wide projects which
may include, but are not limited to:
-Auditorium & Performing Arts
Program Facility
787 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
-Student Center Facility
-Wellness Center Facility
Fulton-Montgomery Community College .. 3,800 1,900
For university-wide projects which
may include, but are not limited to:
-Campus Fire Alarms integration
-Library & Comm Arts Bldg connection
-Exterior Lighting and Security Cameras
Genesee Community College ............ 7,400 3,700
For university-wide projects which
may include, but are not limited to:
-Update Main Building Mechanical
Systems
-Pool Dehumidification System
replacement
-Smart Classrooms construction
Herkimer County Community College .... 5,400 2,700
For university-wide projects which
may include, but are not limited to:
-Athletic Complex Master Plan
-Library roof replacement
-Track Facility improvement
Hudson Valley Community College ..... 17,512 8,756
For university-wide projects which
may include, but are not limited to:
-Campus Center Rehab
-Acad/Admin Bldg construction
-Loop Road renovation
Jamestown Community College .......... 6,200 3,100
For university-wide projects which
may include, but are not limited to:
-Hamilton Collegiate Center
Improvements
-Central Heating Plant renovations
-Gymnasium improvements
Jefferson Community College .......... 5,200 2,600
For university-wide projects which
may include, but are not limited to:
-Dewey Library renovation
-McVean College Center A/C
-Guthrie Science/Engr Building
renovation
Mohawk Valley Community College ...... 9,600 4,800
For university-wide projects which
may include, but are not limited to:
-Rome Campus Master Plan update
-Campus-wide Road Drainage, Walk-
ways, and Signage improvements
-Athletic Facilities Master Plan
(Ice Arena, Field House) update
Monroe Community College ............ 28,388 14,194
788 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For university-wide projects which
may include, but are not limited to:
-Advanced Training & Ed Center
construction
-Building 9 Renovation for
training and education
-Health and Safety renovations
Nassau Community College ............ 36,000 18,000
For university-wide projects which
may include, but are not limited to:
-Emergency Generator upgrade
-HVAC upgrade
-Library Renovation
Niagara County Community College ..... 9,200 4,600
For university-wide projects which
may include, but are not limited to:
-Cafeteria Floor replacement
-Campus Signage upgrade
-Emergency System upgrade
North Country Community College ...... 2,200 1,100
For university-wide projects which
may include, but are not limited to:
-Classroom renovations
-Hodson Hall roof replacement
-Campus Master Plan update
Onondaga Community College .......... 13,600 6,800
For university-wide projects which
may include, but are not limited to:
-Coyne Building elevator renovations
-Security System upgrade
-Signage improvements
Orange County Community College ...... 8,800 4,400
For university-wide projects which
may include, but are not limited to:
-Bio-Tech Facility upgrades
-Cooling Tower replacement
-Retaining wall repair
Rockland Community College .......... 10,800 5,400
For university-wide projects which
may include, but are not limited to:
-Master Plan update
-Student Union/Library HVAC
renovations
-Elevator upgrades
Schenectady County Community College . 5,600 2,800
For university-wide projects which
may include, but are not limited to:
-Boiler Replacement
-Van Curler Room renovations
-Property acquisition
Suffolk County Community College .... 30,600 15,300
789 12554-05-3
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For university-wide projects which
may include, but are not limited to:
-Health & Safety projects
-Roofs repairs
-ADA Compliance
Sullivan County Community College .... 2,800 1,400
For university-wide projects which
may include, but are not limited to:
-Paul Gerry Field House renovations
-Window replacement
-Student Union renovation
Tompkins-Cortland Community College .. 5,800 2,900
For university-wide projects which
may include, but are not limited to:
-Sports Complex construction
-Cyber Cafe/Student Event Area
construction
-Infrastructure repairs
Ulster County Community College ...... 4,800 2,400
For university-wide projects which
may include, but are not limited to:
-Master Plan update
-Gymnasium rehabilitation
-Parking lots, roads and side-
walk repairs
Westchester Community College ....... 22,200 11,100
For university-wide projects which
may include, but are not limited to:
-Academic Building renovation
-Instructional Building construction
-Student Center improvements/
expansion
Systemwide .......................... 22,500 11,250
For university-wide projects which
may include, but are not limited to:
-program improvement
--------
Total ........................................ 175,000
========
790 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 7,420,071,000 12,797,407,000
Capital Projects Funds - Federal ... 3,520,000,000 12,921,838,000
Special Revenue Funds - Federal .... 25,251,000 130,401,000
Fiduciary Funds .................... 50,000,000 653,003,000
---------------- ----------------
All Funds ........................ 11,015,322,000 26,502,649,000
================ ================
AIRPORT OR AVIATION STATE PROGRAM (CCP) ..................... 14,000,000
--------------
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Aviation Purpose Account - 30053
Aviation Purpose
For state aid to municipal corporations,
private airports as authorized by section
14-h of the transportation law and for
payment of the cost of projects at Stewart
and Republic Airports, for the acquisi-
tion, construction, reconstruction, and
improvement of airport or aviation capital
projects, including the acquisition of
real property and liabilities incurred
prior to April 1, 2023.
Prior to requesting approval of a certif-
icate of approval of availability for
moneys appropriated, the commissioner of
transportation shall certify that each
airport or aviation project progressed
under the program, other than state owned
airports, has received federal approval
and the federally authorized level of
financial assistance (17232314) (54293) ..... 14,000,000
ENGINEERING SERVICES PROGRAM (CCP) .......................... 25,251,000
--------------
Special Revenue Funds - Federal
Federal Miscellaneous Operating Grants Fund
DOT Federal Account - 25381
Preparation of Plans Purpose
New York Metropolitan Transportation Council
791 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
For the continuing comprehensive transporta-
tion planning and coordinated support
undertaken as part of the united work
programs of participating local planning
or municipal agreements in accordance with
grant agreements approved by the federal
transit administration or the federal
highway administration (53243).
Personal service (17M12330) (50000) ............ 5,873,000
Nonpersonal service (17M42330) (57050) ........ 14,841,000
Fringe benefits (17M82330) (60090) ............. 3,786,000
Indirect costs (17M92330) (58850) ................ 314,000
Watertown Jefferson County Area Transportation Council
For the continuing comprehensive transporta-
tion planning and coordinated support
undertaken as part of the united work
programs of participating local planning
or municipal agreements in accordance with
grant agreements approved by the federal
transit administration or the federal
highway administration (54203).
Personal service (17W12330) (50000) .............. 178,000
Nonpersonal service (17W42330) (57050) ........... 134,000
Fringe benefits (17W82330) (60090) ............... 115,000
Indirect costs (17W92330) (58850) ................. 10,000
FEDERAL AID HIGHWAYS FEDERAL PURPOSE (CCP) ............... 3,510,000,000
--------------
Capital Projects Funds - Federal
Federal Capital Projects Fund
Transportation Account - 31354
Federal Aid Highways Purpose
For the federal share, from any federal
agency under any federal program, of state
transportation projects including but not
limited to construction, reconstruction,
reconditioning and preservation, operating
costs as provided for in the bipartisan
infrastructure law (BIL) and related prior
and successive federal legislation, and
the payment of liabilities incurred prior
to April 1, 2023.
Notwithstanding section 93 of the state
finance law or any other law, rule or
regulation to the contrary, all or a
portion of the funds appropriated herein
may be suballocated or transferred to any
department, agency, or public authority
792 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
for the implementation of any eligible
electric or zero-emission vehicle activ-
ities authorized under P.L. 117-58
(17032320) (53163) ....................... 3,000,000,000
For the federal share, from any federal
agency under any federal program, of the
acquisition of property for state trans-
portation projects including but not
limited to construction, reconstruction,
reconditioning and preservation, including
the payment of liabilities incurred prior
to April 1, 2023 (17RW2320) (54259) ......... 50,000,000
For the federal share of engineering costs,
or for reimbursements to the dedicated
highway and bridge trust fund of the
department of transportation, of the
federal share of engineering costs,
including fringe benefits, personal
services, and nonpersonal services, for
activities including but not limited to
the preparation of designs, plans, spec-
ifications and estimates; construction
management and supervision; and
appraisals, surveys, testing, and environ-
mental impact statements for transporta-
tion projects, the payment of liabilities
incurred prior to April 1, 2023 and other
such purposes as specified in section 89-b
of the state finance law as amended
(17EG2320) (54260) ......................... 260,000,000
For the federal share of engineering costs,
or for reimbursements to the dedicated
highway and bridge trust fund of the
department of transportation, of the
federal share of engineering costs,
including the contract services provided
by private firms, for activities including
but not limited to the preparation of
designs, plans, specifications and esti-
mates; construction management and super-
vision; and appraisals, surveys, testing,
and environmental impact statements for
transportation projects, the payment of
liabilities incurred prior to April 1,
2023 and other such purposes as specified
in section 89-b of the state finance law
as amended (17EC2320) (54261) .............. 200,000,000
FEDERAL AIRPORT OR AVIATION (CCP) ........................... 10,000,000
--------------
Capital Projects Funds - Federal
793 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
Federal Capital Projects Fund
Federal Capital Projects Account - 31350
Aviation Purpose
For payment by the state of the federal
share of the cost, including payment of
liabilities incurred prior to April 1,
2023, of construction, reconstruction,
alteration and rehabilitation of airport
and aviation facilities at Republic
airport, including the cost of acquisition
of real property, the acquisition of
equipment and other related incidental
expenses thereto and for the federal share
of consultant services in carrying out
federally approved aviation studies.
Within the amount appropriated herein,
authorization is granted to the department
of transportation to enter into all neces-
sary contracts and agreements, subject to
the approval of the director of the budg-
et, to carry out the purposes of this
appropriation.
Prior to requesting a certificate of
approval of availability for any of the
moneys authorized herein, the commissioner
of transportation shall certify to the
director of the budget that the federal
government has agreed to finance the
federal share of the project. However with
the approval of the director of the budg-
et, projects may be designed prior to
federal approval upon the written assur-
ance by the commissioner of transportation
that federal funds are likely to be forth-
coming (17522314) (53248) ................... 10,000,000
MAINTENANCE FACILITIES (CCP) ................................ 37,405,000
--------------
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Maintenance Facilities Purpose
For the preparation of designs, plans, spec-
ifications and estimates, for the acquisi-
tion, alterations, and rehabilitation of
existing facilities, for the acquisition
of land and construction of new facilities
for highway maintenance purposes, for the
794 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
contract engineering services provided by
private firms, including the payment of
liabilities incurred prior to April 1,
2023 (17252313) (53249) ..................... 31,634,000
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Preparation of Plans Purpose
For payment to the design and construction
management account of the centralized
services fund of the New York state office
of general services for the purpose of
preparation and review of plans, specifi-
cations, estimates, services, construction
management and supervision, inspection,
studies, appraisals, surveys, testing and
environmental impact statements, including
the payment of liabilities incurred prior
to April 1, 2023 (17D12330) (53250) .......... 5,771,000
MASS TRANSPORTATION (CCP) ................................... 50,600,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transit Purpose
For the costs of mass transportation capital
projects and facilities including replace-
ment of buses meeting federal standards
for replacement, related bus equipment and
the acquisition, design and construction,
including engineering and consulting
costs, of mass transit bus garages or
other mass transportation projects and
facilities approved by the commissioner of
transportation in a program of projects.
Such funding may be part of a total
project of which a portion is federally
funded. The moneys hereby appropriated are
to be made available for projects under-
taken by mass transit systems which are
outside of the Metropolitan Transportation
Commuter District (17KC23MT) (54242) ........ 20,000,000
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
795 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
Capital Projects Funds - Other
Capital Projects Fund - 30000
Omnibus and Transit Purpose
796 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
For state aid to municipal corporations for
the preparation of designs, plans, spec-
ifications and estimates, for the acquisi-
tion, construction, reconstruction, and
improvement of mass transportation capital
projects including the acquisition of real
property, for other mass transportation
projects including local transportation
planning studies. Notwithstanding any
inconsistent provisions of law, the state
share of such projects shall be 50 percent
of the non-federal share, but in no event
shall the state share exceed 10 percent of
project costs.
Notwithstanding any other provision of law,
the commissioner of transportation shall
make available directly to the City of New
York (City) an amount commensurate with
the state share of (i) federal funds
previously awarded to the City and reallo-
cated to the metropolitan transportation
authority (MTA), and (ii) the federally
authorized level of financial assistance
transferred by resolution of the metropol-
itan planning organization (MPO) to the
metropolitan transportation authority
(MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall
be 50 percent of the non-federal share of
the federally authorized level of finan-
cial assistance transferred to the MTA,
but in no event shall the state share
exceed 10 percent of project costs. Prior
to requesting reimbursement for projects
progressed by the MTA on behalf of the
City, the City shall certify to the
commissioner of transportation that each
eligible project progressed under this
provision is federally eligible and that
the match amount requested does not exceed
the state share of the federally author-
ized level of financial assistance. In
addition, the City must provide an appli-
cation to the commissioner of transporta-
tion certifying that the work to be funded
under the project has been performed and
that the City has reimbursed the MTA for
100 percent of the match amount for the
project. Upon such application, the
commissioner of transportation shall
797 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
review and approve eligible activities for
reimbursement.
Prior to requesting approval of a certif-
icate of approval of availability for the
moneys hereby appropriated, the commis-
sioner of transportation shall certify
that each omnibus project progressed under
the program has received federal approval.
Such certificate shall report the federally
authorized level of financial assistance
(17OM2329) (53252) .......................... 30,600,000
MASS TRANSPORTATION AND RAIL FREIGHT (CCP) .................. 72,830,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-MTA Capital Purpose
For the payment of the costs of mass trans-
portation capital projects and facilities
including replacement of buses meeting
federal standards for replacement, related
bus equipment and the acquisition, design
and construction, including engineering
and consulting costs, of mass transit bus
garages or other mass transportation
projects and facilities approved by the
commissioner of transportation in a
program of projects. Such funding may be
part of a total project of which a portion
is federally funded but shall not be used
in substitution for the required non-fed-
eral matching shares of the federally-
funded portion of the project to which it
is added. The moneys hereby appropriated
are to be made available for projects
undertaken by mass transit systems other
than those mass transit operating agencies
which receive money from the metropolitan
transportation authority dedicated tax
fund (17NM2331) (53253) ..................... 18,500,000
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Rail Service Preservation Purpose
For the payment of the costs, including the
payment of liabilities incurred prior to
April 1, 2023, of the construction and
improvement of passenger rail, freight
798 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital
facilities outside the jurisdiction of the
port authority of New York and New Jersey,
including but not limited to the acquisi-
tion, construction, reconstruction,
improvement or rehabilitation of railroad
or port capital facilities, and any capi-
tal improvement used in connection here-
with, and for the acquisition of real
property or interests in real property
required or expected to be required there-
for (17162341) (53256) ...................... 10,000,000
Notwithstanding the provisions of section
89-b of the state finance law, for
contractual agreements entered into for
rail passenger service (17172341) (54278) ... 44,330,000
NEW YORK STATE AGENCY FUND (CCP) ............................ 50,000,000
--------------
Fiduciary Funds
Miscellaneous New York State Agency Fund
DOT Land Acquisition Projects Account - 60606
Non-Federal Aided Highway Purpose
For that portion of liabilities incurred by
the department of transportation on behalf
of entities other than state departments
or agencies pursuant to the highway law or
transportation law (17502322) (53259) ....... 50,000,000
NEW YORK WORKS (CCP) ..................................... 4,263,358,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Aviation Purpose
For state aid to municipal corporations and
private airports as authorized by section
14-h of the transportation law and for
payment of the cost of projects at Stewart
and Republic airports, for the acquisi-
tion, construction, reconstruction, and
improvement of airport or aviation capital
projects, including the acquisition of
real property and liabilities incurred
prior to April 1, 2023. Prior to request-
ing approval of a certificate of approval
of availability for moneys appropriated,
the commissioner of transportation shall
799 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
certify that each airport or aviation
project progressed under the program,
other than state owned airports, has
received federal approval and the feder-
ally authorized level of financial assist-
ance. Funds from this appropriation may
also be utilized for grants to municipal
corporations and private airports for the
cost of projects authorized by section
14-l of the transportation law, including
the acquisition of real property and
liabilities incurred prior to April 1,
2023 (17552314) (53101) ..................... 12,500,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Federal Aided Highway Purpose
Transportation infrastructure and facilities
in the department of transportation plan,
for the payment of costs, including the
payment of liabilities incurred prior to
April 1, 2023, of transportation infras-
tructure projects, including but not
limited to, state and local roads and
bridges; airport, freight and passenger
rail, port and transit projects or multi-
modal facilities, including work appurten-
ant and ancillary thereto. Project costs
funded from this appropriation may include
but shall not be limited to construction,
reconstruction, reconditioning and preser-
vation, the acquisition of property, and
engineering services, including personal
services, nonpersonal services, fringe
benefits, the contract services provided
by private firms, and reimbursements to
the dedicated highway and bridge trust
fund and capital projects funds, for
activities including but not limited to,
the preparation of designs, plans, spec-
ifications and estimates; construction
management and supervision; and
appraisals, surveys, testing and environ-
mental impact statements for transporta-
tion infrastructure projects.
Notwithstanding section 93 of the state
finance law or any other law, rule or
regulation to the contrary, all or a
portion of the funds appropriated herein
may be interchanged, or transferred from
this appropriation to any other capital
800 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
projects appropriation or appropriations
(17992322) (54201) ....................... 2,000,000,000
For the costs of capital projects to be
reimbursed from bond fund proceeds for the
planning and design, construction, recon-
struction, replacement, improvement,
reconditioning, rehabilitation and preser-
vation, including the acquisition of real
property and interests therein required or
expected to be required in connection
therewith, for the purpose of bringing
State highways to a state of good repair . 2,000,000,000
For the payment of costs, including the
payment of liabilities incurred prior to
April 1, 2023, of complete street trans-
portation infrastructure projects and
complete street designs as determined by
the commissioner of transportation,
including but not limited to, state and
local roads and bridges, including work
appurtenant and ancillary thereto. Project
costs funded from this appropriation may
include but shall not be limited to engi-
neering services, including personal
services, nonpersonal services, fringe
benefits, the contract services provided
by private firms, and reimbursements to
the dedicated highway and bridge trust
fund and capital projects funds, for
activities including but not limited to,
the preparation of designs, plans, spec-
ifications and estimates; and appraisals,
surveys, testing and environmental impact
statements for transportation infrastruc-
ture projects (17CS2322) ..................... 5,000,000
For the additional payment of costs, includ-
ing the payment of liabilities incurred
prior to April 1, 2023, of complete street
transportation infrastructure projects and
complete street designs as determined by
the commissioner of transportation,
including but not limited to, state and
local roads and bridges, including work
appurtenant and ancillary thereto. Project
costs funded from this appropriation may
include but shall not be limited to engi-
neering services, including personal
services, nonpersonal services, fringe
benefits, the contract services provided
by private firms, and reimbursements to
the dedicated highway and bridge trust
fund and capital projects funds, for
801 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
activities including but not limited to,
the preparation of designs, plans, spec-
ifications and estimates; and appraisals,
surveys, testing and environmental impact
statements for transportation infrastruc-
ture projects (17CS2322) ..................... 5,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-MTA Capital Purpose
For the costs of mass transportation capital
projects and facilities including replace-
ment of buses meeting federal standards
for replacement, related bus equipment and
the acquisition, design and construction,
including engineering and consulting
costs, of mass transit bus garages or
other mass transportation projects and
facilities approved by the commissioner of
transportation in a program of projects.
Such funding may be part of a total
project of which a portion is federally
funded but shall not be used in substi-
tution for the required non-federal match-
ing shares of the federally-funded portion
of the project to which it is added. The
moneys hereby appropriated are to be made
available for projects undertaken by mass
transit systems other than those mass
transit operating agencies which receive
money from the metropolitan transportation
authority dedicated tax fund (17552331)
(53102) ..................................... 50,400,000
For the payment of the costs, which shall be
reimbursed from bond proceeds, of the
reconstruction, improvement, rehabili-
tation and maintenance of the existing
passenger rail system of the Niagara Fron-
tier transportation authority (17NF2331)
(54220) ..................................... 20,000,000
For the payment of the costs of the electri-
fication of mass transit bus fleets,
including the replacement of conventional
fossil-fueled buses with electric buses.
The moneys hereby appropriated are to be
made available for projects undertaken by
mass transit systems other than those mass
transit operating agencies which receive
money from the metropolitan transportation
authority dedicated tax fund (17EB2331)
(54222) ..................................... 20,000,000
802 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
The additional sum of $100,000,000 is hereby
appropriated for projects under the BRIDGE
NY program ................................. 100,000,000
Capital Projects Funds - Other
Capital Projects Fund - 30000
Rail Service Preservation Purpose
For the construction and improvement of rail
freight projects including, but not limit-
ed to, the acquisition, construction,
reconstruction, improvement or rehabili-
tation of any railroad capital facility
and any capital improvement used in
connection herewith, and for the acquisi-
tion of real property or interests in real
property required or expected to be
required therefor. Of this appropriation,
the amount of up to $3,000,000 will be
provided to the metropolitan transporta-
tion authority for costs associated with
implementing a program to upgrade diesel
train engines owned by the Long Island
Rail Road to improve emissions standards,
and the amount of up to $1,000,000 for
other diesel train engine retrofit uses
(17552341) (53104) .......................... 35,458,000
NON-FEDERALLY AIDED HIGHWAY CAPITAL PROJECTS (CCP) ....... 1,893,781,000
--------------
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Aviation Purpose Account - 30053
Aviation Purpose
For Aviation Bureau including personal
services, nonpersonal services, fringe
benefits and the contract services
provided by private firms.
Notwithstanding any other provision of law
to the contrary, the OGS Interchange and
Transfer Authority and the IT Interchange
and Transfer Authority as defined in the
2023-24 state fiscal year state operations
appropriation for the budget division
program of the division of the budget, are
deemed fully incorporated herein and a
part of this appropriation as if fully
stated (17012314) (54205).
Expense accounts (00000) ....................... 1,263,000
803 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Maintenance Purpose
For the payment of costs, including the
payment of liabilities incurred prior to
April 1, 2023, of preventive maintenance
on state roads and bridges as defined in
paragraph (a) of subdivision 1 of section
10-d of the highway law, and snow and ice
control on state highways, including
personal services, nonpersonal services,
fringe benefits and contractual services
provided by private firms and munici-
palities, but not including the costs of
heavy equipment (53260).
Personal service (170123HM) (50000) .......... 176,000,000
Nonpersonal service (170423HM) (57050) ....... 163,767,000
Fringe benefits (170823HM) (60090) ........... 118,008,000
Indirect costs (170923HM) (58850) .............. 5,474,000
For the payment of the costs of heavy equip-
ment, including the payment of liabilities
incurred prior to April 1, 2023 (54275).
Nonpersonal service (170523HM) (57050) ........ 60,953,000
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Non-Federal Aided Highway Purpose
For the payment of the costs, including the
payment of liabilities incurred prior to
April 1, 2023, of state highways, park-
ways, bridges, the New York State Thruway,
Indian reservation roads, and facilities
for which the responsibility is vested
with the state department of transporta-
tion including work appurtenant and ancil-
lary thereto, for the state share of
federally authorized high speed rail
improvement projects, and for the cost of
administrative services of the department
of transportation and the cost of services
provided by private firms; including the
costs of preventive maintenance on state
roads and bridges as defined in paragraph
(a) of subdivision 1 of section 10-d of
the highway law for contractual preventive
maintenance services provided by private
firms; and including but not limited to
the preparation of designs, plans, spec-
804 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
ifications and estimates; construction
management and supervision, and
appraisals, surveys, testing and environ-
mental impact statements for transporta-
tion projects. Project costs funded from
this appropriation may include but shall
not be limited to construction, recon-
struction, reconditioning and preserva-
tion, and preventive maintenance. Up to
$5,000,000 of this appropriation may be
used for traffic maintenance and traffic
protection services provided by the divi-
sion of state police.
With the approval of the director of the
budget, the commissioner of transportation
is authorized to enter into agreements
with any municipality to finance local
bridge projects through state non-federal-
ly aided highway funds appropriated herein
when the use of federal aid funds for such
local bridge projects would not be cost
effective and the federal aid and state
matching funds saved as a result of the
use of non-federal aid funds for local
bridge projects are made available for
bridge projects on the state highway
system. The total amount of non-federally
aided highway funds made available for
local bridge projects from this appropri-
ation shall not exceed $2,500,000 in state
fiscal year 2023-24 (53164).
Personal service (17012322) (50000) ............ 5,000,000
Nonpersonal service (17042322) (57050) ........ 20,000,000
Capital projects (17082322) (60551) .......... 449,150,000
For the payment of the costs, including the
payment of liabilities incurred prior to
April 1, 2023, of the acquisition of prop-
erty related to construction, recon-
struction, reconditioning and preserva-
tion, and preventive maintenance of state
highways, parkways, bridges, the New York
State Thruway, Indian reservation roads,
and facilities for which the responsibil-
ity is vested with the state department of
transportation (17092322) (54276) ........... 22,000,000
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Preparation of Plans Purpose
Capital Project Management and Traffic and Safety
805 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
For capital project management and traffic
and safety, including personal services,
nonpersonal services, fringe benefits, and
the contract services provided by private
firms (53263).
Personal service (17P12330) (50000) ........... 48,261,000
Nonpersonal service (17P42330) (57050) ......... 9,597,000
Fringe benefits (17P82330) (60090) ............ 32,360,000
Indirect costs (17P92330) (58850) .............. 1,501,000
Department Management and Administration
For department management and administration
including personal services, nonpersonal
services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law
to the contrary, the OGS Interchange and
Transfer Authority and the IT Interchange
and Transfer Authority as defined in the
2023-24 state fiscal year state operations
appropriation for the budget division
program of the division of the budget, are
deemed fully incorporated herein and a
part of this appropriation as if fully
stated (53262).
Personal service (17A12330) (50000) ........... 36,100,000
Nonpersonal service (17A42330) (57050) ........ 33,354,000
Fringe benefits (17A82330) (60090) ............ 24,206,000
Indirect costs (17A92330) (58850) .............. 1,123,000
Design and Construction
For engineering services, including personal
services, nonpersonal services, and fringe
benefits, including, but not limited to,
the preparation of designs, plans, spec-
ifications and estimates; construction
management and supervision; and
appraisals, surveys, testing, and environ-
mental impact statements for transporta-
tion projects, and for suballocation of
$575,000 to the office of the inspector
general.
Notwithstanding any other provision of law
to the contrary, the OGS Interchange and
Transfer Authority and the IT Interchange
and Transfer Authority as defined in the
2023-24 state fiscal year state operations
appropriation for the budget division
program of the division of the budget, are
deemed fully incorporated herein and a
806 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
part of this appropriation as if fully
stated (53166).
Personal service (17E12330) (50000) .......... 244,387,000
Nonpersonal service (17E42330) (57050) ........ 10,741,000
Fringe benefits (17E82330) (60090) ........... 163,862,000
Indirect costs (17E92330) (58850) .............. 7,601,000
For the costs of the contract services
provided by private firms including, but
not limited to, the preparation of
designs, plans, specifications and esti-
mates; construction management and super-
vision; and appraisals, surveys, testing,
and environmental impact statements for
transportation projects (53105).
Nonpersonal service (17EP2330) (57050) ....... 232,965,000
Real Estate
For real estate services, including personal
services, nonpersonal services, fringe
benefits and the contract services
provided by private firms.
Notwithstanding any other provision of law
to the contrary, the OGS Interchange and
Transfer Authority and the IT Interchange
and Transfer Authority as defined in the
2023-24 state fiscal year state operations
appropriation for the budget division
program of the division of the budget, are
deemed fully incorporated herein and a
part of this appropriation as if fully
stated (53264).
Personal service (17R12330) (50000) ........... 15,165,000
Nonpersonal service (17R42330) (57050) ........... 302,000
Fringe benefits (17R82330) (60090) ............ 10,169,000
Indirect costs (17R92330) (58850) ................ 472,000
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account
Highway Maintenance Facilities Purpose
To provide funding for the costs to reim-
burse cities an additional one dollar and
two cents per square yard of grade level
state arterial highway plus an additional
twenty cents per square yard of elevated
state arterial highway for the period of
April 1, 2023 through March 31, 2024
pursuant to subdivision 5-a of section
340-b of the highway law and subdivision 7
807 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
of section 349-c of the highway law, as
amended by the laws of 2021 ................. 15,000,000
OTHER TRANSPORTATION AID (CCP) ........................... 1,088,097,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Highway Aid Purpose
For capital grants to municipalities under
the municipal streets and highways program
for repayment of eligible costs of federal
aid municipal street and highway projects
pursuant to section 15 of chapter 329 of
the laws of 1991, as added by section 9 of
chapter 330 of the laws of 1991, as
amended. The department of transportation
shall provide such information to the
municipalities as may be necessary to
maintain the federal tax exempt status of
any bonds, notes, or other obligations
issued by such municipalities to provide
for the non-federal share of the cost of
projects pursuant to chapter 330 of the
laws of 1991 or section 80-b of the high-
way law (17MA2321) (54265) .................. 39,700,000
For additional capital grants to munici-
palities under the municipal streets and
highways program for repayment of eligible
costs of federal aid municipal street and
highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added
by section 9 of chapter 330 of the laws of
1991, as amended. The department of trans-
portation shall provide such information
to the municipalities as may be necessary
to maintain the federal tax exempt status
of any bonds, notes, or other obligations
issued by such municipalities to provide
for the non-federal share of the cost of
projects pursuant to chapter 330 of the
laws of 1991 or section 80-b of the high-
way law ..................................... 10,300,000
For capital grants to municipalities under
the consolidated local street and highway
improvement program:
The sum of $479,300,000 to counties, cities,
towns and villages for reimbursement of
eligible costs of local highway and bridge
projects pursuant to sections 16 and 16-a
of chapter 329 of the laws of 1991, as
808 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
added by section 9 of chapter 330 of the
laws of 1991, as amended. For the purposes
of computing allocations to munici-
palities, the amount distributed pursuant
to section 16 of chapter 329 of the laws
of 1991 shall be deemed to be
$129,156,000. The amount distributed
pursuant to section 16-a of chapter 329 of
the laws of 1991 shall be deemed to be
$350,144,000. Notwithstanding the
provisions of any general or special law,
the amounts deemed distributed in accord-
ance with section 16 of chapter 329 of the
laws of 1991 shall be adjusted so that
such amounts will not be less than 89.073
percent of the "funding level" as defined
in subdivision 5 of section 10-c of the
highway law for each such municipality. In
order to achieve the objectives of section
16 of chapter 329 of the laws of 1991, to
the extent necessary, the amounts in
excess of 89.073 percent of the funding
level to be deemed distributed to each
municipality under this subdivision shall
be reduced in equal proportion.
The sum of $58,797,000 to municipalities for
reimbursement of eligible costs of local
highway and bridge projects pursuant to
sections 16 and 16-a of chapter 329 of the
laws of 1991, as added by section 9 of
chapter 330 of the laws of 1991, as
amended. For the purposes of computing
allocations to municipalities, the amount
distributed pursuant to section 16 of
chapter 329 of the laws of 1991 shall be
deemed to be $15,844,000. The amount
distributed pursuant to section 16-a of
chapter 329 of the laws of 1991 shall be
deemed to be $42,953,000. Notwithstanding
the provisions of any general or special
law, the amounts deemed distributed in
accordance with section 16 of chapter 329
of the laws of 1991 shall be adjusted so
that such amounts will not be less than
10.927 percent of the "funding level" as
defined in subdivision 5 of section 10-c
of the highway law for each such munici-
pality. In order to achieve the objectives
of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the
amounts in excess of 10.927 percent of the
funding level to be deemed distributed to
809 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
each municipality under this paragraph
shall be reduced in equal proportion. To
the extent that the total of remaining
payment allocations calculated herein
varies from $58,797,000, the payment
amounts to each locality shall be adjusted
by a uniform percentage so that the total
payments equal $58,797,000.
Payments shall be made on the fifteenth day
of June, September, December and March
(17CH2321) (54267) ......................... 538,097,000
The sum of $200,000,000 to municipalities
for reimbursement of eligible costs of
local highway and bridge projects pursuant
to section 16-a of chapter 329 of the laws
of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For
the purposes of computing allocations to
municipalities, the amount distributed
pursuant to section 16-a of chapter 329 of
the laws of 1991 shall be deemed to be
$200,000,000. To the extent that the total
of payment allocations calculated herein
varies from $200,000,000 the payment
amounts to each locality shall be adjusted
by a uniform percentage so that the total
payments equal $200,000,000. Payments
shall be made on the fifteenth day of
June, September, December and March.
Provided, however, that no obligations
against, or spending from this appropri-
ation shall be authorized unless the
director of the division of the budget
certifies that such obligations or spend-
ing can be accommodated within the State's
multi-year financial plan without adverse-
ly affecting the funding available for (a)
capital projects currently authorized that
are deemed essential to the health and
safety of the public, or (b) essential
governmental services ...................... 200,000,000
For capital grants to municipalities for
extreme winter recovery: The sum of
$100,000,000 to municipalities for
reimbursement of eligible costs of local
highway and bridge projects pursuant to
section 16-a of chapter 329 of the laws of
1991, as added by section 9 of chapter 330
of the laws of 1991, as amended. For the
purposes of computing allocations to muni-
cipalities, the amount distributed pursu-
ant to section 16-a of chapter 329 of the
810 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
laws of 1991 shall be deemed to be
$100,000,000. To the extent that the total
of payment allocations calculated herein
varies from $100,000,000, the payment
amounts to each locality shall be adjusted
by a uniform percentage so that the total
payments equal $100,000,000. Payments
shall be made on the fifteenth day of
June, September, December and March
(17EW2321) (53160) ......................... 100,000,000
For additional capital grants to munici-
palities for extreme winter recovery: The
sum of $70,000,000 to municipalities for
reimbursement of eligible costs of local
highway and bridge projects pursuant to
section 16-a of chapter 329 of the laws of
1991, as added by section 9 of chapter 330
of the laws of 1991, as amended. For the
purposes of computing allocations to muni-
cipalities, the amount distributed pursu-
ant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be
$70,000,000. To the extent that the total
of payment allocations calculated herein
varies from $70,000,000 the payment
amounts to each locality shall be adjusted
by a uniform percentage so that the total
payments equal $70,000,000. Payments shall
be made on the fifteenth day of June,
September, December and March (53160) ....... 70,000,000
For capital grants to cities, towns and
villages for the reimbursement of eligible
capital costs of local highway and bridge
projects within such municipality.
Funds shall be allocated to cities, towns
and villages based on the total number of
New York or United States or interstate
signed touring route miles for which such
municipality has capital maintenance
responsibility, as determined pursuant to
the most recent local highway inventory
conducted by the highway data services
bureau of the department of transporta-
tion.
Eligible capital costs include the costs of
construction and repair of highways,
bridges, highway-railroad crossings, and
other transportation facilities for
projects with a service life of ten years
or more (17TR2321) (54229) ................. 100,000,000
For additional capital grants to cities,
towns and villages for the reimbursement
811 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2023-24
of eligible capital costs of local highway
and bridge projects within such munici-
pality.
Funds shall be allocated to cities, towns
and villages based on the total number of
New York or United States or interstate
signed touring route miles for which such
municipality has capital maintenance
responsibility, as determined pursuant to
the most recent local highway inventory
conducted by the highway data services
bureau of the department of transporta-
tion.
Eligible capital costs include the costs of
construction and repair of highways,
bridges, highway-railroad crossings, and
other transportation facilities for
projects with a service life of ten years
or more ..................................... 30,000,000
812 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
All or a portion of the disbursements made pursuant to the reappropri-
ations made hereinafter from the dedicated highway and bridge trust
fund may be repaid from the proceeds of bonds and notes issued
pursuant to chapter 56 of the laws of 1993.
ACCELERATED CAPACITY AND TRANSPORTATION IMPROVEMENTS FUND (CCP)
Capital Projects Funds - Other
Accelerated Capacity and Transportation Improvements Bond Fund
Accelerated Capacity and Transportation Improvements Bond Fund Account
- 30680
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 1989, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $2,530,000,000, or so much thereof as may be necessary and
available, is hereby appropriated from the accelerated capacity and
transportation improvements fund as established by section 77 of the
state finance law in accordance with the provisions of such section
for payment to the capital projects fund in order to reimburse such
fund for disbursements certified by the state comptroller as bonda-
ble under the provisions of section 50 of chapter 261 of the laws of
1988.
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the capital
projects fund for purposes for which accelerated capacity and trans-
portation improvements fund expenditures are authorized. The state
comptroller shall at the commencement of each month certify to the
director of the budget, the chairman of the senate finance commit-
tee, and the chairman of the assembly ways and means committee, the
amounts disbursed from the appropriations so designated by the
director of the budget from the capital projects fund for such
purposes for the month preceding such certification and such certif-
ications shall not exceed in the aggregate the moneys hereby appro-
priated. A copy of each such certificate shall also be delivered to
state departments and agencies to which such capital projects fund
appropriations are made available.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the accelerated capacity and trans-
portation improvements fund until a certificate of approval of
availability shall have been issued by the director of the budget,
and a copy of such certificate of approval filed with the state
comptroller, the chairman of the senate finance committee and the
chairman of the assembly ways and means committee. Such certificate
may be amended from time to time by the director of the budget, and
a copy of each such amendment shall be filed with the state comp-
troller, the chairman of the senate finance committee and the chair-
man of the assembly ways and means committee (71258910) (80923) ....
2,530,000,000 .................................... (re. $23,010,000)
AIRPORT OR AVIATION PROGRAM (CCP)
813 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Aviation Purpose
By chapter 54, section 1, of the laws of 1990:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law, and to the depart-
ment of transportation for the preparation of designs, plans, spec-
ifications and estimates, for the contract engineering services
provided by private firms, and for the acquisition, construction,
reconstruction, and improvement of airport or aviation capital
projects, including the acquisition of real property, pursuant to
the provisions of the rebuild New York through transportation
infrastructure renewal bond act of 1983, in accordance with the
schedule set forth below. The moneys hereby appropriated are to be
made available for payment of state aid to municipal corporations
including payment of liabilities incurred prior to April 1, 1990.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each airport or aviation project
progressed under the program categories listed in the schedule below
has received federal approval. Such certification shall report the
amount of the federally authorized level of financial assistance
(17239014) (53230) ... ..... 2,800,000 ............. (re. $10,000)
By chapter 54, section 1, of the laws of 1989, for:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law, and to the depart-
ment of transportation for the preparation of designs, plans, spec-
ifications and estimates, for the contract engineering services
provided by private firms, and for the acquisition, construction,
reconstruction, and improvement of airport or aviation capital
projects, including the acquisition of real property, pursuant to
the provisions of the rebuild New York through transportation
infrastructure renewal bond act of 1983, in accordance with the
schedule set forth below. The moneys hereby appropriated are to be
made available for payment of state aid to municipal corporations
including payment of liabilities incurred prior to April 1, 1989.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each airport or aviation project
progressed under the program categories listed in the schedule below
has received federal approval and the amount of federally authorized
814 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
level of financial assistance (17238914) (53230) ... .............
2,800,000 ............................................. (re. $3,000)
By chapter 54, section 1, of the laws of 1988, as amended by chapter
262, section 1, of the laws of 1988:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law, and to the depart-
ment of transportation for the preparation of designs, plans, spec-
ifications and estimates, for the contract engineering services
provided by private firms, and for the acquisition, construction,
reconstruction, and improvement of airport or aviation capital
projects, including the acquisition of real property, pursuant to
the provisions of the rebuild New York through transportation
infrastructure renewal bond act of 1983, in accordance with the
schedule set forth below. The moneys hereby appropriated are to be
made available for payment of state aid to municipal corporations
including payment of liabilities incurred prior to April 1, 1988.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each airport or aviation project
progressed under the program categories listed in the schedule below
has received federal approval and the federally authorized level of
financial assistance (17238814) (53230) ... ......................
10,400,000 ........................................... (re. $52,000)
By chapter 54, section 1, of the laws of 1987:
For state aid to municipal corporations and to the department of
transportation for the preparation of designs, plans, specifications
and estimates, for the contract engineering services provided by
private firms, and for the acquisition, construction, recon-
struction, and improvement of airport or aviation capital projects,
including the acquisition of real property, pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, in accordance with the schedule
set forth below. The moneys hereby appropriated are to be made
available for payment of state aid to municipal corporations includ-
ing payment of liabilities incurred prior to April 1, 1987. The
items shown in the project schedule below shall be for projects with
a common purpose and may be interchanged without limitation subject
to the approval of the director of the division of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner shall
certify that each airport or aviation project progressed under the
program categories listed in the schedule below has received federal
approval and the federally authorized level of financial assistance
(17168714) (53230) ... ..... 3,900,000 ............ (re. $183,000)
815 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
section 3, of the laws of 1988:
For state aid to municipal corporations and to the department of
transportation for the preparation of designs, plans, specifications
and estimates, for the contract engineering services provided by
private firms, and for the acquisition, construction, recon-
struction, and improvement of airport or aviation capital projects,
including the acquisition of real property, pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, in accordance with the schedule
set forth below. The moneys hereby appropriated are to be made
available for payment of state aid to municipal corporations includ-
ing payment of liabilities incurred prior to April one, nineteen
hundred eighty-six. The items shown in the project schedule below
shall be for projects with a common purpose and may be interchanged
without limitation subject to the approval of the director of the
division of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner shall
certify that each airport or aviation project progressed under the
program categories listed in the schedule below has received federal
approval and the federally authorized level of financial assistance
(17238614) (53230) ... ..... 5,100,000 ............ (re. $110,000)
By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
section 3, of the laws of 1987:
For payment of the costs, including the payment of liabilities
incurred prior to April one, nineteen hundred eighty-six, for the
preparation of designs, plans, specifications and estimates, for the
construction, reconstruction, and improvement of airport or aviation
capital projects, including infrastructure improvements at Stewart
airport, for the costs of real property acquisition, contract engi-
neering services provided by private firms, and other expenses
related thereto, pursuant to the transportation capital facilities
development act of nineteen hundred sixty-seven, notwithstanding any
inconsistent provisions of law.
No funds shall be allocated that are directly related to a private
facility until the commissioner of transportation enters into a
written agreement, subject to the approval of the director of the
budget, with such private entity providing that such entity is
committed to locate its facilities at Stewart airport and has
arranged financing for the costs of construction of such facilities.
Funds shall not be allocated from this appropriation for infrastruc-
ture improvements or other development purposes not directly related
to a private facility until the commissioner of transportation has
provided the director of the budget with the following projections
to support any such allocation of funds: (a) effect on Stewart
airport net operating revenues; (b) effect on new jobs for the state
of New York; and (c) effect on net revenues of amortization of state
capital expenditures.
The commissioner of transportation shall secure and use any federal
funds which are or may become available for the purposes of this
816 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriation. Any such funds shall be used to reduce the state's
share of project costs for which federal funds become available
(17A18614) (53231) ... 19,500,000 ................... (re. $134,000)
By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
section 3, of the laws of 1988:
For state aid to municipal corporations for the acquisition,
construction, reconstruction, and improvement of airport or aviation
capital projects, including the acquisition of real property, pursu-
ant to the transportation capital facilities development act of
nineteen hundred sixty-seven notwithstanding any inconsistent
provisions of law, in accordance with the schedule set forth below.
The moneys hereby appropriated are to be made available for payment
of state aid to municipal corporations including payment of liabil-
ities incurred prior to April one, nineteen hundred eighty-five, as
defined in the transportation capital facilities development act of
nineteen hundred sixty-seven. The items shown in the project sched-
ule below shall be for projects with a common purpose and may be
interchanged without limitation subject to the approval of the
director of the division of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner shall
certify that each airport or aviation project progressed under the
program categories listed in the schedule below has received federal
approval and the federally authorized level of financial assistance
(17158514) (53230) ... ..... 3,700,000 ............ (re. $726,000)
By chapter 54, section 1, of the laws of 1984:
For state aid to municipal corporations for the acquisition,
construction, reconstruction, and improvement of airport or aviation
capital projects, including the acquisition of real property, pursu-
ant to the transportation capital facilities development act of
nineteen hundred sixty-seven notwithstanding any inconsistent
provisions of law, in accordance with the schedule set forth below.
The moneys hereby appropriated are to be made available for payment
of state aid to municipal corporations including payment of liabil-
ities incurred prior to April one, nineteen hundred eighty-four, as
defined in the transportation capital facilities development act of
nineteen hundred sixty-seven.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner shall
certify that each airport or aviation project progressed under the
program categories listed in the schedule below has received federal
approval and the federally authorized level of financial assistance
(17178414) (53230) ... ............................ (re. $313,000)
REPUBLIC AND STEWART AIRPORTS
By chapter 54, section 7, of the laws of 1973, as transferred by chapter
370, section 3, of the laws of 1982, and as amended by chapter 54,
section 3, of the laws of 1986:
817 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
To the department of transportation, notwithstanding the provisions of
title one of chapter seven hundred seventeen of the laws of nineteen
hundred sixty-seven, as amended, or of any agreements entered into
pursuant to such provisions (which agreements shall no longer be
applicable to such projects), for one hundred percentum of the net
project cost of the acquisition, construction, reconstruction and
improvement, with expected federal aid as indicated, of airport or
aviation capital projects in accordance with the schedule set forth
below, including the completion of those of the said projects
already commenced, which amount shall be available for the payment
of liabilities incurred prior to April 1, 1971, provided that as to
any project in the foregoing schedule which has not heretofore been
authorized by the legislature in an appropriation act, no certif-
icate of approval of availability shall be issued until the commis-
sioner of transportation has delivered to the director of the budget
his certification that such project is consistent with the
provisions of subdivision 1 of section 15 of the transportation law.
The amount hereby appropriated is in addition to and supplemental to
the amounts heretofore expended from the capital construction fund
as part of the "net project cost" as set forth in the schedule
below:
AIRPORT OR AVIATION CAPITAL PROJECTS
project schedule
ADDITIONAL
ADDITIONAL ESTIMATED ADDITIONAL
COMPLETION ESTIMATED FEDERAL NET PROJECT
CAPITAL PROJECT DATE TOTAL COST SHARE COST
-----------------------------------------------------------------------
(thousands)
To supplement the project
appropriated by 320/23/71 as
supplemented by 34/8/72, for
the project reading:
"Acquire and develop Republic
Airport, including new
hangars, administration
building, and other capital
improvements;
acquire lands;
close Zahn's Airport" ..... 12/74 $4,205 ........ $4,205
------- -------
Total ................... $4,205 $4,205
======= =======
Notwithstanding the provisions of any general or special law, no part
of any such appropriation shall be available for the purposes desig-
nated until a certificate of approval of availability shall have
been issued by the director of the budget and a copy of such certif-
icate filed with the state comptroller, the chairman of the senate
finance committee and the chairman of the assembly ways and means
818 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
committee. Such certificate may be amended from time to time subject
to the approval of the director of the budget and a copy of each
such amendment shall be filed with the state comptroller, the chair-
man of the senate finance committee and the chairman of the assembly
ways and means committee.
The moneys hereby appropriated, when made available pursuant to a
certificate of approval of availability, issued by the director of
the budget, shall be paid from the capital construction fund on the
audit and warrant of the state comptroller on vouchers approved by
the commissioner of transportation or his duly designated officer
(02412614) (53232) ... 4,205,000 .................... (re. $837,000)
AIRPORT OR AVIATION PROGRAM--BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Aviation Purpose
By chapter 54, section 1, of the laws of 1991:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the state share of federally aided projects at Stewart and Republic
Airports, for the acquisition, construction, reconstruction, and
improvement of airport or aviation capital projects, including the
acquisition of real property, pursuant to the transportation capital
facilities development act of 1967 notwithstanding any inconsistent
provisions of law, in accordance with the schedule set forth below.
The moneys hereby appropriated are to be made available for payment
of state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the state share of federally aided projects at Stewart and Republic
Airports, including payment of liabilities incurred prior to April
1, 1991, as defined in the transportation capital facilities devel-
opment act of 1967. The items shown in the project schedule below
shall be for projects with a common purpose and may be interchanged
without limitation subject to the approval of the director of the
division of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each airport or aviation project
progressed under the program categories listed in the schedule below
has received federal approval and the federally authorized level of
financial assistance.
No funds shall be allocated for projects at Stewart Airport that are
directly related to a private facility until the commissioner of
transportation enters into a written agreement, subject to the
approval of the director of the budget, with such private entity
providing that such entity is committed to locate its facilities at
Stewart airport and has arranged financing for the costs of
construction of such facilities.
Funds shall not be allocated for projects at Stewart airport from this
appropriation for infrastructure improvements or other development
819 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
purposes not directly related to a private facility until the
commissioner of transportation has provided the director of the
budget with the following projections to support any such allocation
of funds: (a) effect on Stewart airport net operating revenues; (b)
effect on new jobs for the state of New York; and (c) effect on net
revenues of amortization of state capital expenditures. It is
acknowledged that funds provided herein pursuant to the transporta-
tion capital facilities development act of 1967 are made available
by repealing a portion of an appropriation for the payment of the
state's share to the Niagara frontier transportation authority for
construction, reconstruction, and improvement of airport or aviation
capital projects at Buffalo international airport. It is the intent
of the legislature that the repeal of such funds appropriated to the
Niagara frontier transportation authority does not void the state's
commitment to provide alternative state share funding sources to the
authority to complete the airport or aviation capital projects at
Buffalo international airport as originally provided by chapter 54,
section 1, of the laws of 1982, as amended by chapter 54, section 3,
of the laws of 1988. It is further the intent of the legislature
that such alternative state share funding be provided to the author-
ity no later than March 31, 1993 (17439114) (53271) ................
11,800,000 .......................................... (re. $824,000)
AIRPORT OR AVIATION STATE PROGRAM (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Aviation Purpose Account - 30053
Aviation Purpose
By chapter 54, section 1, of the laws of 2022:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2022.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17232214) (54293) ... 14,000,000 ................ (re. $14,000,000)
By chapter 54, section 1, of the laws of 2021:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2021.
820 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17232114) (54293) ... 4,000,000 .................. (re. $4,000,000)
By chapter 54, section 1, of the laws of 2020:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2020.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Provided, however, that no obligations against, or spending from
this appropriation shall be authorized unless the director of the
division of the budget certifies that such obligations or spending
can be accommodated within the State's multi-year financial plan
without adversely affecting the funding available for (a) capital
projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17232014) (54293) ... 4,000,000 ......... (re. $4,000,000)
By chapter 54, section 1, of the laws of 2019:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2019.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231914) (54293) ... 4,000,000 .................... (re. $835,000)
By chapter 54, section 1, of the laws of 2018:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2018.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
821 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231814) (54293) ... 4,000,000 .................... (re. $501,000)
By chapter 54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2017.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231714) (54293) ... 4,000,000 .................... (re. $570,000)
By chapter 55, section 1, of the laws of 2016, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2016.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231614) (54293) ... 4,000,000 .................... (re. $156,000)
By chapter 54, section 1, of the laws of 2015, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2015.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231514) (54293) ... 4,000,000 .................... (re. $696,000)
By chapter 54, section 1, of the laws of 2014, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
822 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2014.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231414) (54293) ... 4,000,000 .................... (re. $136,000)
By chapter 54, section 1, of the laws of 2013, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2013.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231314) (54293) ... 4,000,000 .................... (re. $168,000)
By chapter 54, section 1, of the laws of 2012, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2012.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2012; provided, however, that funds available for this purpose
shall not exceed the amount by which $1,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17231214) (54293) ............................
1,000,000 ........................................... (re. $420,000)
823 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2011, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2011.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2011; provided, however, that funds available for this purpose
shall not exceed the amount by which $4,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17231114) (54293) ............................
4,000,000 ......................................... (re. $4,000,000)
By chapter 55, section 1, of the laws of 2010, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2010.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17231014) (54293) ... 4,000,000 .................. (re. $4,000,000)
By chapter 55, section 1, of the laws of 2009, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2009.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
824 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2008; provided, however, that funds available for this purpose
shall not exceed the amount by which $4,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17230914) (54293) ............................
4,000,000 ......................................... (re. $4,000,000)
By chapter 55, section 1, of the laws of 2008, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2008.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2008; provided, however, that funds available for this purpose
shall not exceed the amount by which $8,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17230814) (54293) ............................
8,000,000 ......................................... (re. $6,575,000)
By chapter 55, section 1, of the laws of 2007, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2007.
825 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2007; provided, however, that funds available for this purpose
shall not exceed the amount by which $8,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17230714) (54293) ............................
8,000,000 ........................................... (re. $850,000)
By chapter 55, section 1, of the laws of 2006, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2006.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17230614) (54293) ... 8,000,000 .................. (re. $1,323,000)
By chapter 55, section 1, of the laws of 2005, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2005.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17230514) (54293) ... 8,000,000 .................. (re. $1,200,000)
By chapter 55, section 1, of the laws of 2004, as transferred by chapter
54, section 1, of the laws of 2017:
826 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2004.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17230414) (54293) ... 8,000,000 ..................... (re. $45,000)
By chapter 55, section 1, of the laws of 2002, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2002. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17230214) (54293) ... 8,000,000 ..................... (re. $66,000)
By chapter 55, section 1, of the laws of 2001, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2001, in
accordance with the following project schedule.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program categories listed in a project schedule other than state
owned airports, has received federal approval and the federally
authorized level of financial assistance.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17230114)
(54293) ... 6,000,000 ................................ (re. $41,000)
By chapter 55, section 1, of the laws of 2000, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
827 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2000, in
accordance with the following project schedule.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program categories listed in a project schedule other than state
owned airports, has received federal approval and the federally
authorized level of financial assistance.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17230014)
(54293) ... ..... 6,000,000 ........................ (re. $79,000)
By chapter 55, section 1, of the laws of 1999, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 1999, in
accordance with the following project schedule.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program categories listed in a project schedule other than state
owned airports, has received federal approval and the federally
authorized level of financial assistance.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17239914)
(54293) ... ..... 4,500,000 ........................ (re. $19,000)
By chapter 55, section 1, of the laws of 1998, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 1998, in
accordance with the following project schedule.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program categories listed in a project schedule other than state
owned airports, has received federal approval and the federally
authorized level of financial assistance.
828 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17239814)
(54293) ... ..... 4,500,000 ........................ (re. $15,000)
By chapter 55, section 1, of the laws of 1997, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 1997, in
accordance with the following project schedule.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program categories listed in a project schedule other than state
owned airports, has received federal approval and the federally
authorized level of financial assistance.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17249714)
(54293) ... ..... 4,500,000 ........................ (re. $11,000)
By chapter 54, section 1, of the laws of 1995, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 1995, in
accordance with the following project schedule. The items shown in
the project schedule below shall be for projects with a common
purpose and may be interchanged without limitation subject to the
approval of the director of the budget (17239514) (54293) ... ....
6,500,000 ............................................ (re. $60,000)
By chapter 54, section 1, of the laws of 1993, as transferred by chapter
54, section 1, of the laws of 2017:
For payment of the costs, including the payment of liabilities
incurred prior to April 1, 1993, for the preparation of designs,
plans, specifications, estimates and studies, for the construction,
reconstruction, and improvement of airport or aviation capital
projects, including infrastructure improvements at Stewart and
Republic airports, for the costs of real property acquisition,
contract engineering services provided by private firms, and other
expenses related thereto.
The commissioner of transportation shall secure and use any federal
funds which are or may become available for the purposes of this
829 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriation. Any such funds shall be used to reduce the state's
share of project costs for which federal funds become available.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et (17229314) (53234) ... ..... 10,840,000 ...... (re. $1,211,000)
By chapter 54, section 1, of the laws of 1992, as transferred by chapter
54, section 1, of the laws of 2017:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 1992, in
accordance with the schedule set forth below.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each airport or aviation project
progressed under the program categories listed in the schedule
below, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance
(17239214) (54293) ... ..... 12,300,000 ............ (re. $12,000)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
Stewart Airport-15 Account - 32210
Aviation Purpose
By chapter 54, section 1, of the laws of 2012:
For state aid to municipal corporations, private airports as author-
ized by section 14-h of the transportation law and for payment of
the cost of projects at Stewart and Republic Airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2012.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2012; provided, however, that funds available for this purpose
shall not exceed the amount by which $3,000,000 exceeds the sum of
the amount in such state fiscal year necessary for the state share
of federal projects provided pursuant to section 14-h of the trans-
830 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
portation law and the amount in such state fiscal year required for
payment of the costs of projects at Stewart and Republic Airports,
upon certification by the commissioner of transportation at the end
of the calendar year (17241214) (54293) ............................
3,000,000 ........................................... (re. $162,000)
By chapter 55, section 1, of the laws of 2008:
For payment of costs related to Stewart Airport, including but not
limited to environmental remediation; acquisition, construction,
reconstruction, demolition and improvement of capital projects;
acquisition of real property and facilities; projects related to
passenger, cargo, and commercial development; acquisition of equip-
ment; funding of operating needs; and for liabilities incurred prior
to April 1, 2008 (17RA0814) (53233) ... 4,000,000 . (re. $4,000,000)
By chapter 55, section 1, of the laws of 2006:
For payment of costs related to municipal, private, state owned and
public authority airports and aviation facilities, including but not
limited to environmental remediation; acquisition, construction,
reconstruction, demolition and improvement of capital projects;
acquisition of real property and facilities; projects related to
passenger, cargo, and commercial development; acquisition of equip-
ment; funding of operating needs; and for liabilities incurred prior
to April 1, 2006.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17RA0614) (54290) ...
5,300,000 ........................................... (re. $831,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter
108, section 5, of the laws of 2006:
For payment of costs related to Stewart International Airport includ-
ing, but not limited to, acquisition of real property and facili-
ties; construction, reconstruction, demolition and improvement of
capital facilities; and payment of liabilities incurred prior to
April 1, 1999. Notwithstanding any inconsistent provision of law, of
amounts appropriated herein, $1,000,000 shall be made available to
labor organizations for training programs (17RA9914) (53233) .......
17,500,000 .......................................... (re. $532,000)
For payment of the costs of capital projects as set forth in a memo-
randum of understanding among the governor, the majority leader of
the senate, and the speaker of the assembly (17RD9914) (53235) .....
4,500,000 ......................................... (re. $1,500,000)
For expenses and payments incurred in implementation of the airport
improvement and revitalization program (17RE9914) (53236) ..........
2,500,000 ............................................ (re. $69,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter
295, part A, section 1, of the laws of 2001:
For payment of the costs of operating and capital projects including,
but not limited to, acquisition of real property and facilities;
construction, reconstruction, demolition and improvement of capital
831 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
facilities; and payment of liabilities incurred prior to April 1,
1999 (17RB9914) (53237) ... 2,500,000 ............... (re. $757,000)
AMERICAN RECOVERY AND REINVESTMENT ACT (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
DOT American Recovery and Reinvestment Act Account - 31372
American Recovery and Reinvestment Act Purpose
By chapter 55, section 1, of the laws of 2009:
For Transit Capital Assistance funded by Title 12 of the American
Recovery and Reinvestment Act of 2009. Funds appropriated herein
shall be subject to all applicable reporting and accountability
requirements contained in such act.
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities, including liabilities incurred prior to April 1,
2009 (170509FS) (53242) ... 26,300,000 ............ (re. $3,085,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2013:
For Highway Infrastructure Investment funded by Title 12 of the Ameri-
can Recovery and Reinvestment Act of 2009. Funds appropriated herein
shall be subject to all applicable reporting and accountability
requirements contained in such act.
For the payment of eligible costs, including but not limited to
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation, preservation, related appurtenances, equipment,
facilities, the acquisition of real property and interests therein,
the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements, including the payment
of liabilities incurred prior to April 1, 2009.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund, including but not limited
to personal services, nonpersonal services and fringe benefits, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements, including the payment of liabilities incurred
prior to April 1, 2009 (170309FS) (53162) ..........................
950,700,000 ...................................... (re. $26,547,000)
For Capital Assistance for High Speed Rail Corridors and Intercity
Passenger Rail Service funded by Title 12 of the American Recovery
and Reinvestment Act of 2009. Funds appropriated herein shall be
subject to all applicable reporting and accountability requirements
contained in such act.
832 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of eligible costs, including but not limited to
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation, preservation, related appurtenances, equipment,
facilities, the acquisition of real property and interests therein,
the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements, including the payment
of liabilities incurred prior to April 1, 2009.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund, including but not limited
to personal services, nonpersonal services and fringe benefits, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements, including the payment of liabilities incurred
prior to April 1, 2009 (170409FS) (53241) ..........................
600,000,000 ..................................... (re. $114,881,000)
AVIATION (CCP)
Capital Projects Funds - Other
Transportation Capital Facilities Bond Fund
Transportation Capital Facilities Bond Fund Account - 30630
Bond Proceeds Purpose
By chapter 54, section 9, of the laws of 1981, as amended by chapter 55,
section 1, of the laws of 2008:
The sum of $17,305,787, or so much thereof as may be necessary is
hereby appropriated from the transportation capital facilities bond
fund pursuant to the provisions of chapter seven hundred fifteen of
the laws of nineteen hundred sixty-seven, known as the "Transporta-
tion Capital Facilities Bond Act", for payment to the capital
projects fund for disbursements from such fund pursuant to appropri-
ations for the acquisition, construction, reconstruction and
improvement of any airport or aviation capital facility and of any
capital equipment used in connection therewith, by the State, any
county, city, town, village, special transportation district, public
benefit corporation or other public corporation, or two or more of
the foregoing acting jointly in accordance with the provisions of
the transportation capital facilities development act and as herein-
after referred to as "airport or aviation capital project bond
disbursements."
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the transportation capital facilities
bond fund until a certificate of approval of availability shall have
been issued by the director of the division of the budget, and a
copy of such certificate filed with the state comptroller, the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee. Such certificate may be amended
from time to time by the director of the division of the budget and
a copy of each such amendment shall be filed with the state comp-
833 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
troller, the chairman of the senate finance committee and the chair-
man of the assembly ways and means committee.
The director of the division of the budget is hereby authorized to
designate to the state comptroller specific appropriations made from
the capital projects fund for purposes for which airport or aviation
capital project bond expenditures are authorized. The state comp-
troller shall, at the commencement of each month, certify to the
director of the division of the budget, the chairman of the senate
finance committee and the chairman of the assembly ways and means
committee, the amounts disbursed from the appropriations designated
by the director of the division of the budget from the capital
projects fund for these disbursements pursuant to appropriations
from such fund for such purposes for the month preceding such
certification and such certifications shall not exceed in the aggre-
gate the moneys hereby appropriated (03025510) (80919) .............
17,305,787 ........................................ (re. $3,329,000)
CANALS AND WATERWAYS - BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewal (Bondable) - 30000
Canals and Waterways Purpose
By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
section 3, of the laws of 1991:
For the preparation of designs, plans, specifications and estimates,
for the contract engineering services provided by private firms, for
the acquisition of property, reconstruction and improvement of dams,
canal locks, embankments and related structures and facilities on
the state barge canal system, including the payment of liabilities
incurred prior to April 1, 1988, pursuant to the rebuild New York
through transportation infrastructure renewal bond act of 1983.
The moneys hereby appropriated, when made available pursuant to a
certificate of approval of availability issued by the director of
the budget, shall be made available in accordance with the schedule
shown below. The items shown in the project schedule below shall be
for projects with a common purpose and may be interchanged without
limitation subject to the approval of the director of the division
of the budget (17328816) (53272) ... .............................
2,823,657 ........................................... (re. $158,000)
By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
section 3, of the laws of 1989:
For the preparation of designs, plans, specifications and estimates,
for the contract engineering services provided by private firms, for
the acquisition of property, reconstruction and improvement of dams,
canal locks, embankments and related structures and facilities on
the state barge canal system, including the payment of liabilities
incurred prior to April 1, 1987, pursuant to the rebuild New York
through transportation infrastructure renewal bond act of 1983.
The moneys hereby appropriated, when made available pursuant to a
certificate of approval of availability issued by the director of
834 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the budget, shall be made available in accordance with the schedule
shown below. The items shown in the project schedule below shall be
for projects with a common purpose and may be interchanged without
limitation subject to the approval of the director of the division
of the budget (17208716) (53272) ... .............................
6,200,000 ........................................... (re. $326,000)
ENGINEERING SERVICES PROGRAM (CCP)
Capital Projects Funds - Other
Department of Transportation Engineering Services Fund
Highway Facility Purpose Account - 31951
Preparation of Plans Purpose
By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
section 1, of the laws of 2004:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $170,000 to the office of inspector general for
services and expenses including fringe benefits ....................
(17H10230) (53244) ... 546,256,000 ................ (re. $9,700,000)
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms (17H20230) (53245) ...
57,259,000 .......................................... (re. $526,000)
By chapter 55, section 1, of the laws of 2001, as amended by chapter 55,
section 1, of the laws of 2003:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $170,000 to the office of inspector general for
services and expenses including fringe benefits (17H10130) (53244)
... 566,922,000 ................................... (re. $7,682,000)
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms (17H20130) (53245) ...
53,384,000 .......................................... (re. $334,000)
By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
section 1, of the laws of 2002:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
835 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $170,000 to the office of inspector general for
services and expenses including fringe benefits (17H10030) (53244)
... 513,628,000 ................................... (re. $6,092,000)
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms (17H20030) (53245) ...
51,892,000 .......................................... (re. $830,000)
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H30030) (53246) ... 16,684,000 ..... (re. $615,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2005:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $170,000 to the office of inspector general for
services and expenses including fringe benefits (17H19930) (53244)
... 492,101,680 ................................... (re. $1,815,000)
By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2000:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19830) (53244) ... .............................
532,078,000 ...................................... (re. $23,709,000)
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms (17H29830) (53245)
... ... 56,876,000 ................................ (re. $674,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
section 1, of the laws of 2000:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19730) (53244) ... .............................
490,281,000 ....................................... (re. $5,660,000)
By chapter 55, section 1, of the laws of 1996:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17H19630)
(53244) ... ..... 471,758,000 ................... (re. $2,833,000)
836 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1995:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19530) (53244) ...................................
470,364,000 ...................................... (re. $19,725,000)
By chapter 54, section 1, of the laws of 1994:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19430) (53244) ... .............................
530,329,000 ...................................... (re. $21,829,000)
By chapter 54, section 1, of the laws of 1993, as amended by chapter 54,
section 3, of the laws of 1995:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19330) (53244) ... .............................
500,923,000 ....................................... (re. $4,528,000)
By chapter 54, section 1, of the laws of 1992, as amended by chapter 54,
section 3, of the laws of 1995:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H19230) (53244) ... .............................
455,207,200 ...................................... (re. $15,615,000)
Special Revenue Funds - Federal
Federal Miscellaneous Operating Grants Fund
DOT Federal Account - 25381
Preparation of Plans Purpose
New York Metropolitan Transportation Council
By chapter 54, section 1, of the laws of 2022:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M12230) (50000) ... 5,873,000 ... (re. $4,649,000)
Nonpersonal service (17M42230) (57050) ...............................
14,841,000 ....................................... (re. $13,984,000)
Fringe benefits (17M82230) (60090) ... 3,743,000 .... (re. $3,120,000)
Indirect costs (17M92230) (58850) ... 214,000 ......... (re. $162,000)
By chapter 54, section 1, of the laws of 2021:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M12130) (50000) ... 4,518,000 ... (re. $3,357,000)
837 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (17M42130) (57050) ...............................
11,416,000 ........................................ (re. $8,928,000)
Fringe benefits (17M82130) (60090) ... 2,795,000 .... (re. $1,785,000)
Indirect costs (17M92130) (58850) ... 191,000 ......... (re. $145,000)
By chapter 54, section 1, of the laws of 2020:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M12030) (50000) ... 4,518,000 ...... (re. $12,000)
Nonpersonal service (17M42030) (57050) ...............................
11,416,000 ........................................ (re. $9,419,000)
Fringe benefits (17M82030) (60090) ... 2,608,000 ....... (re. $18,000)
Indirect costs (17M92030) (58850) ... 221,000 .......... (re. $31,000)
By chapter 54, section 1, of the laws of 2019:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11930) (50000) ... 4,518,000 ..... (re. $138,000)
Nonpersonal service (17M41930) (57050) ...............................
11,416,000 ....................................... (re. $10,484,000)
Fringe benefits (17M81930) (60090) ... 2,755,000 ...... (re. $384,000)
Indirect costs (17M91930) (58850) ... 221,000 .......... (re. $35,000)
By chapter 54, section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11830) (50000) ... 4,518,000 ..... (re. $911,000)
Nonpersonal service (17M41830) (57050) ...............................
11,416,000 ........................................ (re. $3,654,000)
Fringe benefits (17M81830) (60090) ... 2,823,000 ...... (re. $263,000)
Indirect costs (17M91830) (58850) ... 287,000 .......... (re. $25,000)
By chapter 54, section 1, of the laws of 2017:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Nonpersonal service (17M41730) (57050) ...............................
11,416,000 ........................................ (re. $7,794,000)
Fringe benefits (17M81730) (60090) ... 2,690,000 ...... (re. $263,000)
Indirect costs (17M91730) (58850) ... 197,000 ........... (re. $5,000)
838 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11630) (50000) ... 841,179 ....... (re. $744,000)
Nonpersonal service (17M41630) (57050) ...............................
9,365,163 ......................................... (re. $6,446,000)
Fringe benefits (17M81630) (60090) ... 865,985 ........ (re. $866,000)
Indirect costs (17M91630) (58850) ... 44,621 ........... (re. $21,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11530) (50000) ... 933,623 ....... (re. $934,000)
Nonpersonal service (17M41530) (57050) ...............................
8,977,108 ......................................... (re. $6,515,000)
Fringe benefits (17M81530) (60090) ... 560,252 ......... (re. $27,000)
Indirect costs (17M91530) (58850) ... 25,886 ............ (re. $2,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11430) (50000) ... 383,260 ....... (re. $383,000)
Nonpersonal service (17M41430) (57050) ...............................
8,138,071 ......................................... (re. $7,080,000)
Fringe benefits (17M81430) (60090) ... 235,268 ........ (re. $235,000)
Indirect costs (17M91430) (58850) ... 12,741 ........... (re. $13,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11330) (50000) ... 325,828 ....... (re. $325,000)
Nonpersonal service (17M41330) (57050) ...............................
10,450,902 ........................................ (re. $7,199,000)
Fringe benefits (17M81330) (60090) ... 323,259 ........ (re. $323,000)
Indirect costs (17M91330) (58850) ... 44,494 ........... (re. $44,000)
839 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (53243).
Personal service (17M11230) (50000) ... 358,282 ....... (re. $358,000)
Nonpersonal service (17M41230) (57050) ...............................
6,907,424 ......................................... (re. $5,934,000)
Fringe benefits (17M81230) (60090) ... 87,098 .......... (re. $87,000)
Indirect costs (17M91230) (58850) ... 49,174 ........... (re. $49,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC1130) (53243) ...........
4,520,393 ......................................... (re. $2,707,000)
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC1030) (53243) ...........
6,462,022 ......................................... (re. $6,430,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0930) (53243) ...........
3,325,948 ......................................... (re. $2,786,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0830) (53243) ...........
5,471,502 ......................................... (re. $4,646,000)
By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
840 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0730) (53243) ...........
1,080,731 ........................................... (re. $733,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0630) (53243) ... .....
659,748 ............................................. (re. $659,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0530) (53243) ... .....
1,494,680 ......................................... (re. $1,345,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0430) (53243) ... .....
442,854 ............................................. (re. $442,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2018:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (17NC0330) (53243) ... .....
1,251,229 ......................................... (re. $1,088,000)
Watertown Jefferson County Area Transportation Council
By chapter 54, section 1, of the laws of 2022:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Personal service (17W12230) (50000) ... 178,000 ....... (re. $178,000)
841 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (17W42230) (57050) ... 134,000 .... (re. $134,000)
Fringe benefits (17W82230) (60090) ... 114,000 ........ (re. $114,000)
Indirect costs (17W92230) (58850) ... 7,000 ............. (re. $7,000)
By chapter 54, section 1, of the laws of 2021:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Personal service (17W12130) (50000) ... 137,000 ....... (re. $137,000)
Nonpersonal service (17W42130) (57050) ... 103,000 .... (re. $103,000)
Fringe benefits (17W82130) (60090) ... 85,000 .......... (re. $85,000)
Indirect costs (17W92130) (58850) ... 6,000 ............. (re. $6,000)
By chapter 54, section 1, of the laws of 2020:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Personal service (17W12030) (50000) ... 137,000 ....... (re. $137,000)
Nonpersonal service (17W42030) (57050) ... 103,000 ..... (re. $77,000)
Fringe benefits (17W82030) (60090) ... 80,000 .......... (re. $80,000)
Indirect costs (17W92030) (58850) ... 7,000 ............. (re. $7,000)
By chapter 54, section 1, of the laws of 2019:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Personal service (17W11930) (50000) ... 137,000 ....... (re. $125,000)
Nonpersonal service (17W41930) (57050) ... 103,000 .... (re. $102,000)
Fringe benefits (17W81930) (60090) ... 84,000 .......... (re. $77,000)
Indirect costs (17W91930) (58850) ... 7,000 ............. (re. $6,000)
The appropriation made by chapter 54, section 1, of the laws of 2018, as
supplemented by a transfer in accordance with section 51 of state
finance law, is hereby amended and reappropriated to read:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Personal service (17W11830) (50000) ..................................
[137,000] 126,000 ................................... (re. $118,000)
Nonpersonal service (17W41830) (57050) ...............................
[103,000] 114,000 ................................... (re. $113,000)
Fringe benefits (17W81830) (60090) ... 86,000 .......... (re. $81,000)
Indirect costs (17W91830) (58850) ... 9,000 ............. (re. $9,000)
842 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The appropriation made by chapter 54, section 1, of the laws of 2017, as
supplemented by a transfer in accordance with section 51 of state
finance law, is hereby amended and reappropriated to read:
For the continuing comprehensive transportation planning and coordi-
nated support undertaken as part of the united work programs of
participating local planning or municipal agreements in accordance
with grant agreements approved by the federal transit administration
or the federal highway administration (54203).
Nonpersonal service (17W41730) (57050) ...............................
[590,000] 1,261,000 ................................. (re. $696,000)
Indirect costs (17W91730) (58850) ... 35,000 ........... (re. $22,000)
FEDERAL AID HIGHWAYS BONDABLE PURPOSE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Federal Aid Highways Purpose
By chapter 54, section 1, of the laws of 1988:
For the state share of highway projects to be reimbursed from the
infrastructure renewal bond fund and pursuant to the provisions of
that bond act (17028820) (54295) ... 56,000,000 ... (re. $1,419,000)
By chapter 54, section 1, of the laws of 1987:
For the state share of highway projects to be reimbursed from the
infrastructure renewal bond fund and pursuant to the provisions of
that bond act (17028720) (54295) ... 66,000,000 ... (re. $1,126,000)
By chapter 54, section 1, of the laws of 1986:
For the state share of highway projects to be reimbursed from the
infrastructure renewal bond fund and pursuant to the provisions of
that bond act (17428620) (54295) ... 66,000,000 ..... (re. $356,000)
By chapter 54, section 1, of the laws of 1985:
For the state share of highway projects to be reimbursed from the
infrastructure renewal bond fund and pursuant to the provisions of
that bond act (17028520) (54295) .................. (re. $1,210,000)
By chapter 54, section 1, of the laws of 1984:
For the state share of highway projects to be reimbursed from the
infrastructure renewal bond fund and pursuant to the provisions of
that bond act (17028420) (54295) .................. (re. $1,969,000)
FEDERAL AID HIGHWAYS FEDERAL PURPOSE (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Transportation Account - 31354
Federal Aid Highways Purpose
By chapter 54, section 1, of the laws of 2022:
843 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the bipartisan infrastructure law
(BIL) and related prior and successive federal legislation, and the
payment of liabilities incurred prior to April 1, 2022.
Notwithstanding section 93 of the state finance law or any other law,
rule or regulation to the contrary, all or a portion of the funds
appropriated herein may be suballocated or transferred to any
department, agency, or public authority for the implementation of
any eligible electric or zero-emission vehicle activities authorized
under P.L. 117-58 (17032220) (53163) ...............................
3,000,000,000 ................................. (re. $2,880,975,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2022 (17RW2220) (54259) ...........
50,000,000 ....................................... (re. $49,547,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2022 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG2220) (54260) ... 260,000,000 .............. (re. $260,000,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2022 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC2220)
(54261) ... 200,000,000 ......................... (re. $200,000,000)
By chapter 54, section 1, of the laws of 2021:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2021 (17032120) (53163) ... 2,010,000,000 .. (re. $1,114,397,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
844 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2021 (17RW2120) (54259) ...........
50,000,000 ....................................... (re. $48,444,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2021 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG2120) (54260) ... 260,000,000 .............. (re. $260,000,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2021 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC2120)
(54261) ... 200,000,000 ......................... (re. $200,000,000)
By chapter 54, section 1, of the laws of 2020:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2020. Provided, however, that during state fiscal year 2020-21,
the department of transportation shall, ten calendar days prior to
the start of each quarter or as soon as practicable thereafter,
provide to the director of the budget, the secretary of the senate
finance committee, and the secretary of the assembly ways and means
committee, a schedule of planned highway and bridge capital project
lettings to take place during such quarter; and provided, further,
that the projects to be let by the department may differ from the
schedules so provided due to emergencies, environmental concerns,
federal mandates, unforeseen conditions, design changes or other
factors (17032020) (53163) ... 2,010,000,000 .... (re. $956,130,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2020 (17RW2020) (54259) ...........
50,000,000 ....................................... (re. $49,875,000)
845 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2020 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG2020) (54260) ... 260,000,000 ............... (re. $70,020,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2020 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC2020)
(54261) ... 200,000,000 ......................... (re. $182,911,000)
By chapter 54, section 1, of the laws of 2019:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2019 (17031920) (53163) ... 2,010,000,000 .... (re. $360,945,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2019 (17RW1920) (54259) ...........
50,000,000 ....................................... (re. $49,009,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2019 and other such purposes
846 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
as specified in section 89-b of the state finance law as amended
(17EG1920) (54260) ... 260,000,000 .............. (re. $241,239,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2019 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC1920)
(54261) ... 200,000,000 ......................... (re. $131,643,000)
By chapter 54, section 1, of the laws of 2018:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2018 (17031820) (53163) ... 2,010,000,000 .... (re. $319,088,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2018 (17RW1820) (54259) ...........
50,000,000 ....................................... (re. $46,634,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2018 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG1820) (54260) ... 260,000,000 ............... (re. $77,298,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2018 and other such purposes as specified
847 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
in section 89-b of the state finance law as amended (17EC1820)
(54261) ... 160,000,000 ......................... (re. $113,438,000)
By chapter 54, section 1, of the laws of 2017:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2017 (17031720) (53163) ... 1,950,000,000 .... (re. $178,189,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2017 (17RW1720) (54259) ...........
50,000,000 ....................................... (re. $43,941,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2017 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG1720) (54260) ... 260,000,000 ............... (re. $70,353,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2017 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC1720)
(54261) ... 160,000,000 .......................... (re. $72,167,000)
By chapter 55, section 1, of the laws of 2016:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the fixing America's surface
transportation (FAST) act and related prior and successive federal
legislation, and the payment of liabilities incurred prior to April
1, 2016 (17031620) (53163) ... 1,711,000,000 .... (re. $517,834,000)
848 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2016 (17RW1620) (54259) ...........
50,000,000 ....................................... (re. $32,326,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2016 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG1620) (54260) ... 250,000,000 ............... (re. $84,261,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2016 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC1620)
(54261) ... 151,000,000 .......................... (re. $64,062,000)
By chapter 54, section 1, of the laws of 2015:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the moving ahead for progress in
the 21st century legislation and related prior and successive feder-
al legislation, and the payment of liabilities incurred prior to
April 1, 2015 (17031520) (53163) ...................................
1,600,000,000 ................................... (re. $455,073,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2015 (17RW1520) (54259) ...........
50,000,000 ....................................... (re. $37,503,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
849 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2015 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG1520) (54260) ... 225,000,000 ............... (re. $38,093,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2015 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC1520)
(54261) ... 125,000,000 .......................... (re. $34,833,000)
By chapter 54, section 1, of the laws of 2014:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
operating costs as provided for in the moving ahead for progress in
the 21st century legislation and related prior and successive feder-
al legislation, and the payment of liabilities incurred prior to
April 1, 2014 (17031420) (53163) ...................................
1,600,000,000 ................................... (re. $605,819,000)
For the federal share, from any federal agency under any federal
program, of the acquisition of property for state transportation
projects including but not limited to construction, reconstruction,
reconditioning and preservation, including the payment of liabil-
ities incurred prior to April 1, 2014 (17RW1420) (54259) ...........
50,000,000 ....................................... (re. $18,530,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2021:
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
transportation, of the federal share of engineering costs, including
fringe benefits, personal services, and nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2014 and other such purposes
as specified in section 89-b of the state finance law as amended
(17EG1420) (54260) ... 225,000,000 ............... (re. $46,727,000)
For the federal share of engineering costs, or for reimbursements to
the dedicated highway and bridge trust fund of the department of
850 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transportation, of the federal share of engineering costs, including
the contract services provided by private firms, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 2014 and other such purposes as specified
in section 89-b of the state finance law as amended (17EC1420)
(54261) ... 125,000,000 .......................... (re. $49,416,000)
By chapter 54, section 1, of the laws of 2013:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
the acquisition of property, operating costs as provided for in the
Moving Ahead for Progress in the 21st Century legislation and
related prior and successive federal legislation, payment of
reimbursements to the dedicated highway and bridge trust fund of the
department of transportation, including but not limited to fringe
benefits, and the contract services provided by private firms;
personal services, nonpersonal services, for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects, the payment of liabilities incurred
prior to April 1, 2013 and any other such purposes as specified in
section 89-b of the state finance law as amended (17031320) (53163)
... 2,000,000,000 ............................... (re. $546,427,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
the acquisition of property, operating costs as provided for in the
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
Legacy for Users and any successive legislation, payment of
reimbursements to the dedicated highway and bridge trust fund of the
department of transportation, including but not limited to fringe
benefits, and the contract services provided by private firms;
personal services, nonpersonal services, for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects, the payment of liabilities incurred
prior to April 1, 2012 and any other such purposes as specified in
section 89-b of the state finance law as amended (17031220) (53163)
... 1,800,000,000 ............................... (re. $138,402,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2013:
851 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
the acquisition of property, operating costs as provided for in the
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
Legacy for Users and any successive legislation, payment of
reimbursements to the dedicated highway and bridge trust fund of the
department of transportation, including but not limited to fringe
benefits, and the contract services provided by private firms;
personal services, nonpersonal services, for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects, the payment of liabilities incurred
prior to April 1, 2011 and any other such purposes as specified in
section 89-b of the state finance law as amended (17031120) (53163)
... 1,600,000,000 ............................... (re. $218,073,000)
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share, from any federal agency under any federal
program, of state transportation projects including but not limited
to construction, reconstruction, reconditioning and preservation,
the acquisition of property, operating costs as provided for in the
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
Legacy for Users and any successive legislation, payment of
reimbursements to the dedicated highway and bridge trust fund of the
department of transportation, including but not limited to fringe
benefits, and the contract services provided by private firms;
personal services, nonpersonal services, for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects, the payment of liabilities incurred
prior to April 1, 2010 and any other such purposes as specified in
section 89-b of the state finance law as amended (17031020) ( 53163)
... 1,725,000,000 ............................... (re. $198,620,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Safe, Accountable, Flexible, Efficient Transpor-
tation Equity Act: A Legacy for Users and any successive legis-
lation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
852 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2009 and any other such
purposes as specified in section 89-b of the state finance law as
amended (17030920) (53163) ... 1,550,000,000 .... (re. $163,363,000)
By chapter 55, section 1, of the laws of 2008:
For the federal share of state transportation maintenance projects
including but not limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, operating
costs as provided for in the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users, and any successive
legislation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2008 and any other such
purposes as specified in section 89-b of the state finance law as
amended (17440820) (53247) ... 50,000,000 ........ (re. $50,000,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2016:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Safe, Accountable, Flexible, Efficient Transpor-
tation Equity Act: A Legacy for Users and any successive legis-
lation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2008 and any other such
purposes as specified in section 89-b of the state finance law as
amended (17030820) (53163) ... 1,915,000,000 .... (re. $128,957,000)
By chapter 55, section 1, of the laws of 2007:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Safe, Accountable, Flexible, Efficient Transpor-
tation Equity Act: A Legacy for Users and any successive legis-
lation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
853 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2007 and any other such
purposes as specified in section 89-b of the state finance law as
amended (17030720) (53163) ... 1,977,299,000 ..... (re. $99,733,000)
For the federal share of state transportation maintenance projects
including but not limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, operating
costs as provided for in the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users, and any successive
legislation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2007 and any other such
purposes as specified in section 89-b of the state finance law as
amended.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of budget (17440720) (53247) ..........
50,000,000 ....................................... (re. $14,754,000)
PERSONAL SERVICE
Personal service--regular ...................... 5,000,000
Holiday/overtime compensation .................... 500,000
--------------
Amount available for personal service ........ 5,500,000
--------------
NONPERSONAL SERVICE
Supplies and materials ......................... 4,200,000
Travel ........................................... 300,000
Contractual services .......................... 11,850,000
Equipment ..................................... 25,386,000
Fringe benefits ................................ 2,534,000
Indirect costs ................................... 230,000
--------------
Amount available for nonpersonal service .... 44,500,000
--------------
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
854 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
preservation, the acquisition of property, operating costs as
provided for in the Safe, Accountable, Flexible, Efficient Transpor-
tation Equity Act: A Legacy for Users and any successive legis-
lation, payment of reimbursements to the dedicated highway and
bridge trust fund of the department of transportation, including but
not limited to fringe benefits, and the contract services provided
by private firms; personal services, nonpersonal services, for
activities including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing, and environmental
impact statements for transportation projects, the payment of
liabilities incurred prior to April 1, 2006 and any other such
purposes as specified in section 89-b of the state finance law as
amended (17030620) (53163) ... 1,580,000,000 ..... (re. $89,967,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to fringe benefits, and the
contract services provided by private firms; personal services,
nonpersonal services, for activities including but not limited to
the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, the payment of liabilities incurred prior to April 1, 2005
and any other such purposes as specified in section 89-b of the
state finance law as amended (17030520) (53163) ....................
1,580,000,000 .................................... (re. $56,297,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to fringe benefits, and the
contract services provided by private firms; personal services,
nonpersonal services, for activities including but not limited to
the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, the payment of liabilities incurred prior to April 1, 2004
and any other such purposes as specified in section 89-b of the
state finance law as amended (17030420) (53163) ....................
1,610,000,000 .................................... (re. $67,360,000)
855 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to fringe benefits, and the
contract services provided by private firms; personal services,
nonpersonal services, for activities including but not limited to
the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, the payment of liabilities incurred prior to April 1, 2003
and any other such purposes as specified in section 89-b of the
state finance law as amended (17030320) (53163) ....................
1,597,000,000 .................................... (re. $56,363,000)
By chapter 55, section 1, of the laws of 2002, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 2002 and any other
such purposes as specified in section 89-b of the state finance law
as amended (17030220) (53163) ... 1,451,000,000 .. (re. $54,637,000)
By chapter 55, section 1, of the laws of 2001, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 2001 and any other
856 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
such purposes as specified in section 89-b of the state finance law
as amended (17030120) (53163) ... 1,440,500,000 .. (re. $26,608,000)
By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 2000 and any other
such purposes as specified in section 89-b of the state finance law
as amended (17030020) (53163) ... 1,205,500,000 .. (re. $25,932,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Transportation Equity Act for the 21st Century
and any successive legislation, payment of reimbursements to the
engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 1999 and any other
such purposes as specified in section 89-b of the state finance law
as amended (17039920) (53163) ... 1,260,000,000 .. (re. $13,513,000)
By chapter 55, section 1, of the laws of 1998, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Intermodal Surface Transportation Efficiency Act
of 1991 and any successive legislation, payment of reimbursements to
the engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
857 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 1998 and any other
such purposes as specified in section 89-b of the state finance law
as amended (17039820) (53163) ... 1,175,000,000 .. (re. $25,075,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Intermodal Surface Transportation Efficiency Act
of 1991 and any successive legislation, payment of reimbursements to
the engineering services fund of the department of transportation,
including but not limited to fringe benefits, and the contract
services provided by private firms; personal services, nonpersonal
services, for activities including but not limited to the prepara-
tion of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing, and
environmental impact statements for transportation projects, the
payment of liabilities incurred prior to April 1, 1997 and any other
such purposes as specified in section 89-b of the state finance law
as amended by chapter 56 of the laws of 1993 (17039720) (53163)
1,120,000,000 .................................... (re. $31,374,000)
By chapter 55, section 1, of the laws of 1996, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Intermodal Surface Transportation Efficiency Act
of 1991, payment of reimbursements to the engineering services fund
of the department of transportation, including but not limited to
fringe benefits, and the contract services provided by private
firms; personal services, nonpersonal services, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 1996 and any other such purposes as spec-
ified in section 89-b of the state finance law as amended by chapter
56 of the laws of 1993 (17039620) (53163) ..........................
1,135,000,000 .................................... (re. $34,685,000)
By chapter 54, section 1, of the laws of 1995, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state transportation projects including but
not limited to construction, reconstruction, reconditioning and
preservation, the acquisition of property, operating costs as
provided for in the Intermodal Surface Transportation Efficiency Act
of 1991, payment of reimbursements to the engineering services fund
of the department of transportation, including but not limited to
fringe benefits, and the contract services provided by private
858 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
firms; personal services, nonpersonal services, for activities
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects, the payment of liabilities
incurred prior to April 1, 1995 and any other such purposes as spec-
ified in section 89-b of the state finance law as amended by chapter
56 of the laws of 1993 (17039520) (53163) ..........................
908,000,000 ...................................... (re. $59,286,000)
By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of state highway projects including but not
limited to construction, reconstruction, reconditioning and preser-
vation, the acquisition of property, operating costs as provided for
in the Intermodal Surface Transportation Efficiency Act of 1991,
payment of reimbursements to the engineering services fund of the
department of transportation, including but not limited to fringe
benefits, and the contract services provided by private firms;
personal services, nonpersonal services, for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects, the payment of liabilities incurred
prior to April 1, 1994 and any other such purposes as specified in
section 89-b of the state finance law as amended by chapter 56 of
the laws of 1993 (17039420) (53163) ... ..........................
670,100,000 ...................................... (re. $20,719,000)
By chapter 54, section 1, of the laws of 1993, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of highway projects including the state thruway
(17039320) (53163) ... ... 780,100,000 ......... (re. $16,968,000)
By chapter 54, section 1, of the laws of 1992, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of highway projects including the state thruway
(17039220) (53163) ... ... 892,100,000 ......... (re. $26,349,000)
By chapter 54, section 1, of the laws of 1991, as amended by chapter 54,
section 1, of the laws of 2013:
For the federal share of highway projects including the state thruway
(17039120) (53163) ... ... 690,000,000 ......... (re. $17,297,000)
FEDERAL AIRPORT OR AVIATION (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Federal Capital Projects Account - 31350
Aviation Purpose
By chapter 54, section 1, of the laws of 2022:
859 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2022, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17522214) (53248) .....................................
10,000,000 ....................................... (re. $10,000,000)
By chapter 54, section 1, of the laws of 2021:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2021, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17522114) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2020:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2020, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
860 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forth-coming (17522014) (53248) ... 6,000,000 ..... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2019:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2019, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521914) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2018:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2018, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
861 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521814) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2017:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2017, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521714) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 55, section 1, of the laws of 2016:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2016, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521614) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2015:
862 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2015, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521514) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2014:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2014, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521414) (53248) ... 6,000,000 ...... (re. $5,576,000)
By chapter 54, section 1, of the laws of 2013:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2013, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
863 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521314) (53248) ... 6,000,000 ...... (re. $5,931,000)
By chapter 54, section 1, of the laws of 2012:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2012, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521214) (53248) ... 6,000,000 ...... (re. $6,000,000)
By chapter 54, section 1, of the laws of 2011:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2011, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
864 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521114) (53248) ... 6,000,000 ...... (re. $2,476,000)
By chapter 55, section 1, of the laws of 2010:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2010, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17521014) (53248) ... 6,000,000 ...... (re. $3,571,000)
By chapter 55, section 1, of the laws of 2008:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2008, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17520814) (53248) ... 6,000,000 ...... (re. $2,456,000)
By chapter 55, section 1, of the laws of 2007:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2007, of
865 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17520714) (53248) ... 6,000,000 ...... (re. $2,041,000)
By chapter 55, section 1, of the laws of 2006:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2006, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17520614) (53248) ... 6,000,000 ...... (re. $1,496,000)
By chapter 55, section 1, of the laws of 2005:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 2005, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Republic airport, including the
cost of acquisition of real property, the acquisition of equipment
and other related incidental expenses thereto and for the federal
share of consultant services in carrying out federally approved
aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
866 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forth coming (17520514) (53248) ... 6,000,000 ....... (re. $390,000)
By chapter 54, section 1, of the laws of 1991:
For payment by the state of the federal share of the cost, including
payment of liabilities incurred prior to April 1, 1991, of
construction, reconstruction, alteration and rehabilitation of
airport and aviation facilities at Stewart and Republic airports,
including the cost of acquisition of real property, the acquisition
of equipment and other related incidental expenses thereto and for
the federal share of consultant services in carrying out federally
approved aviation studies.
Within the amount appropriated herein, authorization is granted to the
department of transportation to enter into all necessary contracts
and agreements, subject to the approval of the director of the budg-
et, to carry out the purposes of this appropriation.
Prior to requesting a certificate of approval of availability for any
of the moneys authorized herein, the commissioner of transportation
shall certify to the director of the budget that the federal govern-
ment has agreed to finance the federal share of the project. Howev-
er with the approval of the director of the budget, projects may be
designed prior to federal approval upon the written assurance by the
commissioner of transportation that federal funds are likely to be
forthcoming (17529114) (53248) ... 40,000,000 ..... (re. $1,321,000)
HIGHWAY FACILITIES (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Facilities Purpose
STATE HIGHWAYS
By chapter 54, section 1, of the laws of 1987, as amended by chapter 55,
section 1, of the laws of 2000:
The sum of $37,310,801 is hereby appropriated for the preparation of
designs, plans, specifications and estimates, for the contract engi-
neering services provided by private firms, for the acquisition of
property, and the construction of highway, bridge and traffic
improvements related to the expansion of Fort Drum, with or without
Federal aid, including the payment of liabilities incurred prior to
April 1, 1987 (17068711) (53273) ... 36,926,559 ... (re. $9,489,000)
867 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
STATE GATEWAY INFORMATION CENTERS
By chapter 50, section 1, of the laws of 1986, as amended by chapter 55,
section 1, of the laws of 2000, and as transferred from state oper-
ations - miscellaneous by chapter 54, section 3, of the laws of
1988:
For construction of state gateway information centers on the state's
major highways by the department of transportation. Such centers
shall be established on Interstate Route 90 in the vicinity of the
Massachusetts border; on Interstate Route 87 in the vicinity of
Chazy in the county of Clinton; on Interstate Route 81 in the vicin-
ity of the Canadian border; in Chautauqua county in the vicinity of
the Pennsylvania border; on Interstate Route 81 in the vicinity of
the Pennsylvania border; and on Interstate Route 87 in the vicinity
of State Route 17 (17B18611) (53274) ... 1,999,373 .. (re. $656,000)
HIGHWAY - RAILROAD
GRADE CROSSING ELIMINATIONS
MINEOLA GRADE CROSSING
By chapter 998, section 3, of the laws of 1983:
For the payment of the State's share of the cost of construction, with
or without federal aid, of a grade crossing elimination project in
Mineola, Nassau County, including the cost of the acquisition of
property and other related work. No expenditures shall be made from
this appropriation for services and expenses other than the cost of
consulting services (03334811) (53275) ............ (re. $1,773,000)
INFRASTRUCTURE BOND ACT PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Infrastructure Bond Act Purpose
By chapter 54, section 1, of the laws of 1988:
For the costs, pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
capital projects to be reimbursed from bond fund proceeds for the
improvement of highways, parkways, commuter parking facilities, and
other highway facilities including bridges, other structures, and
appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property, construction, recon-
struction, reconditioning and preservation; the supervision and
inspection of construction; and for the cost of engineering
services. No expenditures shall be made from this appropriation for
personal services and expenses other than consulting services.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
868 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1988 (17068823) (53276)
... ... 22,673,000 .............................. (re. $1,304,000)
For payment of the costs of acquisition of real property and for the
elimination of existing highway-railroad crossings at grade in
accordance with the provisions of article ten of the transportation
law or other highway/bridge projects identified in the project sche-
dule below, for the costs of preparation of designs, plans, specifi-
cations and estimates and for contract engineering services provided
by private firms, including the payment of liabilities incurred
prior to April 1, 1988, pursuant to the rebuild New York through
transportation infrastructure renewal bond act of 1983. The items
shown in the project schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17428823) (53277)
... ... 7,727,000 ............................... (re. $3,311,000)
By chapter 54, section 1, of the laws of 1987:
For the costs pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
the cost of capital projects to be reimbursed from bond fund
proceeds for the improvement of highways, parkways, commuter parking
facilities, and other highway facilities including bridges, other
structures, and appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property, construction, recon-
struction, reconditioning and preservation; the supervision and
inspection of construction; and for the cost of engineering
services.
No expenditures shall be made from this appropriation for personal
services and expenses other than consulting services.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire all necessary land not on the
state highway system for the purpose of highway projects at the
request of the locality under whose jurisdiction the project is
constructed or reconstructed.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1987 (17078723) (53276)
... ... 92,000,000 ................................ (re. $429,000)
By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
section 3, of the laws of 1988:
For payment of the costs of acquisition of real property and for the
elimination of existing highway-railroad crossings at grade in
accordance with the provisions of article ten of the transportation
law or other highway/bridge projects identified in the project sche-
dule below, for the costs of preparation of designs, plans, specifi-
869 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cations and estimates and for contract engineering services provided
by private firms, including the payment of liabilities incurred
prior to April 1, 1987, pursuant to the rebuild New York through
transportation infrastructure renewal bond act of 1983. The items
shown in the project schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17088723) (53277)
... ... 8,700,000 ............................... (re. $1,118,000)
By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
section 3, of the laws of 1988:
For the costs pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
the cost of capital projects to be reimbursed from bond fund
proceeds for the improvement of highways, parkways, commuter parking
facilities, and other highway facilities including bridges, other
structures, and appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property, construction, recon-
struction, reconditioning and preservation; the supervision and
inspection of construction; and for the cost of engineering
services. No expenditures shall be made from this appropriation for
personal services and expenses other than consulting services.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire all necessary land not on the
state highway system for the purpose of highway projects at the
request of the locality under whose jurisdiction the project is
constructed or reconstructed.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April one, nineteen hundred eighty-six
(17068623) (53276) ... ... 76,000,000 ............. (re. $429,000)
By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
section 3, of the laws of 1988:
For the costs pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
the cost of capital projects to be reimbursed from bond fund
proceeds for the improvement of highways, parkways, commuter parking
facilities, and other highway facilities including bridges, other
structures, and appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property, construction, recon-
struction, reconditioning and preservation; the supervision and
inspection of construction; and for the cost of engineering
services. No expenditures shall be made from this appropriation for
personal services and expenses other than consulting services.
870 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire all necessary land not on the
state highway system for the purpose of highway projects at the
request of the locality under whose jurisdiction the project is
constructed or reconstructed.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation or
certification subject to the approval of the director of the divi-
sion of the budget.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April one, nineteen hundred eightyfive
but not for the payment of liabilities incurred prior to November
eight, nineteen hundred eighty-three (17058523) (53276) ... ......
..................................................... (re. $346,000)
By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
section 3, of the laws of 1988:
For the costs pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
the cost of capital projects to be reimbursed from bond fund
proceeds for the improvement of highways, parkways, commuter parking
facilities, and other highway facilities including bridges, other
structures, and appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property, construction, recon-
struction, reconditioning and preservation; the supervision and
inspection of construction; and for the cost of engineering
services. No expenditures shall be made from this appropriation for
personal services and expenses other than consulting services.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire all necessary land not on the
state highway system for the purpose of highway projects at the
request of the locality under whose jurisdiction the project is
constructed or reconstructed.
The items in the schedule below for the purpose of infrastructure
bonds are projects with a common purpose and as such, may be inter-
changed without limitation subject to the approval of the director
of the budget.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April one, nineteen hundred eightyfour
but not for the payment of liabilities incurred prior to November
eight, nineteen hundred eighty-three (17278423) (53276) ... ......
..................................................... (re. $314,000)
MAINTENANCE FACILITIES (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Equipment Management Facilities Purpose
871 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
EQUIPMENT MANAGEMENT FACILITIES
By chapter 55, section 1, of the laws of 2003:
For the purchase of transportation related equipment, including the
cost of all vehicles under 8,500 pounds, and including the payment
of liabilities incurred prior to April 1, 2003 (17260318) (53251)
... 18,100,000 ...................................... (re. $342,000)
By chapter 55, section 1, of the laws of 2002:
For the purchase of transportation related equipment, including the
cost of all vehicles under 8,500 pounds, and including the payment
of liabilities incurred prior to April 1, 2002 (17260218) (53251)
... 18,100,000 ....................................... (re. $28,000)
By chapter 55, section 1, of the laws of 1998:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation and improvement
of existing equipment management facilities, for the acquisition of
land and construction of new facilities for equipment management
purposes, and for the contract engineering services provided by
private firms and for the purchase of transportation related equip-
ment, including the payment of liabilities incurred prior to April
1, 1998 (17269818) (53251) ... 16,300,000 ............ (re. $47,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Maintenance Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2022 (17252213) (53249) ...
31,634,000 ....................................... (re. $27,428,000)
By chapter 54, section 1, of the laws of 2021:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2021 (17252113) (53249) ...
27,405,000 ....................................... (re. $19,260,000)
By chapter 54, section 1, of the laws of 2020:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
872 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2020. Provided, however, that
no obligations against, or spending from this appropriation shall be
authorized unless the director of the division of the budget certi-
fies that such obligations or spending can be accommodated within
the State's multi-year financial plan without adversely affecting
the funding available for (a) capital projects currently authorized
that are deemed essential to the health and safety of the public, or
(b) essential governmental services (17252013) (53249) .............
27,405,000 ........................................ (re. $2,747,000)
By chapter 54, section 1, of the laws of 2019:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2019 (17251913) (53249) ...
27,405,000 ........................................ (re. $1,620,000)
By chapter 54, section 1, of the laws of 2018:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2018 (17251813) (53249) .....
27,405,000 .......................................... (re. $954,000)
By chapter 54, section 1, of the laws of 2017:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2017 (17251713) (53249) .....
15,965,000 .......................................... (re. $159,000)
By chapter 55, section 1, of the laws of 2016:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2016 (17251613) (53249) .....
15,965,000 ........................................ (re. $8,123,000)
By chapter 54, section 1, of the laws of 2015:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
873 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2015 (17251513) (53249) .....
15,965,000 ........................................... (re. $30,000)
By chapter 54, section 1, of the laws of 2014:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2014 (17251413) (53249) .....
15,965,000 ........................................... (re. $32,000)
By chapter 54, section 1, of the laws of 2013:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2013 (17251313) (53249) .....
15,965,000 ............................................ (re. $8,000)
By chapter 54, section 1, of the laws of 2012:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, for the contract engi-
neering services provided by private firms, including the payment of
liabilities incurred prior to April 1, 2012 (17251213) (53249) .....
15,965,000 ........................................... (re. $16,000)
By chapter 54, section 1, of the laws of 2011:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, and for the contract
engineering services provided by private firms, including the
payment of liabilities incurred prior to April 1, 2011 (17251113)
(53249) ... 15,965,000 ............................ (re. $4,794,000)
By chapter 55, section 1, of the laws of 2010:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, and for the contract
engineering services provided by private firms, including the
payment of liabilities incurred prior to April 1, 2010 (17251013)
(53249) ... 15,965,000 ............................ (re. $7,965,000)
By chapter 55, section 1, of the laws of 2009:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
874 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, and for the contract
engineering services provided by private firms, including the
payment of liabilities incurred prior to April 1, 2009 (17250913)
(53249) ... 15,965,000 ........................... (re. $12,772,000)
By chapter 55, section 1, of the laws of 2008:
For the preparation of designs, plans, specifications and estimates,
for the acquisition, alterations, and rehabilitation of existing
facilities, for the acquisition of land and construction of new
facilities for highway maintenance purposes, and for the contract
engineering services provided by private firms, including the
payment of liabilities incurred prior to April 1, 2008 (17250813)
(53249) ... 15,485,000 ............................ (re. $2,485,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Preparation of Plans Purpose
By chapter 54, section 1, of the laws of 2022:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2022 (17D12230) (53250) .................
5,771,000 ......................................... (re. $3,336,000)
By chapter 54, section 1, of the laws of 2021:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2021 (17D12130) (53250) .................
5,000,000 ........................................... (re. $946,000)
By chapter 54, section 1, of the laws of 2020:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2020. Provided, however, that no obli-
gations against, or spending from this appropriation shall be
authorized unless the director of the division of the budget certi-
fies that such obligations or spending can be accommodated within
the State's multi-year financial plan without adversely affecting
875 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the funding available for (a) capital projects currently authorized
that are deemed essential to the health and safety of the public, or
(b) essential governmental services (17D12030) (53250) .............
5,000,000 ........................................... (re. $559,000)
By chapter 54, section 1, of the laws of 2019:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2019 (17D11930) (53250) .................
5,000,000 ........................................... (re. $480,000)
By chapter 54, section 1, of the laws of 2018:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2018 (17D11830) (53250) .................
5,000,000 ........................................... (re. $107,000)
By chapter 54, section 1, of the laws of 2017:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2017 (17D11730) (53250) .................
2,200,000 ............................................ (re. $64,000)
By chapter 55, section 1, of the laws of 2016:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
incurred prior to April 1, 2016 (17D11630) (53250) .................
2,200,000 ............................................ (re. $35,000)
By chapter 54, section 1, of the laws of 2015:
For payment to the design and construction management account of the
centralized services fund of the New York state office of general
services for the purpose of preparation and review of plans, spec-
ifications, estimates, services, construction management and super-
vision, inspection, studies, appraisals, surveys, testing and envi-
ronmental impact statements, including the payment of liabilities
876 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
incurred prior to April 1, 2015 (17D11530) (53250) .................
2,200,000 ............................................. (re. $7,000)
MASS TRANSPORTATION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transit Purpose
By chapter 54, section 1, of the laws of 2022:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC22MT) (54242) ........................................
20,000,000 ....................................... (re. $20,000,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
877 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
By chapter 54, section 1, of the laws of 2021:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC21MT) (54242) ........................................
20,000,000 ....................................... (re. $19,576,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
878 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
For the Metropolitan Transportation Authority for the costs of renam-
ing the Newkirk Avenue subway station on the IRT Nostrand Avenue
line of the New York city subway to the Newkirk Avenue - Little
Haiti station (17SC21MT) (54228) ... 250,000 ........ (re. $250,000)
By chapter 54, section 1, of the laws of 2020:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
879 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District. Provided, however, that no obligations against, or spend-
ing from this appropriation shall be authorized unless the director
of the division of the budget certifies that such obligations or
spending can be accommodated within the State's multi-year financial
plan without adversely affecting the funding available for (a) capi-
tal projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17KC20MT) (54242) ... 20,000,000 ....... (re. $15,852,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
880 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
By chapter 54, section 1, of the laws of 2019:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC19MT) (54242) ... 20,000,000 ........ (re. $7,245,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
881 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
By chapter 54, section 1, of the laws of 2018:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects under- taken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC18MT) (54242) ... 20,000,000 ........ (re. $4,015,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
882 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
By chapter 54, section 1, of the laws of 2017:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
883 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
which are outside of the Metropolitan Transportation Commuter
District (17KC17MT) (54242) ... 20,000,000 ........ (re. $1,984,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
884 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
--------------
Total ....................... 20,000,000
==============
By chapter 55, section 1, of the laws of 2016:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC16MT) (54242) ... 20,000,000 ........ (re. $2,091,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,596,000
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 3,282,600
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
services provided directly
or under contract .............. 3,985,700
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 5,177,500
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
885 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 3,958,200
--------------
Total ....................... 20,000,000
==============
By chapter 54, section 1, of the laws of 2015:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded. The moneys hereby appropriated are to
be made available for projects undertaken by mass transit systems
which are outside of the Metropolitan Transportation Commuter
District (17KC15MT) (54242) ... 15,000,000 .......... (re. $824,000)
Project Schedule
Project Amount
--------------------------------------------
To the Capital District trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 2,697,022
To the Central New York
regional transportation
authority for capital
projects in support of
public transportation
services provided directly
or under contract .............. 2,461,947
To the Rochester-Genesee
regional transportation
authority for capital
projects in support of
public transportation bus
886 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
services provided directly
or under contract .............. 2,989,262
To the Niagara Frontier trans-
portation authority for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,883,115
To all other public transpor-
tation systems serving
primarily outside the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 2,968,654
--------------
Total ....................... 15,000,000
--------------
By chapter 54, section 1, of the laws of 2015, as amended by chapter 55,
section 1, of the laws of 2016:
Notwithstanding any inconsistent provision of law, the following
appropriations are for payment of capital expenses including but not
limited to the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation of mass transit facilities, vehicles,
related equipment and rolling stock with an average service life of
no less than 5 years. Such elements will be set forth in plans to be
approved by the director of the budget (17KW15MT) (54271) ..........
121,547,600 ....................................... (re. $1,477,000)
Project Schedule
Project Amount
--------------------------------------------
To the metropolitan transpor-
tation authority for capital
projects in support of
public transportation
services provided directly
887 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or under contract ............ 104,127,375
To the county of Rockland for
capital projects in support
of public transportation
services provided directly
or under contract ................ 193,212
To the city of New York for
capital projects in support
of the Staten Island ferry ..... 1,884,829
To the county of Westchester
for capital projects in
support of public transpor-
tation services provided
directly or under contract ..... 3,163,599
To the county of Nassau for
capital projects in support
of public transportation
services provided directly
or under contract .............. 3,826,323
To the county of Suffolk for
capital projects in support
of public transportation
services provided directly
or under contract .............. 1,488,296
To the city of New York for
capital projects in support
of public transportation bus
services provided directly
or under contract .............. 5,036,899
To all other public transpor-
tation systems serving
primarily within the metro-
politan commuter transporta-
tion district, as defined in
section 1262 of the public
authorities law and eligible
to receive operating assist-
ance under the provisions of
section 18-b of the trans-
portation law, for capital
projects in support of
public transportation
services provided directly
or under contract in accord-
ance with a formula to be
established by the commis-
sioner of transportation
with the approval of the
director of the budget ......... 1,827,067
--------------
Total ........................ 121,547,600
--------------
888 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Omnibus and Transit Purpose
By chapter 54, section 1, of the laws of 2022:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM2229) (53252) .................................
30,600,000 ....................................... (re. $30,600,000)
By chapter 54, section 1, of the laws of 2021:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
889 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM2129) (53252) .................................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2020:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
890 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance. Provided, however, that no obligations against, or
spending from this appropriation shall be authorized unless the
director of the division of the budget certifies that such obli-
gations or spending can be accommodated within the State's multi-
year financial plan without adversely affecting the funding avail-
able for (a) capital projects currently authorized that are deemed
essential to the health and safety of the public, or (b) essential
governmental services (17OM2029) (53252) ...........................
18,500,000 ....................................... (re. $18,438,000)
By chapter 54, section 1, of the laws of 2019:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
891 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1929) (53252) .................................
18,500,000 ....................................... (re. $15,915,000)
By chapter 54, section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
892 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1829) (53252) .................................
18,500,000 ....................................... (re. $14,458,000)
By chapter 54, section 1, of the laws of 2017:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the non-
federal share of the federally authorized level of financial assist-
ance transferred to the MTA, but in no event shall the state share
exceed 10 percent of project costs. Prior to requesting reimburse-
ment for projects progressed by the MTA on behalf of the City, the
City shall certify to the commissioner of transportation that each
eligible project progressed under this provision is federally eligi-
ble and that the match amount requested does not exceed the state
share of the federally authorized level of financial assistance. In
addition, the City must provide an application to the commissioner
of transportation certifying that the work to be funded under the
project has been performed and that the City has reimbursed the MTA
for 100 percent of the match amount for the project. Upon such
application, the commissioner of transportation shall review and
approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
893 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1729) (53252) .................................
18,500,000 ....................................... (re. $11,535,000)
By chapter 55, section 1, of the laws of 2016:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1629) (53252) .................................
18,500,000 ........................................ (re. $2,456,000)
By chapter 53, section 1, of the laws of 2015, as amended by chapter 55,
section 1, of the laws of 2016:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
894 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
non-federal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1529) (53252) .................................
18,500,000 ........................................ (re. $4,917,000)
By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
section 1, of the laws of 2016:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
895 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner
oftransportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1429) (53252) .................................
18,500,000 ........................................ (re. $4,124,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
896 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval.
Such certificate shall report the federally authorized level of finan-
cial assistance (17OM1329) (53252) .................................
17,740,294 .......................................... (re. $385,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
897 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM1229) (53252) ... 11,709,313 ................. (re. $1,254,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM1129) (53252) ... 4,694,992 .................... (re. $928,000)
898 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM1029) (53252) ... 4,394,227 .................. (re. $1,731,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
899 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0929) (53252) ... 4,278,964 .................... (re. $239,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
900 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0829) (53252) ... 3,162,902 .................... (re. $386,000)
By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
901 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0729) (53252) ... 3,272,225 .................. (re. $1,928,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
dlanning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses.
The state share of such reimbursement shall be 50 percent of the
nonfederal share of the federally authorized level of financial
assistance transferred to the MTA, but in no event shall the state
share exceed 10 percent of project costs. Prior to requesting
reimbursement for projects progressed by the MTA on behalf of the
City, the City shall certify to the commissioner of transportation
that each eligible project progressed under this provision is feder-
ally eligible and that the match amount requested does not exceed
the state share of the federally authorized level of financial
assistance. In addition, the City must provide an application to the
commissioner of transportation certifying that the work to be funded
under the project has been performed and that the City has reim-
bursed the MTA for 100 percent of the match amount for the project.
Upon such application, the commissioner of transportation shall
review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
902 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0629) (53252) ... 1,000,246 .................... (re. $464,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2005.
Notwithstanding any inconsistent provisions of law, the state share
of such projects shall be 50 percent of the non-federal share, but
in no event shall the state share exceed 10 percent of project
costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses. The state share of such reimbursement shall be
50 percent of the non-federal share of the federally authorized
level of financial assistance transferred to the MTA, but in no
event shall the state share exceed 10 percent of project costs.
Prior to requesting reimbursement for projects progressed by the MTA
on behalf of the City, the City shall certify to the commissioner of
transportation that each eligible project progressed under this
provision is federally eligible and that the match amount requested
does not exceed the state share of the federally authorized level of
financial assistance. In addition, the City must provide an applica-
tion to the commissioner of transportation certifying that the work
to be funded under the project has been performed and that the City
has reimbursed the MTA for 100 percent of the match amount for the
project. Upon such application, the commissioner of transportation
shall review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OB0529) (54296) ... 772,717 ...................... (re. $727,000)
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies. Notwithstanding any inconsistent provisions of
law, the state share of such projects shall be 50 percent of the
903 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
nonfederal share, but in no event shall the state share exceed 10
percent of project costs.
Notwithstanding any other provision of law, the commissioner of trans-
portation shall make available directly to the City of New York
(City) an amount commensurate with the state share of (i) federal
funds previously awarded to the City and reallocated to the metro-
politan transportation authority (MTA), and (ii) the federally
authorized level of financial assistance transferred by resolution
of the metropolitan planning organization (MPO) to the metropolitan
transportation authority (MTA) and credited to the City by the MTA
for capital expenses. The state share of such reimbursement shall be
50 percent of the non-federal share of the federally authorized
level of financial assistance transferred to the MTA, but in no
event shall the state share exceed 10 percent of project costs.
Prior to requesting reimbursement for projects progressed by the MTA
on behalf of the City, the City shall certify to the commissioner of
transportation that each eligible project progressed under this
provision is federally eligible and that the match amount requested
does not exceed the state share of the federally authorized level of
financial assistance. In addition, the City must provide an applica-
tion to the commissioner of transportation certifying that the work
to be funded under the project has been performed and that the City
has reimbursed the MTA for 100 percent of the match amount for the
project. Upon such application, the commissioner of transportation
shall review and approve eligible activities for reimbursement.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0529) (53252) ... 406,613 ...................... (re. $207,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2004.
Notwithstanding any inconsistent provisions of law, the state share of
such projects shall be 50 percent of the non-federal share, but in
no event shall the state share exceed 10 percent of project costs.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each omnibus project progressed
under the program has received federal approval. Such certificate
shall report the federally authorized level of financial assistance
(17OM0429) (53252) ... 1,365,089 .................... (re. $624,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2018:
904 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2003
(17OM0329) (53252) ... 55,159 ........................ (re. $55,000)
By chapter 55, section 1, of the laws of 2002, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2002
(17OM0229) (53252) ... 136,853 ....................... (re. $62,000)
By chapter 55, section 1, of the laws of 2001, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2001
(17OM0129) (53252) ... 447,258 ...................... (re. $198,000)
By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 2000
(17OM0029) (53252) ... 6,854,619 .................. (re. $6,747,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 1999
(17OM9929) (53252) ... 1,130,662 .................. (re. $1,054,000)
By chapter 55, section 1, of the laws of 1998, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
905 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 1998
(17OM9829) (53252) ... 380,078 ...................... (re. $380,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property, for
other mass transportation projects including local transportation
planning studies and liabilities incurred prior to April 1, 1997
(17OM9729) (53252) ... 434,519 ...................... (re. $245,000)
By chapter 55, section 1, of the laws of 1996, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property and
liabilities incurred prior to April 1, 1996 (17OM9629) (53252) ...
487,483 ............................................. (re. $457,000)
By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property and
liabilities incurred prior to April 1, 1994 (17OM9429) (53252) ...
9,075,757 ......................................... (re. $8,656,000)
By chapter 54, section 1, of the laws of 1993, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects including the acquisition of real property and
liabilities incurred prior to April 1, 1993 (17OM9329) (53252) ...
4,181,445 ......................................... (re. $3,264,000)
By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
section 1, of the laws of 2018:
For state aid to municipal corporations for the preparation of
designs, plans, specifications and estimates, for the acquisition,
construction, reconstruction, and improvement of mass transportation
capital projects notwithstanding any inconsistent provisions of law,
including the acquisition of real property and liabilities incurred
prior to April one, nineteen hundred eighty-six (17OS8629) (53252)
... 641,834 ......................................... (re. $141,000)
906 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
MASS TRANSPORTATION AND RAIL FREIGHT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
High Speed Rail Purpose
By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
section 5, of the laws of 2006:
For the construction and reconstruction of rail capital and highway
railroad crossings, facilities and intercity rail passenger service
improvements to the New York State Empire Rail Corridor between New
York City and Niagara Falls. A corridor program of projects shall be
advanced in accordance with a memorandum of understanding between
the commissioner and the senate task force on high speed rail
(17270641) (53257) ... 22,000,000 ................... (re. $897,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transportation and Rail Freight Purpose
RAIL AND RAPID TRANSIT
By chapter 369, section 2, of the laws of 1979, as amended by chapter
54, section 3, of the laws of 1988, for:
The acquisition, construction, reconstruction, establishment, improve-
ment and rehabilitation of urban, commuter and intercity rail
passenger and rapid transit systems and rail freight capital facili-
ties, for the acquisition of real property and interests in real
roperty required or expected to be required therefor, and for any
capital equipment to be used in connection therewith, including all
costs incidental thereto in accordance with the following schedule:
(01395012) (53110) ... ............................ (re. $148,000)
The commissioner of transportation shall prepare and submit to the
governor as part of his annual budget request submission a report
which shall make findings and recommendations with respect to the
state's intercity rail passenger service and rail service energy
conservation programs. Such report shall include, in addition to any
other information the commissioner shall determine appropriate, the
following: (a) the impact and effectiveness of the state's programs
to continue and preserve rail passenger and rail freight services,
including federal and state operating subsidy payments actually made
and projected to be made during each of the two next succeeding
state fiscal years; and (b) the development of operating, pricing
and fare guidelines and standards of service and equipment and
facility maintenance standards that may be applied in evaluating the
cost and quality of service on those rail lines receiving state
and/or federal operating and/or capital assistance.
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-MTA Capital Purpose
907 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2022:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM2231) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2021:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM2131) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2020:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund. Provided, however, that no obligations
against, or spending from this appropriation shall be authorized
unless the director of the division of the budget certifies that
such obligations or spending can be accommodated within the State's
908 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
multi-year financial plan without adversely affecting the funding
available for (a) capital projects currently authorized that are
deemed essential to the health and safety of the public, or (b)
essential governmental services (17NM2031) (53253) .................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2019:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1931) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1831) (53253) ....................
18,500,000 ....................................... (re. $13,294,000)
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
909 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority dedicated tax fund (17NP1831) (54207) ....................
20,000,000 ........................................ (re. $9,937,000)
By chapter 54, section 1, of the laws of 2017:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1731) (53253) ....................
18,500,000 ........................................ (re. $4,295,000)
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NP1731) (54207) ....................
20,000,000 ........................................ (re. $4,879,000)
By chapter 55, section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1631) (53253) ....................
18,500,000 ........................................ (re. $7,438,000)
910 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 53, section 1, of the laws of 2015, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1531) (53253) ....................
18,500,000 ........................................ (re. $9,981,000)
By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1431) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
911 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority dedicated tax fund (17NM1331) (53253) ....................
7,667,146 ......................................... (re. $7,085,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1231) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 54, section 1, of the laws of 2011, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1131) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 55, section 1, of the laws of 2010, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
912 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM1031) (53253) ....................
18,500,000 ....................................... (re. $18,500,000)
By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0931) (53253) ....................
21,000,000 ....................................... (re. $21,000,000)
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0831) (53253) ....................
21,000,000 ....................................... (re. $21,000,000)
By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
913 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0731) (53253) ....................
13,577,598 ....................................... (re. $13,242,000)
For the payment of the costs of clean air-related mass transportation
capital infrastructure projects, designed to achieve significant
environmental benefit including but not limited to the acquisition
of clean fuel buses. The moneys hereby appropriated are to be made
available for projects undertaken by mass transit systems other than
those mass transit operating agencies which receive money from the
metropolitan transportation authority dedicated tax fund (17CA0731)
(53254) ... 17,500,000 ........................... (re. $17,500,000)
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0631) (53253) ....................
4,456,030 ......................................... (re. $4,149,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0531) (53253) ....................
3,441,336 ......................................... (re. $3,441,000)
914 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0431) (53253) ....................
1,732,542 ......................................... (re. $1,675,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0331) (53253) ....................
715,460 ............................................. (re. $715,000)
By chapter 55, section 1, of the laws of 2002, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
915 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority dedicated tax fund (17NM0231) (53253) ....................
713,410 ............................................. (re. $713,000)
By chapter 55, section 1, of the laws of 2001, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0131) (53253) ....................
210,034 ............................................. (re. $200,000)
By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM0031) (53253) ....................
79,647 ............................................... (re. $79,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
916 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM9931) (53253) ....................
2,516,669 ......................................... (re. $1,910,000)
By chapter 55, section 1, of the laws of 1998, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM9831) (53253) ....................
107,917 ............................................. (re. $107,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of mass transportation capital projects
and facilities including replacement of buses meeting federal stand-
ards for replacement, related bus equipment and the acquisition,
design and construction, including engineering and consulting costs,
of mass transit bus garages or other mass transportation projects
and facilities approved by the commissioner of transportation in a
program of projects. Such funding may be part of a total project of
which a portion is federally funded but shall not be used in substi-
tution for the required non-federal matching shares of the federal-
ly-funded portion of the project to which it is added. The moneys
hereby appropriated are to be made available for projects undertaken
by mass transit systems other than those mass transit operating
agencies which receive money from the metropolitan transportation
authority dedicated tax fund (17NM9731) (53253) ....................
9,604 ................................................ (re. $10,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Rail Service Preservation Purpose
By chapter 54, section 1, of the laws of 2022:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2022, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
917 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17162241) (53256)
... 10,000,000 ................................... (re. $10,000,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17172241) (54278) ... 44,330,000 ........ (re. $44,330,000)
By chapter 54, section 1, of the laws of 2021:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2021, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17162141) (53256)
... 10,000,000 ................................... (re. $10,000,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17172141) (54278) ... 44,330,000 ........ (re. $40,011,000)
By chapter 54, section 1, of the laws of 2020:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2020, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Provided, howev-
er, that no obli- gations against, or spending from this appropri-
ation shall be authorized unless the director of the division of the
budget certifies that such obligations or spending can be accommo-
dated within the State's multi-year financial plan without adversely
affecting the funding available for (a) capital projects currently
authorized that are deemed essential to the health and safety of the
public, or (b) essential governmental services (17162041) (53256)
... 10,000,000 ................................... (re. $10,000,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service. Provided, however, that no obligations against, or spending
from this appropriation shall be authorized unless the director of
the division of the budget certifies that such obligations or spend-
ing can be accommodated within the State's multi-year financial plan
without adversely affecting the funding available for (a) capital
918 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17172041) (54278) ... 44,330,000 ....... (re. $20,998,000)
By chapter 54, section 1, of the laws of 2019:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2019, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17161941) (53256)
... 10,000,000 ................................... (re. $10,000,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171941) (54278) ... 44,330,000 ........ (re. $10,504,000)
By chapter 54, section 1, of the laws of 2018:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2018, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17161841) (53256)
... 10,000,000 ................................... (re. $10,000,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171841) (54278) ... 44,330,000 ......... (re. $6,882,000)
By chapter 54, section 1, of the laws of 2017:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2017, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17161741) (53256)
... 10,000,000 .................................... (re. $8,504,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171741) (54278) ... 44,330,000 ......... (re. $8,212,000)
919 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2016:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2016, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17161641) (53256)
... 10,000,000 .................................... (re. $4,345,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171641) (54278) ... 44,330,000 ......... (re. $7,417,000)
By chapter 54, section 1, of the laws of 2015:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2015, of the construction and improvement
of passenger rail, freight rail, and, notwithstanding any inconsist-
ent provisions of law, for port capital facilities outside the
jurisdiction of the port authority of New York and New Jersey,
including but not limited to the acquisition, construction, recon-
struction, improvement or rehabilitation of railroad or port capital
facilities, and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor (17161541) (53256)
... 10,000,000 .................................... (re. $2,482,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171541) (54278) ... 44,330,000 ......... (re. $3,428,000)
By chapter 54, section 1, of the laws of 2014:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17161441) (53256) ... 10,000,000 .......... (re. $716,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171441) (54278) ... 44,330,000 ......... (re. $1,484,000)
By chapter 54, section 1, of the laws of 2013:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, and for the acquisition of real property or
920 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
interests in real property required or expected to be required
therefor (17161341) (53256) ... 10,000,000 ........ (re. $3,258,000)
Notwithstanding the provisions of section 89-b of the state finance
law, for contractual agreements entered into for rail passenger
service (17171341) (54278) ... 44,330,000 ......... (re. $1,073,000)
By chapter 54, section 1, of the laws of 2012:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17161241) (53256) ... 26,620,000 ........ (re. $5,715,000)
By chapter 54, section 1, of the laws of 2011:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17161141) (53256) ... 16,930,000 ........ (re. $1,093,000)
By chapter 55, section 1, of the laws of 2010:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17161041) (53256) ... 15,300,000 ........ (re. $1,100,000)
By chapter 55, section 1, of the laws of 2009:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150941) (53256) ... 7,500,000 ........... (re. $130,000)
By chapter 55, section 1, of the laws of 2008:
921 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150841) (53256) ... 20,000,000 ........ (re. $4,299,000)
By chapter 55, section 1, of the laws of 2007:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150741) (53256) ... 20,000,000 .......... (re. $670,000)
By chapter 55, section 1, of the laws of 2006:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150641) (53256) ... 20,000,000 ........ (re. $2,777,000)
By chapter 55, section 1, of the laws of 2005:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150541) (53256) ... 20,000,000 .......... (re. $561,000)
By chapter 55, section 1, of the laws of 2004:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
922 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
interests in real property required or expected to be required
therefor (17150441) (53256) ... 20,000,000 ........ (re. $1,930,000)
By chapter 55, section 1, of the laws of 2003:
Notwithstanding the provisions of section 89-b of the state finance
law, for the construction and improvement of passenger and rail
freight projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, for contractual agreements entered into for
rail passenger service, and for the acquisition of real property or
interests in real property required or expected to be required
therefor (17150341) (53256) ... 20,000,000 .......... (re. $413,000)
By chapter 55, section 1, of the laws of 2000:
For the construction and improvement of passenger and rail freight
projects including, but not limited to, the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection herewith, and for the acquisition of real property or
interests in real property required or expected to be required
therefore (17150041) (53256) ... 10,000,000 ......... (re. $349,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter
295, part A, section 1, of the laws of 2001:
For the state share of the construction and improvement of rail
freight facilities identified by the department of transportation in
a rail freight capital needs survey, including, but not limited to,
the acquisition, construction, reconstruction, improvement or reha-
bilitation of any railroad capital facility and any capital improve-
ment used in connection herewith, and for the acquisition of real
property or interests in real property required or expected to be
required therefore, in accordance with the following schedule.
Project costs funded from this appropriation shall not exceed 80
percent of total project costs. In addition, projects to be funded
from this appropriation shall comply with eligibility criteria
established in program guidelines to be issued by the commissioner
of transportation.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17159941)
(53256) ... ..... 13,000,000 ...................... (re. $242,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Transportation Account - 31354
Mass Transportation and Rail Freight Purpose
RAIL AND RAPID TRANSIT
By chapter 54, section 1, of the laws of 1993, as added by chapter 259,
section 4, of the laws of 1993:
923 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of the federal share of high speed ground transportation
projects including high speed conventional rail, very high speed
rail and magnetic levitation systems. The moneys hereby appropriated
shall be used for the federal share of costs of any program aspect
including, but not limited to, research, development, study, demon-
stration, implementation, operation, real property acquisition,
construction, reconstruction, improvement and rehabilitation of any
capital facility (17419312) (53110) ... ..........................
20,000,000 ....................................... (re. $12,309,000)
RAIL SERVICE PRESERVATION
By chapter 257, section 8, of the laws of 1975, as amended by chapter
54, section 5, of the laws of 1982:
The sum of fifty million dollars ($50,000,000) or so much thereof as
may be necessary to accomplish the purpose designated, is hereby
appropriated to the department of transportation from the capital
projects fund in accordance with section ninety-three of the state
finance law for payment by the state of the share of the federal
government for acquisition, construction, reconstruction, improve-
ment or rehabilitation by the state or a municipality of any rail-
road capital facility and any capital equipment used in connection
therewith and for branch line operation and maintenance costs pursu-
ant to the provisions of section fourteen-d or article ten-a of the
transportation law (01393212) (53110) ... ....... (re. $7,264,000)
MASS TRANSPORTATION AND RAIL FREIGHT--BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewable (Bondable) - 30000
Mass Transportation and Rail Freight Purpose
RAIL AND RAPID TRANSIT
By chapter 998, section 4, of the laws of 1983, as amended by chapter
54, section 3, of the laws of 1984:
For the cost of the preparation of designs, plans, specifications and
estimates and for the acquisition of property and rehabilitation
projects, for railroad capital facilities, mass transportation capi-
tal projects, excluding projects of the New York city transit
authority, its subsidiaries, and the commuter railroads under the
jurisdiction of the metropolitan transportation authority, notwith-
standing any inconsistent provisions of law provided however that
all such costs shall be made pursuant to the provisions of the
rebuild New York through transportation infrastructure renewal bond
act of 1983 and such costs shall be reimbursed from the infrastruc-
ture renewal bond fund (03064812) (53283) ........... (re. $178,000)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewable (Bondable) - 30000
Omnibus and Transit Bondable Purpose
924 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1990:
For payment to the department of transportation pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, for state aid to the Niagara
Frontier Transportation Authority for the preparation of designs,
plans, specifications and estimates, for the acquisition,
construction, reconstruction and improvement of mass transportation
capital projects including the acquisition of real property and
liabilities incurred prior to April 1, 1990 (17199040) (53279) .....
1,840,000 ............................................ (re. $18,000)
By chapter 54, section 1, of the laws of 1988:
For payment to the department of transportation pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, for state aid to municipal corpo-
rations for the preparation of designs, plans, specifications and
estimates, for the acquisition, construction, reconstruction and
improvement of mass transportation capital projects including the
acquisition of real property and liabilities incurred prior to April
1, 1988, in accordance with the schedule shown below. The items
shown in the project schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that each project progressed under the
program listed in the schedule below has received federal approval
and the federally authorized level of financial assistance
(17198840) (53280) ... ..... 10,045,000 ........... (re. $859,000)
By chapter 54, section 1, of the laws of 1986:
For payment to the department of transportation pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, for state aid to municipal corpo-
rations for the preparation of designs, plans, specifications and
estimates, for the acquisition, construction, reconstruction and
improvement of mass transportation capital projects including the
acquisition of real property and liabilities incurred prior to April
one, nineteen hundred eighty-six, in accordance with the schedule
shown below. The items shown in the project schedule below shall be
for projects with a common purpose and may be interchanged without
limitation subject to the approval of the director of the budget.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner shall
certify that each omnibus project progressed under the program list-
ed in the schedule below has received federal approval and the
federally authorized level of financial assistance (17198640)
(53280) ... ..... 5,800,000 ....................... (re. $315,000)
By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
section 3, of the laws of 1986:
925 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment to the department of transportation pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, notwithstanding any inconsistent
provisions of law: (1) on behalf of the Niagara Frontier Transporta-
tion Authority to the extent needed to match federal funds to
finance the state share of construction of the Buffalo light rail
rapid transit (LRRT) project including the acquisition of real prop-
erty and to match local funds for the acquisition of property for a
possible Tonawanda extension of the Buffalo light rail rapid transit
system and, (2) for state aid to municipal corporations for the
acquisition, construction, reconstruction and improvement of Mass
Transportation Omnibus projects including the acquisition of real
property, in accordance with the following schedule. No part of this
appropriation shall be available until the commissioner of transpor-
tation shall certify to the director of the budget that the federal
share of costs has been approved for the purposes authorized and
that the local share is available for the acquisition of property
for a possible Tonawanda extension of the Buffalo light rail rapid
transit system.
The moneys hereby appropriated, when made available pursuant to a
certificate of approval of availability issued by the director of
the budget, shall be paid from the state treasury on the warrant of
the state comptroller on vouchers approved by the commissioner of
transportation (17148440) (53281) ... ............. (re. $930,000)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewable (Bondable) - 30000
Rail Service Preservation Purpose
By chapter 54, section 1, of the laws of 1994:
For payment of the state share of the costs of acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection therewith, for the acquisition of real property or inter-
ests in real property required or expected to be required therefore,
pursuant to the rebuild New York through Transportation Infrastruc-
ture Renewal Bond Act of 1983 notwithstanding any inconsistent
provisions of law and pursuant to the provisions of section 14-d of
the transportation law and including all costs incidental thereto
(17159441) (53282) ... 1,390,000 ..................... (re. $43,000)
By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
section 3, of the laws of 1985:
For payment of the state share of the costs of the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection therewith, for the acquisition of real property or inter-
ests in real property required or expected to be required therefor,
pursuant to rebuild New York through the transportation bond act of
1983 notwithstanding any inconsistent provisions of law and pursuant
to the provisions of section fourteen-d of the transportation law,
as the commissioner may elect for the purpose of improving freight
926 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
service, and including all costs incidental thereto in accordance
with the following schedule (17158441) (53282) ... ...............
..................................................... (re. $339,000)
MULTI-MODAL (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Multi-Modal Purpose
By chapter 55, section 1, of the laws of 2000:
For the cost of multi-modal projects designated as part of the multi-
modal program established by section 14-k of the transportation law
and in accordance with a memorandum of understanding among the
governor, the majority leader of the senate, and the speaker of the
assembly, or their designees (17M100MR) (53284) ....................
150,000,000 ...................................... (re. $31,298,000)
MUNICIPAL HIGHWAY - RAILROAD CROSSING ALTERATIONS (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Railroad Crossing Alteration Purpose
By chapter 54, section 1, of the laws of 1988:
For payment of the state share of the cost of the reconstruction or
removal of existing highway-railway grade crossing or grade sepa-
ration structures, pursuant to the provisions of section 91 of the
railroad law, and in accordance with the schedule below (17108826)
(53285) ... ..... 1,700,000 ....................... (re. $443,000)
By chapter 54, section 1, of the laws of 1986:
For payment of the state share of the cost of the reconstruction or
removal of existing highway-railway grade crossing or grade sepa-
ration structures, pursuant to the provisions of section ninety-one
of the railroad law, and in accordance with the schedule below.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property; reconstruction and
removal; materials testing; the contract engineering services
provided by private firms; and the payment of liabilities incurred
prior to April one, nineteen hundred eighty-six.
Prior to requesting approval of a certificate of approval of avail-
ability for the moneys hereby appropriated, the commissioner of
transportation shall certify that he has applied for and made
reasonable efforts to secure federal assistance for each project
authorized herein. Any such federal assistance received shall be
used to reduce the total project cost prior to the calculation of
the state and local shares in accordance with section ninety-one of
the railroad law.
927 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et (17108626) (53285) ... ..... 2,500,000 ....... (re. $1,124,000)
NEW YORK STATE AGENCY FUND (CCP)
Fiduciary Funds
Miscellaneous New York State Agency Fund
Localities Share Highway Improvement Account - 60612
Highway Facilities Purpose
By chapter 55, section 1, of the laws of 2002:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law for
border crossing studies and activities (17500211) (53258) ..........
2,000,000 ......................................... (re. $2,000,000)
Fiduciary Funds
Miscellaneous New York State Agency Fund
DOT Land Acquisition Projects Account - 60606
Non-Federal Aided Highway Purpose
By chapter 54, section 1, of the laws of 2022:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17502222) (53259) ... 50,000,000 ................ (re. $50,000,000)
By chapter 54, section 1, of the laws of 2021:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17502122) (53259) ... 50,000,000 ................ (re. $50,000,000)
By chapter 54, section 1, of the laws of 2020:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17502022) (53259) ... 50,000,000 ................ (re. $49,005,000)
By chapter 54, section 1, of the laws of 2019:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501922) (53259) ... 50,000,000 ................ (re. $50,000,000)
By chapter 54, section 1, of the laws of 2018:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
928 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
agencies pursuant to the highway law or transportation law
(17501822) (53259) ... 50,000,000 ................ (re. $49,988,000)
By chapter 54, section 1, of the laws of 2017:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501722) (53259) ... 50,000,000 ................ (re. $21,262,000)
By chapter 55, section 1, of the laws of 2016:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501622) (53259) ... 50,000,000 ................ (re. $24,293,000)
By chapter 54, section 1, of the laws of 2015:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501522) (53259) ... 50,000,000 ................ (re. $18,157,000)
By chapter 54, section 1, of the laws of 2014:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501422) (53259) ... 50,000,000 ................ (re. $50,000,000)
By chapter 54, section 1, of the laws of 2013:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501322) (53259) ... 50,000,000 ................ (re. $25,129,000)
By chapter 54, section 1, of the laws of 2012:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501222) (53259) ... 50,000,000 ................ (re. $19,424,000)
By chapter 54, section 1, of the laws of 2011:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501122) (53259) ... 50,000,000 ................ (re. $23,524,000)
By chapter 55, section 1, of the laws of 2010:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17501022) (53259) ... 50,000,000 ................ (re. $10,619,000)
By chapter 55, section 1, of the laws of 2009:
929 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500922) (53259) ... 50,000,000 ................ (re. $16,918,000)
By chapter 55, section 1, of the laws of 2008:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500822) (53259) ... 50,000,000 ................ (re. $22,401,000)
By chapter 55, section 1, of the laws of 2007:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500722) (53259) ... 50,000,000 ................ (re. $11,117,000)
By chapter 55, section 1, of the laws of 2006:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500622) (53259) ... 50,000,000 ................ (re. $39,189,000)
By chapter 55, section 1, of the laws of 2005:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500522) (53259) ... 50,000,000 ................ (re. $29,343,000)
By chapter 55, section 1, of the laws of 2004:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500422) (53259) ... 50,000,000 ................ (re. $10,019,000)
By chapter 55, section 1, of the laws of 2003:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500322) (53259) ... 50,000,000 ................ (re. $37,110,000)
By chapter 55, section 1, of the laws of 2002:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500222) (53259) ... 50,000,000 ................. (re. $8,887,000)
By chapter 55, section 1, of the laws of 2001:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500122) (53259) ... 50,000,000 ................. (re. $6,981,000)
930 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2000:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17500022) (53259) ... 50,000,000 ................ (re. $15,837,000)
By chapter 55, section 1, of the laws of 1999:
For that portion of liabilities incurred by the department of trans-
portation on behalf of entities other than state departments or
agencies pursuant to the highway law or transportation law
(17509922) (53259) ... 50,000,000 ................ (re. $11,800,000)
NEW YORK WORKS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Aviation Purpose
By chapter 54, section 1, of the laws of 2022:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2022. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2022 (17552214) (53101) ... 12,500,000 ........ (re. $12,500,000)
For state aid to municipal corporations, public authorities or public
benefit corporations, except a bi-state authority, and other owners
of public-use airports located in counties or cities with a popu-
lation of less than two million; for projects related to passenger
air service, cargo service, and commercial development, including
but not limited to the acquisition of real property; preparation of
designs, plans, specifications and estimates; environmental impact
statements; construction; construction management and supervision;
the contract services provided by private firms; demolition; recon-
struction; and improvement of airport or aviation-related facili-
ties. Eligible project costs may also include measures to enhance
connections to airports through roadway redesign; increased parking;
improved public transportation service; and liabilities incurred
prior to April 1, 2022 (17AC2214) (54202) ..........................
150,000,000 ..................................... (re. $150,000,000)
By chapter 54, section 1, of the laws of 2021:
931 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2021. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2021 (17552114) (53101) ... 12,500,000 ........ (re. $12,500,000)
By chapter 54, section 1, of the laws of 2020:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2020. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2020. Provided, however, that no obligations against, or spending
from this appropriation shall be authorized unless the director of
the division of the budget certifies that such obligations or spend-
ing can be accommodated within the State's multi-year financial plan
without adversely affecting the funding available for (a) capital
projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17552014) (53101) ... 12,500,000 ....... (re. $12,500,000)
For state aid to municipal corporations, public authorities or public
benefit corporations, except a bi-state authority, and other owners
of public-use airports located in counties or cities with a popu-
lation of less than one million; for projects related to passenger
air service, cargo service, and commercial development, including
but not limited to the acquisition of real property; preparation of
designs, plans, specifications and estimates; environmental impact
statements; construction; construction management and supervision;
the contract services provided by private firms; demolition; recon-
struction; and improvement of airport or aviation-related facili-
ties. Eligible project costs may also include measures to enhance
932 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
connections to airports through roadway redesign; increased parking;
improved public transportation service; and liabilities incurred
prior to April 1, 2020. Provided, however, that no obligations
against, or spending from this appropriation shall be authorized
unless the director of the division of the budget certifies that
such obligations or spending can be accommodated within the State's
multi-year financial plan without adversely affecting the funding
available for (a) capital projects currently authorized that are
deemed essential to the health and safety of the public, or (b)
essential governmental services (17AC2014) (54202) .................
100,000,000 ..................................... (re. $100,000,000)
By chapter 54, section 1, of the laws of 2019:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2019. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2019 (17551914) (53101) ... 12,500,000 ........ (re. $12,500,000)
By chapter 54, section 1, of the laws of 2018:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2018. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2018 (17551814) (53101) ... 12,500,000 ........ (re. $10,393,000)
By chapter 54, section 1, of the laws of 2017:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
933 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2017. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2017 (17551714) (53101) ... 12,500,000 ......... (re. $6,626,000)
For additional state aid to municipal corporations and private
airports as authorized by section 14-h of the transportation law and
for payment of the cost of projects at Stewart and Republic
airports, for the acquisition, construction, reconstruction, and
improvement of airport or aviation capital projects, including the
acquisition of real property and liabilities incurred prior to April
1, 2017. Prior to requesting approval of a certificate of approval
of availability for moneys appropriated, the commissioner of trans-
portation shall certify that each airport or aviation project
progressed under the program, other than state owned airports, has
received federal approval and the federally authorized level of
financial assistance. Funds from this appropriation may also be
utilized for grants to municipal corporations and private airports
for the cost of projects authorized by section 14-1 of the transpor-
tation law, including the acquisition of real property and liabil-
ities incurred prior to April 1, 2017 (17561714) (54208) ...........
10,000,000 ....................................... (re. $10,000,000)
By chapter 55, section 1, of the laws of 2016:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2016. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2016 (17551614) (53101) ... 12,500,000 ......... (re. $5,643,000)
For state aid to municipal corporations, public authorities or public
benefit corporations, except a bi-state authority, and other owners
of public-use airports located in counties or cities with a popu-
lation of less than one million; for projects related to passenger
934 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
air service, cargo service, and commercial development, including
but not limited to the acquisition of real property; preparation of
designs, plans, specifications and estimates; environmental impact
statements; construction; construction management and supervision;
the contract services provided by private firms; demolition; recon-
struction; and improvement of airport or aviation-related facili-
ties. Eligible project costs may also include measures to enhance
connections to airports through roadway redesign; increased parking;
improved public transportation service; and liabilities incurred
prior to April 1, 2016 (17AC1614) (54202) ..........................
200,000,000 ....................................... (re. $7,360,000)
By chapter 54, section 1, of the laws of 2015:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2015.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2015 (17551514) (53101) ... 10,000,000 ......... (re. $5,503,000)
By chapter 54, section 1, of the laws of 2014:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2014. Prior
to requesting approval of a certificate of approval of availability
for moneys appropriated, the commissioner of transportation shall
certify that each airport or aviation project progressed under the
program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2014 (17551414) (53101) ... 10,000,000 ......... (re. $3,049,000)
By chapter 54, section 1, of the laws of 2013:
For state aid to municipal corporations and private airports as
authorized by section 14-h of the transportation law and for payment
of the cost of projects at Stewart and Republic airports, for the
935 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
acquisition, construction, reconstruction, and improvement of
airport or aviation capital projects, including the acquisition of
real property and liabilities incurred prior to April 1, 2013.
Prior to requesting approval of a certificate of approval of avail-
ability for moneys appropriated, the commissioner of transportation
shall certify that each airport or aviation project progressed under
the program, other than state owned airports, has received federal
approval and the federally authorized level of financial assistance.
Funds from this appropriation may also be utilized for grants to
municipal corporations and private airports for the cost of projects
authorized by section 14-l of the transportation law, including the
acquisition of real property and liabilities incurred prior to April
1, 2013 (17551314) (53101) ... 10,000,000 ........... (re. $616,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Capital Assistance Purpose
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2019:
The sum of $78,000,000 is hereby appropriated for the New York State
Capital Assistance Program for Transportation, Infrastructure, and
Economic Development. Funds appropriated herein shall be for
services and expenses, grants, and costs of program administration
for projects related to capital investment in: transportation;
aviation; water and sewer infrastructure improvements; industrial
and manufacturing water supply infrastructure renovations and
improvements; and other economic development purposes. Individual
grants issued pursuant to this appropriation shall be in an amount
no less than $125,000. Funding under this appropriation shall be
pursuant to a plan submitted to the director of the division of the
budget. Notwithstanding any provision of law to the contrary, funds
appropriated herein may, subject to the approval of the director of
the budget, be (i) interchanged, (ii) transferred from this appro-
priation to any other appropriation of any state department, agency,
or public benefit corporation, or (iii) suballocated to any other
state department, agency or public benefit corporation, to achieve
this purpose (17CA1892) (54218) ....................................
78,000,000 ....................................... (re. $51,303,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-Federal Aided Highway Purpose
By chapter 54, section 1, of the laws of 2022:
Transportation infrastructure and facilities in the department of
transportation plan, for the payment of costs, including the payment
of liabilities incurred prior to April 1, 2022, of transportation
infrastructure projects, including but not limited to, state and
local roads and bridges; airport, freight and passenger rail, port
and transit projects or multi-modal facilities, including work
appurtenant and ancillary thereto. Project costs funded from this
936 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriation may include but shall not be limited to construction,
reconstruction, reconditioning and preservation, the acquisition of
property, and engineering services, including personal services,
nonpersonal services, fringe benefits, the contract services
provided by private firms, and reimbursements to the dedicated high-
way and bridge trust fund and capital projects funds, for activities
including but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation infrastructure projects.
Notwithstanding section 93 of the state finance law or any other law,
rule or regulation to the contrary, all or a portion of the funds
appropriated herein may be interchanged, or transferred from this
appropriation to any other capital projects appropriation or appro-
priations (17992222) (54201) .......................................
1,300,000,000 ................................... (re. $870,863,000)
By chapter 54, section 1, of the laws of 2021:
Transportation infrastructure and facilities in the department of
transportation plan, for the payment of costs, including the payment
of liabilities incurred prior to April 1, 2021, of transportation
infrastructure projects, including but not limited to, state and
local roads and bridges; airport, freight and passenger rail, port
and transit projects or multimodal facilities, including work appur-
tenant and ancillary thereto. Project costs funded from this appro-
priation may include but shall not be limited to construction,
reconstruction, reconditioning and preservation, the acquisition of
property, and engineering services, including personal services,
nonpersonal services, fringe benefits, the contract services
provided by private firms, and reimbursements to the dedicated high-
way and bridge trust fund and capital projects funds, for activities
including but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation infrastructure projects.
Notwithstanding section 93 of the state finance law or any other law,
rule or regulation to the contrary, all or a portion of the funds
appropriated herein may be interchanged, or transferred from this
appropriation to any other capital projects appropriation or appro-
priations of the department of transportation (17992122) (54201) ...
1,600,000,000 ................................. (re. $1,459,551,000)
By chapter 54, section 1, of the laws of 2020:
Transportation infrastructure and facilities in the department of
transportation plan, for the payment of costs, including the payment
of liabilities incurred prior to April 1, 2020, of transportation
infrastructure projects, including but not limited to, state and
local roads and bridges; airport, freight and passenger rail, port
and transit projects or multi-modal facilities, including work
appurtenant and ancillary thereto. Project costs funded from this
appropriation may include but shall not be limited to construction,
reconstruction, reconditioning and preservation, the acquisition of
937 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
property, and engineering services, including personal services,
nonpersonal services, fringe benefits, the contract services
provided by private firms, and reimbursements to the dedicated high-
way and bridge trust fund and capital projects funds, for activities
including but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation infrastructure projects.
Notwithstanding section 93 of the state finance law or any other law,
rule or regulation to the contrary, all or a portion of the funds
appropriated herein may be interchanged, or transferred from this
appropriation to any other capital projects appropriation or appro-
priations of the department of transportation. Provided, however,
that no obligations against, or spending from this appropriation
shall be authorized unless the director of the division of the budg-
et certifies that such obligations or spending can be accommodated
within the State's multi-year financial plan without adversely
affecting the funding available for (a) capital projects currently
authorized that are deemed essential to the health and safety of the
public, or (b) essential governmental services. Provided, however,
that during state fiscal year 2020-21, the department of transporta-
tion shall, ten calendar days prior to the start of each quarter or
as soon as practicable thereafter, provide to the director of the
budget, the secretary of the senate finance committee, and the
secretary of the assembly ways and means committee, a schedule of
planned highway and bridge capital project lettings to take place
during such quarter; and provided, further, that the projects to be
let by the department may differ from the schedules so provided due
to emergencies, environmental concerns, federal mandates, unforeseen
conditions, design changes or other factors (17992022) (54201) ...
2,030,000,000 ................................. (re. $1,422,310,000)
By chapter 54, section 1, of the laws of 2019:
Transportation infrastructure and facilities in the five-year depart-
ment of transportation plan for 2015-16 through 2019-20, for the
payment of costs, including the payment of liabilities incurred
prior to April 1, 2019, of transportation infrastructure projects,
including but not limited to, state and local roads and bridges;
airport, freight and passenger rail, port and transit projects or
multi-modal facilities, including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, and engineer-
ing services, including personal services, nonpersonal services,
fringe benefits, the contract services provided by private firms,
and reimbursements to the dedicated highway and bridge trust fund
and capital projects funds, for activities including but not limited
to, the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
infrastructure projects (17991922) (54201) .........................
196,175,000 ...................................... (re. $54,699,000)
938 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2019, of state highways, parkways, bridges, the New York
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17JS1922) (54255) ...................................
77,214,000 ....................................... (re. $52,366,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2019, of state and local bridges, including work appurten-
ant and ancillary thereto. Project costs funded from this appropri-
ation may include but shall not be limited to construction, recon-
struction, reconditioning and preservation, and the acquisition of
property, and for engineering services, including personal services,
nonpersonal services, fringe benefits, and the contract services
provided by private firms, and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects (17BR1922) (54272) ... 150,000,000 ..... (re. $136,167,000)
By chapter 54, section 1, of the laws of 2018:
Transportation infrastructure and facilities in the five-year depart-
ment of transportation plan for 2015-16 through 2019-20, for the
payment of costs, including the payment of liabilities incurred
prior to April 1, 2018, of transportation infrastructure projects,
including but not limited to, state and local roads and bridges;
airport, freight and passenger rail, port and transit projects or
multi-modal facilities, including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, and engineer-
ing services, including personal services, nonpersonal services,
fringe benefits, the contract services provided by private firms,
and reimbursements to the dedicated highway and bridge trust fund
and capital projects funds, for activities including but not limited
to, the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
infrastructure projects (17991822) (54201) .........................
206,175,000 ...................................... (re. $27,699,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2018, of state highways, parkways, bridges, the New York
939 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17JS1822) (54255) ...................................
102,904,000 ...................................... (re. $12,792,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2018, of state and local bridges, including work appurten-
ant and ancillary thereto. Project costs funded from this appropri-
ation may include but shall not be limited to construction, recon-
struction, reconditioning and preservation, and the acquisition of
property, and for engineering services, including personal services,
nonpersonal services, fringe benefits, and the contract services
provided by private firms, and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects (17BR1822) (54272) ... 150,000,000 ...... (re. $87,552,000)
By chapter 54, section 1, of the laws of 2017:
Transportation infrastructure and facilities in the five-year depart-
ment of transportation plan for 2015-16 through 2019-20, for the
payment of costs, including the payment of liabilities incurred
prior to April 1, 2017, of transportation infrastructure projects,
including but not limited to, state and local roads and bridges;
airport, freight and passenger rail, port and transit projects or
multi-modal facilities, including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, and engineer-
ing services, including personal services, nonpersonal services,
fringe benefits, the contract services provided by private firms,
and reimbursements to the dedicated highway and bridge trust fund
and capital projects funds, for activities including but not limited
to, the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
infrastructure projects (17991722) (54201) .........................
503,175,000 ...................................... (re. $87,559,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2017, of state highways, parkways, bridges, the New York
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
940 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17JS1722) (54255) ...................................
327,528,000 ...................................... (re. $28,419,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2017, of state highways, parkways, bridges, and facilities,
including work appurtenant and ancillary thereto, to improve access
to and from the John F. Kennedy International Airport, including
capacity improvements to the interchange between the Grand Central
Parkway, Union Turnpike, Jackie Robinson Parkway and the Van Wyck
Expressway and expansion of the Van Wyck Expressway. Project costs
funded from this appropriation may include but shall not be limited
to construction, reconstruction, reconditioning and preservation,
and the acquisition of property, and for engineering services,
including personal services, nonpersonal services, fringe benefits,
and the contract services provided by private firms, and including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing and environmental impact statements for
transportation projects (17JK1722) (54204) .........................
564,000,000 ...................................... (re. $66,846,000)
Transportation infrastructure and facilities of regional and community
importance to be accelerated in a manner consistent with the Depart-
ment's planning and engineering processes and pursuant to plans
provided by the speaker of the assembly and the temporary president
and majority leader of the senate, and posted to the Department's
public-facing website: for the payment of costs, including the
payment of liabilities incurred prior to April 1, 2017, of transpor-
tation infrastructure projects, including but not limited to, state
and local roads and bridges; airport, freight and passenger rail,
port and transit projects or multi-modal facilities, including work
appurtenant and ancillary thereto. Project costs funded from this
appropriation may include but shall not be limited to construction,
reconstruction, reconditioning and preservation, the acquisition of
property, and engineering services, including personal services,
nonpersonal services, fringe benefits, the contract services
provided by private firms, and reimbursements to the dedicated high-
way and bridge trust fund and capital projects funds, for activities
including but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation infrastructure projects (17RE1722)
(54209) ... 130,000,000 ......................... (re. $130,000,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2017, of state and local bridges, including work appurten-
941 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ant and ancillary thereto. Project costs funded from this appropri-
ation may include but shall not be limited to construction, recon-
struction, reconditioning and preservation, and the acquisition of
property, and for engineering services, including personal services,
nonpersonal services, fringe benefits, and the contract services
provided by private firms, and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects (17BR1722) (54272) ... 150,000,000 ...... (re. $17,219,000)
By chapter 55, section 1, of the laws of 2016:
Transportation infrastructure and facilities in the five-year depart-
ment of transportation plan for 2015-16 through 2019-20, for the
payment of costs, including the payment of liabilities incurred
prior to April 1, 2016, of transportation infrastructure projects,
including but not limited to, state and local roads and bridges;
airport, freight and passenger rail, port and transit projects or
multi-modal facilities, including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, and engineer-
ing services, including personal services, nonpersonal services,
fringe benefits, the contract services provided by private firms,
and reimbursements to the dedicated highway and bridge trust fund
and capital projects funds, for activities including but not limited
to, the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
infrastructure projects (17991622) (54201) .........................
84,475,000 ........................................ (re. $9,316,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2016, of state highways, parkways, bridges, the New York
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17JS1622) (54255) ...................................
208,354,000 ...................................... (re. $10,375,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2016, of state and local bridges, including work appurten-
ant and ancillary thereto. Project costs funded from this appropri-
ation may include but shall not be limited to construction, recon-
struction, reconditioning and preservation, and the acquisition of
942 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
property, and for engineering services, including personal services,
nonpersonal services, fringe benefits, and the contract services
provided by private firms, and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects (17BR1622) (54272) ... 150,000,000 ...... (re. $11,821,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2016, of state highways, parkways, bridges, transit
projects, the New York State Thruway, Indian reservation roads, and
facilities, including work appurtenant and ancillary thereto.
Project costs funded from this appropriation may include but shall
not be limited to construction, reconstruction, reconditioning and
preservation, and the acquisition of property, and for engineering
services, including personal services, nonpersonal services, fringe
benefits, and the contract services provided by private firms, and
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation projects (17LA1622) (54241) ..........
150,000,000 ..................................... (re. $119,556,000)
By chapter 54, section 1, of the laws of 2015:
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2015, of state highways, parkways, bridges, the New York
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17JS1522) (54255) ...................................
200,000,000 ....................................... (re. $4,638,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2015, of state highways, parkways, bridges, the New York
State Thruway, Indian reservation roads, and facilities, including
work appurtenant and ancillary thereto. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property, and for engineering services, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms, and including but not
943 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects (17LA1522) (54241) ...................................
100,000,000 ....................................... (re. $4,416,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, including the payment of liabilities incurred prior to
April 1, 2015, of state and local bridges, including work appurten-
ant and ancillary thereto. Project costs funded from this appropri-
ation may include but shall not be limited to construction, recon-
struction, reconditioning and preservation, and the acquisition of
property, and for engineering services, including personal services,
nonpersonal services, fringe benefits, and the contract services
provided by private firms, and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects (17BR1522) (54272) ... 150,000,000 ...... (re. $13,158,000)
By chapter 54, section 1, of the laws of 2014:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2014, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities, including work appurtenant and ancillary thereto. Project
costs funded from this appropriation may include but shall not be
limited to construction, reconstruction, reconditioning and preser-
vation, and the acquisition of property, and for engineering
services, including personal services, nonpersonal services, fringe
benefits, and the contract services provided by private firms, and
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation projects (17191422) (54255) ..........
155,000,000 ....................................... (re. $6,178,000)
By chapter 54, section 1, of the laws of 2013:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2013, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities, including work appurtenant and ancillary thereto. Project
costs funded from this appropriation may include but shall not be
limited to construction, reconstruction, reconditioning and preser-
vation, and the acquisition of property, and for engineering
services, including personal services, nonpersonal services, fringe
benefits, and the contract services provided by private firms, and
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation projects (17191322) (54255) ..........
155,000,000 ....................................... (re. $6,260,000)
By chapter 54, section 1, of the laws of 2012:
944 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of capital costs, including acquisition of real prop-
erty, engineering services, and the payment of liabilities incurred
prior to April 1, 2012, relating to the construction, reconstruction
and improvement of Buffalo and Fort Erie Public Bridge Authority
facilities, including work on any appurtenant and ancillary state,
local or public authority facilities necessary for improvement of
the Peace Bridge Plaza (17191222) (54255) ..........................
15,000,000 ............................................ (re. $1,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Non-MTA Capital Purpose
By chapter 54, section 1, of the laws of 2022:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17552231) (53102) ....................
50,400,000 ....................................... (re. $50,400,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, of the reconstruction, improvement, rehabilitation and
maintenance of the existing passenger rail system of the Niagara
Frontier transportation authority (17NF2231) (54220) ...............
20,000,000 ....................................... (re. $20,000,000)
For the payment of the costs of the electrification of mass transit
bus fleets, including the replacement of conventional fossil-fueled
buses with electric buses. The moneys hereby appropriated are to be
made available for projects undertaken by mass transit systems other
than those mass transit operating agencies which receive money from
the metropolitan transportation authority dedicated tax fund
(17EB2231) (54222) ... 20,000,000 ................ (re. $20,000,000)
By chapter 54, section 1, of the laws of 2021:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
945 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17552131) (53102) ....................
27,500,000 ....................................... (re. $27,500,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, of the reconstruction, improvement, rehabilitation and
maintenance of the existing passenger rail system of the Niagara
Frontier transportation authority (17NF2131) (54220) ...............
20,000,000 ....................................... (re. $20,000,000)
For the payment of the costs of the electrification of mass transit
bus fleets, including the replacement of conventional fossil-fueled
buses with electric buses. The moneys hereby appropriated are to be
made available for projects undertaken by mass transit systems other
than those mass transit operating agencies which receive money from
the metropolitan transportation authority dedicated tax fund
(17EB2131) (54222) ... 20,000,000 ................ (re. $20,000,000)
By chapter 54, section 1, of the laws of 2020:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund. Provided, however, that no obligations
against, or spending from this appropriation shall be authorized
unless the director of the division of the budget certifies that
such obligations or spending can be accommodated within the State's
multi-year financial plan without adversely affecting the funding
available for (a) capital projects currently authorized that are
deemed essential to the health and safety of the public, or (b)
essential governmental services (17552031) (53102) .................
27,500,000 ....................................... (re. $25,066,000)
For the payment of the costs, which shall be reimbursed from bond
proceeds, of the reconstruction, improvement, rehabilitation and
maintenance of the existing passenger rail system of the Niagara
Frontier transportation authority. Provided, however, that no obli-
gations against, or spending from this appropriation shall be
authorized unless the director of the division of the budget certi-
fies that such obligations or spending can be accommodated within
the State's multi-year financial plan without adversely affecting
the funding available for (a) capital projects currently authorized
that are deemed essential to the health and safety of the public, or
946 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
(b) essential governmental services (17NF2031) (54220) .............
20,000,000 ....................................... (re. $19,993,000)
For the costs of mass transportation capital projects, studies, and
facilities including replacement of buses, related bus equipment and
the acquisition, design and construction, including engineering and
consulting costs, of mass transit bus garages or other mass trans-
portation projects, studies, and facilities approved by the commis-
sioner of transportation in a program of projects. Such funding may
be part of a total project of which a portion is federally funded.
The moneys hereby appropriated are to be made available for the
Niagara Frontier transportation authority. Provided, however, that
no obligations against, or spending from this appropriation shall be
authorized unless the director of the division of the budget certi-
fies that such obligations or spending can be accommodated within
the State's multi-year financial plan without adversely affecting
the funding available for (a) capital projects currently authorized
that are deemed essential to the health and safety of the public, or
(b) essential governmental services (17AM2031) (54221) .............
6,000,000 ......................................... (re. $6,000,000)
For the payment of the costs of the electrification of mass transit
bus fleets, including the replacement of conventional fossil-fueled
buses with electric buses. The moneys hereby appropriated are to be
made available for projects undertaken by mass transit systems other
than those mass transit operating agencies which receive money from
the metropolitan transportation authority dedicated tax fund.
Provided, however, that no obligations against, or spending from
this appropriation shall be authorized unless the director of the
division of the budget certifies that such obligations or spending
can be accommodated within the State's multi-year financial plan
without adversely affecting the funding available for (a) capital
projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17EB2031) (54222) ... 20,000,000 ....... (re. $20,000,000)
By chapter 54, section 1, of the laws of 2019:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551931) (53102) ....................
27,500,000 ....................................... (re. $18,594,000)
947 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2020:
For the payment of the costs, which shall be reimbursed from bond
proceeds, of the reconstruction, improvement, rehabilitation and
maintenance of the existing passenger rail system of the Niagara
Frontier transportation authority (17NF1931) (54220) ...............
20,000,000 ........................................ (re. $4,622,000)
By chapter 54, section 1, of the laws of 2018:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551831) (53102) ....................
27,500,000 ....................................... (re. $12,441,000)
By chapter 54, section 1, of the laws of 2017:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551731) (53102) ....................
27,500,000 ........................................ (re. $3,220,000)
By chapter 55, section 1, of the laws of 2016:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federally-funded
948 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551631) (53102) ....................
27,500,000 ........................................ (re. $4,842,000)
By chapter 54, section 1, of the laws of 2015:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federallyfunded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551531) (53102) ....................
5,000,000 ......................................... (re. $1,781,000)
By chapter 54, section 1, of the laws of 2014:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federallyfunded
portion of the project to which it is added. The moneys hereby
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551431) (53102) ....................
5,000,000 ......................................... (re. $5,000,000)
By chapter 54, section 1, of the laws of 2013:
For the costs of mass transportation capital projects and facilities
including replacement of buses meeting federal standards for
replacement, related bus equipment and the acquisition, design and
construction, including engineering and consulting costs, of mass
transit bus garages or other mass transportation projects and facil-
ities approved by the commissioner of transportation in a program of
projects. Such funding may be part of a total project of which a
portion is federally funded but shall not be used in substitution
for the required non-federal matching shares of the federallyfunded
portion of the project to which it is added. The moneys hereby
949 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
appropriated are to be made available for projects undertaken by
mass transit systems other than those mass transit operating agen-
cies which receive money from the metropolitan transportation
authority dedicated tax fund (17551331) (53102) ....................
5,000,000 ......................................... (re. $1,575,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preparation of Plans Purpose
Design and Construction
By chapter 54, section 1, of the laws of 2013:
For engineering services, including personal services, nonpersonal
services, fringe benefits, and the contract services provided by
private firms, and including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects (17551330)
(53103) ... 45,000,000 ............................ (re. $5,289,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Rail Service Preservation Purpose
By chapter 54, section 1, of the laws of 2022:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17552241) (53104) ... 35,458,000 ................ (re. $35,458,000)
By chapter 54, section 1, of the laws of 2021:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17552141) (53104) ... 17,500,000 ................ (re. $17,500,000)
950 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2020:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17552041) (53104) ... 17,500,000 ................ (re. $17,500,000)
By chapter 54, section 1, of the laws of 2019:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17551941) (53104) ... 17,500,000 ................ (re. $17,500,000)
By chapter 54, section 1, of the laws of 2018:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor.
Of this appropriation, the amount of up to $3,000,000 will be provided
to the metropolitan transportation authority for costs associated
with implementing a program to upgrade diesel train engines owned by
the Long Island Rail Road to improve emissions standards, and the
amount of up to $1,000,000 for other diesel train engine retrofit
uses (17551841) (53104) ... 17,500,000 ........... (re. $17,500,000)
By chapter 54, section 1, of the laws of 2017:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor.
Of this appropriation, the amount of up to $3,000,000 will be provided
to the metropolitan transportation authority for costs associated
with implementing a program to upgrade diesel train engines owned by
951 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the Long Island Rail Road to improve emissions standards, and the
amount of up to $1,000,000 for other diesel train engine retrofit
uses (17551741) (53104) ... 17,500,000 ........... (re. $16,252,000)
By chapter 55, section 1, of the laws of 2016:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17551641) (53104) ... 17,500,000 ................. (re. $8,223,000)
By chapter 54, section 1, of the laws of 2015:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17551541) (53104) ... 10,000,000 ................. (re. $9,942,000)
By chapter 54, section 1, of the laws of 2014:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a program to upgrade diesel train engines owned by the
Long Island Rail Road to improve emissions standards, and the amount
of up to $1,000,000 for other diesel train engine retrofit uses
(17551441) (53104) ... 10,000,000 ................. (re. $3,120,000)
By chapter 54, section 1, of the laws of 2013:
For the construction and improvement of rail freight projects includ-
ing, but not limited to, the acquisition, construction, recon-
struction, improvement or rehabilitation of any railroad capital
facility and any capital improvement used in connection herewith,
and for the acquisition of real property or interests in real prop-
952 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
erty required or expected to be required therefor. Of this appropri-
ation, the amount of up to $3,000,000 will be provided to the metro-
politan transportation authority for costs associated with
implementing a one year pilot program to upgrade diesel train
engines owned by the Long Island Rail Road to improve emissions
standards (17551341) (53104) ... 10,000,000 ....... (re. $2,529,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Non-Federal Aided Highway Purpose
By chapter 54, section 1, of the laws of 2012:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2012, of state and local highways, park-
ways, bridges, the New York State Thruway, Indian reservation roads,
and facilities for which the responsibility is vested with the state
department of transportation, including work appurtenant and ancil-
lary thereto. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and the acquisition of property;
for personal services, fringe benefits, nonpersonal services, and
contract services provided by private firms for activities including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing, and environmental impact statements
for transportation projects (17101222) (54255) .....................
232,049,000 ...................................... (re. $13,471,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Transportation Account - 31354
Federal Aid Highways Purpose
By chapter 54, section 1, of the laws of 2012:
For the federal share, from any federal agency under any federal
program, of state transportation projects, including both state
system and local system projects, and including but not limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property; for personal services, fringe benefits,
nonpersonal services, and contract services provided by private
firms for activities including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects; for the
payment of liabilities incurred prior to April 1, 2012 and for any
other such purposes as specified in section 89-b of the state
finance law as amended (17041220) (54256) ..........................
916,751,000 ...................................... (re. $13,982,000)
NON-FEDERALLY AIDED HIGHWAY CAPITAL PROJECTS (CCP)
953 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Capital Projects Fund - 30000
Highway Maintenance Purpose
By chapter 55, section 1, of the laws of 2007:
For the payment of the costs of diesel emissions reduction activities
and equipment, including but not limited to retrofit and acquisition
of low emission vehicles and equipment to achieve the maximum envi-
ronmental benefit in non-attainment areas as designated by the
United States environmental protection agency in accordance with the
clean air act (170807HM) (53260) ... 3,000,000 ....... (re. $74,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Aviation Purpose Account - 30053
Aviation Purpose
By chapter 54, section 1, of the laws of 2022:
For Aviation Bureau including personal services, nonpersonal services,
fringe benefits and the contract services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2022-23 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (17012214) (54205).
Expense accounts (00000) ... 1,239,000 .............. (re. $1,223,000)
By chapter 54, section 1, of the laws of 2019:
For Aviation Bureau including personal services, nonpersonal services,
fringe benefits and the contract services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2019-20 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (17011914) (54205).
Expense accounts (00000) ... 1,243,000 ................. (re. $89,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2019:
For Aviation Bureau including personal services, nonpersonal services,
fringe benefits and the contract services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2018-19 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (17011814) (54205).
Expense accounts (00000) ... 1,186,000 ................ (re. $177,000)
954 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2019:
For Aviation Bureau including personal services, nonpersonal services,
fringe benefits and the contract services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2017-18 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (17011714) (54205).
Expense accounts (00000) ... 1,176,000 ................ (re. $524,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Maintenance Purpose
By chapter 54, section 1, of the laws of 2022:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2022, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law, and snow and ice control on state
highways, including personal services, nonpersonal services, fringe
benefits and contractual services provided by private firms and
municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170122HM) (50000) ..................................
150,000,000 ...................................... (re. $77,319,000)
Nonpersonal service (170422HM) (57050) ...............................
163,767,000 ..................................... (re. $133,848,000)
Fringe benefits (170822HM) (60090) ... 95,925,000 .. (re. $64,029,000)
Indirect costs (170922HM) (58850) ... 4,230,000 ..... (re. $2,679,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2022 (54275).
Nonpersonal service (170522HM) (57050) ...............................
60,953,000 ....................................... (re. $60,953,000)
By chapter 54, section 1, of the laws of 2021:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2021, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law, and snow and ice control on state
highways, including personal services, nonpersonal services, fringe
benefits and contractual services provided by private firms and
municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170121HM) (50000) ..................................
140,883,000 ...................................... (re. $15,578,000)
Nonpersonal service (170421HM) (57050) ...............................
104,419,000 ...................................... (re. $50,054,000)
Fringe benefits (170821HM) (60090) ... 88,334,000 .. (re. $10,443,000)
Indirect costs (170921HM) (58850) ... 3,973,000 ....... (re. $456,000)
955 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2021 (54275).
Nonpersonal service (170521HM) (57050) ...............................
38,963,000 ....................................... (re. $35,676,000)
By chapter 54, section 1, of the laws of 2020:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2020, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law, and snow and ice control on state
highways, including personal services, nonpersonal services, fringe
benefits and contractual services provided by private firms and
municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170120HM) (50000) ..................................
140,883,000 ...................................... (re. $21,457,000)
Nonpersonal service (170420HM) (57050) ...............................
104,419,000 ...................................... (re. $57,519,000)
Fringe benefits (170820HM) (60090) ... 87,897,000 .. (re. $13,729,000)
Indirect costs (170920HM) (58850) ... 4,833,000 ..... (re. $1,492,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2020 (54275).
Nonpersonal service (170520HM) (57050) ...............................
38,963,000 ........................................ (re. $4,974,000)
By chapter 54, section 1, of the laws of 2019:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2019, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law, and snow and ice control on state
highways, including personal services, nonpersonal services, fringe
benefits and contractual services provided by private firms and
municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170119HM) (50000) ..................................
140,883,000 ...................................... (re. $16,154,000)
Nonpersonal service (170419HM) (57050) ...............................
104,419,000 ...................................... (re. $16,643,000)
Fringe benefits (170819HM) (60090) ... 89,968,000 .. (re. $10,876,000)
Indirect costs (170919HM) (58850) ... 4,833,000 ....... (re. $605,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2019 (54275).
Nonpersonal service (170519HM) (57050) ...............................
38,963,000 .......................................... (re. $269,000)
By chapter 54, section 1, of the laws of 2018:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2018, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law, and snow and ice control on state
highways, including personal services, nonpersonal services, fringe
benefits and contractual services provided by private firms and
956 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170118HM) (50000) ..................................
124,903,000 ....................................... (re. $2,677,000)
Nonpersonal service (170418HM) (57050) ...............................
104,419,000 ....................................... (re. $3,258,000)
Fringe benefits (170818HM) (60090) ... 79,801,000 ... (re. $2,882,000)
Indirect costs (170918HM) (58850) ... 3,847,000 ......... (re. $2,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2018 (54275).
Nonpersonal service (170518HM) (57050) ...............................
38,963,000 ........................................... (re. $32,000)
By chapter 54, section 1, of the laws of 2017:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2017, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities, but not including the costs of heavy equipment
(53260).
Nonpersonal service (170417HM) (57050) ...............................
241,000,000 ......................................... (re. $834,000)
Indirect costs (170917HM) (58850) ... 7,633,000 ....... (re. $358,000)
By chapter 55, section 1, of the laws of 2016:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2016, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170116HM) (50000) ..................................
255,443,000 ...................................... (re. $11,274,000)
Nonpersonal service (170416HM) (57050) ...............................
240,000,000 ...................................... (re. $19,149,000)
Fringe benefits (170816HM) (60090) ... 143,610,000 ..... (re. $25,000)
Indirect costs (170916HM) (58850) ... 6,846,000 ....... (re. $294,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2016 (54275).
Nonpersonal service (170516HM) (57050) ...............................
36,727,000 ........................................... (re. $40,000)
By chapter 54, section 1, of the laws of 2015:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2015, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
957 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
fringe benefits and contractual services provided by private firms
and municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170115HM) (50000) ... 253,110,000 ..... (re. $2,000)
Nonpersonal service (170415HM) (57050) ...............................
235,648,000 ......................................... (re. $886,000)
Fringe benefits (170815HM) (60090) ... 141,438,000 .. (re. $2,081,000)
Indirect costs (170915HM) (58850) ... 6,404,000 ....... (re. $239,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2015 (54275).
Nonpersonal service (170515HM) (57050) ... 35,657,000 ... (re. $8,000)
For the operating and capital costs of the Wells Bridge highway rest
area/text stop located on Interstate 88 westbound between exits 11
and 12 in Delaware County (17WB15HM) (54240) .......................
2,500,000 ......................................... (re. $1,200,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
For the capital costs of the highway rest areas/text stops located on
Interstate 87 in Warren and Essex Counties (17GF15HM) (54239) ......
1,000,000 ........................................... (re. $528,000)
By chapter 54, section 1, of the laws of 2014:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2014, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities, but not including the costs of heavy equipment
(53260).
Personal service (170114HM) (50000) ... 249,824,000 ... (re. $399,000)
Nonpersonal service (170414HM) (57050) ...............................
222,000,000 ......................................... (re. $859,000)
Fringe benefits (170814HM) (60090) ... 142,051,000 .. (re. $1,018,000)
Indirect costs (170914HM) (58850) ... 6,996,000 ........ (re. $50,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2014 (54275).
Nonpersonal service (170514HM) (57050) ...............................
40,000,000 ........................................ (re. $5,387,000)
For the operating and capital costs of the Worcester highway rest
area/text stop located on Interstate 88 eastbound between exits 18
and 19 in Otsego County (17RA14HM) (53159) .........................
1,200,000 ............................................ (re. $68,000)
By chapter 54, section 1, of the laws of 2013:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2013, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
958 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and municipalities, but not including the costs of heavy equipment
(53260).
Nonpersonal service (170413HM) (57050) ...............................
195,880,000 ......................................... (re. $175,000)
For the payment of the costs of heavy equipment, including the payment
of liabilities incurred prior to April 1, 2013 (54275).
Nonpersonal service (170513HM) (57050) ...............................
49,070,000 ....................................... (re. $20,670,000)
By chapter 54, section 1, of the laws of 2012:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2012, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities (53260).
Personal service (170112HM) (50000) ... 234,144,000 ... (re. $521,000)
Nonpersonal service (170412HM) (57050) ...............................
244,950,000 .......................................... (re. $93,000)
Fringe benefits (170812HM) (60090) ... 121,006,000 .. (re. $2,127,000)
Indirect costs (170912HM) (58850) ... 6,298,000 ....... (re. $110,000)
By chapter 54, section 1, of the laws of 2011:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2011, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170411HM) (53260) ......
614,652,000 ...................................... (re. $27,634,000)
PERSONAL SERVICE
Personal service--regular ...... 204,261,000
Temporary service ................ 2,700,000
Holiday/overtime compensation ... 22,500,000
--------------
Amount available for
personal service ........... 229,461,000
--------------
NONPERSONAL SERVICE
Supplies and materials ......... 140,747,000
Travel ............................. 900,000
Contractual services ............ 81,000,000
Equipment ....................... 13,500,000
959 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Fringe benefits ................ 123,475,000
Indirect costs ................... 7,929,000
--------------
Amount available for nonper-
sonal service .............. 367,551,000
--------------
For the purchase of transpor-
tation related equipment,
including the cost of all
vehicles under 8,500 pounds:
Contractual services ............... 180,000
Equipment ....................... 17,460,000
--------------
Amount available for nonper-
sonal service ............... 17,640,000
--------------
614,652,000
==============
By chapter 55, section 1, of the laws of 2010:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2010, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170410HM) (53260) ......
668,346,000 ....................................... (re. $9,398,000)
PERSONAL SERVICE
Personal service--regular ...... 226,956,000
Temporary service ................ 3,000,000
Holiday/overtime compensation ... 25,000,000
--------------
Amount available for personal
service ...................... 254,956,000
--------------
NONPERSONAL SERVICE
Supplies and materials ......... 156,386,000
Travel ........................... 1,000,000
Contractual services ............ 90,000,000
Equipment ....................... 15,000,000
960 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Fringe benefits ................ 123,475,000
Indirect costs ................... 7,929,000
--------------
Amount available for nonper-
sonal service .............. 393,790,000
--------------
MAINTENANCE UNDISTRIBUTED
For the purchase of transpor-
tation related equipment,
including the cost of all
vehicles under 8,500 pounds ... 19,600,000
NONPERSONAL SERVICE
Contractual services ............... 200,000
Equipment ....................... 19,400,000
--------------
Amount available for nonper-
sonal service ............... 19,600,000
--------------
668,346,000
==============
By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
section 1, of the laws of 2011:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2009, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170409HM) (53260) ......
664,757,267 ...................................... (re. $36,903,000)
PERSONAL SERVICE
Personal service--regular ...... 215,326,267
Temporary service ................ 3,000,000
Holiday/overtime compensation ... 30,000,000
--------------
Amount available for
personal service ........... 248,326,267
--------------
961 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NONPERSONAL SERVICE
Supplies and materials ......... 161,375,000
Travel ........................... 1,500,000
Contractual services ............ 90,000,000
Equipment ....................... 15,000,000
Fringe benefits ................ 109,139,000
Indirect costs ................... 8,556,000
--------------
Amount available for nonper-
sonal service .............. 385,570,000
--------------
MAINTENANCE UNDISTRIBUTED
For the purchase of transpor-
tation related equipment,
including the cost of all
vehicles under 8,500 pounds ... 19,600,000
NONPERSONAL SERVICE
Contractual services ............... 200,000
Equipment ....................... 19,400,000
--------------
Amount available for nonper-
sonal service ............... 19,600,000
--------------
For costs associated with the
contract maintenance and
operation of interstate 84,
the department of transpor-
tation and the thruway
authority are hereby author-
ized and empowered to enter
into an annual contract for
the thruway authority solely
to perform such maintenance
and operation on behalf of
the department, notwith-
standing any other provision
of law, provided such
contract shall include the
same indemnification and
hold harmless clauses for
the thruway authority that
are provided to munici-
palities pursuant to subdi-
vision 2-a of section 12 of
the highway law ............... 11,261,000
--------------
962 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NONPERSONAL SERVICE
Contractual services ............ 11,261,000
--------------
Amount available for nonper-
sonal service ............... 11,261,000
--------------
664,757,267
==============
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2010:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2008, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170408HM) (53260) ......
614,421,000 ....................................... (re. $1,132,000)
PERSONAL SERVICE
Personal service--regular ...... 231,213,000
Temporary service ................ 2,259,000
Holiday/overtime compensation ... 27,392,000
--------------
Amount available for
personal service ........... 260,864,000
--------------
NONPERSONAL SERVICE
Supplies and materials ......... 118,595,000
Travel ........................... 1,435,000
Contractual services ............ 77,787,000
Equipment ....................... 13,747,000
Fringe benefits ................ 103,050,000
Indirect costs ................... 8,710,000
--------------
Amount available for nonper-
sonal service .............. 323,324,000
--------------
MAINTENANCE UNDISTRIBUTED
For the purchase of transpor-
tation related equipment,
963 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
including the cost of all
vehicles under 8,500 pounds ... 19,300,000
NONPERSONAL SERVICE
Contractual services ............... 193,000
Equipment ....................... 19,107,000
--------------
Amount available for nonper-
sonal service ............... 19,300,000
--------------
For costs associated with the
contract maintenance and
operation of interstate 84,
the department of transpor-
tation and the thruway
authority are hereby author-
ized and empowered to enter
into an annual contract for
the thruway authority solely
to perform such maintenance
and operation on behalf of
the department, notwith-
standing any other provision
of law, provided such
contract shall include the
same indemnification and
hold harmless clauses for
the thruway authority that
are provided to munici-
palities pursuant to subdi-
vision 2-a of section 12 of
the highway law ............... 10,933,000
--------------
NONPERSONAL SERVICE
Contractual services ............ 10,933,000
--------------
Amount available for nonper-
sonal service ............... 10,933,000
--------------
614,421,000
==============
By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
section 1, of the laws of 2010:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2007, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
964 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170407HM) (53260) ......
573,779,500 ......................................... (re. $300,000)
PERSONAL SERVICE
Personal service--regular ...... 194,220,000
Temporary service ................ 2,215,000
Holiday/overtime compensation ... 26,861,000
--------------
Amount available for
personal service ........... 223,296,000
--------------
NONPERSONAL SERVICE
Supplies and materials ......... 120,805,000
Travel ........................... 1,377,000
Contractual services ............ 73,203,000
Equipment ....................... 12,711,000
Fringe benefits ................. 85,721,000
Indirect costs .................. 26,002,000
--------------
Amount available for nonper-
sonal service .............. 319,819,000
--------------
MAINTENANCE UNDISTRIBUTED
For the purchase of transpor-
tation related equipment,
including the cost of all
vehicles under 8,500 pounds ... 19,100,000
NONPERSONAL SERVICE
Contractual services ............... 191,000
Equipment ....................... 18,909,000
--------------
Amount available for nonper-
sonal service ............... 19,100,000
--------------
For costs associated with the
contract maintenance and
operation of interstate 84,
the department of transpor-
tation and the thruway
965 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
authority are hereby author-
ized and empowered to enter
into an annual contract for
the thruway authority solely
to perform such maintenance
and operation on behalf of
the department, notwith-
standing any other provision
of law, provided such
contract shall include the
same indemnification and
hold harmless clauses for
the thruway authority that
are provided to munici-
palities pursuant to subdi-
vision 2-a of section 12 of
the highway law ............... 11,565,000
--------------
NONPERSONAL SERVICE
Contractual services ............ 11,565,000
--------------
Amount available for nonper-
sonal service ............... 11,565,000
--------------
573,779,500
==============
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2007:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2006, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170406HM) (53260)
... ... 528,118,000 ............................. (re. $3,115,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
section 1, of the laws of 2007:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2005, of snow and ice control on state
highways and preventive maintenance on state roads and bridges as
defined in paragraph (a) of subdivision 1 of section 10-d of the
highway law, including personal services, nonpersonal services,
fringe benefits and contractual services provided by private firms
and municipalities. Such costs shall not include the costs of vehi-
966 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cles under 8,500 pounds without the prior approval of the director
of the budget.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (170405HM) (53260)
... ... 479,947,000 ............................... (re. $714,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Industrial Access Purpose
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2010:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 2004. For the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17060479) (53267) ... 5,400,000 .................. (re. $1,972,000)
By chapter 55, section 1, of the laws of 2003:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
967 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sition of property and the payment of liabilities incurred prior to
April 1, 2003. For the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17060379) (53267) ... 9,000,000 .................. (re. $3,140,000)
By chapter 55, section 1, of the laws of 2002:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 2002. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
968 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17060279) (53267) ... 9,000,000 .................... (re. $291,000)
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 2002. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
For the payment of the costs of projects from this appropriation as
set forth in a memorandum of understanding between the majority
leader of the senate and the speaker of the assembly or their desig-
nee.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
969 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17070279) (54280) ... 6,000,000 .................. (re. $6,000,000)
By chapter 55, section 1, of the laws of 2000:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 2000. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17060079) (53267) ... 15,000,000 .................... (re. $82,000)
By chapter 55, section 1, of the laws of 1999:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 1999. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
970 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17069979) (54280) ... 15,000,000 ................... (re. $301,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2000:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 1999. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
971 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
For the payment of the costs of projects from this appropriation as
set forth in a memorandum of understanding between the majority
leader of the senate and the speaker of the assembly or their desig-
nees.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
access portion of such project's cost is greater than $2,000,000
(17079979) (53267) ... 10,000,000 ................. (re. $1,574,000)
By chapter 55, section 1, of the laws of 1998:
For the construction or improvement of highway, bridge and rail
freight projects related to industrial access, including the acqui-
sition of property and the payment of liabilities incurred prior to
April 1, 1998. For the payment of reimbursements to the engineering
services fund for the cost of the contract services provided by
private firms, including but not limited to the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects. No funds shall
be allocated for such purposes until the commissioner of transporta-
tion enters into an agreement subject to the approval of the direc-
tor of the budget with any public or private entity for the repay-
ment of 40 percent of each project's costs disbursed from such
funds. Such agreement shall require repayment within 5 years of the
date of acceptance of the project by the department of transporta-
tion except that the repayment may occur over a period of up to 10
years when total project costs exceed $1,000,000. All projects must
be approved by the director of the budget prior to the obligation of
the moneys so appropriated.
The moneys so appropriated shall be made available pursuant to rules
and regulations promulgated by the commissioner of transportation
establishing the maximum amount of assistance to be provided for
each project and the information that must be provided by the entity
requesting assistance, establishing criteria for providing assist-
ance from the moneys so appropriated and including standards for
receiving of assistance including but not limited to the number of
jobs created or maintained by the transportation improvement.
Notwithstanding any inconsistent provision of law, the commissioner of
transportation may waive the requirement to repay 40 percent of the
cost of a project provided that private funds are dedicated to the
cost of such industrial access project and related economic develop-
ment for at least 40 percent of the total cost of the industrial
access project and related economic development and the industrial
972 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
access portion of such project's cost is greater than $2,000,000
(17069879) (53267) ... 5,000,000 ..................... (re. $69,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Multi-Modal Purpose
By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
section 5, of the laws of 2006:
For the cost of multi-modal projects designated as part of the multi-
modal program established by section 14-k of the transportation law
and in accordance with the 2005 memorandum of understanding among
the governor, the majority leader of the senate, and the speaker of
the assembly, or their designees. Notwithstanding any other incon-
sistent provision of law, funds allocated and made available from
this appropriation in state fiscal years 2006-07 through 2009-10
shall not exceed $50,000,000 annually pursuant to section viii of
the 2005 transportation memorandum of understanding (17MM06MR)
(53268) ... 200,000,000 ......................... (re. $121,793,000)
By chapter 55, section 1, of the laws of 2005:
For the cost of multi-modal projects designated as part of the multi-
modal program established by section 14-k of the transportation law
and in accordance with a memorandum of understanding among the
governor, the majority leader of the senate, and the speaker of the
assembly, or their designees (17MM05MR) (53268) ....................
150,000,000 ....................................... (re. $9,525,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Non-Federal Aided Highway Purpose
By chapter 54, section 1, of the laws of 2022:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2022, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
973 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The
total amount of non-federally aided highway funds made available for
local bridge projects from this appropriation shall not exceed
$2,500,000 in state fiscal year 2022-23 (53164).
Personal service (17012222) (50000) ... 5,000,000 ... (re. $5,000,000)
Nonpersonal service (17042222) (57050) ...............................
20,000,000 ....................................... (re. $16,047,000)
Capital projects (17082222) (60551) ..................................
449,150,000 ..................................... (re. $367,552,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2022, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (17092222) (54276) ....................
22,000,000 ....................................... (re. $21,757,000)
By chapter 54, section 1, of the laws of 2021:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2021, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
974 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state non-federal-
ly aided highway funds appropriated herein when the use of federal
aid funds for such local bridge projects would not be cost effective
and the federal aid and state matching funds saved as a result of
the use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2021-22 (53164).
Personal service (17012122) (50000) ... 5,000,000 ..... (re. $407,000)
Nonpersonal service (17042122) (57050) ...............................
20,000,000 ........................................ (re. $4,211,000)
Capital projects (17082122) (60551) ..................................
449,150,000 ..................................... (re. $174,669,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2021, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (17092122) (54276) ....................
22,000,000 ....................................... (re. $21,969,000)
By chapter 54, section 1, of the laws of 2020:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2020, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
975 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2020-21. Provided, however, that no obligations
against, or spending from this appropriation shall be authorized
unless the director of the division of the budget certifies that
such obligations or spending can be accommodated within the State's
multi-year financial plan without adversely affecting the funding
available for (a) capital projects currently authorized that are
deemed essential to the health and safety of the public, or (b)
essential governmental services. Provided, however, that during
state fiscal year 2020-21, the department of transportation shall,
ten calendar days prior to the start of each quarter or as soon as
practicable thereafter, provide to the director of the budget, the
secretary of the senate finance committee, and the secretary of the
assembly ways and means committee, a schedule of planned highway and
bridge capital project lettings to take place during such quarter;
and provided, further, that the projects to be let by the department
may differ from the schedules so provided due to emergencies, envi-
ronmental concerns, federal mandates, unforeseen conditions, design
changes or other factors (53164).
Personal service (17012022) (50000) ... 5,000,000 ...... (re. $60,000)
Nonpersonal service (17042022) (57050) ...............................
20,000,000 ........................................ (re. $1,376,000)
Capital projects (17082022) (60551) ..................................
449,150,000 ...................................... (re. $57,219,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2020, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation. Provided, however, that no obligations
against, or spending from this appropriation shall be authorized
unless the director of the division of the budget certifies that
such obligations or spending can be accommodated within the State's
multi-year financial plan without adversely affecting the funding
available for (a) capital projects currently authorized that are
deemed essential to the health and safety of the public, or (b)
essential governmental services (17092022) (54276) .................
22,000,000 ....................................... (re. $21,417,000)
By chapter 54, section 1, of the laws of 2019:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2019, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
976 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state non-federal-
ly aided highway funds appropriated herein when the use of federal
aid funds for such local bridge projects would not be cost effective
and the federal aid and state matching funds saved as a result of
the use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2019-20 (53164).
Capital projects (17081922) (60551) ..................................
449,150,000 ...................................... (re. $29,990,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2019, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (17091922) (54276) ....................
22,000,000 ....................................... (re. $11,591,000)
By chapter 54, section 1, of the laws of 2018:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2018, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
977 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state non-federal-
ly aided highway funds appropriated herein when the use of federal
aid funds for such local bridge projects would not be cost effective
and the federal aid and state matching funds saved as a result of
the use of non federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2018-19 (53164).
Nonpersonal service (17041822) (57050) ... 20,000,000 . (re. $458,000)
Capital projects (17081822) (60551) ..................................
449,150,000 ...................................... (re. $38,481,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2018, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (17091822) (54276) ....................
22,000,000 ........................................ (re. $3,331,000)
By chapter 54, section 1, of the laws of 2017:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2017, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
978 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state non-federal-
ly aided highway funds appropriated herein when the use of federal
aid funds for such local bridge projects would not be cost effective
and the federal aid and state matching funds saved as a result of
the use of non federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2017-18 (53164).
Nonpersonal service (17041722) (57050)................................
20,000,000 .......................................... (re. $439,000)
Capital projects (17081722) (60551) ..................................
408,443,000 ...................................... (re. $24,000,000)
By chapter 55, section 1, of the laws of 2016:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2016, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2016-17 (53164).
Personal service (17011622) (50000) ... 5,000,000 ...... (re. $31,000)
Nonpersonal service (17041622) (57050) ...............................
20,000,000 ........................................ (re. $1,302,000)
979 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital projects (17081622) (60551) ..................................
436,487,000 ...................................... (re. $14,871,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2016, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (17091622) (54276) ....................
24,562,000 ....................................... (re. $10,655,000)
By chapter 54, section 1, of the laws of 2015:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2015, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2015-16 (53164).
Personal service (17011522) (50000) ... 5,000,000 ...... (re. $99,000)
Nonpersonal service (17041522) (57050) ...............................
20,000,000 .......................................... (re. $285,000)
Capital projects (17081522) (60551) ..................................
413,251,000 ...................................... (re. $10,173,000)
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2015, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
980 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (54276).
Capital projects (17091522) ... 23,431,000 .......... (re. $7,476,000)
By chapter 54, section 1, of the laws of 2014:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2014, of the acquisition of property
related to construction, reconstruction, reconditioning and preser-
vation, and preventive maintenance of state highways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation (54276).
Capital projects (17091422) (60551) ... 27,690,000 .... (re. $147,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 55,
section 1, of the laws of 2016:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2014, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$5,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2014-15 (53164).
Personal service (17011422) (50000) ... 6,000,000 ..... (re. $190,000)
981 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (17041422) (57050) ...............................
27,000,000 ........................................... (re. $26,000)
Capital projects (17081422) (60551) 474,079,000 ..... (re. $4,637,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2015:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2013, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, and preventive maintenance. Up to
$3,000,000 of this appropriation may be used for traffic maintenance
and traffic protection services provided by the division of state
police.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2013-14 (53164).
Nonpersonal service (17041322) (57050) ...............................
19,000,000 .......................................... (re. $186,000)
Capital projects (17081322) (60551) ..................................
553,121,000 ...................................... (re. $77,608,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2012, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
982 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, preventive maintenance, and the
acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2012-13 (53164).
Nonpersonal service (17041222) (57050) ...............................
15,100,000 ........................................... (re. $46,000)
Capital projects (17081222) (60551) ..................................
508,950,000 ....................................... (re. $9,383,000)
By chapter 54, section 1, of the laws of 2011:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2011, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, preventive maintenance, and the
acquisition of property. With the approval of the director of the
budget, the commissioner of transportation is authorized to enter
into agreements with any municipality to finance local bridge
projects through state non-federally aided highway funds appropri-
ated herein when the use of federal aid funds for such local bridge
983 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
projects would not be cost effective and the federal aid and state
matching funds saved as a result of the use of non-federal aid funds
for local bridge projects are made available for bridge projects on
the state highway system. The total amount of non-federally aided
highway funds made available for local bridge projects from this
appropriation shall not exceed $2,500,000 in state fiscal year
2011-12.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17021122) (53164) ......
526,050,000 ...................................... (re. $20,315,000)
PERSONAL SERVICE
Personal service--regular ........ 1,500,000
Holiday/overtime compensation ...... 500,000
--------------
Amount available for
personal service ............. 2,000,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,000,000
Travel .............................. 10,000
Contractual services ............. 7,000,000
Equipment ........................ 3,990,000
--------------
Amount available for nonper-
sonal service ............... 13,000,000
--------------
CAPITAL PROJECTS
Highway and Bridge
Construction and Preventive
Maintenance .................. 486,000,000
--------------
Right of Way Acquisition ........ 25,050,000
--------------
Amount available for capital
projects ................... 511,050,000
--------------
526,050,000
==============
By chapter 55, section 1, of the laws of 2010:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2010, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
984 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
thereto, for the state share of federally authorized high speed rail
improvement projects, and for the cost of administrative services of
the department of transportation and the cost of services provided
by private firms; including the costs of preventive maintenance on
state roads and bridges as defined in paragraph (a) of subdivision 1
of section 10-d of the highway law for contractual preventive main-
tenance services provided by private firms; and including but not
limited to the preparation of designs, plans, specifications and
estimates; construction management and supervision, and appraisals,
surveys, testing and environmental impact statements for transporta-
tion projects. Project costs funded from this appropriation may
include but shall not be limited to construction, reconstruction,
reconditioning and preservation, preventive maintenance, and the
acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2010-11.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17021022) (53164) ......
526,050,000 ....................................... (re. $1,850,000)
SCHEDULE
PERSONAL SERVICE
Personal service--regular ........ 1,500,000
Holiday/overtime compensation ...... 500,000
--------------
Amount available for
personal service ............. 2,000,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,000,000
Travel .............................. 10,000
Contractual services ............. 7,000,000
Equipment ........................ 3,990,000
--------------
Amount available for nonper-
sonal service ............... 13,000,000
--------------
985 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
MAINTENANCE UNDISTRIBUTED
Highway and Bridge
Construction and Preventive
Maintenance .................. 486,000,000
--------------
Right of Way Acquisition ........ 25,050,000
--------------
Amount available for mainte-
nance undistributed ........ 511,050,000
--------------
526,050,000
==============
By chapter 55, section 1, of the laws of 2009:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2009, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
transportation and the cost of services provided by private firms;
including the costs of preventive maintenance on state roads and
bridges as defined in paragraph (a) of subdivision 1 of section 10-d
of the highway law for contractual preventive maintenance services
provided by private firms; and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision, and appraisals, surveys,
testing and environmental impact statements for transportation
projects. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, preventive maintenance, and the acquisi-
tion of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2009-10.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17020922) (53164) ......
516,550,000 ...................................... (re. $18,827,000)
986 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
SCHEDULE
PERSONAL SERVICE
Personal service--regular ........ 1,000,000
Holiday/overtime compensation .... 1,000,000
--------------
Amount available for
personal service ............. 2,000,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 1,000,000
Travel .............................. 10,000
Contractual services ............. 8,000,000
Equipment ........................ 3,990,000
--------------
Amount available for nonper-
sonal service ............... 13,000,000
--------------
MAINTENANCE UNDISTRIBUTED
Highway and Bridge Construcion
and Preventive Maintenance ... 476,000,000
--------------
Right of Way Acquisition ........ 25,550,000
--------------
Amount available for mainte-
nance undistributed ........ 501,550,000
--------------
516,550,000
==============
By chapter 55, section 1, of the laws of 2008:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2008, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
transportation and the cost of services provided by private firms;
including the costs of preventive maintenance on state roads and
bridges as defined in paragraph (a) of subdivision 1 of section 10-d
of the highway law for contractual preventive maintenance services
provided by private firms; and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision, and appraisals, surveys,
testing and environmental impact statements for transportation
projects. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
987 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tioning and preservation, preventive maintenance, and the acquisi-
tion of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2008-09.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17020822) (53164) ......
539,352,000 ...................................... (re. $13,334,000)
SCHEDULE
PERSONAL SERVICE
Personal service--regular .......... 926,000
Holiday/overtime compensation .... 1,074,000
--------------
Amount available for
personal service ............. 2,000,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 1,283,000
Travel ............................... 3,000
Contractual services ............. 7,833,000
Equipment ........................ 3,881,000
--------------
Amount available for nonper-
sonal service ............... 13,000,000
--------------
MAINTENANCE UNDISTRIBUTED
Highway and Bridge Construcion
and Preventive Maintenance ... 524,352,000
--------------
Amount available for mainte-
nance undistributed ........ 524,352,000
--------------
539,352,000
==============
By chapter 55, section 1, of the laws of 2007:
988 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2007, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
transportation and the cost of services provided by private firms;
including the costs of preventive maintenance on state roads and
bridges as defined in paragraph (a) of subdivision 1 of section 10-d
of the highway law for contractual preventive maintenance services
provided by private firms; and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision, and appraisals, surveys,
testing and environmental impact statements for transportation
projects. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, preventive maintenance, and the acquisi-
tion of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2007-2008.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17020722) (53164) ......
520,505,000 ....................................... (re. $1,603,000)
SCHEDULE
PERSONAL SERVICE
Personal service--regular .......... 463,000
Holiday/overtime compensation ...... 537,000
--------------
Amount available for
personal service ............. 1,000,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 1,184,000
Travel ............................... 3,000
Contractual services ............. 7,231,000
Equipment ........................ 3,582,000
--------------
989 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Amount available for nonper-
sonal service ............... 12,000,000
--------------
MAINTENANCE UNDISTRIBUTED
Highway and Bridge
Construction and Preventive
Maintenance .................. 507,505,000
--------------
Amount available for mainte-
nance undistributed ........ 507,505,000
--------------
520,505,000
==============
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2008:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2006, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
transportation and the cost of services provided by private firms;
including the costs of preventive maintenance on state roads and
bridges as defined in paragraph (a) of subdivision 1 of section 10-d
of the highway law for contractual preventive maintenance services
provided by private firms; and including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision, and appraisals, surveys,
testing and environmental impact statements for transportation
projects. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, preventive maintenance, and the acquisi-
tion of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2006-2007.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17020622) (53164) ......
667,502,000 ....................................... (re. $2,198,000)
990 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
SCHEDULE
Highway and Bridge
Construction ................. 457,502,000
--------------
Preventive Maintenance ......... 210,000,000
--------------
667,502,000
==============
By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
section 1, of the laws of 2007:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2005, of state high ways, parkways,
bridges, the New York State Thruway, Indian reservation roads, and
facilities for which the responsibility is vested with the state
department of transportation including work appurtenant and ancil-
lary thereto, the cost of administrative services of the department
of transportation and the cost of services provided by private
firms; including the costs of preventive maintenance on state roads
and bridges as defined in paragraph (a) of subdivision 1 of section
10-d of the highway law for contractual preventive maintenance
services provided by private firms; and including but not limited to
the preparation of designs, plans, specifications and estimates;
construction management and supervision, and appraisals, surveys,
testing and environmental impact statements for transportation
projects. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, preventive maintenance, and the acquisi-
tion of property.
The funds made available through this appropriation shall be utilized
for the payment of the costs of eligible projects in accordance with
a memorandum of understanding entered into between the governor, the
majority leader of the senate and the speaker of the assembly, or
their designees.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2005-2006.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17020522) (53164)
... ... 604,125,000 ............................. (re. $2,158,000)
991 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2006:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2004, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
transportation and the cost of services provided by private firms,
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation projects. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2004-2005 (17020422) (53164) ..................
380,000,000 ...................................... (re. $17,778,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2007:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2004, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms. Such costs shall not include the costs of
vehicles under 8,500 pounds without the prior approval of the direc-
tor of the budget.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17040422) (53261)
... ... 331,260,000 ............................. (re. $1,093,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
section 1, of the laws of 2005:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2003, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto, the cost of administrative services of the department of
992 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transportation and the cost of services provided by private firms,
including but not limited to the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing and environmental impact
statements for transportation projects. Project costs funded from
this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2003-2004 (17020322) (53164) ..................
370,000,000 ....................................... (re. $2,355,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
section 1, of the laws of 2005:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2003, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms. Such costs shall not include the costs of
vehicles under 8,500 pounds without the prior approval of the direc-
tor of the budget.
The items shown in the schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the budget (17040322) (53261)
... ... 317,684,000 ............................. (re. $2,106,000)
By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
section 1, of the laws of 2009:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2002, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
993 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2002-2003 (17020222) (53164) ..................
1,042,107,000 ..................................... (re. $2,048,000)
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2002, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms. Such costs shall not include the costs of
vehicles under 8,500 pounds without the prior approval of the direc-
tor of the budget (17040222) (53260) ...............................
330,132,036 ...................................... (re. $20,516,000)
SCHEDULE
Personal service .............................. 47,600,000
Nonpersonal service ........................... 41,391,000
Maintenance undistributed
For expenses of highway maintenance ........... 87,193,000
For the costs of the contract services
provided by private firms performing
preventive maintenance ..................... 153,948,036
--------------
Available for maintenance undistributed .... 245,153,036
--------------
330,132,036
==============
By chapter 55, section 1, of the laws of 2001, as amended by chapter 55,
section 1, of the laws of 2003:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2001, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
994 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2001-2002 (17020122) (53164) ..................
1,069,754,000 ................................... (re. $127,605,000)
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2001, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms. Such costs shall not include the costs of
vehicles under 8,500 pounds without the prior approval of the direc-
tor of the budget (17040122) (53261) ...............................
330,864,000 ...................................... (re. $14,693,000)
By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
section 1, of the laws of 2003:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 2000, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
995 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 2000-2001 (17020022) (53164) ..................
943,841,000 ....................................... (re. $4,384,000)
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 2000, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms (17040022) (53261) .......................
328,297,000 ......................................... (re. $139,000)
By chapter 55, section 1, of the laws of 1999:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1999, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 1999-2000 (17029922) (53164) ..................
845,000,000 ....................................... (re. $6,675,000)
By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
section 1, of the laws of 2003:
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 1999, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms (17049922) (53261) .......................
346,818,000 ......................................... (re. $596,000)
996 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
section 1, of the laws of 2003:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1998, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects (17029822) (53164) ...
1,165,139,000 ..................................... (re. $5,777,000)
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 1998, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms (17049822) (53261) .......................
345,011,000 ....................................... (re. $2,153,000)
By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
section 1, of the laws of 2007:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1997, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of nonfederal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 1997-98 (17029722) (53164) ....................
915,748,000 ....................................... (re. $4,251,000)
997 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of costs, including the payment of liabilities
incurred prior to April 1, 1997, of preventive maintenance on state
roads and bridges as defined in paragraph (a) of subdivision 1 of
section 10-d of the highway law including personal services, nonper-
sonal services, fringe benefits and the contractual services
provided by private firms.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the budget (17049722)
(53261) ... ..... 278,668,000 ................... (re. $1,872,000)
By chapter 55, section 1, of the laws of 1996, as amended by chapter
295, part A, section 1, of the laws of 2001:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1996, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects (17029622) (53164) ...
779,430,000 ......................................... (re. $704,000)
By chapter 54, section 1, of the laws of 1995, as amended by chapter 55,
section 1, of the laws of 2003:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1995, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
998 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 1995-96 (17029522) (53164) ....................
880,323,000 ...................................... (re. $21,803,000)
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 1996:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1994, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto and the payment of reimbursements to the engineering
services fund for the cost of administrative services of the depart-
ment of transportation and the cost of services provided by private
firms, including but not limited to the preparation of designs,
plans, specifications and estimates; construction management and
supervision; and appraisals, surveys, testing and environmental
impact statements for transportation projects. Project costs funded
from this appropriation may include but shall not be limited to
construction, reconstruction, reconditioning and preservation, and
the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective and
the federal aid and state matching funds saved as a result of the
use of non-federal aid funds for local bridge projects are made
available for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available for local
bridge projects from this appropriation shall not exceed $2,500,000
in state fiscal year 1994-95 (17029422) (53164) ... ..............
1,095,524,000 ..................................... (re. $9,580,000)
By chapter 54, section 1, of the laws of 1993, as amended by chapter
295, part A, section 1, of the laws of 2001:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1993, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, and the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective.
Federal aid and state matching funds saved as a result of the use of
non-federal aid funds for local bridge projects shall be made avail-
999 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
able for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available to local
bridge projects shall not exceed $2,500,000 in state fiscal year
1993-94.
For the payment of reimbursements to the engineering services fund for
the cost of administrative services of the department of transporta-
tion and the cost of services provided by private firms, including
but not limited to the preparation of designs, plans, specifications
and estimates; construction management and supervision; and
appraisals, surveys, testing and environmental impact statements for
transportation projects (17029322) (53164) ... ...................
1,042,787,000 ..................................... (re. $3,753,000)
By chapter 54, section 1, of the laws of 1992:
For the payment of the costs, including the payment of liabilities
incurred prior to April 1, 1992, of state highways, parkways, bridg-
es, the New York State Thruway, Indian reservation roads, and facil-
ities for which the responsibility is vested with the state depart-
ment of transportation including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, and the acquisition of property.
With the approval of the director of the budget, the commissioner of
transportation is authorized to enter into agreements with any muni-
cipality to finance local bridge projects through state nonfederally
aided highway funds appropriated herein when the use of federal aid
funds for such local bridge projects would not be cost effective.
Federal aid and state matching funds saved as a result of the use of
non-federal aid funds for local bridge projects shall be made avail-
able for bridge projects on the state highway system. The total
amount of non-federally aided highway funds made available to local
bridge projects shall not exceed $2,500,000 in state fiscal year
1992-93.
For the payment of reimbursements to the engineering services fund for
the cost of the contract services provided by private firms, includ-
ing but not limited to the preparation of designs, plans, specifica-
tions and estimates; construction management and supervision; and
appraisals, surveys, testing and environmental impact statements for
transportation projects (17029222) (53164) ... ...................
208,855,000 ........................................ (re.$8,632,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Preparation of Plans Purpose
Capital Project Management and Traffic and Safety
By chapter 54, section 1, of the laws of 2022:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
1000 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Personal service (17P12230) (50000) ..................................
48,261,000 ....................................... (re. $48,224,000)
Nonpersonal service (17P42230) (57050) ...............................
9,597,000 ......................................... (re. $9,597,000)
Fringe benefits (17P82230) (60090) ... 30,834,000 .. (re. $19,925,000)
Indirect costs (17P92230) (58850) ... 1,472,000 ....... (re. $950,000)
By chapter 54, section 1, of the laws of 2021:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P12130) (50000) ..................................
45,510,000 ....................................... (re. $35,803,000)
Nonpersonal service (17P42130) (57050) ... 122,000 ...... (re. $2,000)
Fringe benefits (17P82130) (60090) ... 27,771,000 ... (re. $5,218,000)
Indirect costs (17P92130) (58850) ... 1,470,000 ....... (re. $486,000)
By chapter 54, section 1, of the laws of 2020:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P12030) (50000) ..................................
45,510,000 ........................................ (re. $2,695,000)
Nonpersonal service (17P42030) (57050) ... 122,000 ..... (re. $65,000)
Fringe benefits (17P82030) (60090) ... 27,771,000 ... (re. $1,634,000)
Indirect costs (17P92030) (58850) ... 1,757,000 ....... (re. $375,000)
By chapter 54, section 1, of the laws of 2019:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P11930) (50000) ..................................
45,510,000 ........................................ (re. $2,288,000)
Nonpersonal service (17P41930) (57050) ... 122,000 ...... (re. $1,000)
Fringe benefits (17P81930) (60090) ... 28,654,000 ... (re. $1,679,000)
Indirect costs (17P91930) (58850) ... 1,766,000 ....... (re. $111,000)
By chapter 54, section 1, of the laws of 2018:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P11830) (50000) ..................................
44,171,000 ........................................ (re. $1,267,000)
Nonpersonal service (17P41830) (57050) ... 122,000 ...... (re. $1,000)
Fringe benefits (17P81830) (60090) ... 28,053,000 ..... (re. $192,000)
Indirect costs (17P91830) (58850) ... 1,754,000 ......... (re. $8,000)
By chapter 54, section 1, of the laws of 2017:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
1001 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Personal service (17P11730) (50000) ..................................
43,426,000 ........................................ (re. $1,951,000)
Nonpersonal service (17P41730) (57050) ... 122,000 ..... (re. $11,000)
Fringe benefits (17P81730) (60090) ... 26,393,000 ... (re. $1,427,000)
Indirect costs (17P91730) (58850) ... 1,462,000 ........ (re. $35,000)
By chapter 55, section 1, of the laws of 2016:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P11630) (50000) ... 41,359,000 .. (re. $4,105,000)
Nonpersonal service (17P41630) (57050) ... 122,000 ..... (re. $23,000)
Indirect costs (17P91630) (58850) ... 1,303,000 ........ (re. $34,000)
By chapter 54, section 1, of the laws of 2015:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Nonpersonal service (17P41530) (57050) ... 120,000 ..... (re. $31,000)
Fringe benefits (17P81530) (60090) ... 22,597,000 ..... (re. $656,000)
Indirect costs (17P91530) (58850) ... 1,293,000 ........ (re. $37,000)
By chapter 54, section 1, of the laws of 2014:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Personal service (17P11430) (50000) ... 40,295,000 .... (re. $203,000)
Nonpersonal service (17P41430) (57050) ... 117,000 ..... (re. $34,000)
Fringe benefits (17P81430) (60090) ... 22,569,000 ... (re. $1,202,000)
Indirect costs (17P91430) (58850) ... 1,253,000 ........ (re. $67,000)
By chapter 54, section 1, of the laws of 2013:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Nonpersonal service (17P41330) (57050) ... 114,000 ..... (re. $16,000)
Fringe benefits (17P81330) (60090) ... 22,042,000 ..... (re. $905,000)
Indirect costs (17P91330) (58850) ... 1,296,000 ........ (re. $53,000)
By chapter 54, section 1, of the laws of 2012:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits, and the
contract services provided by private firms (53263).
Nonpersonal service (17P41230) (57050) ... 111,000 ..... (re. $25,000)
Fringe benefits (17P81230) (60090) ... 19,320,000 ...... (re. $96,000)
Indirect costs (17P91230) (58850) ... 1,207,000 ....... (re. $195,000)
By chapter 54, section 1, of the laws of 2011:
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms (17H21130) (53263)
58,657,000 .......................................... (re. $259,000)
1002 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PERSONAL SERVICE
Personal service--regular ....... 38,037,000
Holiday/overtime compensation ...... 919,000
--------------
Amount available for
personal service ............ 38,956,000
--------------
NONPERSONAL SERVICE
Supplies and materials .............. 61,000
Travel ............................. 121,000
Contractual services ................ 57,000
Equipment ........................... 15,000
Fringe benefits ................. 18,068,000
Indirect costs ................... 1,379,000
--------------
Amount available for nonper-
sonal service ............... 19,701,000
--------------
58,657,000
==============
Department Management and Administration
By chapter 54, section 1, of the laws of 2022:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2022-23 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Personal service (17A12230) (50000) ..................................
34,415,000 ....................................... (re. $34,415,000)
Nonpersonal service (17A42230) (57050) ...............................
33,354,000 ....................................... (re. $33,354,000)
Fringe benefits (17A82230) (60090) ... 22,009,000 .. (re. $13,723,000)
Indirect costs (17A92230) (58850) ... 971,000 ......... (re. $568,000)
By chapter 54, section 1, of the laws of 2021:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2021-22 state fiscal year state
operations appropriation for the budget division program of the
1003 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Personal service (17A12130) (50000) ..................................
31,415,000 ........................................ (re. $3,065,000)
Nonpersonal service (17A42130) (57050) ...............................
33,354,000 ....................................... (re. $20,619,000)
Fringe benefits (17A82130) (60090) ... 19,698,000 ... (re. $2,721,000)
Indirect costs (17A92130) (58850) ... 886,000 ......... (re. $123,000)
By chapter 54, section 1, of the laws of 2020:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2020-21 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Personal service (17A12030) (50000) ... 31,415,000 .. (re. $3,235,000)
Nonpersonal service (17A42030) (57050) ...............................
33,354,000 ....................................... (re. $11,866,000)
Fringe benefits (17A82030) (60090) ... 19,600,000 ... (re. $2,121,000)
Indirect costs (17A92030) (58850) ... 1,078,000 ....... (re. $288,000)
By chapter 54, section 1, of the laws of 2019:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2019-20 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Personal service (17A11930) (50000) ... 31,415,000 .... (re. $320,000)
Nonpersonal service (17A41930) (57050) ...............................
33,354,000 ........................................ (re. $4,437,000)
Fringe benefits (17A81930) (60090) ... 20,062,000 ..... (re. $341,000)
Indirect costs (17A91930) (58850) ... 1,078,000 ........ (re. $28,000)
By chapter 54, section 1, of the laws of 2018:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2018-19 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Personal service (17A11830) (50000) ... 31,604,000 .... (re. $788,000)
1004 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (17A41830) (57050) ...............................
33,363,000 .......................................... (re. $984,000)
Fringe benefits (17A81830) (60090) ... 20,192,000 ..... (re. $161,000)
Indirect costs (17A91830) (58850) ... 974,000 ........... (re. $8,000)
By chapter 54, section 1, of the laws of 2017:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2017-18 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Nonpersonal service (17A41730) (57050) ...............................
33,363,000 .......................................... (re. $892,000)
Fringe benefits (17A81730) (60090) ... 18,807,000 ..... (re. $158,000)
Indirect costs (17A91730) (58850) ... 902,000 .......... (re. $26,000)
By chapter 55, section 1, of the laws of 2016:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2016-17 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Nonpersonal service (17A41630) (57050) ...............................
31,919,000 ........................................ (re. $9,401,000)
Indirect costs (17A91630) (58850) ... 837,000 .......... (re. $14,000)
By chapter 54, section 1, of the laws of 2015:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2015-16 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Nonpersonal service (17A41530) (57050) ...............................
31,919,000 ........................................ (re. $6,217,000)
Fringe benefits (17A81530) (60090) ... 17,442,000 ...... (re. $55,000)
Indirect costs (17A91530) (58850) ... 790,000 .......... (re. $11,000)
By chapter 54, section 1, of the laws of 2014:
1005 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2014-15 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Nonpersonal service (17A41430) (57050) ...............................
27,982,000 .......................................... (re. $213,000)
Indirect costs (17A91430) (58850) ... 844,000 .......... (re. $15,000)
By chapter 54, section 1, of the laws of 2013:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2013-14 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53262).
Nonpersonal service (17A41330) (57050) ...............................
33,102,000 .......................................... (re. $367,000)
By chapter 54, section 1, of the laws of 2012:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority, the IT Interchange and Transfer
Authority, and the Call Center Interchange and Transfer Authority as
defined in the 2012-13 state fiscal year state operations appropri-
ation for the budget division program of the division of the budget,
are deemed fully incorporated herein and a part of this appropri-
ation as if fully stated (53262).
Nonpersonal service (17A41230) (57050) ...............................
40,300,000 .......................................... (re. $386,000)
By chapter 54, section 1, of the laws of 2011:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms (17H51130) (53262) ..............
112,348,000 ...................................... (re. $12,209,000)
PERSONAL SERVICE
Personal service--regular ....... 42,593,000
Temporary service .................. 824,000
Holiday/overtime compensation .... 1,261,000
--------------
1006 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Amount available for
personal service ............ 44,678,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 1,845,000
Travel ........................... 4,570,000
Contractual services ............ 35,957,000
Equipment .......................... 180,000
Fringe benefits ................. 23,332,000
Indirect costs ................... 1,786,000
--------------
Amount available for nonper-
sonal service ............... 67,670,000
--------------
112,348,000
==============
By chapter 55, section 1, of the laws of 2010:
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms (17H51030) (53262) ..............
122,040,000 ....................................... (re. $9,106,000)
PERSONAL SERVICE
Personal service--regular ....... 47,325,000
Temporary service .................. 916,000
Holiday/overtime compensation .... 1,401,000
--------------
Amount available for
personal service ............ 49,642,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,050,000
Travel ........................... 5,078,000
Contractual services ............ 39,952,000
Equipment .......................... 200,000
Fringe benefits ................. 23,332,000
Indirect costs ................... 1,786,000
--------------
Amount available for nonper-
sonal service ............... 72,398,000
--------------
122,040,000
==============
By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
section 1, of the laws of 2010:
1007 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For department management and administration including personal
services, nonpersonal services, fringe benefits and the contract
services provided by private firms (17H50930) (53262) ..............
122,554,000 ....................................... (re. $3,037,000)
PERSONAL SERVICE
Personal service--regular ....... 47,005,000
Temporary service .................. 911,000
Holiday/overtime compensation .... 1,394,000
--------------
Amount available for
personal service ............ 49,310,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,506,000
Travel ........................... 5,622,000
Contractual services ............ 40,222,000
Equipment .......................... 427,000
Fringe benefits ................. 22,538,000
Indirect costs ................... 1,929,000
--------------
Amount available for nonper-
sonal service ............... 73,244,000
--------------
122,554,000
==============
Design and Construction
By chapter 54, section 1, of the laws of 2022:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2022-23 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E12230) (50000) ..................................
244,387,000 ..................................... (re. $167,459,000)
Nonpersonal service (17E42230) (57050) ...............................
10,741,000 ....................................... (re. $10,741,000)
Fringe benefits (17E82230) (60090) ...................................
156,139,000 ..................................... (re. $104,049,000)
1008 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Indirect costs (17E92230) (58850) ... 7,454,000 ..... (re. $4,827,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP2230) (57050) ...............................
232,965,000 ..................................... (re. $228,618,000)
By chapter 54, section 1, of the laws of 2021:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2021-22 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E12130) (50000) ..................................
277,832,000 ..................................... (re. $109,388,000)
Nonpersonal service (17E42130) (57050) ...............................
10,741,000 ........................................ (re. $5,744,000)
Fringe benefits (17E82130) (60090) ...................................
149,125,000 ...................................... (re. $23,292,000)
Indirect costs (17E92130) (58850) ... 9,434,000 ..... (re. $2,823,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP2130) (57050) ...............................
199,520,000 ..................................... (re. $195,597,000)
By chapter 54, section 1, of the laws of 2020:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2020-21 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
1009 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Personal service (17E12030) (50000) ..................................
277,832,000 ...................................... (re. $53,131,000)
Nonpersonal service (17E42030) (57050) ...............................
10,741,000 ........................................ (re. $2,829,000)
Fringe benefits (17E82030) (60090) ...................................
149,125,000 ...................................... (re. $33,402,000)
Indirect costs (17E92030) (58850) ... 9,434,000 ..... (re. $2,965,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP2030) (57050) ...............................
199,520,000 ..................................... (re. $125,422,000)
By chapter 54, section 1, of the laws of 2019:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2019-20 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E11930) (50000) ..................................
277,832,000 ...................................... (re. $82,205,000)
Nonpersonal service (17E41930) (57050) ...............................
10,741,000 ........................................ (re. $2,653,000)
Fringe benefits (17E81930) (60090) ...................................
144,369,000 ...................................... (re. $22,456,000)
Indirect costs (17E91930) (58850) ... 8,897,000 ..... (re. $1,417,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1930) (57050) ...............................
199,520,000 ...................................... (re. $99,535,000)
By chapter 54, section 1, of the laws of 2018:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
1010 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2018-19 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E11830) (50000) ..................................
257,419,000 ...................................... (re. $70,356,000)
Nonpersonal service (17E41830) (57050) ...............................
10,741,000 .......................................... (re. $269,000)
Fringe benefits (17E81830) (60090) ...................................
142,816,000 ....................................... (re. $2,005,000)
Indirect costs (17E91830) (58850) ... 8,927,000 ....... (re. $177,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1830) (57050) ...............................
199,520,000 ...................................... (re. $44,762,000)
By chapter 54, section 1, of the laws of 2017:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2017-18 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E11730) (50000) ..................................
248,470,000 ...................................... (re. $43,246,000)
Nonpersonal service (17E41730) (57050) ...............................
10,741,000 .......................................... (re. $324,000)
Fringe benefits (17E81730) (60090) ...................................
123,448,000 ...................................... (re. $17,675,000)
Indirect costs (17E91730) (58850) ... 6,838,000 ....... (re. $864,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1730) (57050) ...............................
199,520,000 ...................................... (re. $28,698,000)
By chapter 55, section 1, of the laws of 2016:
1011 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $575,000 to the office of the
inspector general.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2016-17 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53166).
Personal service (17E11630) (50000) ..................................
244,387,000 ...................................... (re. $68,282,000)
Nonpersonal service (17E41630) (57050) ...............................
10,565,000 .......................................... (re. $627,000)
Fringe benefits (17E81630) (60090) ... 111,895,000 .... (re. $209,000)
Indirect costs (17E91630) (58850) ... 6,320,000 ....... (re. $204,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1630) (57050) ...............................
198,564,000 ...................................... (re. $26,231,000)
By chapter 54, section 1, of the laws of 2015:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $175,000 to the office of the
inspector general (53166).
Nonpersonal service (17E41530) (57050) ...............................
10,413,000 .......................................... (re. $184,000)
Fringe benefits (17E81530) (60090) ... 109,621,000 .. (re. $5,646,000)
Indirect costs (17E91530) (58850) ... 6,269,000 ....... (re. $344,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1530) (57050) ...............................
137,778,000 ...................................... (re. $13,871,000)
By chapter 54, section 1, of the laws of 2014:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
1012 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
testing, and environmental impact statements for transportation
projects, and for suballocation of $175,000 to the office of the
inspector general (53166).
Nonpersonal service (17E41430) (57050) ...............................
10,159,000 .......................................... (re. $177,000)
Fringe benefits (17E81430) (60090) ... 111,819,000 .. (re. $6,992,000)
Indirect costs (17E91430) (58850) ... 6,209,000 ....... (re. $388,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1430) (57050) ...............................
118,015,000 ....................................... (re. $8,461,000)
By chapter 54, section 1, of the laws of 2013:
For engineering services, including personal services, nonpersonal
services, and fringe benefits, including, but not limited to, the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing, and environmental impact statements for transportation
projects, and for suballocation of $175,000 to the office of the
inspector general (53166).
Nonpersonal service (17E41330) (57050) ... 9,911,000 .. (re. $277,000)
Fringe benefits (17E81330) (60090) ... 108,498,000 .. (re. $3,054,000)
Indirect costs (17E91330) (58850) ... 6,380,000 ........ (re. $67,000)
For the costs of the contract services provided by private firms
including, but not limited to, the preparation of designs, plans,
specifications and estimates; construction management and super-
vision; and appraisals, surveys, testing, and environmental impact
statements for transportation projects (53105).
Nonpersonal service (17EP1330) (57050) ...............................
119,003,000 ...................................... (re. $13,120,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2015:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects, and for subal-
location of $175,000 to the office of the inspector general (53166).
Nonpersonal service (17E41230) (57050) ...............................
172,203,000 ...................................... (re. $15,155,000)
Indirect costs (17E91230) (58850) ... 5,941,000 ....... (re. $475,000)
By chapter 54, section 1, of the laws of 2011:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
1013 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects, and for subal-
location of $175,000 to the office of the inspector general
(17H11130) (53166) ... 469,901,000 ............... (re. $14,997,000)
PERSONAL SERVICE
Personal service--regular ...... 185,850,000
Temporary service ................ 5,280,000
Holiday/overtime compensation .... 3,985,000
--------------
Amount available for
personal for service ....... 195,115,000
--------------
NONPERSONAL SERVICE
Supplies and materials ............. 802,000
Travel ........................... 5,959,000
Contractual services ............. 1,577,000
Equipment ........................... 80,000
Fringe benefits ................. 90,493,000
Indirect costs ................... 6,907,000
--------------
Amount available for nonper-
sonal service .............. 105,818,000
--------------
CAPITAL PROJECTS
For the costs of the contract
services provided by private
firms including, but not
limited to, the preparation
of designs, plans, specifi-
cations and estimates;
construction management and
supervision; and appraisals,
surveys, testing, and envi-
ronmental impact statements
for transportation projects:
Preliminary Design .............. 53,827,000
Construction Inspection ......... 65,280,000
Bridge Inspection ............... 15,958,000
Other Consultant Services ....... 33,903,000
--------------
168,968,000
--------------
Amount available for capital
projects ................... 168,968,000
1014 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
--------------
469,901,000
==============
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2012:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects (17H11030)
(53166) ... 487,035,000 ........................... (re. $6,696,000)
PERSONAL SERVICE
Personal service--regular ...... 190,168,000
Temporary service ................ 4,737,000
Holiday/overtime compensation .... 6,711,000
--------------
Amount available for
personal service ........... 201,616,000
--------------
NONPERSONAL SERVICE
Supplies and materials ............. 876,000
Travel ........................... 6,657,000
Contractual services ............. 1,554,000
Equipment .......................... 310,000
Fringe benefits ................. 94,760,000
Indirect costs ................... 7,256,000
--------------
Amount available for nonper-
sonal service .............. 111,413,000
--------------
MAINTENANCE UNDISTRIBUTED
For suballocation of $175,000
to the office of the inspec-
tor general for services and
expenses in accordance with
the following:
Supplies and materials .............. 44,000
Travel .............................. 44,000
Contractual services ................ 44,000
Equipment ........................... 43,000
--------------
175,000
--------------
1015 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the costs of the contract
services provided by private
firms including, but not
limited to, the preparation
of designs, plans, specifi-
cations and estimates;
construction management and
supervision; and appraisals,
surveys, testing, and envi-
ronmental impact statements
for transportation projects:
Preliminary Design .............. 55,260,000
Construction Inpsection ......... 67,018,000
Bridge Inspection ............... 16,383,000
Other Consultant Services ....... 34,805,000
--------------
173,466,000
--------------
Amount available for mainte-
nance undistributed ........ 173,641,000
--------------
486,670,000
==============
By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
section 1, of the laws of 2010:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects (17H10930)
(53166) ... 497,742,000 ........................... (re. $9,477,000)
PERSONAL SERVICE
Personal service--regular ...... 194,006,000
Temporary service ................ 4,024,000
Holiday/overtime compensation .... 6,208,000
--------------
Amount available for
personal service ........... 204,238,000
--------------
NONPERSONAL SERVICE
Supplies and materials ............. 412,000
Travel ............................. 928,000
Contractual services ............. 6,367,000
Equipment ........................ 1,995,000
1016 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Fringe benefits ................. 85,064,000
Indirect costs ................... 7,992,000
--------------
Amount available for nonper-
sonal service .............. 102,758,000
--------------
MAINTENANCE UNDISTRIBUTED
For suballocation of $175,000
to the office of the inspec-
tor general for services and
expenses in accordance with
the following:
Supplies and materials .............. 44,000
Travel .............................. 44,000
Contractual services ................ 44,000
Equipment ........................... 43,000
--------------
175,000
--------------
For the costs of the contract services
provided by private firms including, but
not limited to, the preparation of
designs, plans, specifications and esti-
mates; construction management and super-
vision; and appraisals, surveys, testing,
and environmental impact statements for
transportation projects:
Preliminary Design .............. 60,709,000
Construction Inspection ......... 73,627,000
Bridge Inspection ............... 17,998,000
Other Consultant Services ....... 38,237,000
--------------
190,571,000
--------------
Amount available for mainte-
nance undistributed ........ 190,746,000
--------------
497,742,000
==============
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2010:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
1017 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
mental impact statements for transportation projects (17H10830)
(53166) ... 677,702,000 .......................... (re. $31,374,000)
PERSONAL SERVICE
Personal service--regular ...... 244,058,000
Temporary service ................ 3,100,000
Holiday/overtime compensation .... 8,077,000
--------------
Amount available for
personal service ........... 255,235,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,976,000
Travel .......................... 10,370,000
Contractual services ............ 44,067,000
Equipment ........................ 3,976,000
Fringe benefits ................ 110,019,000
Indirect costs .................. 10,608,000
--------------
Amount available for nonper-
sonal service .............. 182,016,000
--------------
MAINTENANCE UNDISTRIBUTED
For suballocation of $192,000
to the office of the inspec-
tor general for services and
expenses in accordance with
the following:
Supplies and materials .............. 48,000
Travel .............................. 48,000
Contractual services ................ 48,000
Equipment ........................... 48,000
--------------
192,000
--------------
For the costs of the contract services
provided by private firms including, but
not limited to, the preparation of
designs, plans, specifications and esti-
mates; construction management and super-
vision; and appraisals, surveys, testing,
and environmental impact statements for
transportation projects:
1018 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Preliminary Design .............. 76,538,000
Construction Inspection ......... 92,824,000
Bridge Inspection ............... 22,691,000
Other Consultant Services ....... 48,206,000
--------------
240,259,000
--------------
Amount available for mainte-
nance undistributed ........ 240,451,000
--------------
677,702,000
==============
By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
section 1, of the laws of 2008:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects (17H10730)
(53166) ... 672,105,000 .......................... (re. $15,813,000)
PERSONAL SERVICE
Personal service--regular ...... 227,962,000
Temporary service ................ 5,156,000
Holiday/overtime compensation .... 8,234,000
--------------
Amount available for
personal service ........... 241,352,000
--------------
NONPERSONAL SERVICE
Supplies and materials ........... 2,475,000
Travel ........................... 6,638,000
Contractual services ............ 49,926,000
Equipment ........................ 7,869,000
Fringe benefits ................ 116,111,000
Indirect costs ................... 9,305,000
--------------
Amount available for nonper-
sonal service .............. 192,324,000
--------------
MAINTENANCE UNDISTRIBUTED
For suballocation of $192,000
to the office of the inspec-
tor general for services and
1019 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
expenses in accordance with
the following:
Supplies and materials .............. 48,000
Travel .............................. 48,000
Contractual services ................ 48,000
Equipment ........................... 48,000
--------------
192,000
--------------
For the costs of the contract services
provided by private firms including, but
not limited to, the preparation of
designs, plans, specifications and esti-
mates; construction management and super-
vision; and appraisals, surveys, testing,
and environmental impact statements for
transportation projects:
Preliminary Design .............. 75,894,000
Construction Inspection ......... 92,043,000
Bridge Inspection ............... 22,500,000
Other Consultant Services ....... 47,800,000
--------------
238,237,000
--------------
Amount available for mainte-
nance undistributed ........ 238,429,000
--------------
672,105,000
==============
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2008:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $192,000 to the office of inspector general for
services and expenses including fringe benefits (17H10630) (53166)
... 650,996,000 ................................... (re. $8,888,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
section 1, of the laws of 2010:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
1020 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $192,000 to the office of inspector general for
services and expenses including fringe benefits (17H10530) (53166)
... 544,571,000 ................................... (re. $8,035,000)
By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
section 1, of the laws of 2006:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $192,000 to the office of inspector general for
services and expenses including fringe benefits (17H10430) (53166)
... 514,002,000 ................................... (re. $4,652,000)
By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
section 1, of the laws of 2006:
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing, and environ-
mental impact statements for transportation projects.
For suballocation of $192,000 to the office of inspector general for
services and expenses including fringe benefits (17H10330) (53166)
... 512,475,000 .................................. (re. $14,898,000)
Information Technology Projects
By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
section 1, of the laws of 2010:
For federally eligible costs of information technology projects,
including personal services, nonpersonal services, fringe benefits
and contract services provided by private firms (17H40830) (53265)
... 15,000,000 ................................... (re. $15,000,000)
PERSONAL SERVICE
Personal service--regular ........ 1,000,000
--------------
Amount available for
personal service ............. 1,000,000
--------------
1021 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NONPERSONAL SERVICE
Contractual services ............ 13,488,000
Fringe benefits .................... 477,000
Indirect costs ...................... 35,000
--------------
Amount available for nonper-
sonal service ............... 14,000,000
--------------
15,000,000
==============
By chapter 55, section 1, of the laws of 2007:
For federally eligible costs of information technology projects,
including personal services, nonpersonal services, fringe benefits
and contract services provided by private firms (17H40730) (53265)
... 15,000,000 ................................... (re. $15,000,000)
PERSONAL SERVICE
Personal service--regular ........ 1,000,000
--------------
Amount available for
personal service ............. 1,000,000
--------------
NONPERSONAL SERVICE
Contractual services ............ 13,488,000
Fringe benefits .................... 477,000
Indirect costs ...................... 35,000
--------------
Amount available for nonper-
sonal service ............... 14,000,000
--------------
15,000,000
==============
Real Estate
By chapter 54, section 1, of the laws of 2022:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2022-23 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R12230) (50000) ..................................
15,165,000 ........................................ (re. $9,874,000)
1022 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (17R42230) (57050) ... 302,000 .... (re. $257,000)
Fringe benefits (17R82230) (60090) ... 9,689,000 .... (re. $6,839,000)
Indirect costs (17R92230) (58850) ... 463,000 ......... (re. $327,000)
By chapter 54, section 1, of the laws of 2021:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2021-22 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R12130) (50000) ..................................
12,665,000 ........................................ (re. $2,006,000)
Nonpersonal service (17R42130) (57050) ... 302,000 .... (re. $219,000)
Fringe benefits (17R82130) (60090) ... 7,729,000 .... (re. $1,093,000)
Indirect costs (17R92130) (58850) ... 409,000 ......... (re. $106,000)
By chapter 54, section 1, of the laws of 2020:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2020-21 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R12030) (50000) ..................................
12,665,000 ........................................ (re. $2,122,000)
Nonpersonal service (17R42030) (57050) ... 302,000 .... (re. $245,000)
Fringe benefits (17R82030) (60090) ... 7,729,000 .... (re. $1,343,000)
Indirect costs (17R92030) (58850) ... 489,000 ......... (re. $151,000)
By chapter 54, section 1, of the laws of 2019:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2019-20 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R11930) (50000) ..................................
12,665,000 ........................................ (re. $1,897,000)
Nonpersonal service (17R41930) (57050) ... 302,000 .... (re. $180,000)
Fringe benefits (17R81930) (60090) ... 7,974,000 .... (re. $1,249,000)
Indirect costs (17R91930) (58850) ... 491,000 .......... (re. $79,000)
1023 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2018:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2018-19 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R11830) (50000) ..................................
12,296,000 ........................................ (re. $1,411,000)
Nonpersonal service (17R41830) (57050) ... 302,000 .... (re. $129,000)
Fringe benefits (17R81830) (60090) ... 7,809,000 ...... (re. $781,000)
Indirect costs (17R91830) (58850) ... 488,000 .......... (re. $49,000)
By chapter 54, section 1, of the laws of 2017:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2017-18 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R11730) (50000) ... 12,055,000 .. (re. $1,087,000)
Nonpersonal service (17R41730) (57050) ... 302,000 .... (re. $113,000)
Fringe benefits (17R81730) (60090) ... 7,357,000 ...... (re. $743,000)
Indirect costs (17R91730) (58850) ... 407,000 .......... (re. $27,000)
By chapter 55, section 1, of the laws of 2016:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2016-17 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (53264).
Personal service (17R11630) (50000) ... 11,604,000 .. (re. $1,842,000)
Nonpersonal service (17R41630) (57050) ... 177,000 ..... (re. $26,000)
Fringe benefits (17R81630) (60090) ... 6,471,000 ...... (re. $225,000)
Indirect costs (17R91630) (58850) ... 366,000 .......... (re. $24,000)
By chapter 54, section 1, of the laws of 2015:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (53264).
Nonpersonal service (17R41530) (57050) ... 174,000 ...... (re. $4,000)
Fringe benefits (17R81530) (60090) ... 6,340,000 ...... (re. $306,000)
1024 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Indirect costs (17R91530) (58850) ... 363,000 .......... (re. $19,000)
By chapter 54, section 1, of the laws of 2014:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (53264).
Personal service (17R11430) (50000) ... 11,337,000 .... (re. $133,000)
Nonpersonal service (17R41430) (57050) ... 170,000 ...... (re. $5,000)
Fringe benefits (17R81430) (60090) ... 6,350,000 ...... (re. $568,000)
Indirect costs (17R91430) (58850) ... 353,000 .......... (re. $32,000)
By chapter 54, section 1, of the laws of 2013:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (53264).
Nonpersonal service (17R41330) (57050) ... 166,000 ...... (re. $5,000)
By chapter 54, section 1, of the laws of 2011:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H31130) (53264) ... 16,956,000 ..... (re. $505,000)
PERSONAL SERVICE
Personal service--regular ....... 11,074,000
Holiday/overtime compensation ....... 10,000
--------------
Amount available for
personal service ............ 11,084,000
--------------
NONPERSONAL SERVICE
Supplies and materials .............. 85,000
Travel ............................. 162,000
Contractual services ................ 91,000
Equipment ............................ 1,000
Fringe benefits .................. 5,141,000
Indirect costs ..................... 392,000
--------------
Amount available for nonper-
sonal service ................ 5,872,000
--------------
16,956,000
==============
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2012:
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms (17H31030) (53264) ... 20,183,000 ... (re. $2,045,000)
1025 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PERSONAL SERVICE
Personal service--regular ....... 13,355,000
Holiday/overtime compensation ....... 20,000
--------------
Amount available for
personal service ............ 13,375,000
--------------
NONPERSONAL SERVICE
Supplies and materials .............. 90,000
Travel ............................. 172,000
Contractual services ................ 96,000
Equipment ........................... 48,000
Fringe benefits .................. 6,286,000
Indirect costs ..................... 481,000
--------------
Amount available for nonper-
sonal service ................ 7,173,000
--------------
20,548,000
==============
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Preventive Maintenance Purpose
By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
section 1, of the laws of 1996:
For preventive maintenance on state roads and bridges as defined in
paragraph (a) of subdivision 1 of section 10-d of the highway law
including personal services, nonpersonal services, fringe benefits
and the contractual services provided by private firms (170594PM)
(53261) ... ..... 278,439,000 ................... (re. $8,688,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Public Transportation Purpose
Bus Safety
By chapter 54, section 1, of the laws of 2017:
For the payment of personal services and fringe benefits of state
forces (53266).
Personal service (170117PT) (50000) ... 6,477,000 ..... (re. $363,000)
Fringe benefits (170817PT) (60090) ... 3,982,000 ...... (re. $241,000)
Indirect costs (170917PT) (58850) ... 191,000 .......... (re. $30,000)
By chapter 55, section 1, of the laws of 2016:
1026 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of personal services and fringe benefits of state
forces (53266).
Personal service (170116PT) (50000) ... 6,033,000 ..... (re. $403,000)
Fringe benefits (170816PT) (60090) ... 3,392,000 ....... (re. $35,000)
Indirect costs (170916PT) (58850) ... 162,000 ........... (re. $3,000)
By chapter 54, section 1, of the laws of 2015:
For the payment of personal services and fringe benefits of state
forces (53266).
Fringe benefits (170815PT) (60090) ... 3,356,000 ...... (re. $103,000)
Indirect costs (170915PT) (58850) ... 152,000 ........... (re. $5,000)
By chapter 54, section 1, of the laws of 2014:
For the payment of personal services and fringe benefits of state
forces (53266).
Personal service (170114PT) (50000) ... 5,906,000 ...... (re. $89,000)
Fringe benefits (170814PT) (60090) ... 3,359,000 ...... (re. $238,000)
Indirect costs (170914PT) (58850) ... 166,000 .......... (re. $12,000)
By chapter 54, section 1, of the laws of 2013:
For the payment of personal services and fringe benefits of state
forces in the office of passenger and freight transportation
(53266).
Fringe benefits (170813PT) (60090) ... 3,133,000 ....... (re. $68,000)
Indirect costs (170913PT) (58850) ... 176,000 ........... (re. $3,000)
By chapter 54, section 1, of the laws of 2012:
For the payment of personal services and fringe benefits of state
forces in the office of passenger and freight transportation
(53266).
Personal service (170112PT) (50000) ... 5,670,000 ..... (re. $117,000)
Fringe benefits (170812PT) (60090) ... 2,931,000 ....... (re. $20,000)
By chapter 55, section 1, of the laws of 2010:
For the payment of personal services and fringe benefits of state
forces in the office of passenger and freight transportation
(170110PT) (53266) ... 8,885,000 .................... (re. $607,000)
SCHEDULE
PERSONAL SERVICE
Personal service--regular ........ 5,762,000
Holiday/overtime compensation ...... 100,000
--------------
Amount available for
personal service ............. 5,862,000
--------------
1027 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NONPERSONAL SERVICE
Fringe benefits .................. 2,839,000
Indirect costs ..................... 184,000
--------------
Amount available for nonper-
sonal service ................ 3,023,000
--------------
8,885,000
==============
Motor Carrier Safety
By chapter 54, section 1, of the laws of 2017:
For motor carrier safety, including personal services, nonpersonal
services, and fringe benefits.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority, and the IT Interchange and
Transfer Authority as defined in the 2017-18 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (54263).
Personal service (172117PT) (50000) ... 3,430,000 ... (re. $1,159,000)
Nonpersonal service (172417PT) (57050) ...............................
1,531,000 ........................................... (re. $692,000)
Fringe benefits (172817PT) (60090) ... 2,109,000 ....... (re. $56,000)
By chapter 55, section 1, of the laws of 2016:
For motor carrier safety, including personal services, nonpersonal
services, and fringe benefits.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2016-17 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (54263).
Personal service (172116PT) (50000) ... 3,347,000 ..... (re. $960,000)
Nonpersonal service (172416PT) (57050) ...............................
1,531,000 ........................................... (re. $916,000)
Fringe benefits (172816PT) (60090) ... 1,882,000 ...... (re. $418,000)
Indirect costs (172916PT) (58850) ... 90,000 ........... (re. $27,000)
By chapter 54, section 1, of the laws of 2015:
For motor carrier safety, including personal services, nonpersonal
services, and fringe benefits.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2015-16 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (54263).
Personal service (172115PT) (50000) ... 3,175,000 ... (re. $1,279,000)
1028 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Nonpersonal service (172415PT) (57050) ... 1,531,000 .. (re. $516,000)
Fringe benefits (172815PT) (60090) ... 1,774,000 ...... (re. $478,000)
Indirect costs (172915PT) (58850) ... 81,000 ........... (re. $29,000)
By chapter 54, section 1, of the laws of 2014:
For motor carrier safety, including personal services, nonpersonal
services, and fringe benefits.
Notwithstanding any other provision of law to the contrary, the OGS
Interchange and Transfer Authority and the IT Interchange and Trans-
fer Authority as defined in the 2014-15 state fiscal year state
operations appropriation for the budget division program of the
division of the budget, are deemed fully incorporated herein and a
part of this appropriation as if fully stated (54263).
Personal service (172114PT) (50000) ... 2,949,000 ..... (re. $215,000)
Nonpersonal service (172414PT) (57050) ...............................
1,905,000 ......................................... (re. $1,045,000)
Indirect costs (172914PT) (58850) ... 83,000 ........... (re. $12,000)
Rail Safety
By chapter 54, section 1, of the laws of 2017:
For rail safety, including personal services, nonpersonal services,
and fringe benefits (54264).
Personal service (171117PT) (50000) ... 674,000 ........ (re. $60,000)
Nonpersonal service (171417PT) (57050) ... 87,000 ...... (re. $39,000)
Fringe benefits (171817PT) (60090) ... 414,000 ......... (re. $36,000)
Indirect costs (171917PT) (58850) ... 20,000 ............ (re. $4,000)
By chapter 55, section 1, of the laws of 2016:
For rail safety, including personal services, nonpersonal services,
and fringe benefits (54264).
Personal service (171116PT) (50000) ... 674,000 ....... (re. $173,000)
Nonpersonal service (171416PT) (57050) ... 87,000 ...... (re. $37,000)
Fringe benefits (171816PT) (60090) ... 379,000 ......... (re. $36,000)
Indirect costs (171916PT) (58850) ... 18,000 ............ (re. $2,000)
By chapter 54, section 1, of the laws of 2015:
For rail safety, including personal services, nonpersonal services,
and fringe benefits (54264).
Personal service (171115PT) (50000) ... 674,000 ........ (re. $87,000)
Nonpersonal service (171415PT) (57050) ... 87,000 ...... (re. $55,000)
Fringe benefits (171815PT) (60090) ... 377,000 ......... (re. $81,000)
Indirect costs (171915PT) (58850) ... 17,000 ............ (re. $4,000)
By chapter 54, section 1, of the laws of 2014:
For rail safety, including personal services, nonpersonal services,
and fringe benefits (54264).
Personal service (171114PT) (50000) ... 702,000 ....... (re. $118,000)
Nonpersonal service (171414PT) (57050) ... 66,000 ...... (re. $19,000)
Fringe benefits (171814PT) (60090) ... 399,000 ......... (re. $96,000)
Indirect costs (171914PT) (58850) ... 19,000 ............ (re. $4,000)
1029 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Southern Tier Expressway Purpose
By chapter 54, section 1, of the laws of 1985:
For the cost of construction including land acquisition, surveys,
design and contract engineering for the Southern Tier Expressway as
defined in section 340-c of the Highway Law (17348590) (53270) .....
................................................... (re. $2,149,000)
OTHER HIGHWAY AID (CCP)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Highway and Bridge Capital Account - 30051
Highway Aid Purpose
By chapter 54, section 1, of the laws of 1993:
For construction of sound abatement barriers on a section of the
northbound side of the New England Thruway (Interstate 95) from the
Bronx line through the Town of Pelham, Westchester County (17369321)
(53286) ... 1,150,000 ............................. (re. $1,150,000)
OTHER TRANSPORTATION AID (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Highway Aid Purpose
By chapter 54, section 1, of the laws of 2022:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA2221) (54265) ... 39,700,000 ................ (re. $39,598,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $479,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $129,156,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
1030 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
laws of 1991 shall be deemed to be $350,144,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
89.073 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 89.073
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $15,844,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$42,953,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 10.927 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 10.927 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH2221) (54267) ...................................
538,097,000 ..................................... (re. $468,327,000)
For capital grants to municipalities for extreme winter recovery: The
sum of $100,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $100,000,000. To the extent that the total of payment allocations
calculated herein varies from $100,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $100,000,000. Payments shall be made on the
fifteenth day of June, September, December and March (17EW2221)
(53160) ... 100,000,000 .......................... (re. $74,256,000)
For capital grants to cities, towns and villages for the reimbursement
of eligible capital costs of local highway and bridge projects with-
in such municipality.
1031 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Funds shall be allocated to cities, towns and villages based on the
total number of New York or United States or interstate signed tour-
ing route miles for which such municipality has capital maintenance
responsibility, as determined pursuant to the most recent local
highway inventory conducted by the highway data services bureau of
the department of transportation.
Eligible capital costs include the costs of construction and repair of
highways, bridges, highway-railroad crossings, and other transporta-
tion facilities for projects with a service life of ten years or
more (17TR2221) (54229) ............................................
100,000,000 ...................................... (re. $98,206,000)
By chapter 54, section 1, of the laws of 2021:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA2121) (54265) ... 39,700,000 ................ (re. $37,001,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $479,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $129,156,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $350,144,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
89.073 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 89.073
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $15,844,000. The amount distributed pursuant to section
1032 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$42,953,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 10.927 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 10.927 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH2121) (54267) ...................................
538,097,000 ..................................... (re. $177,785,000)
For capital grants to municipalities for extreme winter recovery: The
sum of $100,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $100,000,000. To the extent that the total of payment allocations
calculated herein varies from $100,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $100,000,000. Payments shall be made on the
fifteenth day of June, September, December and March (17EW2121)
(53160) ... 100,000,000 .......................... (re. $13,590,000)
For capital grants to cities, towns and villages for the reimbursement
of eligible capital costs of local highway and bridge projects with-
in such municipality.
Funds shall be allocated to cities, towns and villages based on the
total number of New York or United States or interstate signed tour-
ing route miles for which such municipality has capital maintenance
responsibility, as determined pursuant to the most recent local
highway inventory conducted by the highway data services bureau of
the department of transportation.
Eligible capital costs include the costs of construction and repair of
highways, bridges, highway-railroad crossings, and other transporta-
tion facilities for projects with a service life of ten years or
more (17TR2121) (54229) ... 100,000,000 .......... (re. $67,688,000)
By chapter 54, section 1, of the laws of 2020:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
1033 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law.
Provided, however, that no obligations against, or spending from
this appropriation shall be authorized unless the director of the
division of the budget certifies that such obligations or spending
can be accommodated within the State's multi-year financial plan
without adversely affecting the funding available for (a) capital
projects currently authorized that are deemed essential to the
health and safety of the public, or (b) essential governmental
services (17MA2021) (54265) ... 39,700,000 ....... (re. $14,988,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
1034 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March. Provided, however, that no obligations against, or
spending from this appropriation shall be authorized unless the
director of the division of the budget certifies that such obli-
gations or spending can be accommodated within the State's multiyear
financial plan without adversely affecting the funding available for
(a) capital projects currently authorized that are deemed essential
to the health and safety of the public, or (b) essential govern-
mental services (17CH2021) (54267) .................................
438,097,000 ...................................... (re. $30,954,000)
For capital grants to municipalities for extreme winter recovery:
The sum of $65,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $65,000,000. To the extent that the total of payment allocations
calculated herein varies from $65,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $65,000,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March.Provided, however, that no obligations against, or
spending from this appropriation shall be authorized unless the
director of the division of the budget certifies that such obli-
gations or spending can be accommodated within the State's multiyear
financial plan without adversely affecting the funding available for
(a) capital projects currently authorized that are deemed essential
to the health and safety of the public, or (b) essential govern-
mental services (17EW2021) (53160) .................................
65,000,000 ........................................ (re. $2,996,000)
By chapter 54, section 1, of the laws of 2019:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1921) (54265) ... 39,700,000 ................ (re. $13,117,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
1035 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1921) (54267) ...................................
438,097,000 ...................................... (re. $14,312,000)
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
For capital grants to municipalities for extreme winter recovery:
The sum of $65,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $65,000,000. To the extent that the total of payment allocations
1036 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
calculated herein varies from $65,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $65,000,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17EW1921) (53160) ...................................
65,000,000 ........................................ (re. $2,123,000)
By chapter 54, section 1, of the laws of 2018:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1821) (54265) ... 39,700,000 ................ (re. $39,700,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
1037 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1821) (54267) ...................................
438,097,000 ....................................... (re. $3,131,000)
For capital grants to municipalities for extreme winter recovery:
The sum of $65,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $65,000,000. To the extent that the total of payment allocations
calculated herein varies from $65,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $65,000,000. Payments shall be made on the
fifteenth day of June, September, December and March (17EW1821)
(53160) ... 65,000,000 ............................ (re. $1,279,000)
For municipalities eligible to receive aid under section 10-c of the
highway law, for the reimbursement of eligible costs to replace
guiderail end-cap terminals removed from the department of transpor-
tation's approved list during state fiscal year 2017-18, provided
such costs do not exceed $10,000 per unit (17GR1821) (54219) .......
375,000 ............................................. (re. $375,000)
By chapter 54, section 1, of the laws of 2017:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1721) (54265) ... 39,700,000 ................ (re. $37,276,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
1038 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000.
The amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1721) (54267) ...................................
438,097,000 ....................................... (re. $1,631,000)
For capital capital grants to municipalities for extreme winter recov-
ery:
The sum of $65,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $65,000,000. To the extent that the total of payment allocations
calculated herein varies from $65,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $65,000,000.
1039 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17EW1721) (53160) ... 65,000,000 ..... (re. $852,000)
By chapter 55, section 1, of the laws of 2016:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1621) (54265) ... 39,700,000 ................ (re. $39,700,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
1040 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1621) (54267) ...................................
438,097,000 ....................................... (re. $1,084,000)
By chapter 54, section 1, of the laws of 2015:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1521) (54265) ... 39,700,000 ................. (re. $5,726,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
1041 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1521) (54267) ...................................
438,097,000 ......................................... (re. $426,000)
For capital grants to municipalities for extreme winter recovery:
The sum of $50,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $50,000,000. To the extent that the total of payment allocations
calculated herein varies from $50,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $50,000,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17EW1521) (53160) ... 50,000,000 ..... (re. $226,000)
By chapter 54, section 1, of the laws of 2014:
For capital grants to municipalities under the municipal streets and
highways program for repayment of eligible costs of federal aid
municipal street and highway projects pursuant to section 15 of
chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. The department of transporta-
tion shall provide such information to the municipalities as may be
necessary to maintain the federal tax exempt status of any bonds,
notes, or other obligations issued by such municipalities to provide
for the non-federal share of the cost of projects pursuant to chap-
ter 330 of the laws of 1991 or section 80-b of the highway law
(17MA1421) (54265) ... 39,700,000 ................ (re. $15,825,000)
For capital grants to municipalities under the consolidated local
street and highway improvement program:
The sum of $379,300,000 to counties, cities, towns and villages for
reimbursement of eligible costs of local highway and bridge projects
pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
as added by section 9 of chapter 330 of the laws of 1991, as
amended. For the purposes of computing allocations to munici-
palities, the amount distributed pursuant to section 16 of chapter
329 of the laws of 1991 shall be deemed to be $125,540,000. The
amount distributed pursuant to section 16-a of chapter 329 of the
1042 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
provisions of any general or special law, the amounts deemed
distributed in accordance with section 16 of chapter 329 of the laws
of 1991 shall be adjusted so that such amounts will not be less than
86.579 percent of the "funding level" as defined in subdivision 5 of
section 10-c of the highway law for each such municipality. In order
to achieve the objectives of section 16 of chapter 329 of the laws
of 1991, to the extent necessary, the amounts in excess of 86.579
percent of the funding level to be deemed distributed to each muni-
cipality under this subdivision shall be reduced in equal propor-
tion.
The sum of $58,797,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to sections 16
and 16-a of chapter 329 of the laws of 1991, as added by section 9
of chapter 330 of the laws of 1991, as amended. For the purposes of
computing allocations to municipalities, the amount distributed
pursuant to section 16 of chapter 329 of the laws of 1991 shall be
deemed to be $19,460,000. The amount distributed pursuant to section
16-a of chapter 329 of the laws of 1991 shall be deemed to be
$39,337,000. Notwithstanding the provisions of any general or
special law, the amounts deemed distributed in accordance with
section 16 of chapter 329 of the laws of 1991 shall be adjusted so
that such amounts will not be less than 13.421 percent of the "fund-
ing level" as defined in subdivision 5 of section 10-c of the high-
way law for each such municipality. In order to achieve the objec-
tives of section 16 of chapter 329 of the laws of 1991, to the
extent necessary, the amounts in excess of 13.421 percent of the
funding level to be deemed distributed to each municipality under
this paragraph shall be reduced in equal proportion. To the extent
that the total of remaining payment allocations calculated herein
varies from $58,797,000, the payment amounts to each locality shall
be adjusted by a uniform percentage so that the total payments equal
$58,797,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CH1421) (54267) ...................................
438,097,000 ......................................... (re. $338,000)
For capital grants to municipalities pursuant to annual program
authorizations enacted and effective prior to April 1, 2014, in
relation to the suburban highway improvement program in sections
10-f and 10-g of the highway law. Notwithstanding any contrary
provision of law contained in such annual program authorization,
payments pursuant to this appropriation shall be made from the state
capital projects fund (17SH1421) (54269) ...........................
1,700,000 ......................................... (re. $1,700,000)
For capital grants to municipalities for extreme winter recovery:
The sum of $40,000,000 to municipalities for reimbursement of eligible
costs of local highway and bridge projects pursuant to section 16-a
of chapter 329 of the laws of 1991, as added by section 9 of chapter
330 of the laws of 1991, as amended. For the purposes of computing
allocations to municipalities, the amount distributed pursuant to
section 16-a of chapter 329 of the laws of 1991 shall be deemed to
be $40,000,000. To the extent that the total of payment allocations
1043 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
calculated herein varies from $40,000,000, the payment amounts to
each locality shall be adjusted by a uniform percentage so that the
total payments equal $40,000,000.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17EW1421) (53160) ... 40,000,000 ..... (re. $134,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2015:
For capital grants to municipalities pursuant to annual program
authorizations enacted and effective prior to April 1, 2014 under
the municipal streets and highways program for repayment of eligible
costs of federal aid municipal street and highway projects pursuant
to section 15 of chapter 329 of the laws of 1991, as added by
section 9 of chapter 330 of the laws of 1991, as amended. The
department of transportation shall provide such information to the
municipalities as may be necessary to maintain the federal tax
exempt status of any bonds, notes, or other obligations issued by
such municipalities to provide for the non-federal share of the cost
of projects pursuant to chapter 330 of the laws of 1991 or section
80-b of the highway law (17MR1421) (54266) .........................
217,097,000 ...................................... (re. $22,558,000)
For capital grants to municipalities pursuant to annual program
authorizations enacted and effective prior to April 1, 2014, in
relation to the consolidated local street and highway improvement
program in section 10-c of the highway law and sections 16 and 16a
of chapter 329 of the laws of 1991. Notwithstanding any contrary
provision of law contained in such annual program authorization,
payments pursuant to this appropriation shall be made from the state
capital projects fund.
Payments shall be made on the fifteenth day of June, September, Decem-
ber and March (17CR1421) (54268) ...................................
110,803,000 ....................................... (re. $1,051,000)
For capital grants to municipalities pursuant to annual program
authorizations enacted and effective prior to April 1, 2014, in
relation to the multi-modal program in section 14-k of the transpor-
tation law. Notwithstanding any contrary provision of law contained
in such annual program authorization, payments pursuant to this
appropriation shall be made from the state capital projects fund
(17MM1421) (54270) ... 47,123,000 ................ (re. $38,006,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Transportation Account - 31354
Mass Transportation and Rail Freight Purpose
By chapter 54, section 1, of the laws of 2022:
For payment of eligible costs for the federal share of capital assist-
ance for intercity passenger rail corridors, congestion relief, and
high-speed rail corridor development funded by the infrastructure
investment and jobs act (IIJA) or bipartisan infrastructure law
(BIL) and any successor legislation (17012212) (54288) .............
500,000,000 ..................................... (re. $499,998,000)
1044 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
section 1, of the laws of 2013:
For payment of eligible costs for the federal share of capital assist-
ance for intercity passenger rail corridors, congestion relief, and
high-speed rail corridor development funded by the Passenger Rail
Investment and Improvement Act of 2008 and any successor legislation
(17011012) (54288) ... 100,000,000 ............... (re. $19,035,000)
PORT DEVELOPMENT BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewal Bondable - 30000
Port Development Purpose
By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
section 3, of the laws of 1990:
For the preparation of designs, plans, specifications and estimates,
for the contract engineering services provided by private firms, for
construction, reconstruction, rehabilitation, and for the acquisi-
tion of real property, for port facilities under the jurisdiction of
the Niagara Frontier Transportation Authority and the Port of Oswego
Authority, including the payment of liabilities incurred prior to
April 1, 1988, pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983
(17278815) (53112) ... ..... 1,495,000 ............. (re. $47,000)
By chapter 54, section 1, of the laws of 1986:
For the preparation of designs, plans, specifications and estimates,
for the contract engineering services provided by private firms, for
construction, reconstruction, rehabilitation, and for the acquisi-
tion of real property, for port facilities under the jurisdiction of
the Albany Port District Commission, the Ogdensburg Bridge and Port
Authority, the Port of Oswego Authority, including the payment of
liabilities incurred prior to April one, nineteen hundred eightysix,
pursuant to the provisions of the rebuild New York through transpor-
tation infrastructure renewal bond act of 1983, and in accordance
with the schedule shown below. The items in the project schedule
below shall be for projects with a common purpose and may be inter-
changed without limitation subject to the approval of the director
of the division of the budget (17278615) (53112) ...................
3,840,000 ............................................. (re. $5,000)
By chapter 54, section 1, of the laws of 1985:
For construction, reconstruction, rehabilitation, and for the acquisi-
tion of real property, for port facilities under the jurisdiction of
the Albany Port District Commission, the Ogdensburg Bridge and Port
Authority, the Port of Oswego Authority, the Niagara Frontier Trans-
portation Authority, including the payment of liabilities incurred
prior to April one, nineteen hundred eighty-five, pursuant to the
provisions of the rebuild New York through transportation infras-
tructure renewal bond act of 1983, notwithstanding any inconsistent
provisions of law, and in accordance with the schedule shown below.
1045 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The items in the project schedule below shall be for projects with a
common purpose and may be interchanged without limitation subject to
the approval of the director of the division of the budget
(17198515) (53112) .................................... (re. $3,000)
PRIORITY BOND ACT PROJECTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewal (Bondable) - 30000
Priority Bond Act Purpose
By chapter 54, section 1, of the laws of 1984, as amended by chapter
259, section 6, of the laws of 1993:
For the costs pursuant to the provisions of the rebuild New York
through transportation infrastructure renewal bond act of 1983, of
the cost of capital projects to be reimbursed from bond fund
proceeds for the improvement of highways, parkways, commuter parking
facilities, and other highway facilities including bridges, other
structures, and appurtenances. Project costs funded from this appro-
priation may include, but shall not necessarily be limited to,
preliminary planning and feasibility studies; survey and design;
acquisition of property, construction, reconstruction, recondition-
ing and preservation; the contract engineering services provided by
private firms. No expenditures shall be made from this appropriation
for personal services and expenses other than consulting services.
The items in the schedule below are projects with a common purpose and
as such, may be interchanged without limitation.
Notwithstanding any other provision of the law, the commissioner of
transportation is authorized to acquire all necessary land not on
the state highway system for the purpose of highway projects at the
request of the locality under whose jurisdiction the project is
constructed or reconstructed.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April one, nineteen hundred eightyfour
but not for the payment of liabilities incurred prior to November
eight, nineteen hundred eighty-three (17288424) (53287) ... ......
....................................................(re. $7,056,000)
RAIL FREIGHT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transportation and Rail Freight Purpose
By chapter 54, section 2, of the laws of 1992:
For advance payment of the Port Authority of New York and New Jersey's
share of the cost of acquisition and construction of the South Bronx
oak point link subject to a written repayment agreement entered into
by the Authority and the commissioner of transportation and approved
by the director of the budget, such repayment agreement to include a
repayment schedule which states the date or dates on which the
authority will be notified of advance payments made and the date or
1046 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
dates on which the advance shall be repaid to the state and such
other terms and conditions as determined by the director of the
budget. The authority shall reimburse the State of New York in full
for all moneys advanced by the state from this appropriation within
30 days of the date of such notification (17779212) (53113) ........
64,050,000 ....................................... (re. $17,433,000)
For advance payment of the city of New York's share of the cost of
acquisition and construction of the South Bronx oak point link
subject to a written repayment agreement entered into by the city of
New York and the commissioner of transportation and approved by the
director of the budget, such repayment agreement to include a repay-
ment schedule which states the date or dates on which the city will
be notified of advance payments made and the date or dates on which
the advance shall be repaid to the state and such other terms and
conditions as determined by the director of the budget. The commis-
sioner of transportation, or such other person as the commissioner
shall designate, shall notify the city of New York in accordance
with a schedule to be determined in the repayment agreement of
payments made from this appropriation for the construction of the
South Bronx oak point link. The city of New York shall reimburse the
state of New York in full for all moneys advanced by the state from
this appropriation within 30 days of the date of such notification.
In the event that the city shall fail to make payment to the state for
any payment due and owing in accordance with the repayment agreement
entered into by the commissioner and the city of New York, the
commissioner or such other person as the commissioner shall desig-
nate shall certify to the state comptroller the amount due and owing
the state at the end of each period as specified in the repayment
agreement for which such amounts have been advanced by the state
from this appropriation and the state comptroller shall withhold an
equivalent amount from the next succeeding state aid allocated to
the city from highway aid, the motor fuel tax and the motor vehicle
registration fee distributed pursuant to section 10-c of the highway
law, or per capita local assistance pursuant to section 54 of the
state finance law subject to the following limitations: prior to
withholding amounts due the state from the city, the comptroller
shall pay in full any amount due the state of New York municipal
bond bank agency, on account of the city's obligation to such agen-
cy; the city university construction fund, pursuant to the
provisions of the city university construction fund act, the New
York city housing development corporation, pursuant to the
provisions of the New York city housing development corporation act
(article 12 of the private housing finance law); the transit
construction fund, pursuant to the provisions of title 9-a of arti-
cle 5 of the public authorities law; and, pursuant to section 92-e
of the state finance law, any amounts necessary for payments to
holders of bonds or notes as certified by the municipal assistance
corporation for the city of New York created under article 10 of the
public authorities law. The comptroller shall give the director of
the budget notification of any such payment. Such amount or amounts
so withheld by the state comptroller shall be used for the repayment
of the state advances hereby authorized. When such amount or amounts
1047 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
are received by the state, it shall credit such amounts against any
amounts due and owing by the city on whose account such was withheld
and paid (17789212) (53172) ... 18,210,000 ........ (re. $3,927,000)
By chapter 54, section 1, of the laws of 1992, as amended by chapter 54,
section 1, of the laws of 2018:
For payment of the state share of the cost of acquisition and
construction of the South Bronx oak point link subject to agreements
entered into by the commissioner of transportation with the Port
Authority of New York and New Jersey and the city of New York and
approved by the director of the budget, and to remove clearance
restrictions north of Highbridge yard (17OP9212) (54294) ...........
1,291,890 ......................................... (re. $1,291,000)
Capital Projects Funds - Other
Capital Projects Fund - Infrastructure Renewal (Bondable) - 30000
Rail Service Preservation Purpose
By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
section 3, of the laws of 1992:
For payment of the state share of the costs of the acquisition,
construction, reconstruction, improvement or rehabilitation of any
railroad capital facility and any capital improvement used in
connection therewith, for the acquisition of real property or inter-
ests in real property required or expected to be required therefor,
pursuant to the provisions of the rebuild New York through the
transportation infrastructure renewal bond act of 1983, notwith-
standing any inconsistent provisions of law, and pursuant to the
provisions of section fourteen-d of the transportation law, as the
commissioner may elect for the purpose of improving freight service,
and including all costs incidental thereto in accordance with the
following schedule.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et (17148541) (53288) ... ..... 21,000,000 ........ (re. $120,000)
RAIL PRESERVATION AND DEVELOPMENT FUND (CCP)
Capital Projects Funds - Other
Energy Conservation Thru Improved Transportation Bond Fund
Energy Conservation Thru Improved Transportation Bond Fund Account
30600
Bond Proceeds Purpose
By chapter 54, section 8, of the laws of 1980, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of four hundred million dollars ($400,000,000) or so much
thereof as may be necessary is hereby appropriated from the rail
preservation and development fund pursuant to the energy conserva-
tion through improved transportation bond act of nineteen hundred
seventy-nine for payment to the capital projects fund for disburse-
1048 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ments from such fund pursuant to an appropriation for acquisition,
construction, reconstruction, establishment, improvement and reha-
bilitation of urban, commuter and intercity rail passenger and rapid
transit systems and rail freight capital facilities, for the acqui-
sition of real property and interests in real property required or
expected to be required therefor and for any capital equipment to be
used in connection therewith, including all costs incidental there-
to.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the rail preservation and development
fund until a certificate of approval of availability shall have been
issued by the director of the budget, and a copy of such certificate
filed with the state comptroller, the chairman of the senate finance
committee and the chairman of the assembly ways and means committee.
Such certificate may be amended from time to time by the director of
the budget, and a copy of each such amendment shall be filed with
the state comptroller, the chairman of the senate finance committee
and the chairman of the assembly ways and means committee. The
director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the projects
fund for purposes for which rail preservation and development fund
expenditures are authorized. The state comptroller shall at the
commencement of each month certify to the director of the budget,
the chairman of the senate finance committee and the chairman of the
assembly ways and means committee, the amounts disbursed from the
appropriations designated by the director of the budget from the
capital projects fund for these disbursements pursuant to appropri-
ations from such fund for such purposes for the month preceding such
certification and such certifications shall not exceed in the aggre-
gate the moneys hereby appropriated (01371310) (80915) .............
..................................................... (re. $149,000)
By chapter 50, section 1, of the laws of 1980, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of one hundred million dollars ($100,000,000) or so much ther-
eof as may be necessary is hereby appropriated from the rail preser-
vation and development fund pursuant to the energy conservation
through improved transportation bond act of nineteen hundred seven-
ty-nine for payment to the local assistance account for disburse-
ments from such fund pursuant to an appropriation for the recon-
struction, improvement, reconditioning and preservation of highways
and bridges of the state highway system, for the acquisition of real
property and interest in real property required or expected to be
required therefor by any county, city, town or village, or two or
more of the foregoing acting jointly.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the rail preservation and development
fund until a certificate of approval of availability shall have been
issued by the director of the budget, and a copy of such certificate
filed with the state comptroller, the chairman of the senate finance
committee, and the chairman of the assembly ways and means commit-
tee. Such certificate may be amended from time to time by the direc-
1049 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tor of the budget, and a copy of each such amendment shall be filed
with the state comptroller, the chairman of the senate finance
committee and the chairman of the assembly ways and means committee.
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the local
assistance fund for purposes for which rail preservation and devel-
opment fund expenditures are authorized. The state comptroller shall
at the commencement of each month certify to the director of the
budget, the chairman of the senate finance committee and the chair-
man of the assembly ways and means committee, the amounts disbursed
from the appropriations designated by the director of the budget
from the local assistance account for these disbursements pursuant
to appropriations from such fund for such purposes for the month
preceding such certification and such certification shall not exceed
in the aggregate the moneys hereby appropriated (01371210) (80925) .
...................................................... (re. $15,000)
REBUILD AND RENEW NEW YORK TRANSPORTATION (CCP)
Capital Projects Funds - Other
Rebuild and Renew New York Transportation Bond Fund
Rebuild and Renew New York Transportation Bond Fund Account - 30650
Bond Proceeds Purpose
By chapter 55, section 1, of the laws of 2005:
The sum of $2,900,000,000, or so much thereof as may be necessary and
available, is hereby appropriated from the rebuild and renew New
York transportation fund as established by section 97-eeee of the
state finance law in accordance with the provisions of such section,
for payment to the capital projects fund in order to reimburse such
fund for disbursements certified by the state comptroller as bonda-
ble under the provisions of the rebuild and renew New York transpor-
tation bond act of 2005.
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the capital
projects fund for purposes for which rebuild and renew New York
transportation fund expenditures are authorized. The state comp-
troller shall at the commencement of each month certify to the
director of the budget, the chairman of the senate finance commit-
tee, and the chairman of the assembly ways and means committee, the
amounts disbursed from the appropriations so designated by the
director of the budget from the capital projects fund for such
purposes for the month preceding such certification and such certif-
ications shall not exceed in the aggregate the moneys hereby appro-
priated. A copy of each such certificate shall also be delivered to
state departments and agencies to which such capital projects fund
appropriations are made available.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the rebuild and renew New York trans-
portation fund until a certificate of approval of availability shall
have been issued by the director of the budget, and a copy of such
certificate of approval filed with the state comptroller, the chair-
1050 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
man of the senate finance committee and the chairman of the assembly
ways and means committee. Such certificate may be amended from time
to time by the director of the budget, and a copy of each such
amendment shall be filed with the state comptroller, the chairman of
the senate finance committee and the chairman of the assembly ways
and means committee (17010510) (80921) .............................
2,900,000,000 ................................... (re. $452,278,000)
ROAD AND BRIDGE IMPROVEMENTS (BONDABLE) (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Federal Aid Highways Purpose
By chapter 54, section 1, of the laws of 1990:
For the state share of highway projects to be reimbursed from the
accelerated capacity and transportation improvements fund pursuant
to the provisions of the accelerated capacity and transportation
improvements of the nineties bond act (17E19020) (53290) ...........
10,300,000 .......................................... (re. $188,000)
By chapter 54, section 1, of the laws of 1989:
For the state share of highway projects to be reimbursed from the
accelerated capacity and transportation improvements fund pursuant
to the provisions of that bond act (17E18920) (53290) ..............
10,300,000 ........................................... (re. $29,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Highway Facilities Purpose
By chapter 54, section 1, of the laws of 1992:
For the costs, pursuant to the provisions of the accelerated capacity
and transportation improvements of the nineties bond act, of capital
projects, advanced with or without federal aid, to be reimbursed
from bond fund proceeds for the improvement of state highways, thru-
ways and other highway facilities including bridges, other struc-
tures, and appurtenances.
For 80 percent of the costs of capital local bridge projects advanced
pursuant to the provisions of the accelerated capacity and transpor-
tation improvements of the nineties bond act. The remaining 20
percent share of project costs shall be paid by the municipality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
Project costs funded from this appropriation may include, but shall
not be limited to, construction, reconstruction, reconditioning and
preservation, and the acquisition of property.
For the payment of reimbursements to the engineering services fund for
the cost of the engineering services of the department of transpor-
tation, including fringe benefits, and the contract services
provided by private firms, for activities including but not limited
to the preparation of designs, plans, specifications and estimates;
1051 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire any necessary land not on the
state highway system for the purpose of local bridge projects
financed through this appropriation at the request of the locality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated. The items shown in the project schedule below
shall be for projects with a common purpose and may be interchanged
without limitation subject to the approval of the director of the
budget.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1992 (17F19222) (53291) .....
514,165,000 ....................................... (re. $9,164,000)
By chapter 54, section 1, of the laws of 1991:
For the costs, pursuant to the provisions of the accelerated capacity
and transportation improvements of the nineties bond act, of capital
projects, advanced with or without federal aid, to be reimbursed
from bond fund proceeds for the improvement of state highways, thru-
ways and other highway facilities including bridges, other struc-
tures, and appurtenances.
For 80 percent of the costs of capital local bridge projects advanced
pursuant to the provisions of the accelerated capacity and transpor-
tation improvements of the nineties bond act. The remaining 20
percent share of project costs shall be paid by the municipality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
Project costs funded from this appropriation may include, but shall
not be limited to, construction, reconstruction, reconditioning and
preservation, and the acquisition of property.
For the payment of reimbursements to the engineering services fund for
the cost of the engineering services of the department of transpor-
tation, including fringe benefits, and the contract services
provided by private firms, for activities including but not limited
to the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire any necessary land not on the
state highway system for the purpose of local bridge projects
financed through this appropriation at the request of the locality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
1052 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1991 (17F19122) (53291)
... ... 660,400,000 ............................. (re. $7,119,000)
For the costs, pursuant to the provisions of the accelerated capacity
and transportation improvements of the nineties bond act, of capital
projects, advanced with or without federal aid, to be reimbursed
from bond fund proceeds for the improvement of state highways, thru-
ways and other highway facilities including bridges, other struc-
tures, and appurtenances.
Project costs funded from this appropriation may include, but shall
not be limited to, construction, reconstruction, reconditioning and
preservation, and the acquisition of property.
For the payment of reimbursements to the engineering services fund for
the cost of the engineering services of the department of transpor-
tation, including fringe benefits, and the contract services
provided by private firms, for activities including but not limited
to the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire any necessary land not on the
state highway system for the purpose of local bridge projects
financed through this appropriation at the request of the locality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1991 (17F19122) (53291)
... ... 1,716,000 ............................... (re. $1,716,000)
By chapter 54, section 1, of the laws of 1990, as amended by chapter
947, section 6, of the laws of 1990:
For the costs, pursuant to the provisions of the accelerated capacity
and transportation improvements of the nineties bond act, of capital
projects to be reimbursed from bond fund proceeds for the improve-
ment of state highways, thruways and other highway facilities
including bridges, other structures, and appurtenances.
Notwithstanding any other provisions of law, the New York State Thru-
way shall be considered a state highway for the purposes of this
appropriation. Prior to the approval of a certificate of approval of
availability for projects advanced by the New York State Thruway
Authority, the director of the budget shall approve a repayment
agreement between the department of transportation and the New York
State Thruway Authority. The state comptroller is hereby authorized
and directed to deposit repayments from the Thruway Authority pursu-
ant to such agreement to the credit of the capital projects fund.
For 80 percent of the costs of capital local bridge projects advanced
pursuant to the provisions of the accelerated capacity and transpor-
1053 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation improvements of the nineties bond act. The remaining 20
percent share of project costs shall be paid by the municipality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
Project costs funded from this appropriation may include, but shall
not be limited to, construction, reconstruction, reconditioning and
preservation, and the acquisition of property.
For the payment of reimbursements to the engineering services fund for
the cost of the engineering services of the department of transpor-
tation, including fringe benefits, and the contract services
provided by private firms, for activities including but not limited
to the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire any necessary land not on the
state highway system for the purpose of local bridge projects
financed through this appropriation at the request of the locality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1990 (17F19022) (53291)
... ... 617,900,000 ............................. (re. $2,586,000)
By chapter 54, section 1, of the laws of 1989:
For the costs, pursuant to the provisions of the accelerated capacity
and transportation improvements of the nineties bond act of 1988, of
capital projects to be reimbursed from bond fund proceeds for the
improvement of state highways, and other highway facilities includ-
ing bridges, other structures, and appurtenances.
For 80 percent of the costs of capital local bridge projects advanced
pursuant to the provisions of the accelerated capacity and transpor-
tation improvements of the nineties bond act of 1988. The remaining
20 percent share of project costs shall be paid by the municipality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
Project costs funded from this appropriation may include, but shall
not be limited to, construction, reconstruction, reconditioning and
preservation, and the acquisition of property.
For the payment of reimbursements to the engineering services fund for
the cost of the engineering services of the department of transpor-
tation, including fringe benefits, and the contract services
provided by private firms, for activities including but not limited
to the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
1054 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Notwithstanding any other provision of law, the commissioner of trans-
portation is authorized to acquire any necessary land not on the
state highway system for the purpose of local bridge projects
financed through this appropriation at the request of the locality
under whose jurisdiction the project is constructed, reconstructed
or rehabilitated.
The items shown in the project schedule below shall be for projects
with a common purpose and may be interchanged without limitation
subject to the approval of the director of the division of the budg-
et.
Funds from this appropriation may be made available for the payment of
liabilities incurred prior to April 1, 1989 (17F18911) (53291)
... ... 715,219,000 ............................... (re. $838,000)
By chapter 261, section 57, of the laws of 1988, as amended by chapter
54, section 3, of the laws of 1989:
The sum of four hundred seventy million dollars ($470,000,000), is
hereby appropriated from the capital projects fund to the department
of transportation for the cost of state highway capital projects
advanced with or without federal aid including bridges, other struc-
tures and appurtenances and municipal bridge improvements advanced
pursuant to the accelerated capacity and transportation improvements
of the nineties bond act. This appropriation shall be reimbursed
from proceeds from the issuance of bonds pursuant to section fifty
of chapter 261, of the laws of nineteen hundred eighty-eight.
Project costs funded from this appropriation may include, but shall
not be limited to, preliminary planning and feasibility studies;
survey and design; acquisition of property; construction, recon-
struction, capacity improvement, replacement, reconditioning and
preservation; the supervision and inspection thereof; and the cost
of engineering services provided by private firms. No expenditure
shall be made from this appropriation for personal services and
expenses other than consulting services.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the accelerated capacity and trans-
portation improvements fund until a certificate of approval of
availability shall have been issued by the director of the budget,
and a copy of such certificate filed with the state comptroller, the
chairman of the senate finance committee and the chairman of the
assembly ways and means committee. Such certificate may be amended
from time to time by the director of the budget, and a copy of each
such amendment shall be filed with the state comptroller, the chair-
man of the senate finance committee and the chairman of the assembly
ways and means committee (17658811) (53291) ........................
470,000,000 ....................................... (re. $1,369,000)
SMALL AND MINORITY AND WOMEN OWNED SMALL BUSINESS ASSISTANCE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Mass Transit Purpose
1055 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 1993, as amended by chapter 55,
section 1, of the laws of 2016:
For services and expenses of a bonding guarantee assistance program
for transportation-related purposes pursuant to section 1838 of the
public authorities law enacted pursuant to chapter 56 of the laws of
1993. The director of the budget may apportion all or a portion of
these funds to the job development authority (17BG93MT) (53293) ....
3,500,000 ......................................... (re. $3,500,000)
For services and expenses of a revolving fund for working capital
loans to small and minority and women-owned firms engaged in trans-
portation construction and reconstruction projects. The director of
the budget may apportion all or a portion of these funds to the
urban development corporation (17WC93MT) (53294) ...................
1,500,000 ......................................... (re. $1,500,000)
Capital Projects Funds - Other
Dedicated Highway and Bridge Trust Fund
Dedicated Highway and Bridge Trust Account - 30050
Non-Federal Aided Highway Purpose
By chapter 54, section 1, of the laws of 1993, as amended by chapter
259, section 4, of the laws of 1993:
For services and expenses of a bonding guarantee assistance program
for transportation related purposes pursuant to section 1838 of the
public authorities law enacted pursuant to chapter 56 of the laws of
1993. The director of the budget may apportion all or a portion of
such funds to the job development authority (17309322) (53292) .....
3,500,000 ......................................... (re. $3,500,000)
SPECIAL RAIL AND AVIATION PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Rail Service Preservation Purpose
By chapter 55, section 1, of the laws of 1996, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of construction, reconstruction, improve-
ment, reconditioning and preservation of rail freight and rail
passenger facilities, pursuant to the provisions of section 14-j of
the transportation law, including, but not limited to, preparation
of designs, plans and specifications, and acquisition of real prop-
erty pursuant to a memorandum of understanding entered into pursuant
to chapter 56 of the laws of 1993 (17SR9641) (53115) ...............
4,137,720 ......................................... (re. $4,138,000)
By chapter 54, section 1, of the laws of 1995, as amended by chapter 54,
section 1, of the laws of 2018:
For the payment of the costs of construction, reconstruction, improve-
ment, reconditioning and preservation of rail freight and rail
passenger facilities, pursuant to the provisions of section 14-j of
the transportation law, including, but not limited to, preparation
1056 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of designs, plans and specifications, and acquisition of real prop-
erty notwithstanding any general or special law (17SR9541) (53115)
... 114,275 .......................................... (re. $39,000)
For the payment of the costs of construction, reconstruction, improve-
ment, reconditioning and preservation of rail freight and rail
passenger facilities, pursuant to the provisions of section 14-j of
the transportation law and in accordance with the schedule below,
including but not limited to, preparation of designs, plans and
specifications, and acquisition of real property (17SP9541) (54281)
... 474,243 ......................................... (re. $474,000)
project schedule
For services and expenses of the Amsterdam
Local Waterfront Revitalization Project
including but not limited to the
construction of an access route traversing
Conrail tracks ............................... 1,000,000
For payment to Alcibiades Ltd. for services
and expenses of the Livonia, Avon, and
Lakeville Railroad, Rochester Cluster
South project including but not limited to
the rehabilitation of track and structures ..... 817,000
For payment to the City of Rochester for
services and expenses of the Rochester
Alternate Transportation Systems Study for
the study of feasible alternative modes of
transportation in the Rochester area
including but not limited to light rail ........ 300,000
For payment to the City of Rochester for
services and expenses of the Buffalo
Road/West Avenue and Chili Avenue projects
including but not limited to the partial
removal of a bridge, lighting, bridge
abutments and safety improvements to the
railroad under pass ............................ 600,000
For payment to the City of Rochester for
services and expenses of the state/St.
Paul Railroad Underpass Improvement
project including but not limited to safe-
ty enhancements ................................. 83,000
For payment to the Onondaga County Indus-
trial Development Agency for design and
installation of new trackage and station
platforms, track realignment, track reha-
bilitation, track removal, and other
related work, including bridgework and
right-of-way purchases for the Syracuse
Intermodal Center ............................ 1,500,000
For payment to the Onondaga County Indus-
trial Development Agency for services and
1057 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
expenses of the Syracuse Intermodal Center
including but not limited to construction ...... 400,000
For payment to the Central New York Regional
Transportation Authority for services and
expenses of the Syracuse Intermodal Center
including but not limited to rail improve-
ments .......................................... 300,000
TRANSPORTATION BONDABLE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew (Bondable) - 30000
Aviation Purpose
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the rebuild and renew New York transporta-
tion bond act of 2005 and article 22 of the transportation law, of
capital projects to be reimbursed from bond fund proceeds for the
planning and design, construction, reconstruction, replacement,
improvement, reconditioning, rehabilitation and preservation,
including the acquisition of real property and interests therein
required or expected to be required in connection therewith, of
airports and aviation facilities, equipment and related projects
exclusive of those airports and facilities under the jurisdiction of
the port authority of New York and New Jersey or operated by the
state of New York.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2009
(17030914) (53297) ... 16,400,000 ................. (re. $2,307,000)
By chapter 55, section 1, of the laws of 2008:
For the costs, pursuant to the rebuild and renew New York transporta-
tion bond act of 2005 and article 22 of the transportation law, of
capital projects to be reimbursed from bond fund proceeds for the
planning and design, construction, reconstruction, replacement,
improvement, reconditioning, rehabilitation and preservation,
including the acquisition of real property and interests therein
required or expected to be required in connection therewith, of
airports and aviation facilities, equipment and related projects
exclusive of those airports and facilities under the jurisdiction of
1058 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the port authority of New York and New Jersey or operated by the
state of New York.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2008
(17030814) (53297) ... 15,000,000 ................. (re. $3,551,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the rebuild and renew New York transporta-
tion bond act of 2005 and article 22 of the transportation law, of
capital projects to be reimbursed from bond fund proceeds for the
planning and design, construction, reconstruction, replacement,
improvement, reconditioning, rehabilitation and preservation,
including the acquisition of real property and interests therein
required or expected to be required in connection therewith, of
airports and aviation facilities, equipment and related projects
exclusive of those airports and facilities under the jurisdiction of
the port authority of New York and New Jersey or operated by the
state of New York. Costs may include highways and bridges either on
or off the state highway system necessary or reasonably expected to
be necessary as a project component or incidental to projects other-
wise authorized herein and by the rebuild and renew New York trans-
portation bond act of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2007
(17030714) (53297) ... 15,000,000 ................. (re. $1,776,000)
By chapter 55, section 1, of the laws of 2006:
For the costs, pursuant to the rebuild and renew New York transporta-
tion bond act of 2005 and article 22 of the transportation law, of
capital projects to be reimbursed from bond fund proceeds for the
planning and design, construction, reconstruction, replacement,
improvement, reconditioning, rehabilitation and preservation,
including the acquisition of real property and interests therein
1059 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
required or expected to be required in connection therewith, of
airports and aviation facilities, equipment and related projects
exclusive of those airports and facilities under the jurisdiction of
the port authority of New York and New Jersey or operated by the
state of New York.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2006
(17030614) (53297) ... 15,000,000 ................... (re. $630,000)
By chapter 55, section 1, of the laws of 2005:
For the costs, pursuant to the rebuild and renew New York transporta-
tion bond act of 2005 and article 22 of the transportation law, of
capital projects to be reimbursed from bond fund proceeds for the
planning and design, construction, reconstruction, replacement,
improvement, reconditioning, rehabilitation and preservation,
including the acquisition of real property and interests therein
required or expected to be required in connection therewith, of
airports and aviation facilities, equipment and related projects
exclusive of those airports and facilities under the jurisdiction of
the port authority of New York and New Jersey or operated by the
state of New York.
The funds made available through this appropriation shall be utilized
for the payment of the costs of eligible projects in accordance with
a memorandum of understanding entered into between the governor, the
majority leader of the senate and the speaker of the assembly, or
their designees, pursuant to article 22 of the transportation law.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For engineering services of the department of transportation, includ-
ing personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms, including, but not
limited to, the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion.
No part of this appropriation shall be made available for the payment
of liabilities incurred prior to the approval of the rebuild and
1060 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
renew New York transportation bond act of 2005 by the voters at the
general election to be held in November of 2005 (17030514) (53297)
... 15,000,000 ...................................... (re. $863,000)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew (Bondable) - 30000
Canals and Waterways Purpose
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: the canal system and appurtenances thereto; moveable bridges
that cross over the canal system; and pedestrian and/or bicycle
trails, pathways and bridges serving transportation needs. Costs may
include highways and bridges either on or off the state highway
system necessary or reasonably expected to be necessary as a project
component or incidental to projects otherwise authorized herein and
by the rebuild and renew New York transportation bond act of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects, and to the canal corporation for the cost of the engineer-
ing services of the corporation or the thruway authority, including
fringe benefits, and the contract services provided by private
firms, for activities including but not limited to the preparation
of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing and
environmental impact statements for transportation projects.
For the payment of liabilities incurred prior to April 1, 2009
(17020916) (53296) ... 10,000,000 ................. (re. $8,852,000)
By chapter 55, section 1, of the laws of 2008:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: the canal system and appurtenances thereto; moveable bridges
that cross over the canal system; and pedestrian and/or bicycle
trails, pathways and bridges serving transportation needs. Costs may
1061 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
include highways and bridges either on or off the state highway
system necessary or reasonably expected to be necessary as a project
component or incidental to projects otherwise authorized herein and
by the rebuild and renew New York transportation bond act of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects, and to the canal corporation for the cost of the engineer-
ing services of the corporation or the thruway authority, including
fringe benefits, and the contract services provided by private
firms, for activities including but not limited to the preparation
of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing and
environmental impact statements for transportation projects.
For the payment of liabilities incurred prior to April 1, 2008
(17020816) (53296) ... 10,000,000 ................. (re. $2,383,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: the canal system and appurtenances thereto; moveable bridges
that cross over the canal system; and pedestrian and/or bicycle
trails, pathways and bridges serving transportation needs. Costs may
include highways and bridges either on or off the state highway
system necessary or reasonably expected to be necessary as a project
component or incidental to projects otherwise authorized herein and
by the rebuild and renew New York transportation bond act of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects, and to the canal corporation for the cost of the engineer-
ing services of the corporation or the thruway authority, including
fringe benefits, and the contract services provided by private
firms, for activities including but not limited to the preparation
of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing and
environmental impact statements for transportation projects.
1062 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the payment of liabilities incurred prior to April 1, 2007
(17020716) (53296) ... 10,000,000 ................. (re. $4,054,000)
By chapter 55, section 1, of the laws of 2006:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: the canal system and appurtenances thereto; moveable bridges
that cross over the canal system; and pedestrian and/or bicycle
trails, pathways and bridges serving transportation needs. Costs may
include highways and bridges either on or off the state highway
system necessary or reasonably expected to be necessary as a project
component or incidental to projects otherwise authorized herein and
by the rebuild and renew New York transportation bond act of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects, and to the canal corporation for the cost of the engineer-
ing services of the corporation or the thruway authority, including
fringe benefits, and the contract services provided by private
firms, for activities including but not limited to the preparation
of designs, plans, specifications and estimates; construction
management and supervision; and appraisals, surveys, testing and
environmental impact statements for transportation projects.
For the payment of liabilities incurred prior to April 1, 2006
(17020616) (53296) ... 10,000,000 ................... (re. $850,000)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew (Bondable) - 30000
Highway Facilities Purpose
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: state highways, bridges and parkways; border crossing enhance-
ments either on or off the state highway system; and the improvement
and/or elimination of highway-railroad grade crossings either on or
off the state highway system.
1063 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
For the payment of liabilities incurred prior to April 1, 2009
(17010911) (53295) ... 168,600,000 ................ (re. $3,279,000)
By chapter 55, section 1, of the laws of 2008:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: state highways, bridges and parkways; border crossing enhance-
ments either on or off the state highway system; and the improvement
and/or elimination of highway-railroad grade crossings either on or
off the state highway system.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
For the payment of liabilities incurred prior to April 1, 2008
(17010811) (53295) ... 275,000,000 ................ (re. $1,774,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: state highways, bridges and parkways; border crossing enhance-
ments either on or off the state highway system; and the improvement
and/or elimination of highway-railroad grade crossings either on or
off the state highway system.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
1064 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
For the payment of liabilities incurred prior to April 1, 2007
(17010711) (53295) ... 290,000,000 ................ (re. $4,944,000)
By chapter 55, section 1, of the laws of 2006:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: state highways, bridges and parkways; border crossing enhance-
ments either on or off the state highway system; and the improvement
and/or elimination of highway-railroad grade crossings either on or
off the state highway system.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
projects.
For the payment of liabilities incurred prior to April 1, 2006
(17010611) (53295) ... 235,000,000 ................ (re. $1,030,000)
By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
section 1, of the laws of 2006:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: state highways, bridges and parkways; border crossing enhance-
ments either on or off the state highway system; and the improvement
and/or elimination of highway-railroad grade crossings either on or
off the state highway system.
For engineering services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms, including, but not limited to, the preparation of
designs, plans, specifications and estimates; construction manage-
ment and supervision; and appraisals, surveys, testing and environ-
mental impact statements for transportation projects.
1065 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For capital project management and traffic and safety, including
personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms.
For real estate services, including personal services, nonpersonal
services, fringe benefits and the contract services provided by
private firms.
No part of this appropriation shall be made available for the payment
of liabilities incurred prior to the approval of the rebuild and
renew New York transportation bond act of 2005 by the voters at the
general election to be held in November of 2005 (17010511) (53295)
... 170,000,000 ................................... (re. $2,512,000)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew (Bondable) - 30000
Mass Transit Purpose
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation, including the acquisition of real property
and interests therein required or expected to be required in
connection therewith, of: omnibus, mass transit and rapid transit
systems, facilities and equipment, including facilities used jointly
by commuter railroad companies and freight railroad companies, but
otherwise exclusive of those operated by or under the jurisdiction
of the metropolitan transportation authority and its subsidiaries,
the New York City transit authority and its subsidiaries and the
Triborough bridge and tunnel authority; intermodal passenger facili-
ties and equipment; and marine terminals and marine transportation
facilities exclusive of those under the jurisdiction of the port
authority of New York and New Jersey or the canal corporation.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2009
(170509MT) (53299) ... 10,000,000 ................. (re. $2,423,000)
By chapter 55, section 1, of the laws of 2008:
1066 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation, including the acquisition of real property
and interests therein required or expected to be required in
connection therewith, of: omnibus, mass transit and rapid transit
systems, facilities and equipment, including facilities used jointly
by commuter railroad companies and freight railroad companies, but
otherwise exclusive of those operated by or under the jurisdiction
of the metropolitan transportation authority and its subsidiaries,
the New York City transit authority and its subsidiaries and the
Triborough bridge and tunnel authority; intermodal passenger facili-
ties and equipment; and marine terminals and marine transportation
facilities exclusive of those under the jurisdiction of the port
authority of New York and New Jersey or the canal corporation.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2008
(170508MT) (53299) ... 10,000,000 ................. (re. $4,660,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation, including the acquisition of real property
and interests therein required or expected to be required in
connection therewith, of: omnibus, mass transit and rapid transit
systems, facilities and equipment, including facilities used jointly
by commuter railroad companies and freight railroad companies, but
otherwise exclusive of those operated by or under the jurisdiction
of the metropolitan transportation authority and its subsidiaries,
the New York City transit authority and its subsidiaries and the
Triborough bridge and tunnel authority; intermodal passenger facili-
ties and equipment; and marine terminals and marine transportation
facilities exclusive of those under the jurisdiction of the port
authority of New York and New Jersey or the canal corporation.
Costs may include highways and bridges either on or off the state
1067 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2007
(170507MT) (53299) ... 10,000,000 ................... (re. $975,000)
By chapter 55, section 1, of the laws of 2006:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation, including the acquisition of real property
and interests therein required or expected to be required in
connection therewith, of: omnibus, mass transit and rapid transit
systems, facilities and equipment, including facilities used jointly
by commuter railroad companies and freight railroad companies, but
otherwise exclusive of those operated by or under the jurisdiction
of the metropolitan transportation authority and its subsidiaries,
the New York City transit authority and its subsidiaries and the
Triborough bridge and tunnel authority; intermodal passenger facili-
ties and equipment; and marine terminals and marine transportation
facilities exclusive of those under the jurisdiction of the port
authority of New York and New Jersey or the canal corporation.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2006
(170506MT) (53299) ... 10,000,000 ................. (re. $2,750,000)
By chapter 55, section 1, of the laws of 2005:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
1068 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, acquisition, construction,
reconstruction, replacement, improvement, reconditioning, rehabili-
tation and preservation, including the acquisition of real property
and interests therein required or expected to be required in
connection therewith, of: omnibus, mass transit and rapid transit
systems, facilities and equipment, including facilities used jointly
by commuter railroad companies and freight railroad companies, but
otherwise exclusive of those operated by or under the jurisdiction
of the metropolitan transportation authority and its subsidiaries,
the New York City transit authority and its subsidiaries and the
Triborough bridge and tunnel authority; intermodal passenger facili-
ties and equipment; and marine terminals and marine transportation
facilities exclusive of those under the jurisdiction of the port
authority of New York and New Jersey or the canal corporation. Costs
may include highways and bridges either on or off the state highway
system necessary or reasonably expected to be necessary as a project
component or incidental to projects otherwise authorized herein and
by the rebuild and renew New York transportation bond act of 2005.
For engineering services of the department of transportation, includ-
ing personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms, including, but not
limited to, the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion.
No part of this appropriation shall be made available for the payment
of liabilities incurred prior to the approval of the rebuild and
renew New York transportation bond act of 2005 by the voters at the
general election to be held in November of 2005 (170505MT) (53299)
... 10,000,000 .................................... (re. $2,750,000)
Capital Projects Funds - Other
Capital Projects Fund - Rebuild and Renew (Bondable) - 30000
Rail and Port Purpose
By chapter 55, section 1, of the laws of 2009:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: intercity passenger rail and freight rail facilities and equip-
ment; ports, marine terminals and marine transportation facilities
exclusive of those under the jurisdiction of the port authority of
New York and New Jersey or the canal corporation; and intermodal
passenger and freight facilities and equipment.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
1069 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2009
(17040915) (53298) ... 27,000,000 ................. (re. $1,902,000)
By chapter 55, section 1, of the laws of 2008:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: intercity passenger rail and freight rail facilities and equip-
ment; ports, marine terminals and marine transportation facilities
exclusive of those under the jurisdiction of the port authority of
New York and New Jersey or the canal corporation; and intermodal
passenger and freight facilities and equipment.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2008
(17040815) (53298) ... 27,000,000 ................... (re. $965,000)
By chapter 55, section 1, of the laws of 2007:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: intercity passenger rail and freight rail facilities and equip-
ment; ports, marine terminals and marine transportation facilities
1070 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
exclusive of those under the jurisdiction of the port authority of
New York and New Jersey or the canal corporation; and intermodal
passenger and freight facilities and equipment.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2007
(17040715) (53298) ... 27,000,000 ................. (re. $1,081,000)
By chapter 55, section 1, of the laws of 2006:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: intercity passenger rail and freight rail facilities and equip-
ment; ports, marine terminals and marine transportation facilities
exclusive of those under the jurisdiction of the port authority of
New York and New Jersey or the canal corporation; and intermodal
passenger and freight facilities and equipment.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For payment of engineering services, including reimbursements to the
dedicated highway and bridge trust fund of the department of trans-
portation, including but not limited to personal services, nonper-
sonal services, fringe benefits, and the contract services provided
by private firms, for activities including but not limited to the
preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation.
For the payment of liabilities incurred prior to April 1, 2006
(17040615) (53298) ... 27,000,000 ................... (re. $420,000)
By chapter 55, section 1, of the laws of 2005:
For the costs, pursuant to the provisions of the rebuild and renew New
York transportation bond act of 2005 and article 22 of the transpor-
tation law, of capital projects to be reimbursed from bond fund
1071 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
proceeds for the planning and design, construction, reconstruction,
replacement, improvement, reconditioning, rehabilitation and preser-
vation, including the acquisition of real property and interests
therein required or expected to be required in connection therewith,
of: intercity passenger rail and freight rail facilities and equip-
ment; ports, marine terminals and marine transportation facilities
exclusive of those under the jurisdiction of the port authority of
New York and New Jersey or the canal corporation; and intermodal
passenger and freight facilities and equipment.
Costs may include highways and bridges either on or off the state
highway system necessary or reasonably expected to be necessary as a
project component or incidental to projects otherwise authorized
herein and by the rebuild and renew New York transportation bond act
of 2005.
For engineering services of the department of transportation, includ-
ing personal services, nonpersonal services, fringe benefits and the
contract services provided by private firms, including, but not
limited to, the preparation of designs, plans, specifications and
estimates; construction management and supervision; and appraisals,
surveys, testing and environmental impact statements for transporta-
tion.
The funds made available through this appropriation shall be utilized
for the payment of the costs of eligible projects in accordance with
a memorandum of understanding entered into between the governor, the
majority leader of the senate and the speaker of the assembly, or
their designees, pursuant to article 22 of the transportation law.
No part of this appropriation shall be made available for the payment
of liabilities incurred prior to the approval of the rebuild and
renew New York transportation bond act of 2005 by the voters at the
general election to be held in November of 2005 (17040515) (53298)
... 27,000,000 ...................................... (re. $703,000)
TRANSPORTATION INFRASTRUCTURE RENEWAL BOND FUND (CCP)
Capital Projects Funds - Other
Transportation Infrastructure Renewal Bond Fund
Transportation Infrastructure Renewal Bond Fund Account - 30660
Bond Proceeds Purpose
By chapter 54, section 1, of the laws of 1993, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $810,000, or so much thereof as may be necessary, is hereby
appropriated from the transportation infrastructure renewal fund as
established by section 74 of the state finance law in accordance
with the provisions of section 7 of chapter 836 of the laws of 1983
for payment, notwithstanding the provisions of any law, to the capi-
tal projects fund, in order to reimburse such fund for disbursements
certified by the state comptroller as bondable under the provisions
of the rebuild New York through transportation infrastructure
renewal bond act of 1983 for payment from the port, marine terminal,
canal and waterway account.
1072 12554-05-3
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The director of the budget is hereby authorized to designate to the
state comptroller specific appropriations made from the capital
projects fund for purposes for which transportation infrastructure
renewal fund expenditures are authorized. The state comptroller
shall at the commencement of each month certify to the director of
the budget, the chairman of the senate finance committee, and the
chairman of the assembly ways and means committee, the amounts
disbursed from the appropriations so designated by the director of
the budget from the capital projects fund for such purposes for the
month preceding such certification and such certification shall not
exceed in the aggregate the moneys hereby appropriated. A copy of
each such certificate shall also be delivered to state departments
and agencies to which such capital projects fund appropriations are
made available.
Notwithstanding the provisions of any general or special law, no
moneys shall be available from the transportation infrastructure
renewal fund until a certificate of approval of availability shall
have been issued by the director of the budget, and a copy of such
certificate of approval filed with the state comptroller, the chair-
man of the senate finance committee and the chairman of the assembly
ways and means committee. Such certificate may be amended from time
to time by the director of the budget, and a copy of each such
amendment shall be filed with the state comptroller, the chairman of
the senate finance committee and the chairman of the assembly ways
and means committee (71119310) (80922) ... 810,000 .. (re. $637,000)
By chapter 54, section 1, of the laws of 1989, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $2,800,000, or so much thereof as may be necessary, is
hereby appropriated from the transportation infrastructure renewal
fund as established by section 74 of the state finance law in
accordance with the provisions of section 7 of chapter 836 of the
laws of 1983 for payment, notwithstanding the provisions of any law,
to the capital projects fund, in order to reimburse such funds for
disbursements certified by the state comptroller as bondable under
the provisions of the rebuild New York through transportation
infrastructure renewal bond act of 1983 (71A58910) (80922) .........
2,800,000 ......................................... (re. $2,800,000)
By chapter 54, section 1, of the laws of 1988, as amended by chapter 55,
section 1, of the laws of 1996:
The sum of $116,580,000 or so much thereof as may be necessary, is
hereby appropriated from the transportation infrastructure renewal
bond fund as established by section 74 of the state finance law in
accordance with the provisions of section 7 of chapter 836 of the
laws of 1983 for payment, notwithstanding the provisions of any law,
to the capital projects fund, in order to reimburse such funds for
disbursements certified by the state comptroller as bondable under
the provisions of the rebuild New York through transportation
infrastructure renewal bond act of 1983 (71A58810) (80922) .........
116,580,000 ...................................... (re. $25,712,000)
1073 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,177,270,000 8,344,791,000
Capital Projects Funds - Federal ... 0 1,145,000,000
---------------- ----------------
All Funds ........................ 1,177,270,000 9,489,791,000
================ ================
ECONOMIC DEVELOPMENT (CCP) ............................... 1,177,270,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
Notwithstanding any inconsistent provision
of law, for services and expenses, loans,
grants, and costs associated with program
administration, of projects and purposes
authorized below, including the payment of
liabilities incurred prior to April 1,
2023. All or a portion of the funds appro-
priated hereby may be suballocated or
transferred to any department, agency, or
public authority, according to the follow-
ing:
The sum of $2,270,000 is hereby appropriated
for services and expenses related to the
retention of professional football in
Western New York (91032309) (47322) .......... 2,270,000
The sum of $8,000,000 is hereby appropriated
for services and expenses, loans, and
grants, related to the market New York
program, including but not limited to,
projects that enhance or promote regional
attractions in the state of New York
(91362309) (47007) ........................... 8,000,000
The sum of $400,000,000 is hereby appropri-
ated for the New York Works Economic
Development Fund. Funds appropriated here-
in shall be for services and expenses,
loans, and grants, related to the New York
Works Economic Development Fund (91102309)
(47006) .................................... 400,000,000
The sum of $150,000,000 is hereby appropri-
ated for the regional economic development
council initiative. Funding will be pursu-
ant to a plan developed by the chief exec-
1074 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2023-24
utive officer of the New York state urban
development corporation and based in part
on a competitive selection process among
the regional economic development councils
and will support initiatives based on
anticipated economic development benefits.
Such moneys will be awarded by the New
York state urban development corporation
at its discretion (91142309) (47009) ....... 150,000,000
The sum of $5,000,000 is hereby appropriated
for services and expenses for the Pace
University Performing Arts Center. Funds
appropriated herein shall be for, includ-
ing but not limited to, the acquisition of
real property, preparation of plans,
design, construction, renovation, adminis-
tration, and other costs incidental there-
to (91982309) (58012) ........................ 5,000,000
The sum of $150,000,000 is hereby appropri-
ated for services and expenses of the
restore New York's communities initiative
pursuant to section 16-n of the New York
state urban development corporation act;
provided however, notwithstanding any law
to the contrary, that such allocation and
distribution is subject to the approval by
the director of the budget of a plan for
such program submitted by the administer-
ing department, agency, or public authori-
ty (91412309) (85513) ...................... 150,000,000
The sum of $5,000,000 is hereby appropriated
for services and expenses for the American
LGBTQ+ Museum ................................ 5,000,000
The sum of $2,000,000 is hereby appropriated
for services and expenses for the Center
for Dance Training ........................... 2,000,000
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
New York Racing Capital Improvement Fund
Economic Development Purpose
The sum of $455,000,000 is hereby appropri-
ated for services and expenses, loans,
grants and costs related to the renovation
of Belmont park racetrack. Funds appropri-
ated herein shall be for, including but
not limited to, the acquisition of real
property, preparation of plans, design,
construction, renovation, demolition of
existing facilities, and other improve-
ments and costs incidental thereto,
1075 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2023-24
including the payment of liabilities
incurred prior to April 1, 2023; provided
however, notwithstanding any provision of
law to the contrary, no portion of the
funds appropriated herein shall be made
available for expenditure until the fran-
chised corporation, pursuant to section
206 of the racing, pari-mutuel wagering
and breeding law, has entered into a
repayment agreement with the director of
the budget providing for repayment of
state funds expended from this appropri-
ation in accordance with the terms of such
repayment agreement. All or a portion of
the funds appropriated hereby may be
suballocated or transferred to any depart-
ment, agency, or public authority
(91BM2309) ................................. 455,000,000
1076 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ECONOMIC DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 54, section 1, of the laws of 2022:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2022. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,204,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91032209) (47322) ... 2,204,000 ................. (re. $1,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
regional attractions in the state of New York (91362209) (47007) ...
8,000,000 ......................................... (re. $8,000,000)
The sum of $320,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91102209) (47006) .................
320,000,000 ..................................... (re. $320,000,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91142209)
(47009) ... 150,000,000 ......................... (re. $150,000,000)
The sum of $250,000,000 is hereby appropriated for services and
expenses of the restore New York's communities initiative pursuant
to section 16-n of the New York state urban development corporation
act; provided however, notwithstanding any law to the contrary, that
such allocation and distribution is subject to the approval by the
director of the budget of a plan for such program submitted by the
administering department, agency, or public authority (91412209)
(85513) ... 250,000,000 ......................... (re. $250,000,000)
The sum of $300,000,000 is hereby appropriated for investment in
broadband infrastructure, access, and affordability under the
ConnectAll Initiative. Funds appropriated herein shall be for
services and expenses, grants, costs of program administration and
other contractual obligations, including but not limited to invest-
ment in infrastructure to provide high-speed internet access to
municipalities, rural broadband deployment, right-of-way access,
last-mile and middle-mile support, cellular siting, digital equity,
1077 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
connectivity innovation, local connectivity planning, costs of the
office of connectivity, and other costs incidental thereto, includ-
ing the payment of liabilities incurred prior to April 1, 2022.
Funds appropriated herein shall also be available to meet match
requirements under the Infrastructure Investment and Jobs Act, Amer-
ican Rescue Plan Act, or any other required match to access federal
funds. Funding will be pursuant to a program and spending plan
developed by the New York state urban development corporation and
subject to the approval of the director of the budget (91472209)
(58004) ... 300,000,000 ......................... (re. $290,000,000)
The sum of $800,000,000 is hereby appropriated for the New York State
Regional Economic and Community Assistance Program. Funds appropri-
ated herein shall be for services and expenses, grants, and costs of
program administration, including but not limited to projects,
purposes, and other initiatives that foster regional workforce and
commercial development, tourism and infrastructure improvement,
community and urban revitalization, small business support, local
community priority projects, and other economic development
purposes. Funds shall be available for, but not limited to the
acquisition of real property, preparation of plans, design,
construction, renovation, purchase and installation of equipment,
costs associated with program implementation and other costs inci-
dental thereto (91482209) (58005) ..................................
800,000,000 ..................................... (re. $800,000,000)
The sum of $500,000,000 is hereby appropriated for services and
expenses, loans, grants, and other costs related to the development
of offshore wind ports, manufacturing, supply chain infrastructure,
and other related improvements and expenses needed to advance the
offshore wind industry (91162209) (58006) ..........................
500,000,000 ..................................... (re. $500,000,000)
The sum of $350,000,000 is hereby appropriated for the Long Island
Investment Fund for projects located within Nassau and Suffolk coun-
ties. Funds appropriated herein shall be available for services and
expenses, loans, grants, and costs of program administrations
related to purposes that may include, but not be limited to, support
of manufacturing, agriculture, business parks, community anchor
facilities, advanced technology, biotechnology and biomedical facil-
ities, and main street revitalization. All or a portion of the funds
may be suballocated or transferred to any department, agency, or
public authority (91632209) (58010) ................................
350,000,000 ..................................... (re. $350,000,000)
The sum of $10,000,000 is hereby appropriated for services and
expenses for the Mohawk Harbor Events Center. Funds appropriated
herein shall be for, including but not limited to, the acquisition
of real property, preparation of plans, design, construction, reno-
vation, administration, and other costs incidental thereto
(91992209) (58011) ... 10,000,000 ................ (re. $10,000,000)
The sum of $5,000,000 is hereby appropriated for services and expenses
for the Pace University Performing Arts Center. Funds appropriated
herein shall be for, including but not limited to, the acquisition
of real property, preparation of plans, design, construction, reno-
1078 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
vation, administration, and other costs incidental thereto
(91982209) (58012) ... 5,000,000 .................. (re. $5,000,000)
The sum of $20,000,000 is hereby appropriated for services and
expenses for the Syracuse University Carrier Dome. Funds appropri-
ated herein shall be for, including but not limited to, the acquisi-
tion of real property, preparation of plans, design, construction,
renovation, administration, and other costs incidental thereto
(91972209) (58013) ... 20,000,000 ................ (re. $20,000,000)
The sum of $11,000,000 is hereby appropriated for services and
expenses for the Universal Hip Hop Museum. Funds appropriated herein
shall be for, including but not limited to, the acquisition of real
property, preparation of plans, design, construction, renovation,
administration, and other costs incidental thereto (91962209)
(58014) ... 11,000,000 ........................... (re. $11,000,000)
The sum of $10,000,000 is hereby appropriated for services and
expenses for the New York Hall of Science. Funds appropriated herein
shall be for, including but not limited to, the acquisition of real
property, preparation of plans, design, construction, renovation,
administration, and other costs incidental thereto (91952209)
(58015) ... 10,000,000 ........................... (re. $10,000,000)
The sum of $182,000,000 is hereby appropriated for services and
expenses for athletic facilities related to professional football in
Orchard Park, New York. Funds appropriated herein shall be for,
including but not limited to, the acquisition of real property,
preparation of plans, design, construction, renovation, demolition
of existing facilities, and other improvements and costs incidental
thereto, including the costs of program administration and the
payment of liabilities incurred prior to April 1, 2022; provided
however, that the release of such funds shall be subject to the
terms of a memorandum of understanding and associated contractual
agreements and any ancillary documents between the Erie County
Stadium Corporation and the lessee of such athletic facilities, for
no less than thirty years. All or a portion of the funds appropri-
ated hereby may be suballocated or transferred to any department,
agency, or public authority (91BB2209) (58016) .....................
182,000,000 ..................................... (re. $182,000,000)
By chapter 54, section 1, of the laws of 2021:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2021. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,431,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91032109) (47322) ... 2,431,000 ............... (re. $287,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
1079 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
regional attractions in the state of New York (91362109) (47007) ...
8,000,000 ......................................... (re. $8,000,000)
The sum of $220,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91102109) (47006) .................
220,000,000 ..................................... (re. $214,627,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91142109)
(47009) ... 150,000,000 ......................... (re. $148,000,000)
By chapter 54, section 1, of the laws of 2020:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2020. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,357,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91032009) (47322) ... 2,357,000 ............... (re. $272,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
regional attractions in the state of New York (91362009) (47007) ...
8,000,000 ......................................... (re. $8,000,000)
The sum of $220,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91102009) (47006) .................
220,000,000 ..................................... (re. $179,965,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91142009)
(47009) ... 150,000,000 ......................... (re. $150,000,000)
By chapter 54, section 1, of the laws of 2019:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
1080 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
payment of liabilities incurred prior to April 1, 2019. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,331,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91031909) (47322) ... 2,331,000 ............... (re. $206,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
regional attractions in the state of New York (91361909) (47007) ...
8,000,000 ......................................... (re. $7,750,000)
The sum of $220,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91101909) (47006) .................
220,000,000 ..................................... (re. $214,391,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91141909)
(47009) ... 150,000,000 ......................... (re. $143,894,000)
The sum of $325,000,000 is hereby appropriated for the High Technology
Innovation and Economic Development Infrastructure Program. Funds
appropriated herein shall be for services and expenses, loans,
grants and costs of program administration, including but not limit-
ed to projects, purposes and other initiatives that foster research
and development of innovative technologies, leverage private invest-
ment in advanced science and technology economic development initi-
atives, infrastructure, manufacturing, and other economic develop-
ment initiatives that leverage private investment in regional
projects that create or retain jobs. Funds shall be available for,
but not limited to the acquisition of real property, preparation of
plans, design, construction, renovation, purchase and installation
of equipment, costs associated with program implementation and other
costs incidental thereto, including the payment of liabilities
incurred prior to April 1, 2019. All or a portion of this appropri-
ation may be suballocated or transferred to any department, agency,
or public authority (91191909) (47022) .............................
325,000,000 ...................................... (re. $45,001,000)
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
The sum of $500,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund, provided that up to $425,000,000
shall be available from this appropriation for the construction of
1081 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
an entrance to Pennsylvania Station at the southwest corner of the
intersection of West 33rd Street and 7th Avenue and other related
improvements and expenses (91161909) (85528) .......................
500,000,000 ...................................... (re. $96,100,000)
By chapter 54, section 1, of the laws of 2018:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2018. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,305,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91031809) (47322) ... 2,305,000 ............... (re. $177,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
regional attractions in the state of New York (91361809) (47007) ...
8,000,000 ......................................... (re. $7,615,000)
The sum of $200,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91131809) (47006) .................
200,000,000 ..................................... (re. $198,960,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91151809)
(47009) ... 150,000,000 ......................... (re. $126,054,000)
The appropriation made by chapter 54, section 1, of the laws of 2017, as
amended by chapter 54, section 1, of the laws of 2022, is hereby
amended and reappropriated to read:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2017. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $2,278,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91031709) (47322) ... 2,278,000 ............... (re. $168,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
1082 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
regional attractions in the state of New York (91361709) (47007) ...
8,000,000 ......................................... (re. $6,443,000)
The sum of $200,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91401709) (47006) .................
200,000,000 ...................................... (re. $38,823,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91191709)
(47009) ... 150,000,000 ......................... (re. $117,537,000)
The sum of $10,000,000 is hereby appropriated for services and
expenses related to the cultural, arts and public spaces fund,
including, but not limited to, projects that enhance or promote
business development and increase tourism. All or a portion of the
funds appropriated hereby may be suballocated or transferred to the
New York state council on the arts (91351709) (85502) ..............
10,000,000 ........................................ (re. $4,207,000)
The sum of $108,000,000 is hereby appropriated for services and
expenses, loans, grants, and costs associated with the redevelopment
of the Kingsbridge armory in Bronx County (91231709) (85503) .......
108,000,000 ..................................... (re. $100,500,000)
The sum of $70,000,000 is hereby appropriated for services and
expenses of the restore New York's communities initiative pursuant
to section 16-n of the New York state urban development corporation
act; provided however, notwithstanding any law to the contrary, that
such allocation and distribution is subject to the approval by the
director of the budget of a plan for such program submitted by the
administering department, agency, or public authority (91411709)
(85513) ... 70,000,000 ........................... (re. $23,419,000)
The sum of $20,000,000 is hereby appropriated for the acquisition of
heavy equipment utilized for snow and ice control on state highways
and bridges, including but not limited to the acquisition and
installation of equipment incidental thereto. All or a portion of
the funds appropriated hereby may be suballocated or transferred to
any department, agency, or public authority (91451709) (85514) .....
20,000,000 ....................................... (re. $20,000,000)
The sum of $65,000,000 is hereby appropriated for services and
expenses, loans, grants, and costs associated with economic develop-
ment and infrastructure projects, provided however that up to
$45,000,000 shall be available from this appropriation for reno-
vations to LIRR stations, including but no limited to Great Neck,
Valley Stream, Merrick, Bellmore, Baldwin, Deer Park, Syosset,
Northport and Stoney Brook. In addition, up to $20,000,000 shall be
available from this appropriation for the LIRR Brookhaven connection
project. All or a portion of the funds appropriated hereby may be
1083 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
suballocated or transferred to any department, agency, or public
authority (91461709) (85515) ... 65,000,000 ...... (re. $65,000,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2022:
Notwithstanding any inconsistent provision of law, for services and
expenses, loans, grants, and costs associated with program adminis-
tration, of projects and purposes authorized below, including the
payment of liabilities incurred prior to April 1, 2016. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority, accord-
ing to the following:
The sum of $685,500,000 is hereby appropriated for services and
expenses of high technology manufacturing projects in Chautauqua and
Erie County including, notwithstanding anything in law to the
contrary, the reimbursement of expenditures for high technology
manufacturing projects in Chautauqua County appropriated herein made
from an appropriation made by chapter 55, section 1, of the laws of
2016 for state and municipal facilities (91061609) (47020) .........
685,500,000 ...................................... (re. $46,409,000)
The sum of $638,000,000 is hereby appropriated for services and
expenses of economic development projects at Nano Utica and at other
locations in Oneida County (91041609) (47008) ......................
638,000,000 ..................................... (re. $276,524,000)
The sum of $125,000,000 is hereby appropriated for services and
expenses of an industrial scale research and development facility
operated by SUNY Polytechnic Institute Colleges of Nanoscale Science
and Engineering in Clinton County (91141609) (47012) ...............
125,000,000 ......................................... (re. $128,000)
The sum of $15,000,000 is hereby appropriated for the NY SUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 350 of the education law. NY
SUNY 2020 plans shall be developed in consultation with the regional
economic development councils and funding will be subject to the
approval of a NY SUNY 2020 plan or plans by the governor and the
chancellor of the state university of New York. The determination of
grant awards shall take into consideration the extent to which
plans: (1) use technology, including but not limited to the expan-
sion of on-line learning, to improve academic success and job oppor-
tunities for students; (2) leverage economic and academic opportu-
nities through the START-UP NY program; and (3) provide experiential
learning opportunities that connect students to the workforce;
provided further, a portion of the funds appropriated herein may be
utilized to complete existing NY SUNY 2020 projects at the universi-
ty at Buffalo and Stony Brook university (91111609) (47329) ...
15,000,000 ....................................... (re. $15,000,000)
The sum of $25,000,000 is hereby appropriated for the NY CUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 6202 of the education law. NY
CUNY 2020 plans shall be developed in consultation with the regional
1084 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
economic development councils and funding will be subject to the
approval of a NY CUNY 2020 plan or plans by the governor and the
chancellor of the city university of New York. The determination of
grant awards shall take into consideration the extent to which
plans: (1) use technology, including but not limited to the expan-
sion of on-line learning, to improve academic success and job oppor-
tunities for students; (2) leverage economic and academic opportu-
nities through the START-UP NY program; and (3) provide experiential
learning opportunities that connect students to the workforce
(91121609) (47320) ... 25,000,000 ................ (re. $25,000,000)
The sum of $2,251,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York (91031609) (47322) ... 2,251,000 ............... (re. $141,000)
The sum of $8,000,000 is hereby appropriated for services and
expenses, loans, and grants, related to the market New York program,
including but not limited to, projects that enhance or promote
regional attractions in the state of New York (91201609) (47007) ...
8,000,000 ......................................... (re. $5,758,000)
The sum of $199,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund (91011609) (47006) .................
199,000,000 ...................................... (re. $66,170,000)
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funding will be pursuant to
a plan developed by the chief executive officer of the New York
state urban development corporation and based in part on a compet-
itive selection process among the regional economic development
councils and will support initiatives based on anticipated economic
development benefits. Such moneys will be awarded by the New York
state urban development corporation at its discretion (91191609)
(47009) ... 150,000,000 .......................... (re. $97,334,000)
The sum of $30,000,000 is hereby appropriated for additional upstate
revitalization initiative projects. Funds appropriated herein shall
be for services and expenses, loans, grants, workforce development,
business and tourism plan development, costs associated with program
administration, and the payment of personal services, nonpersonal
services and contract services provided by private firms to support
economic development projects. Funding will be pursuant to a plan
developed by the chief executive officer of the New York state urban
development corporation and will support initiatives based on antic-
ipated job creation and economic development benefits. Funds shall
not be available from this appropriation for projects within regions
that were Upstate Revitalization Initiative 2015 Best Plan Awardees
or eligible to receive funding from the Buffalo Regional Innovation
Cluster Program. Such moneys will be awarded by the New York state
urban development corporation at its discretion (91161609) (47013)
... 30,000,000 ................................... (re. $13,806,000)
The sum of $20,000,000 is hereby appropriated for services and
expenses of Oakdale merge on Sunrise Highway (NYS Rte. 27 and NYS
Rte. 27-A over the Connetquot River) to conduct a multi-year study
and complete the process of widening bridges and roads to accommo-
1085 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
date traffic flow. All or a portion of the funds appropriated hereby
may be suballocated or transferred to any department, agency, or
public authority (91211609) (47021) ................................
20,000,000 ....................................... (re. $20,000,000)
By chapter 55, section 1, of the laws of 2007:
For services and expenses of redevelopment initiatives at the Harriman
Research and Technology Park (91030709) (47371) ....................
7,500,000 ......................................... (re. $5,562,000)
Cornell University College of Veterinary Medicine
By chapter 54, section 1, of the laws of 2015:
The sum of $19,000,000 is hereby appropriated for services and
expenses of the cornell university college of veterinary medicine,
including the payment of liabilities incurred prior to April 1,
2015. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91051509) (42040) ... 19,000,000 ......... (re. $766,000)
Downstate Regional Projects
By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
section 5, of the laws of 2008:
The sum of $35,000,000 is hereby appropriated for downstate regional
projects including but not limited to those listed in the schedule
below, subject to a plan submitted by the chairman of the New York
state urban development corporation and approved by the director of
the budget. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91090809) (47365) ... 35,000,000 ....... (re. $5,126,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
SUNY Stony Brook Energy
Research Center ............... 10,000,000
Lower Hudson Valley Infras-
tructure and Waterfront
Development ................... 10,000,000
Cold Spring Harbor Laboratory .... 5,000,000
Hudson Valley Solar Energy
Consortium ..................... 5,000,000
Hudson Valley Semiconductor
Manufacturing .................. 5,000,000
--------------
Total ....................... 35,000,000
==============
Downstate Revitalization Fund
1086 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
section 5, of the laws of 2008:
The sum of $35,000,000 is hereby appropriated for the downstate revi-
talization fund, as authorized pursuant to a chapter of the laws of
2008, and subject to a plan submitted by the chairman of the New
York state urban development corporation and approved by the direc-
tor of the budget. All or a portion of the funds appropriated hereby
may be suballocated or transferred to any department, agency, or
public authority (91010809) (47363) ................................
35,000,000 ........................................ (re. $6,020,000)
Economic and Community Development Projects
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $32,148,000 is hereby appropriated for the New York state
economic and community development program, as authorized pursuant
to a chapter of the laws of 2008, subject to a plan approved by the
director of the budget. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (91070809) (47366) .............................
32,148,000 ........................................ (re. $3,723,000)
Economic Development Fund
By chapter 54, section 1, of the laws of 2012, as transferred by chapter
54, section 1, of the laws of 2014:
For services and expenses of the empire state economic development
fund (91021209) (47003) ... 20,000,000 ........... (re. $15,198,000)
Economic Transformation Program
By chapter 54, section 1, of the laws of 2014:
The sum of $32,000,000 is hereby appropriated for the economic trans-
formation program. Funds appropriated herein shall be available for
services and expenses, loans, and grants. Funding will be used to
support initiatives, services and expenses of communities impacted
by the closure of New York state correctional and juvenile justice
facilities. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91041409) (47340) ... 32,000,000 ...... (re. $25,173,000)
Empire State Economic Development Fund
By chapter 54, section 1, of the laws of 2013:
The sum of $12,000,000 is hereby appropriated for services and
expenses of the empire state economic development fund, including
the payment of liabilities incurred prior to April 1, 2013. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91171309) (47373) ... 12,000,000 ................ (re. $12,000,000)
1087 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
NY 2020 Challenge Grant Program
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2022:
The sum of $25,000,000 is hereby appropriated for the NY SUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 350 of the education law. NY
SUNY 2020 plans shall be developed in consultation with the regional
economic development councils and funding will be subject to the
approval of a NY SUNY 2020 plan or plans by the governor and the
chancellor of the state university of New York. The determination of
grant awards shall take into consideration the extent to which
plans: (1) use technology, including but not limited to the expan-
sion of on-line learning, to improve academic success and job oppor-
tunities for students; (2) leverage economic and academic opportu-
nities through the START-UP NY program; and (3) provide experiential
learning opportunities that connect students to the workforce. All
or a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91111509) (47329) ... 25,000,000 ................ (re. $16,222,000)
By chapter 54, section 1, of the laws of 2014:
The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 350 of the education law. NY
SUNY 2020 plans shall be developed in consultation with the regional
economic development councils and funding will be subject to the
approval of a NY SUNY 2020 plan or plans by the governor and the
chancellor of the state university of New York. The determination of
grant awards shall take into consideration the extent to which
plans: (1) use technology, including but not limited to the expan-
sion of on-line learning, to improve academic success and job oppor-
tunities for students; (2) leverage economic and academic opportu-
nities through the START-UP NY program; and (3) provide experiential
learning opportunities that connect students to the workforce. All
or a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91111409) (47329) ... 55,000,000 ................ (re. $12,369,000)
NY-SUNY 2020 Challenge Grant Program
By chapter 54, section 1, of the laws of 2013:
The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 350 of the Education Law, except
that no funds shall be made available from this appropriation for
university centers as defined by subdivision 7 of section 350 of the
education law. NY SUNY 2020 plans shall be developed in consultation
with the regional economic development councils and funding will be
1088 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
subject to the approval of a NY SUNY 2020 plan or plans by the
governor and the chancellor of the state university of New York.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority
(91121309) (47329) ... 55,000,000 ................ (re. $20,508,000)
The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
challenge grant program, notwithstanding any inconsistent provision
of law, shall be available to all colleges, universities and commu-
nity colleges as defined by section 6202 of the Education Law. NY
CUNY 2020 plans shall be developed in consultation with the regional
economic development councils and funding will be subject to the
approval of a NY CUNY 2020 plan or plans by the governor and the
chancellor of the city university of New York. All or a portion of
the funds appropriated hereby may be suballocated or transferred to
any department, agency, or public authority (91131309) (47320)
55,000,000 ....................................... (re. $21,236,000)
By chapter 54, section 1, of the laws of 2012:
The sum of $80,000,000 is hereby appropriated for the NY-SUNY 2020
challenge grant program, as authorized pursuant to chapter 260 of
the laws of 2011. Funding will be subject to the approval of a
NY-SUNY 2020 plan or plans by the governor and the chancellor of the
state university of New York. All or a portion of the funds appro-
priated hereby may be suballocated or transferred to any department,
agency, or public authority (91121209) (47328) .....................
80,000,000 .......................................... (re. $773,000)
Nano Utica Project
By chapter 54, section 1, of the laws of 2014:
The sum of $180,000,000 is hereby appropriated for services and
expenses related to a nano Utica project, including the payment of
liabilities incurred prior to April 1, 2014. All or a portion of the
funds appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (91071409) (42041) .........
180,000,000 ..................................... (re. $120,000,000)
Onondaga County Revitalization Projects
By chapter 54, section 1, of the laws of 2014:
The sum of $30,000,000 is hereby appropriated for services and
expenses related to economic development and infrastructure improve-
ments that encourage the revitalization of Onondaga lake and its
surrounding communities, including the payment of liabilities
incurred prior to April 1, 2014. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (91021409) (44409) .........
30,000,000 ........................................ (re. $5,749,000)
Transformative Investment Program
1089 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
The sum of $400,000,000 is hereby appropriated for the payment, over a
multi-year period, of capital costs of regionally significant
economic development initiatives that create or retain private
sector jobs, including but not limited to those listed in the sched-
ule below. Funds shall not be available from this appropriation for
projects within regions that are eligible to receive funding from
the Upstate Revitalization Initiative or the Buffalo Regional Inno-
vation Cluster Program. Funds appropriated herein shall be available
for project costs, services, expenses, loans and grants that cata-
lyze private investment, grow commercial and residential tax bases
and enhance the environment and quality of life for New York State
residents. Investment purposes may include, but shall not be limited
to, support of manufacturing, agriculture, business parks, community
anchor facilities, county and local fairgrounds, advanced technolo-
gy, biotechnology and biomedical facilities, and main street revi-
talization. The portion of any such project funded by this appropri-
ation shall be no less than $5,000,000. The items shown in the
schedule below shall be for projects with a common purpose and may
be interchanged without limitation subject to the approval of the
director of the budget. All or a portion of the funds may be subal-
located or transferred to any department, agency, or public authori-
ty (91161509) (45618) ... 400,000,000 ........... (re. $320,914,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
NSLIJ, Feinstein Institute of
Medical Research: Center for
Bioelectronic Medicine
(CBEM) - Manhasset ............ 30,000,000
Hofstra University: School of
Engineering and Applied
Sciences (SEAS) ............... 25,000,000
Cold Spring Harbor Lab: Center
for Therapeutics Research
(CTR) ......................... 25,000,000
Commercialization and research
and development projects at
Stony Brook University
pursuant to a plan developed
by Stony Brook University
and submitted to the chief
executive officer of the New
York state urban development
corporation for approval ...... 75,000,000
Renovation and expansion of
MacArthur airport ............. 20,000,000
Smithtown Business District
Sewer Improvement Area ........ 20,000,000
1090 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Kings Park Waste Water Treat-
ment Facility ................. 20,000,000
Cryo-electron Microscopy
(CryoEM) facility at the
Brookhaven National Labora-
tory .......................... 15,000,000
Great Neck Water Pollution
Control District .............. 12,290,000
All other projects ............. 157,710,000
--------------
Total ...................... 400,000,000
==============
Upstate Agricultural Economic Development Fund
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $25,000,000 is hereby appropriated for the upstate agricul-
tural economic development fund, as authorized pursuant to a chapter
of the laws of 2008, subject to a plan submitted by the chairman of
the upstate empire state development corporation in consultation
with the commissioner of the department of agriculture and markets
and approved by the director of the budget. All or a portion of the
funds appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (91030809) (47361) .........
25,000,000 .......................................... (re. $291,000)
Upstate City-by-City Projects
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $22,037,000 is hereby appropriated for upstate city-by-city
projects subject to a plan submitted by the chairman of the upstate
empire state development corporation and approved by the director of
the budget. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91110809) (47351) ... 22,037,000 .......... (re. $77,000)
By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
section 5, of the laws of 2008:
The sum of $115,000,000 is hereby appropriated for upstate city-by-
city projects including but not limited to those listed in the sche-
dule below, subject to a plan submitted by the chairman of the
upstate empire state development corporation and approved by the
director of the budget. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (91100809) (47364) .............................
115,000,000 ....................................... (re. $5,440,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
1091 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Midtown Plaza/Paetec ............ 55,000,000
University of Rochester --
Translational Research ........ 25,000,000
Syracuse Connective Corridor .... 10,000,000
Fort Drum -- Infrastructure
Improvements .................. 10,000,000
City of Buffalo -- Revitaliza-
tion Efforts .................. 15,000,000
--------------
Total ...................... 115,000,000
==============
Upstate Regional Blueprint Fund
By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $117,265,000 is hereby appropriated for the upstate
regional blueprint fund, as authorized pursuant to a chapter of the
laws of 2008, subject to a plan submitted by the chairman of the
upstate empire state development corporation and approved by the
director of the budget. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (91020809) (47362) .............................
117,265,000 ...................................... (re. $11,855,000)
Western New York Economic Development Projects
By chapter 54, section 1, of the laws of 2015:
The sum of $2,223,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York, including the payment of liabilities incurred prior to April
1, 2015. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91031509) (47322) ... 2,223,000 ........... (re. $95,000)
By chapter 54, section 1, of the laws of 2014:
The sum of $680,000,000 is hereby appropriated for the Buffalo
regional innovation cluster. Funds appropriated herein shall be for
services and expenses, loans, grants, workforce development, busi-
ness and tourism plan development, and the payment of personal
services, nonpersonal services and contract services provided by
private firms to support economic development projects within the
city of Buffalo or surrounding environs, including the payment of
liabilities incurred prior to April 1, 2014. Provided however, that
up to $33,000,000 is provided to Western NY STAMP. No monies for
Western NY STAMP shall be disbursed prior to approval by the chief
executive officer of the New York state urban development corpo-
ration of a business plan that identifies regionally significant
projects, as defined in economic development law, article 17,
section 352, subdivision 14, at Western NY STAMP. All or a portion
of the funds appropriated hereby may be suballocated or transferred
1092 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to any department, agency, or public authority (91131409) (47321)
... 680,000,000 ................................. (re. $104,273,000)
The sum of $2,195,000 is hereby appropriated for services and expenses
related to the retention of professional football in Western New
York, including the payment of liabilities incurred prior to April
1, 2014. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91151409) (47322) ... 2,195,000 ........... (re. $28,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2013:
The sum of $130,550,000 is hereby appropriated for the regional
economic development council initiative. Funds appropriated herein
shall be available for services and expenses, loans, and grants.
Funding will be pursuant to a plan developed by the chair of the New
York state urban development corporation and based in part on a
competitive selection process among the regional economic develop-
ment councils and will support initiatives based on anticipated
economic development benefits. Such moneys will be awarded by the
New York state urban development corporation at its discretion. All
or a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(910211A3) (47341) ... 130,550,000 ............... (re. $31,131,000)
Economic Transformation Program
By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
section 1, of the laws of 2013:
The sum of $50,000,000 is hereby appropriated for the economic trans-
formation program. Funds appropriated herein shall be available for
services and expenses, loans, and grants. Funding will be used to
support initiatives, services and expenses of communities impacted
by the closure of New York state prison, correctional and juvenile
justice facilities, pursuant to a plan developed by the chair of the
New York state urban development corporation. The regional economic
development council representing the impacted community shall make
non-binding recommendations to the chair consistent with the execu-
tive order establishing such council. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (910311A3) (47340) .........
50,000,000 ........................................ (re. $7,040,000)
Capital Projects Funds - Other
Dedicated Infrastructure Investment Fund
Infrastructure Investment Account - 33050
ECONOMIC DEVELOPMENT PURPOSE
By chapter 54, section 1, of the laws of 2022:
1093 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The sum of $418,000,000 is hereby appropriated for services and
expenses for athletic facilities related to professional football in
Orchard Park, New York. Funds appropriated herein shall be for,
including but not limited to, the acquisition of real property,
preparation of plans, design, construction, renovation, demolition
of existing facilities, and other improvements and costs incidental
thereto, including the costs of program administration and the
payment of liabilities incurred prior to April 1, 2022; provided
however, that the release of such funds shall be subject to the
terms of a memorandum of understanding and associated contractual
agreements and any ancillary documents between the Erie County
Stadium Corporation and the lessee of such athletic facilities, for
no less than thirty years. Payments made pursuant to this appropri-
ation shall be supported from gaming settlement proceeds, which
shall be transferred to the dedicated infrastructure investment
fund. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91BD2209) (58017) .......................................
418,000,000 ..................................... (re. $418,000,000)
[Capital Projects Funds - Other
Dedicated Infrastructure Investment Fund
Infrastructure Investment Account - 33050
Economic Development Purpose]
By chapter 54, section 1, of the laws of 2017:
The sum of $400,000,000 is hereby appropriated for the second phase of
the Buffalo regional innovation cluster initiative. Funds appropri-
ated herein shall be for services, expenses, loans, grants, and
costs associated with program administration to support economic
development projects within the city of Buffalo or surrounding envi-
rons, including the payment of liabilities incurred prior to April
1, 2017. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (91311709) (85516) ... 400,000,000 .... (re. $184,589,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter 54,
section 1, of the laws of 2019:
The sum of $320,000,000 is hereby appropriated for services and
expenses, loans, grants, and costs associated with program adminis-
tration of a life sciences initiative which shall include but not be
limited to investments in agricultural biotechnology, biogenerics,
bioinformatics, biomedical engineering, biopharmaceuticals, academic
medical centers, biotechnology, chemical synthesis, chemistry tech-
nology, medical diagnostics, genomics, medical image analysis,
marine biology, medical devices, medical nanotechnology, natural
product pharmaceuticals, proteomics, regenerative medicine, RNA
interference, stem cell research, medical and neurological clinical
trials, health robotics and veterinary science. Eligible costs of
such initiative may include but not be limited to laboratory space,
equipment, technology, research and development, venture capital
investments and other costs in support of a comprehensive life
1094 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
sciences cluster strategy, including the payment of liabilities
incurred prior to April 1, 2017, provided, however, that the total
annual amount in venture capital investments made from this appro-
priation shall not exceed $10,000,000 annually. In addition, the sum
of $20,000,000 shall be available from this appropriation for bios-
cience research labs and academic medical centers. Funding will be
pursuant to a plan developed by the chief executive officer of the
New York state urban development corporation which shall take into
consideration regional balance and anticipated job retention, job
creation and regional economic development benefits. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91321709) (85508) ... 320,000,000 .............. (re. $252,536,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Economic Development Purpose
By chapter 54, section 1, of the laws of 2022:
The sum of $800,000,000 is hereby appropriated for the federal share,
from any federal agency under any federal program, of State broad-
band projects and programs, including but not limited to services
and expenses, grants, costs of program administration, and other
contractual obligations related to investment in broadband infras-
tructure, access, and affordability as provided for in the Infras-
tructure Investment and Jobs Act and related prior and successive
federal legislation, and the payment of liabilities incurred prior
to April 1, 2022, provided that up to $10,000,000 or the amount of
federal funds awarded to New York State for digital equity or
digital inclusion programs shall be available for use as prescribed
under the program requirements of the Infrastructure Investment and
Jobs Act (91512209) ................................................
800,000,000 ..................................... (re. $800,000,000)
The sum of $345,000,000 is hereby appropriated for the federal share
from any federal agency under any federal program, of State broad-
band projects and programs, including but not limited to services
and expenses, grants, costs of program administration, and other
contractual obligations related to investment in broadband infras-
tructure, access, and affordability as provided for in the American
Rescue Plan Act and related prior and successive federal legis-
lation, and the payment of liabilities incurred prior to April 1,
2022. Funds appropriated herein shall also be available to meet
match requirements under the Infrastructure Investment and Jobs Act,
or any other required match to access federal funds. (91522209) ....
345,000,000 ..................................... (re. $345,000,000)
NEW YORK STATE CAPITAL ASSISTANCE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
1095 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
section 5, of the laws of 2008:
The sum of $350,000,000 is hereby appropriated for the New York State
Capital Assistance Program, as authorized pursuant to a chapter of
the laws of 2008.
All or a portion of the funds may be suballocated or transferred to
any department, agency or public authority (91150809) (47385) ......
350,000,000 ..................................... (re. $123,424,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 55, section 1, of the laws of 2000, as amended by chapter
684, section 2, of the laws of 2003:
For economic development projects which will facilitate the creation
and retention of jobs or increase business activity within downtown
Buffalo, the Buffalo inner harbor area, or surrounding environs.
Notwithstanding any other provision of law to the contrary, such
projects shall be determined pursuant to a memorandum of understand-
ing to be executed by the governor, the temporary president of the
senate and the speaker of the assembly. The funds appropriated here-
by may be suballocated to any department, agency or public authori-
ty. Eligible project(s) shall include, but not be limited to Haupt-
man-Woodward Medical Research Institute; Buffalo Medical Campus;
University of Buffalo - Center of Excellence in Bioinformatics;
Roswell Park Cancer Institute Corporation; and other projects relat-
ing to historic preservation, cultural facilities and transportation
projects (91AD00A3) (47384) ... 50,000,000 ........... (re. $50,000)
NEW YORK STATE ECONOMIC DEVELOPMENT ASSISTANCE PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
section 5, of the laws of 2008:
The sum of $350,000,000 is hereby appropriated for the New York State
Economic Development Assistance Program, as authorized pursuant to a
chapter of the laws of 2008.
All or a portion of the funds appropriated hereby may be suballocated
or transferred to any department, agency, or public authority
(91140809) (47386) ... 350,000,000 ............... (re. $52,108,000)
NEW YORK WORKS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
Buffalo Regional Innovation Cluster
1096 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 54, section 1, of the laws of 2012:
The sum of $75,000,000 is hereby appropriated for the Buffalo Regional
Innovation Cluster. Funds appropriated herein shall be for services
and expenses, loans, and grants, to support economic development
projects within the city of Buffalo or surrounding environs. All or
a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91211209) (47325) ... 75,000,000 ................... (re. $674,000)
New York Works Economic Development Fund
By chapter 54, section 1, of the laws of 2015:
The sum of $45,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund, including the payment of liabil-
ities incurred prior to April 1, 2015. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (91101509) (47104) .........
45,000,000 ....................................... (re. $15,000,000)
By chapter 54, section 1, of the laws of 2012:
The sum of $75,000,000 is hereby appropriated for the New York Works
Economic Development Fund. Funds appropriated herein shall be for
services and expenses, loans, and grants, related to the New York
Works Economic Development Fund. All or a portion of the funds
appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (91151209) (47324) .........
75,000,000 ........................................ (re. $4,847,000)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2018:
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funds appropriated herein
shall be available for services and expenses, loans, and grants.
Funding will be pursuant to a plan developed by the chief executive
officer of the New York state urban development corporation and
based in part on a competitive selection process among the regional
economic development councils and will support initiatives based on
anticipated economic development benefits. Such moneys will be
awarded by the New York state urban development corporation at its
discretion. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (911415A3) (47326) ... 150,000,000 ..... (re. $68,590,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2018:
1097 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funds appropriated herein
shall be available for services and expenses, loans, and grants.
Funding will be pursuant to a plan developed by the chief executive
officer of the New York state urban development corporation and
based in part on a competitive selection process among the regional
economic development councils and will support initiatives based on
anticipated economic development benefits. Such moneys will be
awarded by the New York state urban development corporation at its
discretion. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (911414A3) (47326) ... 150,000,000 ..... (re. $41,162,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2018:
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funds appropriated herein
shall be available for services and expenses, loans, and grants.
Funding will be pursuant to a plan developed by the chief executive
officer of the New York state urban development corporation and
based in part on a competitive selection process among the regional
economic development councils and will support initiatives based on
anticipated economic development benefits. Such moneys will be
awarded by the New York state urban development corporation at its
discretion. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (911413A3) (47326) .......................................
150,000,000 ...................................... (re. $39,182,000)
By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
section 1, of the laws of 2013:
The sum of $150,000,000 is hereby appropriated for the regional
economic development council initiative. Funds appropriated herein
shall be for services and expenses, loans, and grants. Funding will
be pursuant to a plan developed by the chief executive officer of
the New York state urban development corporation and based in part
on a competitive selection process among the regional economic
development councils and will support initiatives based on antic-
ipated economic development benefits. Such moneys will be awarded by
the New York state urban development corporation at its discretion.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority
(911412A3) (47326) ... 150,000,000 ............... (re. $38,150,000)
REGIONAL DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
Community Revitalization Projects
1098 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $292,385,000 is hereby appropriated for the Restore New
York Communities Initiative, however, that of such amount, no more
than $50,000,000 shall be disbursed prior to April 1, 2007 and no
more than $150,000,000 shall be disbursed prior to April 1, 2008
(911106A3) (47376) ... 292,385,000 ............... (re. $30,956,000)
Cultural Facilities Projects
By chapter 55, section 1, of the laws of 2006, as amended by chapter
108, section 5, of the laws of 2006:
The sum of $143,000,000 is hereby appropriated for projects that
improve arts or cultural facilities including but not limited to
those listed in the schedule below, subject to a plan submitted by
the chairman of the New York state urban development corporation and
approved by the director of the budget. All or a portion of the
funds appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (910306A3) (47380) .........
143,000,000 ......................................... (re. $105,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
Museum of Natural History ....... 18,000,000
World Trade Center Visitor
Orientation and Education
Center ........................ 57,000,000
Adirondack Natural History
Museum ......................... 6,500,000
New York City Public Library .... 12,000,000
New York Historical Society ...... 5,500,000
Old Fort Niagara ................. 1,000,000
Lincoln Center .................. 15,000,000
Stanley Theater .................. 1,000,000
Museum of Jewish Heritage ....... 10,000,000
Albany Institute of History
and Art ........................ 1,000,000
Thirteen/WNET New York ........... 1,000,000
Whitney Museum of America Art ... 15,000,000
--------------
Total ...................... 143,000,000
==============
Economic Development/Other Projects
By chapter 55, section 1, of the laws of 2006, as amended by chapter
108, section 5, of the laws of 2006:
The sum of $269,500,000 is hereby appropriated for economic develop-
ment projects including but not limited to those listed in the sche-
dule below, subject to a plan submitted by the chairman of the New
York state urban development corporation and approved by the direc-
1099 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
tor of the budget. All or a portion of the funds appropriated hereby
may be suballocated or transferred to any department, agency, or
public authority (910106A3) (47382) ................................
269,500,000 ......................................... (re. $977,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
Albany Convention Center ........ 75,000,000
Canal Corporation - new initi-
atives ........................ 10,000,000
Hudson River Park ............... 11,000,000
Rivers and Estuaries Center ..... 25,000,000
Historic Hudson Valley ........... 5,000,000
Plattsburgh International
Airport ........................ 5,000,000
Plattsburgh Aeronautical
Institute ...................... 1,200,000
Governor's Island ............... 22,500,000
Department of Environmental
Conservation Fish Hatcheries ... 3,000,000
Roswell Park Cancer Institute ... 18,000,000
Lower Manhattan Energy Inde-
pendence Initiative ........... 25,000,000
Atlantic Yards Railway Rede-
velopment ..................... 34,000,000
Delphi Harrison ................. 25,000,000
Other ............................ 9,800,000
--------------
Total ...................... 269,500,000
==============
By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
section 1, of the laws of 2017:
The sum of $603,050,000 is hereby appropriated for economic develop-
ment projects, university development projects, homeland security
projects, environmental projects, public recreation projects and
arts and cultural facility improvement projects, including but not
limited to those listed in the schedule below. All or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency or public authority (910606A3) (47349) ......
603,050,000 ...................................... (re. $58,403,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
City of Yonkers Saw Mill River
Redevelopment .................. 8,000,000
NYS Applied Science Center of
Innovation and Excellence in
Homeland Security ............. 25,000,000
Renaissance Square Project
1100 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
and/or other economic devel-
opment projects ............... 18,000,000
Renaissance Square Project
which may include the reha-
bilitation of the Eastman
Theatre and/or other
performance venues ............ 18,000,000
Schenectady Superconductivity
Partnership .................... 2,000,000
Kingston Business Park ........... 1,000,000
Public Safety Training Center .... 2,500,000
Chemung County IDA/Academic
and Career Advancement
Center ......................... 5,000,000
Comprehensive Emergency Shel-
tering Program on Long
Island ......................... 2,500,000
Clarkson University - Walker
Center ......................... 1,000,000
Atlantic Yards Railway Rede-
velopment ..................... 33,000,000
Atlantic Yards Railway - Nets
Project ....................... 33,000,000
Buffalo Building Demolition ...... 5,000,000
Buffalo Lakeside Commerce Park ... 5,000,000
East River Bioscience Park ...... 12,000,000
Albany College of
Pharmacy/Pharmaceutical
Center ......................... 2,000,000
Science and Technology Center
at Utica College ................. 675,000
City of Utica/East Government
Parking District or for
other projects of the Upper
Mohawk Valley Memorial Audi-
torium Authority ............... 1,500,000
Upper Mohawk Valley Memorial
Auditorium Authority ........... 2,000,000
State University of New York
at Stony Brook Brookhaven
National Laboratory Super-
computer ...................... 26,000,000
Brooklyn Museum - Third Floor
Beaux Arts Court ............... 7,500,000
Foothills Performing Arts
Center ......................... 4,000,000
Syracuse University Restore
Center for Environmental
Biotechnology .................. 5,000,000
Fredonia Agricultural Exper-
imental Station - Cornell
University ..................... 3,359,000
1101 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Rochester Rhinos Soccer Stadi-
um ............................. 5,000,000
Canisius College - Interdisci-
plinary Science Center ......... 3,000,000
Buffalo Niagara Medical Campus ... 5,200,000
Lower Manhattan 21st Century
Communications ................ 13,600,000
Lincoln Center ................... 7,500,000
Buffalo State College - New
Technology Building ........... 40,330,000
Rochester and Buffalo Educa-
tional Opportunity Center
Facilities .................... 28,000,000
Advanced Energy Research and
Technology Center on Long
Island ........................ 35,000,000
Of the amounts appropriated
herein $14,000,000 shall be
made available to the Luther
Forest Technology Campus
infrastructure and
$10,000,000 shall be made
available to Uptown and
Downtown Campus, University
at Albany ..................... 24,000,000
SUNY Fredonia - Science Center .. 10,000,000
The Putnam Community Founda-
tion ........................... 2,000,000
Hudson Valley Domestic
Preparedness, Response and
Recovery Initiative ............ 4,000,000
Center for Lithography Devel-
opment ........................ 12,000,000
State University of New York
at Fredonia-Science Center .... 12,000,000
Westchester Community College
Master Plan Projects ........... 6,000,000
Bethel Woods Performing Arts
Center ......................... 1,000,000
To Long Island Bus for the
purchase of hybrid buses ....... 3,000,000
Suffolk Community College ........ 3,000,000
Queensborough Public Library ..... 6,000,000
State University of New York
at New Paltz-Old Main Reno-
vation ......................... 3,000,000
1102 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
East River Bioscience Park ...... 11,000,000
Art Park and Company ............. 2,500,000
Landmark Theatre ................. 8,500,000
Rochester Parking Garage ......... 8,000,000
Hunts Point Cooperative Market ... 2,000,000
Office of Court Administra-
tion-Court Officers Academy .... 1,000,000
Buffalo Mainstreet ............... 8,000,000
Hispanic Federation .............. 2,000,000
Manhattan Youth Building ......... 3,100,000
Brooklyn Museum .................. 4,500,000
Boricua College .................. 2,000,000
Schenectady Metroplex Redevel-
opment ......................... 2,000,000
Channel 13 ....................... 1,250,000
Educational Alliance ............. 3,150,000
Brooklyn Public Library .......... 3,000,000
Osborne Association - Reno-
vation of the former Fulton
Correctional Facility .......... 3,000,000
New York City Department of
Parks and Recreation - Van
Cortlandt Park pedestrian
bridge ......................... 3,000,000
For services and expenses of
Nassau County .................. 2,000,000
Other projects to be deter-
mined pursuant to a plan to
be developed by the director
of the budget in consulta-
tion with the speaker of the
assembly ...................... 12,736,000
Other projects to be deter-
mined pursuant to a plan to
be developed by the director
of the budget in consulta-
tion with the temporary
president of the senate ....... 73,650,000
--------------
Total ...................... 603,050,000
==============
Energy/Environmental Projects
By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
section 1, of the laws of 2007:
The sum of $15,000,000 is hereby appropriated for services and
expenses of the New York investment in conservation and efficiency
pilot program. Such funds appropriated shall be suballocated or
transferred to New York energy research and development authority
(911006A3) (47378) ... 15,000,000 ................ (re. $15,000,000)
1103 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
The sum of $30,000,000 is hereby appropriated for projects including,
but not limited to, renewable fuels, flexible fuel vehicles, hybrid
electric vehicles, plug-in hybrid electric vehicles, and other
research and development regarding fuel diversification and energy
efficiency in the transportation sector. All or a portion of the
funds appropriated hereby may be suballocated or transferred to any
department, agency, or public authority (910406A3) (47377) .........
30,000,000 ........................................ (re. $1,806,000)
By chapter 55, section 1, of the laws of 2006, as added by chapter 53,
section 3, of the laws of 2006:
The sum of $20,000,000 is hereby appropriated for a competitive solic-
itation for construction of a pilot cellulosic ethanol refinery.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority
(910506A3) (47350) ... 20,000,000 ................. (re. $6,867,000)
University Development Projects
By chapter 55, section 1, of the laws of 2006, as amended by chapter
108, section 5, of the laws of 2006:
The sum of $201,500,000 is hereby appropriated for university develop-
ment projects including but not limited to those listed in the sche-
dule below, subject to a plan submitted by the chairman of the New
York state urban development corporation and approved by the direc-
tor of the budget. All or a portion of the funds appropriated hereby
may be suballocated or transferred to any department, agency, or
public authority (910206A3) (47381) ... 201,500,000 . (re. $938,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
University at Buffalo --
Krabbe Disease Research ........ 6,000,000
Columbia University - Nano
Facility ...................... 10,000,000
Columbia University - Cancer
Center ........................ 12,000,000
Fordham University .............. 10,000,000
Syracuse Center of Excellence ... 10,000,000
Energy Recovery Linac Project
at Cornell University ......... 12,000,000
Clarkson University .............. 5,000,000
Paul Smith's College ............. 1,500,000
University at Albany -- Insti-
tute for Nanoelectronics
Discovery and Exploration
(INDEX) ....................... 75,000,000
New York State Veterinary
Diagnostic Laboratory ......... 50,000,000
1104 12554-05-3
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Brooklyn Army Terminal ........... 6,000,000
East River Bioscience Park ....... 4,000,000
--------------
Total ........................ 201,500,000
==============
UPSTATE REVITALIZATION (CCP)
Capital Projects Funds - Other
Dedicated Infrastructure Investment Fund
Infrastructure Investment Account - 33050
Upstate Revitalization Purpose
By chapter 54, section 1, of the laws of 2015:
The sum of $1,500,000,000 is hereby appropriated for the upstate revi-
talization initiative. Funds appropriated herein shall be for
services and expenses, loans, grants, workforce development, busi-
ness and tourism plan development, costs associated with program
administration, and the payment of personal services, nonpersonal
services and contract services provided by private firms to support
economic development projects, including the payment of liabilities
incurred prior to April 1, 2015. Funding will be pursuant to a plan
developed by the chief executive officer of the New York state urban
development corporation and based on a competitive selection process
among the regional economic development councils (R.E.D.C's) and
will support initiatives based on anticipated job creation and
economic development benefits. Such moneys will be awarded by the
New York state urban development corporation at its discretion. All
or a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(910115UR) (43502) ... 1,500,000,000 ............ (re. $841,867,000)
1105 12554-05-3
DEPARTMENT OF VETERANS' SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes, and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 7,000,000 7,000,000
Capital Projects Funds - Federal ... 2,000,000 2,000,000
---------------- ----------------
All Funds ........................ 9,000,000 9,000,000
================ ================
VETERANS' CEMETERY (CCP) ..................................... 4,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For costs associated with design and
construction, and maintenance and oper-
ations of the state's veterans' cemetery
(VEVC2303) (54814) ........................... 2,000,000
Capital Projects Funds - Federal
Federal Capital Projects Fund
Veterans' Cemetery Federal Account
Preservation of Facilities Purpose
For costs associated with design and
construction, and maintenance and oper-
ations of the state's veterans' cemetery
(VEFC2303) ................................... 2,000,000
VETERANS NONPROFIT CAPITAL PROGRAM ........................... 5,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For the comprehensive construction programs,
purposes and projects as herein specified
in accordance with the following:
For payment to the dormitory authority of
the state of New York for services and
expenses relating to the design,
construction, reconstruction, rehabili-
tation, improvement, furnishing, or equip-
ping of new facilities and alterations and
improvements to existing facilities for
capital maintenance, including but not
1106 12554-05-3
DEPARTMENT OF VETERANS' SERVICES
CAPITAL PROJECTS 2023-24
limited to capital design, construction,
reconstruction, rehabilitation, and equip-
ment for facilities for veterans nonprofit
organizations. The dormitory authority
shall have power to enter into a design
and construction management agreement with
the division of veterans' services, pursu-
ant to which one or more facilities are to
be designed, constructed, reconstructed,
rehabilitated, improved, furnished or
equipped for such office. Any such design
and construction management agreement
entered into pursuant to this appropri-
ation shall provide for the following: the
scope of design and construction manage-
ment services to be provided by the dormi-
tory authority, the manner in which those
services will be provided, the fees to be
charged by the authority and the sources
of funds for the projects. Notwithstand-
ing any other law to the contrary, all or
a portion of the amounts hereby appropri-
ated may be suballocated or transferred to
the dormitory authority of the state of
New York for such purpose (VENP2308) ......... 5,000,000
1107 12554-05-3
[DIVISION] DEPARTMENT OF VETERANS' SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
VETERANS' CEMETERY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For costs associated with design and construction, and maintenance and
operations of the state's veterans' cemetery (VEVC2203) (54814) ....
2,000,000 ......................................... (re. $2,000,000)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Veterans' Cemetery Federal Account
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For costs associated with design and construction, and maintenance and
operations of the state's veterans' cemetery (VEFC2203) ............
2,000,000 ......................................... (re. $2,000,000)
VETERANS NONPROFIT CAPITAL PROGRAM
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
For the comprehensive construction programs, purposes and projects as
herein specified in accordance with the following:
[For payment to the dormitory authority of the state of New York for
services and expenses relating to the design, construction, recon-
struction, rehabilitation, improvement, furnishing, or equipping of
new facilities and alterations and improvements to existing facili-
ties for capital maintenance, including but not limited to capital
design, construction, reconstruction, rehabilitation, and equipment
for facilities for veterans nonprofit organizations. The dormitory
authority shall have power to enter into a design and construction
management agreement with the division of veterans' services, pursu-
ant to which one or more facilities are to be designed, constructed,
reconstructed, rehabilitated, improved, furnished or equipped for
such office. Any such design and construction management agreement
entered into pursuant to this appropriation shall provide for the
following: the scope of design and construction management services
to be provided by the dormitory authority, the manner in which those
services will be provided, the fees to be charged by the authority
and the sources of funds for the projects.] NOTWITHSTANDING ANY
OTHER LAW TO THE CONTRARY, FUNDS APPROPRIATED HEREIN SHALL BE FOR
GRANTS ADMINISTERED BY THE DORMITORY AUTHORITY OF THE STATE OF NEW
YORK FOR PAYMENT OF CAPITAL COSTS OF DESIGN, CONSTRUCTION, RECON-
STRUCTION, REHABILITATION, AND EQUIPMENT FOR FACILITIES OWNED OR
1108 12554-05-3
[DIVISION] DEPARTMENT OF VETERANS' SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
CONTROLLED BY VETERANS' NONPROFIT ORGANIZATIONS; PROVIDED THAT IN
CASES INVOLVING THE ACQUISITION OF NON-FIXED EQUIPMENT AND CAPITAL
ASSETS SUCH ASSETS SHALL SOLELY BE USED BY THE GRANT RECIPIENT.
INDIVIDUAL GRANTS ARE TO BE AWARDED ON A COMPETITIVE BASIS TO
NONPROFIT VETERANS' ORGANIZATIONS THROUGH A REQUEST FOR PROPOSALS
AND APPLICATION DETERMINED BY THE DEPARTMENT OF VETERANS SERVICES
AND THE DORMITORY AUTHORITY OF THE STATE OF NEW YORK. Notwithstand-
ing any other law to the contrary, all or a portion of the amounts
hereby appropriated may be suballocated or transferred to the dormi-
tory authority of the state of New York for such purpose (VENP2208)
(54812) ... 5,000,000 ............................. (re. $5,000,000)
1109 12554-05-3
OFFICE OF VICTIM SERVICES
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 1,500,000 1,944,000
---------------- ----------------
All Funds ........................ 1,500,000 1,944,000
================ ================
SOECK STORAGE FACILITY (CCP) ................................. 1,500,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
For services and expenses related to a stor-
age facility for sexual offense evidence
collection kits, including the costs of
demolition, alterations, and improvements
to existing facilities, departmental
administrative costs, preparation of plans
and for services provided by the design
and construction account of the central-
ized services fund of the New York state
office of general services (VSSF2303)
(19920) ...................................... 1,500,000
1110 12554-05-3
OFFICE OF VICTIM SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
SOECK STORAGE FACILITY (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Preservation of Facilities Purpose
By chapter 54, section 1, of the laws of 2022:
For services and expenses related to a storage facility for sexual
offense evidence collection kits, including the costs of demolition,
alterations, and improvements to existing facilities, departmental
administrative costs, preparation of plans and for services provided
by the design and construction account of the centralized services
fund of the New York state office of general services (VSSF2203)
(19920) ... 1,200,000 ............................. (re. $1,200,000)
By chapter 54, section 1, of the laws of 2021:
For services and expenses related to a storage facility for sexual
offense evidence collection kits, including the costs of demolition,
alterations, and improvements to existing facilities, departmental
administrative costs, preparation of plans and for services provided
by the design and construction account of the centralized services
fund of the New York state office of general services (VSSF2103)
(19920) ... 4,300,000 ............................... (re. $744,000)
1111 12554-05-3
WORKERS' COMPENSATION BOARD
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Fund - Other ...... 0 38,733,000
---------------- ----------------
All Funds ........................ 0 38,733,000
================ ================
INFORMATION TECHNOLOGY PROGRAM (CCP)
Capital Projects Funds - Other
Miscellaneous Capital Projects Fund
WCB IT Business Process Design Account - 32218
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2018:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (35011808) (55209) ... 20,000,000 ....... (re. $18,057,000)
By chapter 54, section 1, of the laws of 2015:
For services and expenses related to the acquisition and development
of technology, including but not limited to equipment, software and
services (35011508) (55209) ... 60,000,000 ....... (re. $20,676,000)
1112 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 65,557,000
---------------- ----------------
All Funds ........................ 0 65,557,000
================ ================
ARTS AND CULTURAL FACILITIES IMPROVEMENT (CCP)
Capital Projects Fund - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, as
supplemented by a transfer in accordance with state finance law, is
hereby amended and reappropriated to read:
The sum of [$20,000,000]$40,000,000 is hereby appropriated for
payments and grants, including up to [$400,000]$800,000 in costs
associated with program administration to eligible nonprofit arts
and cultural organizations for the arts and cultural facilities
improvement program. Such program shall provide for targeted invest-
ment for capital projects in such eligible arts or cultural facili-
ties to improve the quality, efficiency, and accessibility of arts
and cultural organizations that benefit New Yorkers. Provided that
such investments may include, but are not limited to: renovations
and retrofitting to comply with COVID-19 health regulations, includ-
ing outdoor performance space projects, HVAC upgrades, renovations
or expansions of space that is open to the public; modifications to
provide for sustainable, energy efficient spaces that would result
in overall energy and cost savings; technology and other equipment
that will benefit the public; and accessibility renovations. Up to
[$10,000,000]$20,000,000 shall be made available exclusively for
small to midsize eligible nonprofit arts and cultural organizations.
Funding from this appropriation shall be made available through a
competitive process to be determined exclusively by the New York
state council on the arts. The determination of this competitive
process and guidelines shall be limited to the New York state coun-
cil on the arts in consultation with the dormitory authority of the
state of New York. The guidelines for the program and competitive
process shall ensure that such funding is made available for uses
throughout the state and takes into account regional distribution,
supports a range of grant awards including a minimum grant of
$50,000, and no match requirements for organizations as deemed
appropriate by the New York state council on the arts. Notwithstand-
ing any inconsistent provision of law, the dormitory authority shall
be authorized to administer this program and designated state agen-
cies shall provide all necessary assistance.
Notwithstanding any inconsistent provision of law, all or a portion of
the funds appropriated herein may be suballocated or transferred to
1113 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
any department, agency, or public authority (ACNP2208) (85021) .....
[20,000,000]40,000,000 ........................... (re. $40,000,000)
By chapter 54, section 1, of the laws of 2021:
The sum of $20,000,000 is hereby appropriated for payments and grants,
including up to $400,000 in costs associated with program adminis-
tration to eligible nonprofit arts and cultural organizations for
the arts and cultural facilities improvement program. Such program
shall provide for targeted investment for capital projects in such
eligible arts or cultural facilities to improve the quality, effi-
ciency, and accessibility of arts and cultural organizations that
benefit New Yorkers. Provided that such investments may include, but
are not limited to: renovations and retrofitting to comply with
COVID-19 health regulations, including outdoor performance space
projects, flexible seating, HVAC and filtration upgrades, reno-
vations or expansions of space that is open to the public; modifica-
tions to provide for sustainable, energy efficient spaces that would
result in overall energy and cost savings; technology and other
equipment that will benefit the public; and accessibility reno-
vations. Up to $10,000,000 shall be made available exclusively for
small to midsize eligible nonprofit arts and cultural organizations.
Funding from this appropriation shall be made available through a
competitive process to be determined exclusively by the New York
state council on the arts. The determination of this competitive
process and guidelines shall be limited to the New York state coun-
cil on the arts in consultation with the dormitory authority of the
state of New York. The guidelines for the program and competitive
process shall ensure that such funding is made available for uses
throughout the state and takes into account regional distribution,
supports a range of grant awards including a minimum grant of
$50,000, and no match requirements for organizations as deemed
appropriate by the New York state council on the arts. Notwithstand-
ing any inconsistent provision of law, the dormitory authority shall
be authorized to administer this program and designated state agen-
cies shall provide all necessary assistance.
Notwithstanding any inconsistent provision of law, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority [(ACNP1808)]ACNP2108
(85021) ..... 20,000,000 ......................... (re. $19,907,000)
By chapter 54, section 1, of the laws of 2018:
The sum of $10,000,000 is hereby appropriated for payments and grants,
including up to $200,000 in costs associated with program adminis-
tration to eligible nonprofit arts and cultural organizations for
the arts and cultural facilities improvement program. Such program
shall provide for targeted investment for capital projects in such
eligible arts or cultural facilities to improve the quality, effi-
ciency, and accessibility of arts and cultural organizations that
benefit New Yorkers. Provided that such investments may include, but
are not limited to: renovations or expansions of space that is open
1114 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to the public; modifications to provide for sustainable, energy
efficient spaces that would result in overall energy and cost
savings; technology and other equipment that will benefit the
public; and accessibility renovations.
Up to $5,000,000 in funding from this appropriation shall be made
available through a competitive process to be determined exclusively
by the New York state council on the arts. The determination of this
competitive process and guidelines shall be limited to the New York
state council on the arts in consultation with the dormitory author-
ity of the state of New York. The guidelines for the program and
competitive process shall ensure that such funding is made available
for uses throughout the state and takes into account regional
distribution, supports a range of grant awards including a minimum
grant of $50,000, consideration of a waiver of match requirements
for organizations as deemed appropriate by the New York state coun-
cil on the arts, and shall be subject to the approval of the direc-
tor of the budget. Notwithstanding any inconsistent provision of
law, the dormitory authority shall be authorized to administer this
program and designated state agencies shall provide all necessary
assistance.
Up to $5,000,000 in funding from this appropriation shall be made
available through a competitive process that shall include represen-
tatives from state agencies to be determined by the director of the
budget and the guidelines for the program and competitive process
shall also ensure that such funding is made available for uses
throughout the state and takes into account regional distribution,
and shall be subject to the approval of the director of the budget.
Such representatives from state agencies shall include, but not be
limited to, the New York state council on the arts, and for purposes
of this appropriation shall also include the dormitory authority of
the state of New York. Notwithstanding any inconsistent provision of
law, the dormitory authority shall be authorized to administer this
program and designated state agencies shall provide all necessary
assistance.
Notwithstanding any inconsistent provision of law, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (ACNP1808) (85021) .....
10,000,000 ........................................ (re. $4,879,000)
By chapter 54, section 1, of the laws of 2017:
The sum of $10,000,000 is hereby appropriated for payments and grants
to eligible nonprofit arts and cultural organizations for the arts
and cultural facilities improvement program. Such program shall
provide for targeted investment for capital projects in such eligi-
ble arts or cultural facilities to improve the quality, efficiency,
and accessibility of arts and cultural organizations that benefit
New Yorkers. Provided that such investments may include, but are not
limited to: renovations or expansions of space that is open to the
public; modifications to provide for sustainable, energy efficient
spaces that would result in overall energy and cost savings; tech-
1115 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
nology and other equipment that will benefit the public; and acces-
sibility renovations.
Funding from this appropriation shall be made available through a
competitive process that shall include representatives from state
agencies to be determined by the director of the budget and the
guidelines for the program and competitive process shall also ensure
that such funding is made available for uses throughout the state
and takes into account regional distribution, and shall be subject
to the approval of the director of the budget. Such representatives
from state agencies shall include, but not be limited to, the New
York state council on the arts, and for purposes of this appropri-
ation shall also include the dormitory authority of the state of New
York. Notwithstanding any inconsistent provision of law, the dormi-
tory authority shall be authorized to administer this program and
designated state agencies shall provide all necessary assistance.
Notwithstanding any inconsistent provision of law, all or a portion of
the funds appropriated herein may be suballocated or transferred to
any department, agency, or public authority (ACNP1708) (85021) .....
10,000,000 .......................................... (re. $771,000)
1116 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Community Enhancement Purpose
By chapter 55, section 2, of the laws of 1997, as amended by chapter 54,
section 1, of the laws of 2018:
The sum of $423,500,000 is hereby appropriated, in accordance with
chapter 432 of the laws of 1997 establishing the community enhance-
ment facilities assistance program, for community enhancement facil-
ities assistance projects. Eligible community enhancement facilities
assistance project(s) shall include, but not be limited to economic
development projects to be located within the county of Nassau
($15,000,000), provided that the allocation made available to the
Governor, as authorized by paragraph one of the memorandum of under-
standing governing administration of the community enhancement
facilities assistance program, shall be reduced by $1,500,000 to
$140,166,666.
Funding for community enhancement facilities assistance projects may
be provided from the proceeds of bonds or notes issued in accordance
with chapter 432 of the laws of 1997 authorizing the issuance of
bonds and notes for community enhancement facilities projects. All
or a portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(91CF97A3) (80551) ... 423,500,000 ............... (re. $20,000,000)
1117 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
COMMUNITY RESILIENCY, ECONOMIC SUSTAINABILITY, AND
TECHNOLOGY PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 385,000,000
---------------- ----------------
All Funds ........................ 0 385,000,000
================ ================
COMMUNITY RESILIENCY, ECONOMIC SUSTAINABILITY, AND TECHNOLOGY
PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Community Resiliency Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
The sum of $385,000,000 is hereby appropriated for the Community Resi-
liency, Economic Sustainability, and Technology program. Funds
appropriated herein shall be for grants for the payment of the capi-
tal costs of acquisition, design, construction, reconstruction,
demolition, rehabilitation, preservation, development, improvement,
or modernization of an existing or proposed facility or other prop-
erty real and personal, and other appurtenances thereto; and the
acquisition of equipment and other capital assets [with a useful
life of not less than ten years] purchased for installation onto
infrastructure that is owned or controlled by the grant recipient or
appurtenant thereto, provided that in cases involving the acquisi-
tion of non-fixed equipment and capital assets with a useful life of
not less than ten years such assets shall solely be used by the
grant recipient. Eligible purposes shall include but not be limited
to projects intended to improve the quality of life of the residents
of the State of New York through investment in facilities which
support arts, cultural, athletic, housing, child care, educational,
parks and recreational, transportation, port development, economic
development, workforce training, employment development, tourism,
community redevelopment, climate change mitigation, resiliency,
environmental sustainability, and other civic activities. Any
projects in support of port development, economic development, work-
force training, or employment development shall create or retain
jobs or catalyze economic activity in New York State as certified by
the commissioner of the department of economic development. Individ-
ual grants issued pursuant to this appropriation shall be in an
amount no less than $50,000. Funding under this appropriation shall
be pursuant to a plan agreed to by the director of the budget,
speaker of the assembly, and president pro temp of the senate.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may be (i) interchanged, (ii) transferred from this
appropriation to any other appropriation of any state department,
agency, public benefit corporation, or public authority, or (iii)
1118 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
COMMUNITY RESILIENCY, ECONOMIC SUSTAINABILITY, AND
TECHNOLOGY PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
suballocated to any other state department, agency or public benefit
corporation, to achieve this purpose (CR002209) (85106) ............
385,000,000 ..................................... (re. $385,000,000)
1119 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 124,719,000
---------------- ----------------
All Funds ........................ 0 124,719,000
================ ================
REGIONAL DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 55, section 1, of the laws of 2004, as transferred by chapter
54, section 1, of the laws of 2012:
For services and expenses of the following purposes, pursuant to a
memorandum of understanding to be executed by the governor, the
temporary president of the senate and the speaker of the assembly:
the Empire Opportunity Fund, as established pursuant to Part T of
chapter 84 of the laws of 2002; Rebuilding the Empire State Through
Opportunities in Regional Economies (RESTORE) New York, as estab-
lished pursuant to Part T of chapter 84 of the laws of 2002; and the
Community Capital Assistance Program, as established pursuant to
Part T of chapter 84 of the laws of 2002, provided that the allo-
cation made available to the governor, as authorized by paragraph
one of the memorandum of understanding governing administration of
the above named programs, shall be reduced by $6,675,000 to
$118,325,000.
Notwithstanding any other inconsistent provision of law, none of the
funds appropriated hereto, as delineated in the below project sched-
ule, may be interchanged among project purposes. All or a portion of
the funds appropriated hereby may be suballocated or transferred to
any department, agency, or public authority. Notwithstanding any
other inconsistent provision of law, this appropriation may not be
disbursed prior to the enactment of an appropriation for the expend-
iture from the community projects fund and the execution of a memo-
randum of understanding for the allocation and transfer of funds
into various accounts pursuant to section 99-d of the state finance
law (71E404A3) (80594) ... 243,325,000 ........... (re. $65,668,000)
Project Schedule
PROJECT AMOUNT
Empire Opportunity Fund ...................... 118,325,000
Community Capital Assistance Program .......... 62,500,000
Rebuilding the Empire State Through Opportu-
nities in Regional Economies (RESTORE) New
York, and the Community Capital Assistance
Program ..................................... 62,500,000
--------------
243,325,000
1120 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
==============
By chapter 55, section 2, of the laws of 2002, as amended by chapter 54,
section 1, of the laws of 2014:
For services and expenses of the following purposes, pursuant to a
memorandum of understanding to be executed by the governor, the
temporary president of the senate and the speaker of the assembly:
Centers of Excellence, as established pursuant to chapter 84 of the
laws of 2002; the Empire Opportunity Fund, as established pursuant
to chapter 84 of the laws of 2002; Gen*NY*sis, as established pursu-
ant to chapter 84 of the laws of 2002; Rebuilding the Empire State
Through Opportunities in Regional Economies (RESTORE) New York, as
established pursuant to chapter 84 of the laws of 2002; for trans-
portation capital projects in accordance with the provisions of
subdivisions 3 and 4 of section 14-k of the transportation law, and
sections 89-b and 89-c of the state finance law; and the Community
Capital Assistance Program, as established pursuant to chapter 84 of
the laws of 2002, provided that the allocation made available to the
governor, as authorized by paragraph seven of the memorandum of
understanding governing administration of the above named programs,
shall be reduced by $10,300,000 to $289,700,000.
No moneys of the state in the state treasury or any of its funds shall
be available for payments pursuant to this appropriation. Funding
for the purposes delineated in this appropriation shall be provided
from the proceeds of bonds or notes issued pursuant to chapter 84 of
the laws of 2002. Notwithstanding any other inconsistent provision
of law, none of the funds appropriated hereto, as delineated in the
below project schedule, may be inter changed among project purposes.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority
(71E102A3) (80593) ... 589,700,000 .............. (re. $59,051,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
Centers of Excellence, and
Empire Opportunity Fund ...... 289,700,000
Gen*NY*sis, Transportation
Capital Projects, and the
Community Capital Assistance
Program ...................... 150,000,000
Rebuilding the Empire State
Through Opportunities in
Regional Economies (RESTORE)
New York, Transportation
Capital Projects, and the
Community Capital Assistance
Program ...................... 150,000,000
--------------
Total ........................ 589,700,000
1121 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
==============
1122 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 68,495,000
---------------- ----------------
All Funds ........................ 0 68,495,000
================ ================
ECONOMIC DEVELOPMENT PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 55, section 1, of the laws of 2005, as added by chapter 162,
section 4, of the laws of 2005:
The sum of $75,000,000 is hereby appropriated to the New York State
economic development program (CCP) out of any moneys in the state
treasury in the general fund to the credit of the capital projects
fund, not otherwise appropriated, and made immediately available,
for the purpose of economic development projects outside cities with
a population of one million or more pursuant to a memorandum of
understanding to be executed by the governor, the temporary presi-
dent of the senate and the speaker of the assembly.
All or portions of the funds appropriated hereby may be suballocated
or transferred to any department, agency, or public authority
(DP000509) (80380) .................................................
75,000,000 ....................................... (re. $63,543,000)
By chapter 3, section 29, of the laws of 2004, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of three hundred forty-five million seven hundred fifty thou-
sand dollars ($345,750,000), or so much thereof as may be necessary,
is hereby appropriated to the New York state economic development
program (CCP) out of any moneys in the state treasury in the general
fund to the credit of the capital projects fund, not otherwise
appropriated, and made immediately available, for the purpose of
economic development projects outside cities with a population of
one million or more pursuant to a memorandum of understanding to be
executed by the governor, the temporary president of the senate and
the speaker of the assembly, provided that the allocation made
available to the governor, as authorized by paragraph one of the
memorandum of understanding governing administration of the New York
state economic development program, shall be reduced by $4,250,000
to $162,416,000.
All or a portion of the funds appropriated hereby may be suballocated
or transferred to any department, agency, or public authority
(DP010409) (80380) .................................................
345,750,000 ....................................... (re. $4,952,000)
1123 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGH TECHNOLOGY AND DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
HIGH TECHNOLOGY AND DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 55, section 1, of the laws of 2005, as transferred by chapter
54, section 1, of the laws of 2012:
For services and expenses of the New York state technology and devel-
opment program pursuant to a memorandum of understanding to be
executed by the governor, the temporary president of the senate, and
the speaker of the assembly, provided that the allocation made
available to the governor, as authorized by paragraphs one and three
of the memorandum of understanding governing administration of the
New York state technology and development program, shall be reduced
by $1,000,000 to $93,054,000.
All or a portion of the funds appropriated hereby may be suballocated
to any department, agency, or public authority (TD0005RD) (80595) ..
249,000,000 ...................................... (re. $66,868,000)
1124 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS PROGRAM
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 80,000,000 151,699,000
---------------- ----------------
All Funds ........................ 80,000,000 151,699,000
================ ================
HIGHER EDUCATION CAPITAL MATCHING GRANTS (CCP) .............. 80,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Capital Matching Grants Purpose
The sum of $50,000,000 is hereby appropri-
ated for the higher education facilities
capital matching grants program. Awards
and grants shall be administered by the
New York state higher education capital
matching grant board created pursuant to
part U of chapter 63 of the laws of 2005,
as amended (MG0923MG) (42301) ............... 50,000,000
For HECap projects that enhance the sustain-
ability of campus infrastructure, includ-
ing, but not limited to, efforts to miti-
gate climate change, reduce localized air
pollution, and improve water management ..... 30,000,000
1125 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
HIGHER EDUCATION CAPITAL MATCHING GRANTS (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Capital Matching Grants Purpose
By chapter 54, section 1, of the laws of 2022:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0923MG) (42301) .........................
30,000,000 ....................................... (re. $30,000,000)
For additional funding for the higher education facilities capital
matching grants program. Awards and grants shall be administered by
the New York state higher education capital matching grant board
created pursuant to part U of chapter 63 of the laws of 2005 as
amended (MG1022MG) (42301) ... 15,000,000 ........ (re. $15,000,000)
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0919MG) (42301) .........................
30,000,000 ....................................... (re. $30,000,000)
By chapter 54, section 1, of the laws of 2018:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0918MG) (42301) .........................
30,000,000 ....................................... (re. $26,000,000)
By chapter 55, section 1, of the laws of 2016:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0816MG) (42301) .........................
30,000,000 ....................................... (re. $24,790,000)
By chapter 54, section 1, of the laws of 2015:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
1126 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
laws of 2005 as amended (MG0815MG) (42301) .........................
30,000,000 ........................................ (re. $4,718,000)
By chapter 54, section 1, of the laws of 2014:
The sum of $30,000,000 is hereby appropriated for the higher education
facilities capital matching grants program. Awards and grants shall
be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0814MG) (42301) .........................
30,000,000 ........................................ (re. $7,041,000)
By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2013:
The sum of $150,000,000 is hereby appropriated for the higher educa-
tion facilities capital matching grants program. Awards and grants
shall be administered by the New York state higher education capital
matching grant board created pursuant to part U of chapter 63 of the
laws of 2005 as amended (MG0805MG) (42301) .........................
150,000,000 ...................................... (re. $14,150,000)
1127 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HUDSON RIVER VALLEY GREENWAY COMMUNITIES COUNCIL
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 11,054,000
---------------- ----------------
All Funds ........................ 0 11,054,000
================ ================
EMPIRE STATE TRAIL (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Environment and Recreation Purpose
By chapter 54, section 1, of the laws of 2017:
For the costs and expenses, including personal services, nonpersonal
services, fringe benefits and indirect costs of projects related to
improvements, alterations, rehabilitation and completion of the
Empire State Trail network in the hudson river valley, champlain
valley and along the erie canal, including the payment of liabil-
ities incurred prior to April 1, 2017. All or a portion of the funds
appropriated herein may be suballocated or transferred to any
department, agency or public authority (80ET17ER) (81112) ..........
123,000,000 ...................................... (re. $11,054,000)
1128 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
JACOB JAVITS CONVENTION CENTER
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 350,000,000
---------------- ----------------
All Funds ........................ 0 350,000,000
================ ================
JACOB JAVITS CONVENTION CENTER (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 55, section 1, of the laws of 2005:
For services and expenses of the Jacob Javits Convention Center expan-
sion project, as authorized pursuant to chapter 3 of the laws of
2004. Any disbursements made pursuant to this appropriation shall be
reimbursed with the proceeds of bonds authorized pursuant to chapter
3 of the laws of 2004 to finance the Jacob Javits Convention Center
expansion project. All or a portion of the funds appropriated hereby
may be suballocated or transferred to any department, agency, or
public authority (CC000509) (80597) ................................
350,000,000 ..................................... (re. $350,000,000)
1129 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
LAKE ONTARIO RESILIENCY AND ECONOMIC DEVELOPMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 40,413,000
---------------- ----------------
All Funds ........................ 0 40,413,000
================ ================
LAKE ONTARIO RESILIENCY AND ECONOMIC DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Lake Ontario Resiliency and Economic Development Purpose
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
The sum of $100,000,000 is hereby appropriated for Lake Ontario resi-
liency and economic development projects and purposes. Funds appro-
priated herein shall be for services and expenses, loans, grants,
and costs of program administration related to hardening infrastruc-
ture along the Lake Ontario waterfront and strengthening local econ-
omies within the region, including but not limited to projects or
priorities recommended by the Lake Ontario Resiliency and Economic
Development Initiative Commission. All or a portion of this appro-
priation may be suballocated or transferred to any department, agen-
cy, or public authority (02011909) (85030) .........................
100,000,000 ...................................... (re. $40,413,000)
1130 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
LOCAL COMMUNITY ASSISTANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 185,000,000
---------------- ----------------
All Funds ........................ 0 185,000,000
================ ================
LOCAL COMMUNITY ASSISTANCE PROGRAM
Capital Projects Funds - Other
Capital Projects Fund - 30000
Local Community Purpose
The appropration made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
The sum of $185,000,000 is hereby appropriated for the Local Community
Assistance Program. Funds appropriated herein shall be for grants
for the payment of the capital costs of acquisition, design,
construction, reconstruction, demolition, rehabilitation and
improvement of an existing or proposed facility or other property
real and personal, and other appurtenances thereto; and the acquisi-
tion of equipment and other capital assets [with a useful life of
not less than ten years] purchased for installation or use in
infrastructure that is owned or controlled by the grant recipient or
appurtenant thereto. Eligible purposes shall include but not be
limited to projects that support community development or redevelop-
ment, revitalization, economic development, economic sustainability,
arts and cultural development, housing, public security and safety
and local infrastructure improvement or enhancement. Eligible enti-
ties may include municipal and state governmental entities, public
authorities and not-for-profit corporations. Individual grants
issued pursuant to this appropriation shall be in an amount no less
than $50,000. Notwithstanding any provision of law to the contrary,
funds appropriated herein may, subject to the approval of the direc-
tor of the budget, be (i) interchanged, (ii) transferred from this
appropriation to any other appropriation of any state department,
agency, public benefit corporation, or public authority, or (iii)
suballocated to any other state department, agency or public benefit
corporation, to achieve this purpose (LO112209) (85104) ...........
185,000,000 ..................................... (re. $185,000,000)
1131 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 87,565,000
---------------- ----------------
All Funds ........................ 0 87,565,000
================ ================
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - Authority Bonds - 30000
Preservation of Facilities Purpose
The appropriation made by chapter 54, section 1, of the laws of 2022, is
hereby amended and reappropriated to read:
The sum of $50,000,000 is hereby appropriated for payments and grants
to eligible nonprofit human services organizations for the nonprofit
infrastructure capital investment program. Such program shall
provide for targeted [investment] INVESTMENTS [for] IN capital
projects [in] FOR such eligible nonprofit human services organiza-
tions to improve the quality, efficiency, and accessibility of SUCH
nonprofit human services organizations that serve New Yorkers.
[Provided that such] SUCH investments MAY include, but are not
limited to: technology upgrades related to improving electronic
records, data analysis, or confidentiality; renovations or expan-
sions of space used for direct program services; modifications to
provide for sustainable, energy efficient spaces that would result
in overall energy and cost savings; and accessibility renovations.
Provided further that such eligible Eligible nonprofit human
services organizations are those which provide direct services to
New Yorkers through state contracts, state authorized payments,
and/or state payment rates. Provided further that nothing herein
shall preclude a nonprofit human services organization that is
otherwise eligible and that is located in publicly owned property
from receiving a grant as long as such purpose and project would be
otherwise eligible and such grant is not used for building or prop-
erty maintenance or improvements, structural maintenance or improve-
ments, or building systems maintenance or improvements. Funding from
this appropriation shall be made available through a competitive
process that shall include representatives from multiple state agen-
cies to be determined by the director of the budget and the guide-
lines for the program and competitive process and such process shall
also ensure that such funding is made available for uses throughout
the state, and shall be subject to the approval of the director of
the budget. Provided further that such proposals submitted by eligi-
ble nonprofit human services organizations shall include, at a mini-
mum, the following: the amount of funds requested in relation to the
size and scope of the proposed project and the number of clients who
will benefit; a detailed description of the project, including
projected costs including the sources and uses of funds, project
1132 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
completion timeline, and funds necessary at each stage of project
completion; the extent to which the proposed project reflects a
necessary improvement or upgrade to continue to serve the nonprofit
human services organization's target NEW YORK population, or a popu-
lation they would be able to serve if such improvements or upgrades
were made; a statement that as of the effective date of this chap-
ter, construction had not begun and equipment had not been purchased
for such project; and if applicable, a statement whether the project
has received all necessary regulatory approvals or can demonstrate a
reasonable expectation that such approvals will be secured. Such
representatives from state agencies shall include, but not be limit-
ed to, the Office of Children and Family Services, the Office of
Temporary and Disability Assistance, the Office for People with
Developmental Disabilities, the Office of Mental Health, and for
purposes of this appropriation, shall also include the Dormitory
Authority of the State of New York and, notwithstanding any incon-
sistent provision of law, the Dormitory Authority shall be author-
ized to administer this program. All or a portion of the funds
appropriated herein may be suballocated or transferred to any
department, agency, or public authority (92NP2203) (80606) ...
50,000,000 ....................................... (re. $50,000,000)
The appropriation made by chapter 54, section 1, of the laws of 2017, is
hereby amended and reappropriated to read:
The sum of $20,000,000 is hereby appropriated for payments and grants
to eligible nonprofit human services organizations for the nonprofit
infrastructure capital investment program. Such program shall
provide for targeted investment for capital projects in such eligi-
ble nonprofit human services organizations to improve the quality,
efficiency, and accessibility of nonprofit human services organiza-
tions that serve New Yorkers. Provided that such investments
include, but are not limited to: technology upgrades related to
improving electronic records, data analysis, or confidentiality;
renovations or expansions of space used for direct program services;
modifications to provide for sustainable, energy efficient spaces
that would result in overall energy and cost savings; and accessi-
bility renovations. Provided further that such eligible nonprofit
human services organizations are those which provide direct services
to New Yorkers through state contracts, state authorized payments,
and/or state payment rates. Provided further that nothing herein
shall preclude a nonprofit human services organization that is
otherwise eligible and that is located in publicly owned property
from receiving a grant as long as such purpose and project would be
otherwise eligible and such grant is not used for building or prop-
erty maintenance or improvements, structural maintenance or improve-
ments, or building systems maintenance or improvements. Funding from
this appropriation shall be made available through a competitive
process that shall include representatives from multiple state agen-
cies to be determined by the director of the budget and the guide-
lines for the program and competitive process and such process shall
1133 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
also ensure that such funding is made available for uses throughout
the state, and shall be subject to the approval of the director of
the budget. Provided further that such proposals submitted by eligi-
ble nonprofit human services organizations shall include, at a mini-
mum, the following: the amount of funds requested in relation to the
size and scope of the proposed project and the number of clients who
will benefit; a detailed description of the project, including
projected costs including the sources and uses of funds, project
completion timeline, and funds necessary at each stage of project
completion; the extent to which the proposed project reflects a
necessary improvement or upgrade to continue to serve the nonprofit
human services organization's target population, or a population
they would be able to serve if such improvements or upgrades were
made; a statement that as of the effective date of this chapter,
construction had not begun and equipment had not been purchased for
such project; and if applicable, a statement whether the project has
received all necessary regulatory approvals or can demonstrate a
reasonable expectation that such approvals will be secured. Such
representatives from state agencies shall include, but not be limit-
ed to, the Office of Children and Family Services, the Office of
Temporary and Disability Assistance, the Office for People with
Developmental Disabilities, the Office of Mental Health, and for
purposes of this appropriation, shall also include the Dormitory
Authority of the State of New York and, notwithstanding any incon-
sistent provision of law, the Dormitory Authority shall be author-
ized to administer this program. CONSISTENT WITH THE REQUIREMENTS OF
THIS APPROPRIATION, ANY FUNDING ALLOCATED PURSUANT TO THIS APPROPRI-
ATION THAT HAS BEEN AWARDED BUT NOT CLAIMED BY AN ELIGIBLE APPLICANT
PURSUANT TO ANY GRANT AWARD, MAY BE MADE AVAILABLE BY THE DORMITORY
AUTHORITY FOR FUTURE GRANT AWARDS TO ELIGIBLE APPLICANTS. All or a
portion of the funds appropriated herein may be suballocated or
transferred to any department, agency, or public authority
(92NP1703) (80606) ... 20,000,000 ................ (re. $20,000,000)
The appropriation made by chapter 55, section 1, of the laws of 2016, is
hereby amended and reappropriated to read:
The sum of $50,000,000 is hereby appropriated for payments and grants
to eligible nonprofit human services organizations for the nonprofit
infrastructure capital investment program. Such program shall
provide for targeted investment for capital projects in such eligi-
ble nonprofit human services organizations to improve the quality,
efficiency, and accessibility of nonprofit human services organiza-
tions that serve New Yorkers. Provided that such investments
include, but are not limited to: technology upgrades related to
improving electronic records, data analysis, or confidentiality;
renovations or expansions of space used for direct program services;
modifications to provide for sustainable, energy efficient spaces
that would result in overall energy and cost savings; and accessi-
bility renovations. Provided further that such eligible nonprofit
human services organizations are those which provide direct services
1134 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
to New Yorkers through state contracts, state authorized payments,
and/or state payment rates. Provided further that nothing herein
shall preclude a nonprofit human services organization that is
otherwise eligible and that is located in publicly owned property
from receiving a grant as long as such purpose and project would be
otherwise eligible and such grant is not used for building or prop-
erty maintenance or improvements, structural maintenance or improve-
ments, or building systems maintenance or improvements. Funding from
this appropriation shall be made available through a competitive
process that shall include representatives from multiple state agen-
cies to be determined by the director of the budget and the guide-
lines for the program and competitive process and such process shall
also ensure that such funding is made available for uses throughout
the state, and shall be subject to the approval of the director of
the budget. Provided further that such proposals submitted by eligi-
ble nonprofit human services organizations shall include, at a mini-
mum, the following: the amount of funds requested in relation to the
size and scope of the proposed project and the number of clients who
will benefit; a detailed description of the project, including
projected costs including the sources and uses of funds, project
completion timeline, and funds necessary at each stage of project
completion; the extent to which the proposed project reflects a
necessary improvement or upgrade to continue to serve the nonprofit
human services organization's target population, or a population
they would be able to serve if such improvements or upgrades were
made; a statement that as of the effective date of this chapter,
construction had not begun and equipment had not been purchased for
such project; and if applicable, a statement whether the project has
received all necessary regulatory approvals or can demonstrate a
reasonable expectation that such approvals will be secured. Such
representatives from state agencies shall include, but not be limit-
ed to, the Office of Children and Family Services, the Office of
Temporary and Disability Assistance, the Office for People with
Developmental Disabilities, the Office of Mental Health, and for
purposes of this appropriation, shall also include the Dormitory
Authority of the State of New York and, notwithstanding any incon-
sistent provision of law, the Dormitory Authority shall be author-
ized to administer this program. CONSISTENT WITH THE REQUIREMENTS OF
THIS APPROPRIATION, ANY FUNDING ALLOCATED PURSUANT TO THIS APPROPRI-
ATION THAT HAS BEEN AWARDED BUT NOT CLAIMED BY AN ELIGIBLE APPLICANT
PURSUANT TO ANY GRANT AWARD, MAY BE MADE AVAILABLE BY THE DORMITORY
AUTHORITY FOR FUTURE GRANT AWARDS TO ELIGIBLE APPLICANTS. All or a
portion of the funds appropriated herein may be suballocated or
transferred to any department, agency, or public authority
(92NP1603) (80606) .................................................
50,000,000 ....................................... (re. $17,565,000)
1135 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
REGIONAL ECONOMIC DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
REGIONAL DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Regional Development Purpose
By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
section 1, of the laws of 2011:
For services and expenses of the regional economic development program
pursuant to a memorandum of understanding to be executed by the
governor, the temporary president of the senate, and the speaker of
the assembly, provided that the allocation made available to the
governor, as authorized by paragraph one of the memorandum of under-
standing governing administration of the regional economic develop-
ment program, shall be reduced by $250,000 to $42,610,000.
All or a portion of the funds appropriated hereby may be suballocated
to any department, agency, or public authority (ED0005RE) (80596) ..
89,750,000 ........................................ (re. $8,664,000)
1136 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 2,147,611,000
---------------- ----------------
All Funds ........................ 0 2,147,611,000
================ ================
ECONOMIC DEVELOPMENT (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Economic Development Purpose
By chapter 54, section 1, of the laws of 2021:
The sum of $1,300,000,000 is hereby appropriated for services and
expenses of the Empire Station Complex project, including but not
limited to the acquisition of all necessary land, real property,
easements, and leasehold interests, including any appurtenances
thereto and improvements thereon, preparation of plans, design,
demolition, construction, renovation, administration, and other
costs incidental thereto, including the payment of liabilities
incurred prior to April 1, 2021. No funds provided under this appro-
priation shall be used directly or indirectly for the formal prepa-
ration of a general project plan for the Empire Station Complex.
Such funds shall only be used in furtherance of the Empire Penn
Expansion or other transportation improvement projects and not for
above-grade development contemplated in the general project plan.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority
(93ES2109) (81117) ... 1,300,000,000 .......... (re. $1,200,000,000)
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT (CCP)
Capital Projects Funds - Other
Dedicated Infrastructure Investment Fund
Infrastructure Investment Account - 33050
Special Infrastructure Purpose
By chapter 54, section 1, of the laws of 2017:
For services and expenses, loans, grants, and costs associated with
program administration, of projects and purposes authorized by
section 93-b of the state finance law to receive funding from the
dedicated infrastructure investment fund - infrastructure investment
account, including the payment of liabilities incurred prior to
April 1, 2017; provided however, that loans or grants under this
appropriation to a private corporation, association or enterprise
shall only be made or given by a public corporation or authority.
All or a portion of the funds appropriated hereby may be suballo-
cated or transferred to any department, agency, or public authority,
according to the following:
1137 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
To prepare for, prevent, deter, or respond to acts of terrorism;
natural or man-made disasters, including severe weather events;
risks to public safety, health, and/or other emergencies (93SC17SP)
(80620) ... 100,000,000 ........................... (re. $2,299,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2017:
Transportation infrastructure and facilities in the five-year depart-
ment of transportation plan for 2015-16 through 2019-20, for the
payment of costs, including the payment of liabilities incurred
prior to April 1, 2016, of transportation infrastructure projects,
including but not limited to, state and local roads and bridges;
airport, freight and passenger rail, port and transit projects or
multi-modal facilities, including work appurtenant and ancillary
thereto. Project costs funded from this appropriation may include
but shall not be limited to construction, reconstruction, recondi-
tioning and preservation, the acquisition of property, and engineer-
ing services, including personal services, nonpersonal services,
fringe benefits, the contract services provided by private firms,
and reimbursements to the dedicated highway and bridge trust fund
and capital projects funds, for activities including but not limited
to, the preparation of designs, plans, specifications and estimates;
construction management and supervision; and appraisals, surveys,
testing and environmental impact statements for transportation
infrastructure projects. Notwithstanding section 93 of the state
finance law or any other law, rule or regulation to the contrary,
all or a portion of the funds appropriated herein may be (i) inter-
changed, (ii) suballocated to the Department of Transportation, or
(iii) transferred from this appropriation to any other capital
projects appropriation or appropriations of the Department of Trans-
portation (931316SP) (79995) ... 200,000,000 ..... (re. $11,768,000)
The sum of $170,000,000 is hereby appropriated for additional upstate
revitalization initiative projects. Funds appropriated herein shall
be for services and expenses, loans, grants, workforce development,
business and tourism plan development, costs associated with program
administration, and the payment of personal services, nonpersonal
services and contract services provided by private firms to support
economic development projects. Funding will be pursuant to a plan
developed by the chief executive officer of the New York state urban
development corporation and will support initiatives based on antic-
ipated job creation and economic development benefits. Funds shall
not be available from this appropriation for projects within regions
that were Upstate Revitalization Initiative 2015 Best Plan Awardees
or eligible to receive funding from the Buffalo Regional Innovation
Cluster Program. Such moneys will be awarded by the New York state
urban development corporation at its discretion (931216SP) (79996)
... 170,000,000 ................................. (re. $170,000,000)
The sum of $85,000,000 is hereby appropriated for services and
expenses, loans, grants, and costs associated with economic develop-
1138 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
ment or infrastructure projects (931416SP) (79992) .................
85,000,000 ....................................... (re. $85,000,000)
For services and expenses related to the empire state poverty
reduction initiative. Funds appropriated herein shall be made avail-
able for sixteen local anti-poverty task forces in municipalities,
or a borough, with high rates of poverty as determined by the U.S.
Census Bureau's 2010-14 American Community Survey Five-year Esti-
mate: Albany, the Bronx, Binghamton, Buffalo, Elmira, Hempstead,
Jamestown, Newburgh, Niagara Falls, Oneonta, Oswego, Rochester,
Syracuse, Troy, Utica and Watertown. Provided that, except in muni-
cipalities where a state-funded anti-poverty task force or initi-
ative already exists and is receiving or has received State funding
for such purpose, the mayor of each municipality, or in the case of
the Bronx, the borough president, will select a not-for-profit
organization that provides services in the municipality, or in the
case of the Bronx, the borough, to serve as the local coordinator of
each such local task force. Provided further that, except in munici-
palities where a state-funded antipoverty task force or initiative
already exists and is receiving or has received funding, each such
taskforce shall make efforts to be comprised of, but not limited to,
the following members: representatives from municipal, county,
and/or state government; individuals who have lived in or currently
live in households in poverty; individuals and advocates represent-
ing local not-for-profit and community organizations; represen-
tatives from local school districts; and representatives from local
social services districts. Of the funds appropriated herein, the
amount available for each local anti-poverty task force shall be
determined based on the number of people in each municipality, or a
borough, who are living in poverty as determined by the U.S. Census
Bureau's 2010-14 American Community Survey Five-year Estimate
provided that each local anti-poverty task force shall be eligible
to receive funding in the following amounts: municipalities with
fewer than 5,000 individuals in poverty shall each be eligible to
receive $500,000; municipalities with between 5,000 and 10,000 indi-
viduals in poverty shall each be eligible to receive $1,000,000;
municipalities with between 10,000 and 40,000 individuals in poverty
shall each be eligible to receive $1,500,000; and municipalities, or
a borough, with more than 40,000 individuals in poverty shall each
be eligible to receive $2,750,000. Funds appropriated herein shall
be available to support the work of each anti-poverty task force and
such work shall be divided into two phases. During the first phase,
the mayor of the municipality, or in the case of the Bronx, the
borough president, will select a not-for-profit organization that
has demonstrated successful performance working with community
stakeholders and achieving objectives specified herein, to coordi-
nate the local antipoverty task force. The not-for-profit organiza-
tion serving as coordinator will assemble the antipoverty task force
using the criteria outlined above. Provided further that, with
guidence and oversight of the commissioner of the office of tempo-
rary and disability assistance, each local anti-poverty task force
1139 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
shall use data to identify high need issues and neighborhoods within
the municipality, or in the case of the Bronx, the borough; identify
problems that are common in neighborhoods throughout the munici-
pality, or in the case of the Bronx, the borough; receive input from
local residents; use data and resident input to select one or more
focus areas related to either one or more issues or one or more
neighborhoods; and develop a plan for how funding will be targeted
toward the identified issues or neighborhoods. Such focus areas may
include, but are not limited to childhood poverty and homelessness.
Activities included in such plan may include, but are not limited
to: providing public assistance recipients opportunities to partic-
ipate in enhanced work activities that either provide recognized
credentialing or enhanced career readiness or job training for
better linkage to potential employment; assisting families in pover-
ty through services provided to parents and children; and addressing
chronic homelessness or housing insecurity. Such plan must include
measurable objectives and a timeframe for completion and shall be
submitted for approval to the commissioner of the office of tempo-
rary and disability assistance. Of the total amount made available
to each anti-poverty task force, the lesser of $300,000 or 20
percent of the total award may be used to carry out planning and
administration, provided however, that the amount used for planning
and administration may exceed such limitation if such amount is
approved by the commissioner of the office of temporary and disabil-
ity assistance as part of the plan required herein. Upon receiving
approval from the commissioner of the office of temporary and disa-
bility assistance, each such anti-poverty task force shall commence
the second phase of its work, which will support the implementation
of the plan developed during the first phase. Funding appropriated
herein shall be made available to the not-for-profit organization
serving as coordinator and its use shall be restricted to purposes
or initiatives that do not necessitate ongoing state financial
support. Such anti-poverty task forces shall be encouraged to secure
match funding from private sector and foundation sources to supple-
ment the funds appropriated herein and provided further that any
funding provided from this appropriation shall not be used to
supplant funding for programs already in existence. Such funds may
be made available pursuant to a plan approved by the director of the
budget (931A16SP) (79994) ... 25,000,000 ............. (re. $30,000)
Notwithstanding any inconsistent provision of law, in support of a
comprehensive statewide multi-year housing program to prevent and
address homelessness across the State, funds appropriated herein may
be used in conjunction with other resources made available as part
of the state fiscal year 2016-17 and 2017-18 local assistance, capi-
tal and state operations budget to support various programs to
support homeless individuals and youth or individuals and youth at
risk of becoming homeless, including but not limited to, a statewide
multiagency supportive housing program to provide housing and
support services for vulnerable New Yorkers including but not limit-
ed to seniors, veterans, victims of domestic violence, formerly
1140 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
incarcerated individuals, individuals diagnosed with HIV/AIDS and
homeless individuals with copresenting health conditions, eligible
services to runaway and homeless youth, and for services to meet the
emergency needs of homeless individuals and families (931116SP)
(79993) ... 50,000,000 ............................ (re. $3,219,000)
Municipal consolidation competition, for payments for capital and
other expenses related to the implementation of: consolidations,
dissolutions, mergers, or other permanent changes in governing
structures; shared services, cooperation agreements, or other effi-
ciencies; or other actions that reduce operational costs or property
tax burdens on a permanent basis, as selected through a competitive
application process developed by the secretary of state (931016SP)
(79991) ... 20,000,000 ........................... (re. $12,302,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2022:
For services and expenses, loans, grants, and costs associated with
program administration, of projects and purposes authorized by
section 93-b of the state finance law to receive funding from the
dedicated infrastructure investment fund - infrastructure investment
account, including the payment of liabilities incurred prior to
April 1, 2015; provided however, that loans or grants under this
appropriation to a private corporation, association or enterprise
shall only be made or given by a public corporation or authority;
and provided further however, notwithstanding the foregoing, and
notwithstanding section 163 of the state finance law or any other
law to the contrary, grants may also be given under this appropri-
ation by the department of agriculture and markets to farm owners
and related industries, not for profit conservation organizations
and local governments to protect, maintain, develop and grow farm,
agricultural and related industries located in the southern tier and
hudson valley, as defined by the commissioner of agriculture and
markets. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority, according to the following:
New NY broadband initiative, to support the development of infrastruc-
ture to bring high-speed internet access to unserved and underserved
regions throughout the state, and to support the development of
other telecommunications infrastructure; provided however that
priority shall be given to projects that bring high-speed internet
access to unserved areas of the state, public libraries, and educa-
tional opportunity centers; provided further that the New York state
urban development corporation shall submit a report before June 30,
2016 to the director of the division of the budget, the temporary
president of the senate, the speaker of the assembly, the minority
leader of the senate and the minority leader of the assembly detail-
ing: (a) the total amount of public funds committed by this program
annually; (b) total amount of private funds committed annually and,
if applicable, the amount of such funds that has been invested by
such parties; (c) the location of each area receiving investments
1141 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
under this program and the goals for each such area; (d) planned
future investments by both public and private parties; and (e) such
other information as the corporation deems necessary (930115SP)
(80617) ... 500,000,000 ......................... (re. $147,896,000)
Municipal restructuring, for payments to local governments, school
districts, and other municipal entities for capital and other
expenses related to the implementation of local government and
school district shared services, cooperation agreements, mergers,
regionalized delivery of services, and other actions that reduce
future operational costs, related property tax burdens, or provide
critical service improvements on a permanent basis, as selected
through an application process developed by the secretary of state,
provided, however, that school districts' expenditures of the funds
appropriated herein shall not be eligible for aid under any
provision of the education law; for payments related to a downtown
revitalization program designed and executed by the department of
state and the division of housing and community renewal for trans-
formative housing, economic development, transportation and communi-
ty projects including those designed to increase the property tax
base, of which up to $500,000 may be made available to fund projects
consistent with the purposes of the healthy food / healthy communi-
ties initiative pursuant to section 16-s of the urban development
corporation act, provided such projects are included in a strategic
plan submitted for funding under the downtown revitalization
program; and for payments of grants, awards, and aid provided
through the local government efficiency grant program, the citizen
empowerment tax credit, local government citizens reorganization
empowerment grant program, and the local government performance and
efficiency program, as authorized by section 54 of the state finance
law (930215SP) (80618) ..... 150,000,000 ......... (re. $62,409,000)
Grants to essential health care providers shall be available upon
determination of the commissioner of health without a competitive
bid or request for proposal process to support debt retirement and
capital projects or non-capital projects that facilitate health care
transformation, including mergers, consolidation, acquisition or
other significant corporate restructuring activities intended to
create a financially sustainable system of care that promotes a
patient-centered model of health care delivery. Grants shall not be
available to support general operating expenses. For purposes of
this appropriation, an essential health care provider is a hospital
or hospital system that, in the discretion of the commissioner of
health, offers health services within a defined and isolated
geographic region where such services would otherwise be unavailable
to the population of such region.
Notwithstanding any other provision of law to the contrary, up to
$83,500,000 appropriated herein may be available for the health
facility restructuring program pursuant to section 2815 of the
public health law.
Notwithstanding any other provision of the laws to the contrary,
amounts appropriated herein, including the $83,500,000 which may be
1142 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
transferred from the department to the dormitory authority, shall be
available net of disllowances, refunds, reimbursements and credits
(930315SP) (80619) ... 355,000,000 ............... (re. $58,198,000)
For the acquisition of information technology systems, electronic
health records, billing systems, or other hardware as well as any
other infrastructure costs associated with the inclusion of behav-
ioral health services in the medicaid managed care benefit package.
Such funds shall be available to not-for-profit agencies licensed,
certified or approved by the office of mental health, the office for
addiction services and supports, or the office for people with
developmental disabilities. A portion of these funds may be used to
support training and technical assistance during the transition
period (93H315SP) (80348) ... 10,000,000 ............ (re. $255,000)
To prepare for, prevent, deter, or respond to acts of terrorism;
natural or man-made disasters, including severe weather events;
risks to public safety, health, and/or other emergencies. Of the
amounts appropriated herein, $10,000,000 shall be available for
grants to local governments and local law enforcement agencies to
support the provision of safety and other related equipment. Such
funds shall be allocated pursuant to a plan prepared by the commis-
sioner of criminal justice services in consultation with the super-
intendent of state police and approved by the director of the budget
(930415SP) (80620) ... 150,000,000 ................ (re. $2,142,000)
Penn station access, for the payment of costs of the metropolitan
transportation authority or metro-north commuter railroad company
for capital projects to link the metro-north commuter railroad
directly to Penn Station and to improve transportation access along
its corridor, including construction of new stations in the Bronx,
including but not limited to planning and design, acquisition,
construction, reconstruction, replacement, improvement, recondition-
ing, rehabilitation and preservation, including the acquisition of
real property and interests therein required or expected to be
required in connection therewith, for commuter railroad facilities
and related equipment (930515SP) (80627) ...........................
250,000,000 ..................................... (re. $250,000,000)
For services and expenses, loans, grants, and costs associated with
transformative economic development projects. $150,000,000 is
authorized for such projects to be reviewed, evaluated and approved
by the New York state urban development corporation, including but
not limited to those listed in the schedule below. A proposed
project must demonstrate that the investment of public funds will
catalyze private investment resulting in significant economic devel-
opment reflected in the creation of temporary and permanent jobs,
the growth of the commercial and residential tax base or an enhance-
ment of the environment and quality of life for residents of Nassau
or Suffolk County. The items shown in the schedule below shall be
for projects with a common purpose and may be interchanged without
limitation subject to the approval of the director of the budget
(930715SP) (80349) ... 150,000,000 .............. (re. $124,515,000)
1143 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Project Schedule
PROJECT AMOUNT
--------------------------------------------
Nassau Hub ...................... 85,000,000
Ronkonkoma Hub .................. 50,000,000
Stony Brook/ Brookhaven Labs .... 15,000,000
--------------
Total ........................ 150,000,000
==============
Infrastructure improvements, to support transportation, upstate trans-
it, rail, airport, port and other infrastructure improvements or
economic development projects (930815SP) (80630) ...................
115,000,000 ....................................... (re. $9,148,000)
Notwithstanding section 163 of the state finance law or any law to the
contrary, for services and expenses of the southern tier agricul-
tural industry enhancement and hudson valley farmland protection
programs, including but not limited to grants or payments to farm
owners and related industries, not for profit conservation organiza-
tions and local governments, to protect, maintain, develop and grow
farm, agricultural and related industries located in the southern
tier and hudson valley, including up to $700,000 for repairs,
improvements, and equipment at Cornell College of Agriculture and
Life Science Dyce Laboratory to the support and benefit of honey and
pollinator research, and up to $1,500,000 to the State University of
New York College of Environmental Science and Forestry, directly or
through its Climate and Applied Forestry Research Institute, to
support research and development of forestry and forest products, as
defined by the commissioner of agriculture and markets (930915SP)
(80647) ... 50,000,000 ............................ (re. $8,430,000)
1144 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 0 2,098,873,000
---------------- ----------------
All Funds ........................ 0 2,098,873,000
================ ================
STATE AND MUNICIPAL FACILITIES PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
State and Municipal Facilities Purpose
By chapter 54, section 1, of the laws of 2021:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 4 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not-for-profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
1145 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
law; not-for-profit fire districts, fire commissions, fire compa-
nies, fire departments, volunteer rescue and ambulance squads;
special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976; and any other
not-for-profit corporation or other not-for-profit entity.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may be subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation or any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
department, agency or public benefit corporation, to achieve this
purpose (SM0121SM) (80001) ... 385,000,000 ...... (re. $385,000,000)
By chapter 54, section 1, of the laws of 2019, as added by chapter 314,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 2 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
1146 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
entities providing affordable housing, public libraries and library
systems chartered by the regents of the state of New York or estab-
lished by an act of the legislature; public park conservancies or
not-for-profit corporations organized for the purpose of investing
in parks owned by the state or municipal corporations, as defined in
section 2 of the general municipal law; and not-for-profit fire
districts, fire commissions, fire companies, fire departments,
volunteer rescue and ambulance squads; and special act school
districts, schools for the blind and deaf and other students with
disabilities subject to article 85 of the education law, and private
schools for students with disabilities authorized pursuant to chap-
ter 853 of the laws of 1976.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. Notwithstanding any inconsistent
provision of this appropriation or any other provision of law, funds
from this appropriation may be made available for Lake Ontario resi-
liency and economic development projects and purposes, including
services and expenses, loans, grants, and costs of program adminis-
tration related to hardening infrastructure along the Lake Ontario
waterfront and strengthening local economies within the region,
including but not limited to projects or priorities recommended by
the Lake Ontario Resiliency and Economic Development Initiative
Commission. No funds from this appropriation may be used as a
required match or be considered a local share to other state
programs or to leverage state aid or grants including but not limit-
ed to the apportionment of aid under the education law. Notwith-
standing any provision of law to the contrary, funds appropriated
herein may, subject to the approval of the director of the budget,
be (i) interchanged, (ii) transferred from this appropriation to any
other appropriation of any state department, agency or public bene-
fit corporation, or (iii) suballocated to any other state depart-
ment, agency or public benefit corporation, to achieve this purpose
(SM0119SM) (80001) ... 385,000,000 .............. (re. $384,641,000)
By chapter 54, section 1, of the laws of 2018, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
1147 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 4 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not-for-profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
law; not-for-profit fire districts, fire commissions, fire compa-
nies, fire departments, volunteer rescue and ambulance squads;
special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976; and any other
not-for-profit corporation or other not-for-profit entity.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may be subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation or any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
department, agency or public benefit corporation, to achieve this
purpose (SM0118SM) (80001) ... 385,000,000 ...... (re. $385,000,000)
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
1148 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 4 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not for profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
law; not for profit fire districts, fire commissions, fire compa-
nies, fire departments, volunteer rescue and ambulance squads;
special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may, subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation of any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
1149 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
department, agency or public benefit corporation, to achieve this
purpose. Notwithstanding the foregoing, any limitations contained
therein or any other inconsistent provision of law, funds from this
appropriation shall be available, including for payment of liabil-
ities incurred or payments made prior to April 1, 2018, for any
purpose, individual, or entity authorized under the Lake Ontario-St.
Lawrence Seaway flood relief and recovery grant program established
pursuant to chapter 85 of the laws of 2017, as amended by chapter 61
of the laws of 2017, as amended by a chapter of the laws of 2018, in
an amount equal to $40,000,000 subject to the approval of the direc-
tor of the budget (SM0218SM) (85063) ...............................
90,000,000 ....................................... (re. $50,000,000)
By chapter 54, section 1, of the laws of 2017, as amended by chapter
314, section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 4 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not for profit corporations organized
for the purpose of investing in parks owned by the state or munici-
1150 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
pal corporations, as defined in section 2 of the general municipal
law; not for profit fire districts, fire commissions, fire compa-
nies, fire departments, volunteer rescue and ambulance squads; and
special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may, subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation of any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
department, agency or public benefit corporation, to achieve this
purpose. Notwithstanding the foregoing, any limitations contained
therein or any other inconsistent provision of law, funds from this
appropriation shall also be available, including for payment of
liabilities incurred or payments made prior to April 1, 2017, (i)
for any purpose, individual, or entity authorized under the Lake
Ontario-St. Lawrence Seaway flood relief and recovery grant program
established pursuant to a chapter of the laws of 2017, subject to
the approval of the director of the budget, (ii) for payment of the
costs of other storm recovery and mitigation projects, not to exceed
10,000,000 dollars in the aggregate to municipalities and special
districts in (a) the counties of Chautauqua, Cattaraugus and Allega-
ny for damages sustained as a result of a severe storm and flooding
which occurred July 14 and 15, 2015, in an amount not less than
6,800,000 dollars or (b) the county of Monroe for damages resulting
from a severe storm which occurred March 8 and 9, 2017, in an amount
not to exceed 2,000,000 dollars subject to the approval of the
director of the budget, (iii) for any purpose, individual, or entity
authorized under the Southern Tier-Finger Lakes recovery program, as
administered by the Housing Trust Fund Corporation, for damages
sustained as a result of a severe storm and flooding which occurred
August 13 thru 15, 2018, in an amount not to exceed $13,000,000, and
(iv) for any purpose, individual, or entity authorized under the
Lake Ontario-St. Lawrence Seaway flood relief and recovery grant
program established pursuant to chapter 85 of the laws of 2017, as
amended by chapter 61 of the laws of 2017, as amended by chapter 59
of the laws of 2018, for damages sustained as a result of severe
storms and flooding which occurred between January 1, 2019 and
December 31, 2019. Notwithstanding any other law to the contrary,
the amounts appropriated herein may be suballocated or transferred
to any state department, agency, or public authority for the
1151 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
purposes stated herein (SM0117SM) (80001) ..........................
398,500,000 ..................................... (re. $328,494,000)
By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 2 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not for profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
law; and not for profit fire districts, fire commissions, fire
companies, fire departments, volunteer rescue and ambulance squads;
and special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
1152 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may, subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation of any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
department, agency or public benefit corporation, to achieve this
purpose (SM0116SM) (80001) ... 385,000,000 ...... (re. $328,484,000)
By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 2 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not for profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
law; and not for profit fire districts, fire commissions, fire
1153 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
companies, fire departments, volunteer rescue and ambulance squads;
and special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976. Costs may include,
but shall not be limited to engineering services, construction,
project management, right-of-way acquisition, and work appurtenant
and ancillary thereto. No funds from this appropriation may be used
as a required match or be considered a local share to other state
programs or to leverage state aid or grants including but not limit-
ed to the apportionment of aid under the education law. Notwith-
standing any provision of law to the contrary, funds appropriated
herein may, subject to the approval of the director of the budget,
be (i) interchanged, (ii) transferred from this appropriation to any
other appropriation of any state department, agency or public bene-
fit corporation, or (iii) suballocated to any other state depart-
ment, agency or public benefit corporation, to achieve this purpose
(SM0115SM) (80001) ... 385,000,000 .............. (re. $175,977,000)
By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, and safety, technology, or innovation;
the acquisition by an eligible entity of capital assets with a
useful life of not less than ten years purchased for the sole
purpose of preserving and protecting infrastructure that is owned,
controlled or appurtenant to an eligible entity, including but not
limited to heavy duty road maintenance and construction vehicles,
pavers, snowplows, street sweepers and heavy duty fire, emergency
response and law enforcement vehicles; economic development projects
sponsored by the state or municipal corporations, as defined in
section 2 of the general municipal law, that will create or retain
jobs in New York state as certified by the commissioner of the
department of economic development; or environmental projects spon-
sored by the state or municipal corporations as defined in section 2
of the general municipal law. Eligible entities shall consist of the
state; municipal corporations as defined in section 2 of the general
municipal law; sanitation districts; special districts as defined in
subdivision 16 of section 102 of the real property tax law; water
and sewer districts; the Metropolitan Transportation Authority or
any other public benefit corporation established pursuant to titles
11, 11-A, 11-B, 11-C, or 11-D of the public authorities law; a
public benefit corporation as defined in section 2 of chapter 1016
of the laws of 1969; a college or university established pursuant to
section 352 of the education law, section 6203 of the education law
or section 6302 of the education law; an independent not-for-profit
1154 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
institution of higher education as defined in subdivision 2 of
section 6401 of the education law; public school districts; public
housing authorities; public libraries and library systems chartered
by the regents of the state of New York or established by an act of
the legislature; public park conservancies or not for profit corpo-
rations organized for the purpose of investing in parks owned by the
state or municipal corporations, as defined in section 2 of the
general municipal law; and not for profit fire districts, fire
commissions, fire companies, fire departments, volunteer rescue and
ambulance squads; and special act school districts, schools for the
blind and deaf and other students with disabilities subject to arti-
cle 85 of the education law, and private schools for students with
disabilities authorized pursuant to chapter 853 of the laws of 1976.
Costs may include, but shall not be limited to engineering services,
construction, project management, right-of-way acquisition, and work
appurtenant and ancillary thereto. No funds from this appropriation
may be used as a required match or be considered a local share to
other state programs or to leverage state aid or grants including
but not limited to the apportionment of aid under the education law.
Notwithstanding any provision of law to the contrary, funds appro-
priated herein may, subject to the approval of the director of the
budget, be (i) interchanged, (ii) transferred from this appropri-
ation to any other appropriation of any state department, agency or
public benefit corporation, or (iii) suballocated to any other state
department, agency or public benefit corporation, to achieve this
purpose (SM0114SM) (80001) ... 385,000,000 ....... (re. $58,271,000)
By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
section 1, of the laws of 2019:
For payment of the capital costs of construction, improvement, reha-
bilitation or reconstruction of facilities owned by eligible enti-
ties; the acquisition of capital facilities and assets by eligible
entities, including fixed capital assets; the acquisition by eligi-
ble entities of equipment and other capital assets, including vehi-
cles, in support of health, safety, technology, or innovation; the
acquisition by an eligible entity of capital assets with a useful
life of not less than ten years purchased for the sole purpose of
preserving and protecting infrastructure that is owned, controlled
or appurtenant to an eligible entity, including but not limited to
heavy duty road maintenance and construction vehicles, pavers, snow
plows, street sweepers and heavy duty fire, emergency response and
law enforcement vehicles; economic development projects sponsored by
the state or municipal corporations, as defined in section 2 of the
general municipal law, that will create or retain jobs in New York
state as certified by the commissioner of the department of economic
development; or environmental projects sponsored by the state or
municipal corporations as defined in section 2 of the general munic-
ipal law. Eligible entities shall consist of the state; municipal
corporations as defined in section 2 of the general municipal law;
sanitation districts; special districts as defined in subdivision 16
1155 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
of section 102 of the real property tax law; water and sewer
districts; the Metropolitan Transportation Authority or any other
public benefit corporation established pursuant to titles 11, 11-A,
11-B, 11-C, or 11-D of the public authorities law; a public benefit
corporation as defined in section 2 of chapter 1016 of the laws of
1969; a college or university established pursuant to section 352 of
the education law, section 6203 of the education law or section 6302
of the education law; an independent not-for-profit institution of
higher education as defined in subdivision 2 of section 6401 of the
education law; public school districts; public housing authorities;
public libraries and library systems chartered by the regents of the
state of New York or established by an act of the legislature;
public park conservancies or not for profit corporations organized
for the purpose of investing in parks owned by the state or munici-
pal corporations, as defined in section 2 of the general municipal
law; and not for profit fire districts, fire commissions, fire
companies, fire departments, volunteer rescue and ambulance squads;
and special act school districts, schools for the blind and deaf and
other students with disabilities subject to article 85 of the educa-
tion law, and private schools for students with disabilities author-
ized pursuant to chapter 853 of the laws of 1976. Costs may include,
but shall not be limited to engineering services, construction,
project management, right-of-way acquisition, and work appurtenant
and ancillary thereto. No funds from this appropriation may be used
as a required match or be considered a local share to other state
programs or to leverage state aid or grants including but not limit-
ed to the apportionment of aid under the education law. Notwith-
standing any provision of law to the contrary, funds appropriated
herein may, subject to the approval of the director of the budget,
be (i) interchanged, (ii) transferred from this appropriation to any
other appropriation of any state department, agency or public bene-
fit corporation, or (iii) suballocated to any other state depart-
ment, agency or public benefit corporation, to achieve this purpose
(SM1013SM) (80001) ... 385,000,000 ................ (re. $3,006,000)
1156 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE EQUIPMENT FINANCE PROGRAM
CAPITAL PROJECTS 2023-24
For the comprehensive construction programs, purposes and
projects as herein specified in accordance with the
following:
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Other ..... 100,000,000 454,395,000
---------------- ----------------
All Funds ........................ 100,000,000 454,395,000
================ ================
EQUIPMENT ACQUISITION (CCP) ................................ 100,000,000
--------------
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
For expenses and grants related to the
acquisition of equipment, including but
not limited to the creation or moderniza-
tion of information technology systems and
related research and development equip-
ment, health and safety equipment, heavy
equipment and machinery, the creation or
improvement of security systems, and labo-
ratory equipment. All or a portion of the
funds appropriated hereby may be suballo-
cated or transferred to any department,
agency, or public authority (2PCE2308)
(85066) .................................... 100,000,000
1157 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE EQUIPMENT FINANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
EQUIPMENT ACQUISITION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2022:
For expenses and grants related to the acquisition of equipment,
including but not limited to the creation or modernization of infor-
mation technology systems and related research and development
equipment, health and safety equipment, heavy equipment and machin-
ery, the creation or improvement of security systems, and laboratory
equipment. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (2PCE2208) (85066) .......................................
100,000,000 ..................................... (re. $100,000,000)
By chapter 54, section 1, of the laws of 2021:
For expenses and grants related to the acquisition of equipment,
including but not limited to the creation or modernization of infor-
mation technology systems and related research and development
equipment, health and safety equipment, heavy equipment and machin-
ery, the creation or improvement of security systems, and laboratory
equipment, provided that up to $10,000,000 shall be made available
for body-worn cameras for municipal police departments. All or a
portion of the funds appropriated hereby may be suballocated or
transferred to any department, agency, or public authority
(2PCE2108) (85066) ... 100,000,000 .............. (re. $100,000,000)
By chapter 54, section 1, of the laws of 2020, as amended by chapter 54,
section 1, of the laws of 2021:
For expenses and grants related to the acquisition of equipment,
including but not limited to the creation or modernization of infor-
mation technology systems and related research and development
equipment, health and safety equipment, heavy equipment and machin-
ery, the creation or improvement of security systems, and laboratory
equipment. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (2PCE2008) (85066) ... 100,000,000 .... (re. $100,000,000)
By chapter 54, section 1, of the laws of 2019, as amended by chapter 54,
section 1, of the laws of 2021:
For expenses and grants related to the acquisition of equipment,
including but not limited to the creation or modernization of infor-
mation technology systems and related research and development
equipment, health and safety equipment, heavy equipment and machin-
ery, the creation or improvement of security systems, and laboratory
equipment. All or a portion of the funds appropriated hereby may be
suballocated or transferred to any department, agency, or public
authority (2PCE1908) (85066) ... 93,000,000 ...... (re. $62,073,000)
1158 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE EQUIPMENT FINANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
PROGRAM CHANGES AND EXPANSION (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Program Improvement/Change Purpose
By chapter 54, section 1, of the laws of 2011:
For the costs of the purchase of equipment or the creation or improve-
ment of information technology systems and related research and
development to be financed as authorized pursuant to article 5-A of
the state finance law. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (2P111108) (80469) .............................
92,751,000 ....................................... (re. $17,282,000)
By chapter 50, section 1, of the laws of 2010:
For the costs of the purchase of equipment or the creation or improve-
ment of information technology systems and related research and
development to be financed as authorized pursuant to article 5-A of
the state finance law. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (2P101008) (80469) .............................
187,285,000 ...................................... (re. $30,504,000)
By chapter 50, section 1, of the laws of 2009:
For the costs of the purchase of equipment or the creation or improve-
ment of information technology systems and related research and
development to be financed as authorized pursuant to article 5-A of
the state finance law. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (2P090908) (80469) .............................
129,800,000 ...................................... (re. $36,128,000)
By chapter 50, section 1, of the laws of 2008:
For the costs of the purchase of equipment or the creation or improve-
ment of information technology systems and related research and
development to be financed as authorized pursuant to article 5-A of
the state finance law. All or a portion of the funds appropriated
hereby may be suballocated or transferred to any department, agency,
or public authority (2P080808) (80469) .............................
141,000,000 ....................................... (re. $8,408,000)
1159 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STRATEGIC INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
STRATEGIC INVESTMENT PROGRAM (CCP)
Capital Projects Funds - Other
Capital Projects Fund - 30000
Strategic Investment Program Purpose
By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
section 1, of the laws of 2011:
The sum of $215,650,000 is hereby appropriated for environmental
projects, including the preservation of historically significant
places in New York state, and projects to conserve, acquire, develop
or improve parklands, parks or public recreation areas; economic
development projects which will facilitate the creation or retention
of jobs or increase business activity within a municipality or
region of the state; higher education projects; projects to estab-
lish new or rehabilitate existing business incubator facilities to
accommodate emerging or small high technology companies; arts or
cultural projects, provided that the allocation made available to
the Governor as authorized by paragraph one of the memorandum of
understanding governing administration of the strategic investment
program, shall be reduced by $9,350,000 to $65,650,000.
Individual projects funded from this appropriation shall be for
$250,000 or more and funds appropriated hereby may be suballocated
to any department, agency, or public authority (71SI00SI) (80589) ..
215,650,000 ...................................... (re. $40,000,000)
Project Schedule
PROJECT AMOUNT
--------------------------------------------
Environmental ................... 63,750,000
Economic Development ............ 69,400,000
Higher Education/High Technol-
ogy Incubator ................. 43,750,000
Arts/Cultural ................... 38,750,000
--------------
Total ...................... 215,650,000
==============
1160 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
APPROPRIATIONS REAPPROPRIATIONS
Capital Projects Funds - Federal ... 0 145,342,000
---------------- ----------------
All Funds ........................ 0 145,342,000
================ ================
WORLD TRADE CENTER PROGRAM (CCP)
Capital Projects Funds - Federal
Federal Capital Projects Fund
Federal Capital Projects Account - 31350
Federal Aid Highways Purpose
By chapter 50, section 1, of the laws of 2006:
To the department of transportation for the federal share of transpor-
tation projects related to service in Lower Manhattan related to the
September 11, 2001 attack on the New York City World Trade Center,
including but not limited to construction, reconstruction, recondi-
tioning and preservation of highways, bridges, ferry and other
transportation facilities; the acquisition of property; payment for
engineering services including, but not limited to costs of personal
services, non-personal services and fringe benefits of the depart-
ment of transportation, and contract services provided by private
firms; appraisals, surveys, testing, and environmental impact state-
ments for transportation projects; the payment of liabilities
incurred prior to April 1, 2006 and any other transportation costs
incurred as part of the recovery from the attack on the World Trade
Center. The funds appropriated hereby shall be used in accordance
with applicable federal transportation statutes and regulations and
may be suballocated for transportation purposes (2CWT0620) (80556)
... 265,000,000 .................................. (re. $34,960,000)
By chapter 50, section 1, of the laws of 2002:
To the department of transportation for the federal share of transpor-
tation projects related to service in Lower Manhattan related to the
September 11, 2001 attack on the New York City World Trade Center,
including but not limited to construction, reconstruction, recondi-
tioning and preservation of highways, bridges, ferry and other
transportation facilities; the acquisition of property; payment for
engineering services including, but not limited to costs of personal
services, non-personal services and fringe benefits of the depart-
ment of transportation, and contract services provided by private
firms; appraisals, surveys, testing, and environmental impact state-
ments for transportation projects; the payment of liabilities
incurred prior to April 1, 2002 and any other transportation costs
incurred as part of the recovery from the attack on the World Trade
Center. The funds appropriated hereby shall be used in accordance
with applicable federal transportation statutes and regulations and
may be suballocated for transportation purposes to the Metropolitan
1161 12554-05-3
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2023-24
Transportation Authority. (17WT0220) (80556) .......................
342,000,000 ..................................... (re. $110,382,000)
1162 12554-05-3
TABLE OF CONTENTS
Page
SECTION 1 - STATE AGENCIES ........................................... 1
ADIRONDACK PARK AGENCY ............................................. 3
AGRICULTURE AND MARKETS, DEPARTMENT OF ............................. 4
ARTS, COUNCIL ON THE .............................................. 19
AUDIT AND CONTROL, DEPARTMENT OF .................................. 22
CITY UNIVERSITY OF NEW YORK ....................................... 24
CORRECTIONS AND COMMUNITY SUPERVISION, DEPARTMENT OF ............. 104
CRIMINAL JUSTICE SERVICES, DIVISION OF ........................... 117
EDUCATION DEPARTMENT ............................................. 122
ELECTIONS, STATE BOARD OF ........................................ 141
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY ........................ 144
ENVIRONMENTAL CONSERVATION, DEPARTMENT OF ........................ 146
FAMILY ASSISTANCE, DEPARTMENT OF
CHILDREN AND FAMILY SERVICES, OFFICE OF ........................ 381
TEMPORARY AND DISABILITY ASSISTANCE, OFFICE OF ................. 403
GENERAL SERVICES, OFFICE OF ...................................... 412
HEALTH, DEPARTMENT OF ............................................ 431
HOMELAND SECURITY AND EMERGENCY SERVICES, DIVISION OF ............ 452
HOUSING AND COMMUNITY RENEWAL, DIVISION OF ....................... 456
HUDSON RIVER PARK TRUST .......................................... 491
INFORMATION TECHNOLOGY SERVICES, OFFICE OF ....................... 492
LAW, DEPARTMENT OF ............................................... 495
MENTAL HYGIENE, DEPARTMENT OF
ADDICTION SERVICES AND SUPPORTS, OFFICE OF ..................... 497
MENTAL HEALTH, OFFICE OF ....................................... 519
PEOPLE WITH DEVELOPMENTAL DISABILITIES, OFFICE FOR ............. 564
1163 12554-05-3
TABLE OF CONTENTS
Page
METROPOLITAN TRANSPORTATION AUTHORITY ............................ 605
MILITARY AND NAVAL AFFAIRS, DIVISION OF .......................... 608
MOTOR VEHICLES, DEPARTMENT OF .................................... 618
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY ........................... 621
PARKS, RECREATION AND HISTORIC PRESERVATION, OFFICE OF ........... 623
POWER AUTHORITY, NEW YORK ........................................ 650
PUBLIC EMPLOYMENT RELATIONS BOARD ................................ 652
STATE, DEPARTMENT OF ............................................. 653
STATE POLICE, DIVISION OF ........................................ 658
STATE UNIVERSITY OF NEW YORK ..................................... 665
TRANSPORTATION, DEPARTMENT OF .................................... 790
URBAN DEVELOPMENT CORPORATION, NEW YORK STATE ................... 1073
VETERANS' SERVICES, DEPARTMENT OF ............................... 1105
VICTIM SERVICES, OFFICE OF ...................................... 1109
WORKERS' COMPENSATION BOARD ..................................... 1111
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES:
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM .............. 1112
COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE PROGRAM ........... 1116
COMMUNITY RESILIENCY, ECONOMIC SUSTAINABILITY, AND
TECHNOLOGY PROGRAM .......................................... 1117
ECONOMIC DEVELOPMENT - CAPITAL ................................ 1119
ECONOMIC DEVELOPMENT PROGRAM .................................. 1122
HIGH TECHNOLOGY AND DEVELOPMENT PROGRAM ....................... 1123
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS
PROGRAM ..................................................... 1124
HUDSON RIVER VALLEY GREENWAY COMMUNITIES COUNCIL .............. 1127
JACOB JAVITS CONVENTION CENTER ................................ 1128
LAKE ONTARIO RESILIENCY AND ECONOMIC DEVELOPMENT .............. 1129
1164 12554-05-3
TABLE OF CONTENTS
Page
LOCAL COMMUNITY ASSISTANCE PROGRAM ............................ 1130
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM ........... 1131
REGIONAL ECONOMIC DEVELOPMENT PROGRAM ......................... 1135
SPECIAL INFRASTRUCTURE ACCOUNT, NEW YORK STATE ................ 1136
STATE AND MUNICIPAL FACILITIES PROGRAM ........................ 1144
STATE EQUIPMENT FINANCE PROGRAM ............................... 1156
STRATEGIC INVESTMENT PROGRAM .................................. 1159
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION ............ 1160